This document provides guidelines for designing flood resistant bridges in Papua New Guinea. It discusses design considerations for bridge abutments, superstructures, piers, and foundations to withstand flooding and scour. It also covers estimating scour depths, designing for structural stability, afflux, and providing scour protection. The goal is to develop low-cost, practical solutions to improve flood resilience of bridges and reduce damage.
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Venkataraju Badanapuri
The ogee-crested spillway’s ability to pass flows efficiently and safely, when properly designed and constructed, with
relatively good flow measuring capabilities, has enabled engineers to use it in a wide variety of situations as a water discharge structure
(USACE, 1988; USBR, 1973). The ogee-crested spillway’s performance attributes are due to its shape being derived from the lower surface of an aerated nappe flowing over a sharp-crested weir.
prepared by Shubham Bhargava and Arnav Tapan from Medi-Caps University, Indore and IIT ,Bombay respectively.
For more info Contact me - bhargavashubham17@gmail.com
Construction methods of Bridges and its typesprathiekraj1
This presentation holds the various types of bridge construction and its methods in detail with real time examples and the source links are included in each slide.
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Venkataraju Badanapuri
The ogee-crested spillway’s ability to pass flows efficiently and safely, when properly designed and constructed, with
relatively good flow measuring capabilities, has enabled engineers to use it in a wide variety of situations as a water discharge structure
(USACE, 1988; USBR, 1973). The ogee-crested spillway’s performance attributes are due to its shape being derived from the lower surface of an aerated nappe flowing over a sharp-crested weir.
prepared by Shubham Bhargava and Arnav Tapan from Medi-Caps University, Indore and IIT ,Bombay respectively.
For more info Contact me - bhargavashubham17@gmail.com
Construction methods of Bridges and its typesprathiekraj1
This presentation holds the various types of bridge construction and its methods in detail with real time examples and the source links are included in each slide.
Topics:
1. Types of Diversion Head Works
2. Weirs and Barrages
3. Layout Diversion Head Works
4. Causes of Failures of Weirs and Barrages on Permeable Foundations
5. Silt Ejectors and Silt Excluders
Sustainability issues have become real in the 21st Century due to natural resource depletion and climate change. Sustainable Bridge Design approach is to give eminence to ecological balance and apply ecological conservation concepts and methods in bridge design. It must provide safe passage for both public and animal safety.
Water treatment is any process that improves the quality of water to make it appropriate for a specific end-use. The end use may be drinking, industrial water supply, irrigation, river flow maintenance, water recreation or many other uses, including being safely returned to the environment. Water treatment removes contaminants and undesirable components, or reduces their concentration so that the water becomes fit for its desired end-use. This treatment is crucial to human health and allows humans to benefit from both drinking and irrigation use.
Introduction to "Science Research Writing" and how it compares to "Academic W...Lawrie Hunter
An introduction to the use of Hilary Glasman-Deal's "Science Research Writing".
This intro is for my PhD engineering students, as a strategy inroad.
Sets up a comparison with Swales and Feak's "Academic Writing for Graduate Students".
Topics:
1. Types of Diversion Head Works
2. Weirs and Barrages
3. Layout Diversion Head Works
4. Causes of Failures of Weirs and Barrages on Permeable Foundations
5. Silt Ejectors and Silt Excluders
Sustainability issues have become real in the 21st Century due to natural resource depletion and climate change. Sustainable Bridge Design approach is to give eminence to ecological balance and apply ecological conservation concepts and methods in bridge design. It must provide safe passage for both public and animal safety.
Water treatment is any process that improves the quality of water to make it appropriate for a specific end-use. The end use may be drinking, industrial water supply, irrigation, river flow maintenance, water recreation or many other uses, including being safely returned to the environment. Water treatment removes contaminants and undesirable components, or reduces their concentration so that the water becomes fit for its desired end-use. This treatment is crucial to human health and allows humans to benefit from both drinking and irrigation use.
Introduction to "Science Research Writing" and how it compares to "Academic W...Lawrie Hunter
An introduction to the use of Hilary Glasman-Deal's "Science Research Writing".
This intro is for my PhD engineering students, as a strategy inroad.
Sets up a comparison with Swales and Feak's "Academic Writing for Graduate Students".
Administating Engineering Student Project in a Research LaboratorySunil Kumar Kopparapu
Details about administration and management of software based student projects at a research laboratory. Based on completed past projects, a set of criteria which
determine the success of a project have been evolved. Further a prediction model is developed to guess estimate the success of a project in progress. Discusses issues associated with these student projects in terms of investments and gains for the laboratory. Some case studies are presented in support of the developed prediction model.
