4. DESIGN OF SPILLWAYS
A reservoir will overflow if its capacity is less than the difference between the
volumes of inflow and outflow.
A spillway is designed to prevent overtopping of a dam at a place that is not
designed for overflow.
Principal function of a spillway is to pass down the surplus water from the
reservoir into the downstream river.
Spillway is a safety structure against dam overtopping.
A spillway is used to maintain optimum reservoir levels before and during
flood-control operations by releasing excess flood water.
40 % of the dam failure hazards is due to inadequate spillway capacity.
1
2
Classification of spillways according to the most prominent
feature
• Ogee spillway
• Chute spillway
• Side channel spillway
• Shaft spillway
• Siphon spillway
• Straight drop or overfall spillway
• Tunnel/Culvert spillway
• Labyrinth spillway
• Stepped spillway
3
Aspects involved in spillway design
• Hydrology
 Estimation of inflow discharge
 Selection of spillway design flood
 Determination of frequency of spillway use
• Topography and geology
 Type and location of spillway
• Utility and operational aspects
 Serviceability
• Constructional and structural aspects
 Cost-effectiveness
4
5
• After a spillway control device and its dimensions have been selected, the
maximum spillway discharge and the maximum reservoir water level should
be determined by flood routing.
• Other components of the spillway can then be proportioned to conform to the
required capacity and to the specific site conditions and a complete layout of
the spillway can be established.
• Cost estimates of the spillway and the dam should be made.
• Comparisons of various combinations of spillway capacity and dam height
for an assumed spillway type, and of alternative types of spillways allow
selection of an economical spillway type.
• Ungated-gated spillways
6
• The lifespan of a dam is of the order of 100 years.
• The design discharge may be related to the maximum flood discharge that
may occur within this period.
• Probability of occurrence of a discharge that can seriously damage the
system should be minimum. As an example (depending on project size and
country regulations) :
• For optimum flow conditions observed.
• For some adverse flow conditions may be tolerated, but
there should be no damage.
• For minor damage may be tolerated but system should
not fail.
Q100
Q1000
Q10000
4.1 Design Discharge of Spillway
7
• Another approach is based on the concept of probable maximum flood
(PMF). The most extreme combination of basic parameters is chosen, and
no return period is specified.
• This design flood has to be diverted without a dam breaching.
• Often, a full reservoir level is assumed and all intakes for power plants etc.
are blocked, and (N-1) spillway outlets are in operation.
• Whether the bottom outlet can be accounted for diversion is a question, but
there is a tendency to include it in the approach.
8
4.2 Overflow Structures
• Depending on the site conditions and hydraulic particularities an overflow
structure can be of various designs:
 Frontal overflow,
 Side-channel overflow, and
 Shaft overflow.
• Other types of structures such as labyrinth spillway use a frontal overflow but
with a crest consisting of successive triangles or trapezoids in plan view.
• Still another type is the orifice spillway in the arch dam.
• The non-frontal overflow type of spillways are used for small and
intermediate discharges, typically up to design floods of 1000 m3/s. 9
Frontal Overflow Side Overflow Shaft Overflow
10
11
• The frontal type of overflow is a standard overflow structure, both due to
simplicity and direct connection of reservoir to tailwater. It can normally be
used in both arch and gravity dams.
• The frontal overflow can easily be extended with gates and piers to regulate
the reservoir level, and to improve the approach flow to spillway.
• Gated overflows of 20 m gate height and more have been constructed, with
a capacity of 200 m3/s per unit width. Such overflows are thus suited for
medium and large dams, with large floods to be conveyed to the tailwater.
• Particular attention has to be paid to cavitation due to immense heads that
may generate pressure below the vapor pressure in the crest domain.
4.2.1 Frontal Overflow
Laleli
12
Laleli
Flow
13
Laleli
14
15
• The gate piers have to be carefully shaped in order to obtain a symmetric
approach flow.
• The downstream of frontal overflow may have various shapes. Usually, a
spillway is connected to the overfall crest as a transition between overflow
and energy dissipator.
• The crest may abruptly end in arch dams to include a falling nappe that
impinges on the tailwater.
• Another design uses a cascade spillway to dissipate energy right away from
the crest end to the tailwater, such that a reduced stilling basin is needed.
• The standard design involves a smooth spillway that convey flow with a high
velocity either directly to the stilling basin, or to a trajectory bucket.
16
Crest Shapes
Overflow structures of different shapes are:
1. Straight (standard)
2. Curved
3. Polygonal
4. Labyrinth
The labyrinth structure has an increased overflow capacity with respect to the
width of the structure.
Plan view
17
Labyrinth spillway
18
• In order to have a symmetric downstream flow, and to accommodate gates,
the rectangular cross section is used almost throughout.
• The longitudinal section of the overflow can be
a) Broad-crested.
b) Circular crested, or
c) Standard crest shape (ogee-type)
• For heads larger than 3 m, the standard overflow shape should be used.
• Although its cost is higher than the other crest shapes, advantages result
both in capacity and safety against cavitation damage.
Broad crested
Circular crested Ogee crested
(Standard)
19
Standard Crest Shape
20
• When the flow over a structure involves curved streamlines with the origin of
curvature below the flow, the gravity component of a fluid element is
reduced by the centrifugal force.
• If the curvature is sufficiently large, the internal pressure may drop below the
atmospheric pressure and even attain values below the vapor pressure for
large structures.
• Then cavitation may occur with a potential cavitation damage. As discussed,
the overflow structure is very important for the dam safety. Therefore, such
conditions are unacceptable.
• For medium and large overflow structures, the crest is shaped so as to
conform the lower surface of the nappe from a sharp-crested weir.
Flow over a sharp-crested weir
21
22
23
USCE Crest Shape
d
24
The radii of the upstream crest profile are:
The origins of curvature O1, O2, and O3, as well as the transition points P1,
P2, and P3, for the upstream quadrant are;
Point O1 O2 O3 P1 P2 P3
x/Hd 0.00 -0.105 -0.242 -0.175 -0.276 -0.2818
z/Hd 0.500 0.219 0.136 0.032 0.115 0.136
04
.
0
,
20
.
0
,
50
.
0 3
2
1



