Ground or Earthing is Word for Safety of Equpments and Human
Let Apply Properly
Earthing Design
Earthing Design
Earthing Design
Equipment Earthing Design Guide
Save your Equipments and Human Lives from Surge & Lightning
Earthing Grid Design as Per IEEE80
Grid Earthing as Per IEEE80
Grid Design as per IEEE80
Earthing ROD and Conductor Size for Grid Earthing
Metro Rail Grounding and Lightning Study Materials
Metro Rail Project
MEP Scope
Safe Building Electrical Earthing & Lighting
Major Products
Follow Electrical Safety(Earthing+Bondng) IEC/IEEE/NFPA Guide Line
Arc –Spark = Surge in Systems= Result Fires
India Smart Power Generation & Utilization
RailwayElectrical and Telecom Guide Line
Surge and discharge
Copper Boned Solid Rod as per UL467
Copper Bonded Rod Life
Driven Rod
Advanced Driven
Rod
Grounding Plate
Concrete
Encased
Electrode
Building
Foundation
Water Pipe
Electrolytic
Electrode
Resistance-to-
Ground (RTG)
Poor Average Poor Average Above Average
Poor to
Excellent**
Excellent
Corrosion
Resistance
Poor Good Poor Good * Good * Varies High
Increase in RTG
in Cold Weather
Highly Affected Slightly Affected Highly Affected Slightly Affected Slightly Affected
Minimally
Affected
Minimally
Affected
Increase in RTG
over Time
RTG Worsens
RTG typically
unaffected
RTG Increases
RTG typically
unaffected
RTG typically
unaffected
RTG typically
unaffected
RTG Improves
Electrode
Ampacity
Poor Average Average Average * Above Average *
Poor to
Excellent**
Excellent
Installation Cost Average Excellent Below Average Below Average Average Average Poor
Life Expectancy Poor5–10 years
Average15–20
years
Poor5-10 years
Average *15-20
years
Above Average
*20-30 years
Below
Average*10-15
years
Excellent30-50
years
Best Practice
Driven rods are relatively inexpensive to purchase, however ease of installation is dependent upon the
type of soil and terrain where the rod is to be installed. The steel used in the manufacture of a standard
driven rod tends to be relatively soft. Mushrooming can occur on both the tip of the rod, as it encounters
rocks on its way down, and the end where force is being applied to drive the rod through the earth.
Driving these rods can be extremely labor-intensive when rocky terrain creates problems as the tips of the
rods continue to mushroom. Often, these rods will hit a rock and actually turn back around on themselves
and pop back up a few feet away from the installation point.
Because driven rods range in length from 8 to 10 feet, a ladder is often required to reach the top of the
rod, hi h a e o e a safet issue. Ma falls ha e resulted fro perso el tr i g to literall ha k
these rods into the earth, while hanging from a ladder, many feet in the air.
The National Electric Code (NEC) requires that driven rods be a minimum of 8 feet in length and that 8 feet
of length must be in direct contact with the soil. Typically, a shovel is used to dig down into the ground 18
inches before a driven rod is installed. The most common rods used by commercial and industrial
contractors are 10 ft in length. Many industrial specifications require this length as a minimum.
A common misconception is that the copper coating on a standard driven rod has been applied for
electrical reasons. While copper is certainly a conductive material, its real purpose on the rod is to provide
corrosion protection for the steel underneath. Many corrosion problems can occur because copper is not
always the best choice in corrosion protection. It should be noted that galvanized driven rods have been
developed to address the corrosion concerns that copper presents, and in many cases are a better choice
for prolonging the life of the grounding rod and grounding systems. Generally speaking, galvanized rods
are a better choice in all but high salt environments.
An additional drawback of the copper-clad driven rod is that copper and steel are two dissimilar metals.
When an electrical current is imposed, electrolysis will occur. Additionally, the act of driving the rod into
the soil can damage the copper cladding, allowing corrosive elements in the soil to attack the bared steel
and further decrease the life expectancy of the rod. Environment, aging, temperature and moisture also
easily affect driven rods, giving them a typical life expectancy of five to 15 years in good soil conditions.
Driven rods also have a very small surface area, which is not always conducive to good contact with the
soil. This is especially true in rocky soils, in which the rod will only make contact on the edges of the
Corrosion
Copper Clad Steel Conductor
Lightning Strikes Lost of Lives and Assests we have to protect
Advance Lightning Protection (ESE Type) NC17-102
A strike can average 100 million volts of
electricity
Current of up to 100,000 amperes
Can generate 54,000 oF
Lightning strikes somewhere on the Earth
every second
Kills Many Lives
Surge Protection Is A Must
Early Streamer Lightning Protection(1)
Advance Systems for ProtectionNFC 17-102
Early Streamer Lightning Protection(2)
Advance Systems for ProtectionNFC 17-102
IEC Declaration by CENELEC for
NFC17-102
BT has confirmed that ESE National Standards would remain valid and thus BT recognized
there ould e o e ide e of o fli t et ee NF C ‐ a d IEC EN ‐ sta dards a d
consequently there is no reason, technical or otherwise, for the withdrawal of the respective
national standard.BT has requested that this standard be modified in order to cancel all
refere e to the IEC EN ‐ series, allowing the NF C ‐ sta dard to e ist, ith the
proposal of possible future migration to international level (lEC). Accordingly, it was established
that European ESE standards (France, Spain, Portugal, Slovaquia, etc.) will not
conflict with other European standards and will remain valid.
• GIMELEC would draw your attention to the fact that
the ter s of refere e of NF C ‐ a d
• other standards, addressing alternative terminals (NF
C ‐ , PR EN ‐ ‐ ) ere fro the
• outset, er differe t. It is a fa t that NF C ‐ ,
whilst referring to ESE Technology also
• comments on other standards for lightning protection
systems, particularly incorporating
• faraday cage, franklin rod and catenary wire systems.
the 'camouflaging' of NF C ‐102 by IEC EN
• ‐ and its proponents, that FRENCH STANDARD
NF C ‐ is still in full force.
National Building Code 2017 in USA
National Building Code 2017 in USA
IEC 62305 and NFC17-102
JMV Earthing Surge Protection
Contact Professionals for Advise
We Protect You
Use Electrical Safety
Earthing & Protection
Contact our Team JMV INDIA
Leader and Insperation behind Mr.Neeraj Saini neeraj@jmv.co.in
Mr.Mahesh Chandra Manav Brand JMV HOD manav@jmv.co.in
www.jmv.co.in
Moblie -919910398999
Telecom -91204590000