Planning and Urban Management-issues & challenges Subodh Shankar
With more and more people shifting to urban areas, the management issues of urban areas are getting complex day by day- posing serious challenges to urban planners and city managers. The slides, with the help of the case study of Curitiba(Brazil), discuss how an architect turned politician, through his innovative approaches solved the complex urban issues in most economical way.
This chapter is based on the book Hydraulics of Spillways and Energy Dissipators By Rajnikant M. Khatsuria ,concerned with the general procedure of an overall design. An evaluation of the basic data should be the first step in the preparation of the design. This includes the topography and geology as well as flood hydrography, storage, and release requirements.
This presentation helps you to get the detailed basics as per DBATU, Lonere for Last Year Civil BTech for subject Infrastructure Engg.
Module-3 Bridge Engineering: Sub-structures, Determination of design discharge, Linear Water Way, Economical Span, Afflux, Scour depth, Indian Road Congress Bridge Code
Abutments: Definition, Functions, Dimensions, Types, Forces acting on an abutment,Conditions of stabilityPiers: Definition, Function, Types, Forces acting on a pier, Conditions of stability, Dimensions, Location, Abutment pier
Wing walls: Definition, Functions, Types, Forces acting on a wing wall, Conditions of stability, Dimensions, Precautions
Materials for sub-structures: Cement concrete, Masonry, Steel etc.
The Detail Project Report is an essential building block for any construction project. The DPR is to be prepared carefully and with sufficient details to ensure appraisal, approval, and subsequent implementation in a timely and efficient manner. The detailed project report gives us the clear idea about the existing site conditions and improvements needed to be accomplished. The DPR survey has been done for construction of a high level bridge on road pertaining @ km 6/2 (R&B) road to Kadapa district. The bridge crosses the river in normal crossing. It has total span of 50.80mts.This work has been executed under MNREGS scheme. The bridge has 3 vents of 6.37m effective span. The bridge is constructed across the stream to provide transportation facilities to people of Proddatur to various places of Kadapa District. This stream has an adequate discharge of 97.00 cusecs and it increases more during in rainy season. Traffic studies have been conducted on this road and the outcome was 120cvpd. The maximum flood level of this stream is 99.830.The linear water way is 18.00m. The design drawings and plans were given by MORT&H for execution of work. To calculate the discharge levels has been surveyed around 300mts both upstream and down streams. Funding for this project has been given by the government of A.P. The work has to be completed in a period of one year. The total estimate amount of the project is said to be 69.50 Lakhs.
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Denish Jangid
Canal its types with design of channels by Denish Jangid sir.
covered kennedy lacey theory IS code method with comparison drawbacks.
design steps by kennedy
design steps by lacey
design of canal types of canal trapezoidal shape. Canal Irrigation. Subject-
Water Resources Engineering By Dr.* Denish Jangid Assistant Professor Civil Engineering Department
Canal Classification based on Financial returns
Canal Classification based on Use
Canal Classification based on Size
Cana Masonry work
alluvial soil
Cross regulator
Head regulator
Silt Control device
Silt ejector
Silt excluder
Factor affecting the Canal Alignment
A contour canal is an artificially-dug navigable canal which closely follows the contour line of the land it traverses in order to avoid costly engineering works such as boring a tunnel through higher ground, building an embankment over lower ground, or constructing a canal lock (or series of locks) to change the level of the canal. Because of this, these canals are characterized by their meandering course.
Step Determine the depth D and bed width B from values of A & P
Cost of construction including cross drainage works should be minimized. .A shorter length of canal ensures less loss of head due to friction and smaller loss of discharge due to seepage and evaporation, so that additional area may be brought under cultivation. A canal may be aligned as a contour canal, a side slope canal or a ridge canal according to the type of terrain and culturable area. A contour canal irrigate areas only on one side of the canal. Where canal crosses valleys, different types of cross drainage works are required. A side slope canal is aligned at 90 degree to the contours of the region. A watershed or ridge canal irrigate areas on both sides. Cross drainage works are eliminated in case of ridge and side slope. Main canal is generally carried on a contour alignment. Branch and distributaries take off from a canal from or near the points where the canal crosses the watershed. All possible alignments should be studied and the best suited alignment should be selected. Number of rinks and acute curves should be minimized. They should be aligned as far as possible in partial cutting partial filling. Deep cutting should be avoided by comparing the overall cost of alternative alignments.
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Satyajit Behera
Embankment failure and riverbank erosion are common problem in Odisha. Almost every year earthen embankments and riverbanks are facing problems like erosion, breaching or retirements. Among many reasons the major causes are considered due to the use of geotechnical unstable materials, improper method of construction, seepage and sliding.
Flood Loads are part of Environmental Loads which act on bridges that are constructed over streams. Bridges constructed over river crossings must be designed for flood loads.
1. General Flood Resistant
Bridge Design Guidelines
FLOOD RESISTANT
BRIDGE DESIGN IN
PAPUA NEW GUINEA
Gibson Ali Holemba
Research Student
Graduate School of Engineering
Hokkaido University
2. Presentation Outline
1. Introduction
2. Bridge Abutment
3. Bridge Superstructure
4. Bridge Pier
5. Bridge Foundation
6. Design of Flow
7. Design for Structural Stability
8. Design of Afflux
9. Estimating Scour
10. Scour Protection Measures
11. Aggradation and Degradation
12. Specific Design Considerations
13. Conclusion
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 2
3. Introduction
• This study is undertaken to address the ever-increasing flood
damaged bridges in Papua New Guinea. Bridge damage by flooding
is so frequent that unless a research is carried to provide some
solutions, it will continue to affect the livelihood of people and cost
the government unbudgeted expenditures in emergency
restoration works. Most restoration works undertaken are very
expensive without proper justification of the cost with no or less
engineering guidelines on long-term improvement of the failed
structures.
• The research question that has guided this study was “How can we
improve flood damage bridges in Papua New Guinea?” This is a big
question and this research alone cannot answer the question.
• This presentation will highlight some of the general flood resistant
bridge design guidelines undertaken by some researchers and State
Agencies in improving flood affected bridges around the world.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 3
4. Bridge Abutment
• Available equations do not satisfactorily predict scour depths for
abutments. It is recommended in this study that concrete sandbag
riprap or guide banks must be considered for abutment protection.
Correctly designed and constructed, the suggested protective
measures can negate the need to compute abutment scour.
• Relief openings, guide banks and river training works must be used,
where necessary, to minimize the effects of adverse flow
conditions at abutments.
• Scour at spill-through abutments is about half of that for vertical
wall abutments, however, consideration must be given to the loss
of spill-through embankment material due to scour.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 4
5. Bridge Superstructure
• Bridge superstructure soffit levels must be positioned above the
general level of the approach roadways wherever practicable. In
the event of overtopping of approach embankments this provides
for a reduction of any hydraulic forces acting on the bridge. This is
particularly important for bridges over rivers or streams carrying
large amounts of debris, which could clog the waterway of the
bridge.
• Bridge superstructures must be securely anchored to the
substructure if the deck will become buoyant, or floating debris is
probable. Where overtopping is likely, the superstructure cross-
section must be shaped to minimize resistance to the flow.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 5
6. Bridge Pier
• Bridge pier foundations on floodplains must be positioned at the same
depth as the pier foundations in the stream channel if there is any
likelihood that the channel will shift its location onto the floodplain over
the life of the bridge.
• Piers must be aligned as far as is practical, in the direction of flood and
tidal flows. Assess the hydraulic advantages of different pier shapes,
particularly where there are complex flow patterns during floods and use
the most appropriate pier shape.
• Streamline pier shapes to decrease scour and minimize potential for the
build-up of debris.
• Evaluate the hazard from debris build-up when considering the use of
multiple pile bents in stream channels. Where debris build-up is a problem,
the bent must be designed as though it were a solid pier for the purposes
of scour estimation. Consider the use of other pier types where clogging
of the waterway area could be a major problem.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 6
7. Bridge Foundation
• Different bed materials scour at different rates. Thus, investigation
must be conducted on the riverbed material and design
considerations must be undertaken to prevent scouring action on
riverbed material near the foundation.
• Bridge foundation analysis must be carried out on the basis that all
stream-bed material within the scour prism above the total scour
depth will have been removed and is not available for bearing or
lateral support.
• Spread Footing Foundation on stabilized fill material shall be
ensured that the abutment foundation footing is below the
calculated scour depth.
• Ensure that the bottom of the abutment and retaining wall footing
is at least 2m below the present streambed level.
• Ensure that circular slip-failure of the soil foundation do not occur.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 7
8. Bridge Foundation continue…
• For pile designs subject to scour, consideration shall be given to
using a lesser number of long piles to develop bearing resistance, as
compared to a greater number of shorter piles.
• Place the top of the pile cap at a depth, below existing riverbed
level and equal to the estimated general scour depth to minimize
obstruction to flood flows and its resulting local scour.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 8
9. Design of Flow
• Calculations must be based on a range of flood return periods of up
to 200 years in order to assess which events produce the worst
effects from considering different flow velocities and depths.