More Related Content

What's hot

Power system earthing
Power system earthingPower system earthing
Power system earthing
Nisarg Amin
 
Alfredkim electrical earthing
Alfredkim electrical earthingAlfredkim electrical earthing
Alfredkim electrical earthing
alfredkim
 
Grounding in power system
Grounding in power systemGrounding in power system
Grounding in power system
vardhan k
 
Earthing
EarthingEarthing
Earthing
Paurav Shah
 
Earthing
EarthingEarthing
Earthing
Jatin Dhola
 
Grounding and techniques
Grounding and techniquesGrounding and techniques
Grounding and techniques
Madamsetty Samatha
 
Earthing
EarthingEarthing
Earthing
Harshil Zaveri
 
Earthing or Grounding
Earthing or GroundingEarthing or Grounding
Earthing or Grounding
Aswin KP
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthing
Denuka
 
Earthing
EarthingEarthing
Earthing
Adityareader
 
Earthing Arrangements 17th
Earthing  Arrangements 17thEarthing  Arrangements 17th
Earthing Arrangements 17th
Paul Holden
 
Sarvayogam corp presentation on chemical earthing
Sarvayogam corp  presentation on chemical earthingSarvayogam corp  presentation on chemical earthing
Sarvayogam corp presentation on chemical earthing
Shrikant Iyer
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing Design
IOSRJEEE
 
Earthling
EarthlingEarthling
Earthling
undergraduate
 
Grounding presentation
Grounding presentationGrounding presentation
Grounding presentation
Kashi78
 
Earthing, grounding and isolation
Earthing, grounding and isolation Earthing, grounding and isolation
Earthing, grounding and isolation
Dhananjaysinh Jhala
 