• In this study the range will be from Q20 – Q200. The reason for this is
that in many rivers, velocities can be high when flows are just within
the banks, and scour can be worse than the higher flooding
discharge rates.
• Bridge located on a local road can be designed for Q20 design
discharge that is able to safely mitigate Q100 flood. Bridges on on
important economic highways must be designed to withstand Q100
floods and Q200 be used as a safe design check.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 9
10. Design for Structural Stability
• In order to satisfy that the structure is adequate to resist against
the hydraulic action of flooding water, the structural design must
be carried out in this order:
a) Calculate the total potential scour depth and check that the
structural design is adequate with that depth of scour.
b) Incorporate appropriate scour protection measures in the design
such as the Groins, Riprap, Levees and Sheet Piling.
c) Calculate the load on the structure and its foundations and check
for structural adequacy.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 10
11. Design of Afflux
• Afflux is the increase in water level upstream of a bridge over that which
would have occurred if the structure was absent.
• For a given cross-sectional area of an opening, the greater the wetted
perimeter, the greater is the afflux. Therefore, it must be considered at
the planning stage that a smaller number of large openings are preferable
to a larger number of small openings.
• There are number of methods available for calculating afflux. The most
widely used is the US Bureau of Public Roads (USBPR) method. This is
applicable to bridges with vertical piers and horizontal soffits. (Δh = kHref +
Hu – Hd)
• To control the afflux at a bridge crossing, particularly where long
embankments cross the flood plain are required, it is necessary to provide
additional flood openings. In simple cases, methods of calculating afflux
such as the USBPR method can be used to determine the length of
openings required. The calculations will indicate the overall length of
openings required in achieving a certain afflux but the appropriate
location for these openings will depend upon the local geometry.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 11
12. Estimating Scour
• The estimation of scour effects may involve the following:
1. Obtain all relevant data from the bridge site
2. Select critical return periods and calculate design discharge.
3. Draw cross-sections at the proposed bridge site showing proposed
foundation depths. Additional cross-sections must be taken in the
neighborhood of the bridge site, e.g. within approximately 5m river
widths upstream and downstream of the bridge site. These areas shall
be inspected for signs of scour or irregularities, which might influence
flow conditions or bed levels at the bridge site.
4. Decide whether long-term bed level variation such as progressive
degradation is allowable.
5. Calculate design water levels and velocities. Establish or estimate
direction of flow trajectories in relation to alignment of bridge piers -
flow trajectories may be significantly different at various flood
conditions than at normal flow conditions.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 12
13. Estimating Scour continue…
6. Calculate hydraulic parameters such as Froude Number (Fr) and
floodplain or main channel discharge split.
7. Calculate general scour depths. Redistribute general scour to the
most critical bed profile, taking into account the layout of the
bridge crossing and its foundation details.
8. Compare the measurements of bed level at the bridge site with
the calculated bed levels.
9. Calculate local scour at each potentially vulnerable foundation,
including abutments. Superimpose local scour upon general
scour, assuming the top width of local scour holes, measured
from the pier face, to be within approximately 1.0 to 2.8 times the
local scour depth.
10. Interpret scour depths in the light of potential effects upon the
structural strength and stability of the foundations.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 13
14. Scour Protection Measures
• It may not be economical to design the elements of a bridge to withstand
the maximum possible scour. However, an alternative is to carry out scour
protection works to prevent or reduce scour of the bed and banks.
• Concrete sandbags to be placed along the bridge abutment and the
riverbank to prevent scouring at bridge abutments and control bank
erosion. Ideally, the concrete sandbag will be abrasion resistant and of
sufficient weight to prevent it from being moved by the flow. The size or
weight of the concrete sandbag must be designed to be roughly
proportional to the sixth power of the flow velocity.
• Gabion and grouted mattresses must be placed locally around piers and
abutments or across the full width of the invert to increase the resistance
of the riverbed to scour. The riverbed should be pre-excavated so that the
mattresses lie below bed level. Mattresses can also be used to protect the
riverbanks.
• Increase the size of the waterway opening at the downstream end and
channel improvements are some methods to resist flood.
5 February 2017
Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido
University 14
15. Aggradation & Degradation
• Progressive degradation results from modification of the stable
regime conditions to which a river has become adjusted. This may
be as a result of alterations to water or sediment flows in the river.
The result of progressive degradation at a bridge site will be a
lowering of bed level, which may place the foundations at risk.
• Degradation will normally increase the risk to bridge structures
from scour, however, in some cases, aggradation may occur - this
will cause increased water levels but will probably reduce the risk
from scour.
• If the channel is expected to degrade, then the estimation of long-
term bed elevation will be used to calculate general and local scour
depth levels.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 15
16. Specific Design Considerations
• Freeboard must be such that bridge soffit levels at flood spans are
600mm above the design flood level or maximum known flood level
on minor watercourses in order to allow floating debris to pass
freely through the structure. In determining the freeboard,
allowance shall be made for afflux.
• Unless, otherwise specified, the design checks must be carried out
both at the ultimate limit state (ULS) and the serviceability limit
state (SIS) using the applicable combination rules and the partial
factors of safety.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 16
17. Specific Design Considerations cont…
• Hydrodynamic forces from the action of flowing water past the
submerged parts of a bridge can act in addition to hydrostatic
forces. The Indian Road Congress (IRC) and American Association of
State Highway and Transportation Officials (AASHTO), recommend
the following equation for the hydrodynamic flow pressure P
(kN/m2), P = 0.51KU2 to determine the Hydrostatic Pressure.
• Debris forces - the type of debris occurring in a river depends upon
the size and characteristics of the river and the area through which
it flows. An investigation must be carried out to determine the type
and size of floating debris to be expected at the bridge site.
• A minimum allowance must be made for a debris collision force
equivalent to that exerted by a three (3) ton log travelling at the
stream velocity calculated for the peak design event and arrested
within distances of 150mm for slender column type piers and 75mm
for massive, non-yielding type piers.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 17
18. Conclusion
• What is now common in Papua New Guinea is we tend to have
Reactive Approach to undertake the failing infrastructure
maintenance in the country then Proactive Approach to plan and
maintain the infrastructure in a more structured way. This research
is undertaken in a way to help decision makers to relook on how
best to address the problem in a simple innovative engineering
approach that is more cost efficient and applicable in the context of
PNG.
• This study is undertaken to improve the road construction industry
in PNG to develop better resilient methods to improve basic
infrastructure that affects the livelihood of people significantly.
• There is always a better and simple way in addressing everyday
engineering challenges however, we think too big that non-
complex solutions becomes so simple to be accepted.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 18
19. References
1. Scottish Design Manual for Roads and Bridges, The Design of Highway Bridges for Hydraulic Action, Volume 1, Section3, Part 6,
(1994).
2. I. Zevgolis and P. Bourdeau, Mechanically Stabilized Earth Wall Abutments for Bridge Support, (2007), U.S DOT FHWA,
Washington DC, USA.
3. US Army Corps of Engineers, Sandbagging Techniques, (2004), Portland, USA.
4. U.S DOT FHWA, Design and Construction of Mechanically Stabilized Earth Walls and Reinforced Soil Slopes, Volume 1, (2009),
Washington DC, USA.
5. WisDOT, Bridge Manual, Chapter 12, (2016), Wisconsin, USA.
6. Sham et al, Foundation Design Methodology for the Padma Main Bridge, (2010), EACOM Asia Company Ltd, Shatin, New
Territory, Hong Kong.
7. U.S DOT FHWA, Evaluating Scour at Bridges, 5th Edition, (2012), Washington DC, USA.
8. E. Snell and A Smith, The Design of Flood Resisting Bridge Abutments and approach Embankments, (2012).
9. European Commission JRC, Seminar on Bridge Design with Eurocodes, (2012).
10. K. Johnson, Abutments, (2012), MinDOT, Minnesota, USA.
11. U.S DOT FHWA, Hydraulic Design of Bridges, (2012), Washington DC, USA.
12. Piellca et al, Flood Damage in the United States 1926 – 2000: A Reanalysis of National Weather Service Estimates, (2012).
13. Department of Main Roads, Bridges and Retaining Walls (Chapter 22), (2006), Queensland, Australia.
14. NSW Transport Roads and Maritime Services, Country Bridge Solutions, Edition 2, Volume 1.2, (2016), Sydney, Australia.
15. PNG Mirror News, Fuel Crisis Looms in Highlands, (3/10/2016), Papua New Guinea.
16. Department of Works, Bridge Inspection Manual, Volume 2, (2005), Papua New Guinea.
17. Markham Culverts Ltd, Tensar Geogrid and Geotextile Guide, (2016), Lae, Papua New Guinea.
5 February 2017 Flood Resistant Bridge Design in PNG - Gibson A Holemba, Graduate School of Engineering, Hokkaido University 19
Editor's Notes
USBPR Method
Δh = kHref + Hu – Hd
Where; Href is the reference velocity head, Hu is the velocity head upstream of the structure, Hd is the velocity head downstream of the structure and k is the overall backwater coefficient
P = 0.51KU2, where; K is the pier shape coefficient and U is the velocity of the current at the point where intensity is calculated.