Earthing
EarthingEarthing
Earthing
Moksha Bhatia
 
Chemical pipe earthing
Chemical pipe earthingChemical pipe earthing
Chemical pipe earthing
VINSENT PAUL
 
Grounding
GroundingGrounding
Grounding
Vima Mali
 
631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculation631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculation
ursharji
 

What's hot (20)

Power system earthing
Power system earthingPower system earthing
Power system earthing
 
Alfredkim electrical earthing
Alfredkim electrical earthingAlfredkim electrical earthing
Alfredkim electrical earthing
 
Grounding in power system
Grounding in power systemGrounding in power system
Grounding in power system
 
Earthing
EarthingEarthing
Earthing
 
Earthing
EarthingEarthing
Earthing
 
Grounding and techniques
Grounding and techniquesGrounding and techniques
Grounding and techniques
 
Earthing
EarthingEarthing
Earthing
 
Earthing or Grounding
Earthing or GroundingEarthing or Grounding
Earthing or Grounding
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthing
 
Earthing
EarthingEarthing
Earthing
 
Earthing Arrangements 17th
Earthing  Arrangements 17thEarthing  Arrangements 17th
Earthing Arrangements 17th
 
Sarvayogam corp presentation on chemical earthing
Sarvayogam corp  presentation on chemical earthingSarvayogam corp  presentation on chemical earthing
Sarvayogam corp presentation on chemical earthing
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing Design
 
Earthling
EarthlingEarthling
Earthling
 
Grounding presentation
Grounding presentationGrounding presentation
Grounding presentation
 
Earthing, grounding and isolation
Earthing, grounding and isolation Earthing, grounding and isolation
Earthing, grounding and isolation
 
Earthing
EarthingEarthing
Earthing
 
Chemical pipe earthing
Chemical pipe earthingChemical pipe earthing
Chemical pipe earthing
 
Grounding
GroundingGrounding
Grounding
 
631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculation631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculation
 

Similar to Ground or earthing is word for safety of equpments and human let apply properly

Hamari metro rail and electrical safety
Hamari metro rail and electrical safetyHamari metro rail and electrical safety
Hamari metro rail and electrical safety
Mahesh Chandra Manav
 
Plz Join us in Invitation Elecrama exhibition (18 22 jan2020 and new product...
Plz Join us in Invitation Elecrama exhibition  (18 22 jan2020 and new product...Plz Join us in Invitation Elecrama exhibition  (18 22 jan2020 and new product...
Plz Join us in Invitation Elecrama exhibition (18 22 jan2020 and new product...
Mahesh Chandra Manav
 
Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1
Mahesh Chandra Manav
 
Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1
Mahesh Chandra Manav
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
Mahesh Chandra Manav
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
Mahesh Chandra Manav
 
Steel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notesSteel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notes
Nick Wang
 
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Mahesh Chandra Manav
 
Earthing in electrical power systems
Earthing in electrical power systemsEarthing in electrical power systems
Earthing in electrical power systems
Rahaf Waheep
 
Concrete Cathodic Protection De Nora
Concrete Cathodic Protection De Nora Concrete Cathodic Protection De Nora
Concrete Cathodic Protection De Nora
winstonmosby
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
Mahesh Chandra Manav
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
Mahesh Chandra Manav
 
Jmv presentation solar
Jmv  presentation solarJmv  presentation solar
Jmv presentation solar
Mahesh Chandra Manav
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
Mahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
Mahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
Mahesh Chandra Manav
 
presentation smart city projects and JMV Products
 presentation  smart city projects  and JMV Products presentation  smart city projects  and JMV Products
presentation smart city projects and JMV Products
Mahesh Chandra Manav
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentation
Mahesh Chandra Manav
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentation
Mahesh Chandra Manav
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
Mahesh Chandra Manav
 

Similar to Ground or earthing is word for safety of equpments and human let apply properly (20)

Hamari metro rail and electrical safety
Hamari metro rail and electrical safetyHamari metro rail and electrical safety
Hamari metro rail and electrical safety
 
Plz Join us in Invitation Elecrama exhibition (18 22 jan2020 and new product...
Plz Join us in Invitation Elecrama exhibition  (18 22 jan2020 and new product...Plz Join us in Invitation Elecrama exhibition  (18 22 jan2020 and new product...
Plz Join us in Invitation Elecrama exhibition (18 22 jan2020 and new product...
 
Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1
 
Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
 
Steel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notesSteel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notes
 
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
 
Earthing in electrical power systems
Earthing in electrical power systemsEarthing in electrical power systems
Earthing in electrical power systems
 
Concrete Cathodic Protection De Nora
Concrete Cathodic Protection De Nora Concrete Cathodic Protection De Nora
Concrete Cathodic Protection De Nora
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
 
Jmv presentation solar
Jmv  presentation solarJmv  presentation solar
Jmv presentation solar
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
presentation smart city projects and JMV Products
 presentation  smart city projects  and JMV Products presentation  smart city projects  and JMV Products
presentation smart city projects and JMV Products
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentation
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentation
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 

More from Mahesh Chandra Manav

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
Mahesh Chandra Manav
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Mahesh Chandra Manav
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
Mahesh Chandra Manav
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
Mahesh Chandra Manav
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
Mahesh Chandra Manav
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
Mahesh Chandra Manav
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
Mahesh Chandra Manav
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
Mahesh Chandra Manav
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
Mahesh Chandra Manav
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
Mahesh Chandra Manav
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
Mahesh Chandra Manav
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
Mahesh Chandra Manav
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
Mahesh Chandra Manav
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
Mahesh Chandra Manav
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
Mahesh Chandra Manav
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
Mahesh Chandra Manav
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
Mahesh Chandra Manav
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
Mahesh Chandra Manav
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
Mahesh Chandra Manav
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
Mahesh Chandra Manav
 

More from Mahesh Chandra Manav (20)

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
 

Recently uploaded

UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 

Recently uploaded (20)

UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 

Ground or earthing is word for safety of equpments and human let apply properly

  • 1. Only Best Earthing Will Protect Equipments and Lightning
  • 3. Lightning and Discharge as per IEEE998
  • 4.
  • 5.
  • 6. Ground or Earthing is Word for Safety of Equpments and Human Let Apply Properly
  • 11. Save your Equipments and Human Lives from Surge & Lightning
  • 12. Earthing Grid Design as Per IEEE80
  • 13. Grid Earthing as Per IEEE80
  • 14. Grid Design as per IEEE80
  • 15. Earthing ROD and Conductor Size for Grid Earthing
  • 16. Metro Rail Grounding and Lightning Study Materials
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 41. Safe Building Electrical Earthing & Lighting
  • 43. Follow Electrical Safety(Earthing+Bondng) IEC/IEEE/NFPA Guide Line
  • 44. Arc –Spark = Surge in Systems= Result Fires
  • 45. India Smart Power Generation & Utilization
  • 48.
  • 49. Copper Boned Solid Rod as per UL467
  • 50.
  • 51. Copper Bonded Rod Life Driven Rod Advanced Driven Rod Grounding Plate Concrete Encased Electrode Building Foundation Water Pipe Electrolytic Electrode Resistance-to- Ground (RTG) Poor Average Poor Average Above Average Poor to Excellent** Excellent Corrosion Resistance Poor Good Poor Good * Good * Varies High Increase in RTG in Cold Weather Highly Affected Slightly Affected Highly Affected Slightly Affected Slightly Affected Minimally Affected Minimally Affected Increase in RTG over Time RTG Worsens RTG typically unaffected RTG Increases RTG typically unaffected RTG typically unaffected RTG typically unaffected RTG Improves Electrode Ampacity Poor Average Average Average * Above Average * Poor to Excellent** Excellent Installation Cost Average Excellent Below Average Below Average Average Average Poor Life Expectancy Poor5–10 years Average15–20 years Poor5-10 years Average *15-20 years Above Average *20-30 years Below Average*10-15 years Excellent30-50 years
  • 53. Driven rods are relatively inexpensive to purchase, however ease of installation is dependent upon the type of soil and terrain where the rod is to be installed. The steel used in the manufacture of a standard driven rod tends to be relatively soft. Mushrooming can occur on both the tip of the rod, as it encounters rocks on its way down, and the end where force is being applied to drive the rod through the earth. Driving these rods can be extremely labor-intensive when rocky terrain creates problems as the tips of the rods continue to mushroom. Often, these rods will hit a rock and actually turn back around on themselves and pop back up a few feet away from the installation point. Because driven rods range in length from 8 to 10 feet, a ladder is often required to reach the top of the rod, hi h a e o e a safet issue. Ma falls ha e resulted fro perso el tr i g to literall ha k these rods into the earth, while hanging from a ladder, many feet in the air. The National Electric Code (NEC) requires that driven rods be a minimum of 8 feet in length and that 8 feet of length must be in direct contact with the soil. Typically, a shovel is used to dig down into the ground 18 inches before a driven rod is installed. The most common rods used by commercial and industrial contractors are 10 ft in length. Many industrial specifications require this length as a minimum. A common misconception is that the copper coating on a standard driven rod has been applied for electrical reasons. While copper is certainly a conductive material, its real purpose on the rod is to provide corrosion protection for the steel underneath. Many corrosion problems can occur because copper is not always the best choice in corrosion protection. It should be noted that galvanized driven rods have been developed to address the corrosion concerns that copper presents, and in many cases are a better choice for prolonging the life of the grounding rod and grounding systems. Generally speaking, galvanized rods are a better choice in all but high salt environments. An additional drawback of the copper-clad driven rod is that copper and steel are two dissimilar metals. When an electrical current is imposed, electrolysis will occur. Additionally, the act of driving the rod into the soil can damage the copper cladding, allowing corrosive elements in the soil to attack the bared steel and further decrease the life expectancy of the rod. Environment, aging, temperature and moisture also easily affect driven rods, giving them a typical life expectancy of five to 15 years in good soil conditions. Driven rods also have a very small surface area, which is not always conducive to good contact with the soil. This is especially true in rocky soils, in which the rod will only make contact on the edges of the
  • 55.
  • 56.
  • 57.
  • 58. Copper Clad Steel Conductor
  • 59.
  • 60.
  • 61. Lightning Strikes Lost of Lives and Assests we have to protect Advance Lightning Protection (ESE Type) NC17-102 A strike can average 100 million volts of electricity Current of up to 100,000 amperes Can generate 54,000 oF Lightning strikes somewhere on the Earth every second Kills Many Lives
  • 63. Early Streamer Lightning Protection(1) Advance Systems for ProtectionNFC 17-102
  • 64. Early Streamer Lightning Protection(2) Advance Systems for ProtectionNFC 17-102
  • 65.
  • 66. IEC Declaration by CENELEC for NFC17-102
  • 67. BT has confirmed that ESE National Standards would remain valid and thus BT recognized there ould e o e ide e of o fli t et ee NF C ‐ a d IEC EN ‐ sta dards a d consequently there is no reason, technical or otherwise, for the withdrawal of the respective national standard.BT has requested that this standard be modified in order to cancel all refere e to the IEC EN ‐ series, allowing the NF C ‐ sta dard to e ist, ith the proposal of possible future migration to international level (lEC). Accordingly, it was established that European ESE standards (France, Spain, Portugal, Slovaquia, etc.) will not conflict with other European standards and will remain valid. • GIMELEC would draw your attention to the fact that the ter s of refere e of NF C ‐ a d • other standards, addressing alternative terminals (NF C ‐ , PR EN ‐ ‐ ) ere fro the • outset, er differe t. It is a fa t that NF C ‐ , whilst referring to ESE Technology also • comments on other standards for lightning protection systems, particularly incorporating • faraday cage, franklin rod and catenary wire systems. the 'camouflaging' of NF C ‐102 by IEC EN • ‐ and its proponents, that FRENCH STANDARD NF C ‐ is still in full force.
  • 68. National Building Code 2017 in USA
  • 69. National Building Code 2017 in USA
  • 70. IEC 62305 and NFC17-102
  • 71. JMV Earthing Surge Protection
  • 73. We Protect You Use Electrical Safety Earthing & Protection
  • 74. Contact our Team JMV INDIA Leader and Insperation behind Mr.Neeraj Saini neeraj@jmv.co.in Mr.Mahesh Chandra Manav Brand JMV HOD manav@jmv.co.in www.jmv.co.in Moblie -919910398999 Telecom -91204590000