d
d
d H
R
H
R
H
R
25
• The downstream quadrant crest shape was originally proposed by Craeger
as:
• This shape is used up to so-called tangency point with a transition to the
straight-crested spillway.
• The disadvantage of USCE crest shape is the abrupt change of curvature at
locations P1 to P3 and at the origin. Such a crest geometry can not be used
for computational approaches due to the curvature discontinuities.
• The crest shape given above for vertical spillways for which the velocity of
approach is zero, i.e.; for Hd /P→0, where P is the height of the spillway. In
general, the shape of the crest depends on:
 The design head Hd,
 The inclination of the upstream face,
 The height of the overflow section above the floor of the entrance
channel (which influences the velocity of approach to the crest).
0
for x
,
50
.
0
85
.
1










d
d H
x
H
z
26
Discharge Characteristics
The discharge over an ogee crest is given by the formula:
where:
Q = discharge
Cd = discharge coefficient
L = overflow crest length
H = total head on the crest
The discharge coefficient is influenced by a number of factors:
 The depth of approach
 Relation of actual crest shape to the ideal nappe shape
 Upstream face slope
 Downstream apron interface
 Downstream submergence
1/2
d LH(2gH)
C
Q 
27








 

H
H
3
3
2
Cd
5
9
4
1
For H+  0, the overflow is shallow and almost hydrostatic pressure occurs.
Then overflow depth is equal to the critical depth and the discharge
coefficient is Cd = 0.385. For the design flow H+ = 1 and Cd = 0.495.
The discharge coefficient may be written as function of relative head up to
H+ = H/Hd = 3
28
Pier Effects
29
• Crest piers and abutments cause contraction of the flow, reduction in the
effective length of the crest, and cause reduction in discharge.
where L = Effective length of the crest for calculating discharge
L’ = Net length of the crest
N = number of piers
Kp = Pier contraction coefficient
Ka = Abutment contraction coefficient
He = Total head on the crest
Kp = 0.2 for square abutments
Kp = 0.1 for abutments rounded by radius between (0.15~0.5)Hd
Kp = 0. for abutments rounded by radius >0.5Hd
30
e
a
p
'
)H
K
NK
L
L 

 (
2
H+
31
Round nose
Pointed nose
Pier contraction coefficients
• Tailwater end of an overflow pier corresponds to an abrupt expansion of
flow.
• Because the spillway flow is supercritical, standing shock waves have their
origins at the pier ends, which will propagate all along the chute.
• In order to suppress pier waves two designs are available:
Either sharpening the pier end both in width and height, or
Continue with the pier as a dividing wall along the chute
• Both designs are not ideal, because even a slim pier end perturbs the flow
and dividing walls may be costly especially for long spillways.
32
Free Surface Profile
• The free surface over an overflow structure is important in relation to
freeboard design and for gated flow
• A generalized approach for plane flow over standard-shaped overflow crest
can be written as:
• for -2 < X /(H+)1.1 < +2
• where S = s / Hd, X = x / Hd
• The surface elevation s is
referred to the crest level
upstream from the crest
origin, and to the bottom
elevation downstream
from the crest.
 
6
/
)
(
75
.
0 1
.
1
X
H
S 
  H+
33
Bottom pressure characteristics
• The bottom pressure distribution pb(x) is important, because it yields:
 an index for the potential danger of cavitation damage, and
 the location where piers can end without inducing separation of flow.
The nondimensionalized bottom pressure heads (Pb = pb/Hd ) for various H+
values are shown in figures below.
H+
Plane flow
Axial btwn. piers
H+
34
• The most severe pressure minima along the piers due to significant
streamline curvature effects.
H+
Along piers
35
  H
p
P
H
H
P m
m
d
m 
/
/
1 

 where
43
.
0
0
0 )
1
/
(
tan
9
.
0
/ 

 d
d H
H
H
x
X 
36
Minimum bottom pressure index Discharge coefficient
Crest bottom pressure index Location of atmospheric bottom pressure
H+
H+
H+
H+
37
Cavitation Design
Standard overflow with
H+ < 1 under designed
H+ > 1 over designed and thus sub atmospheric bottom pressures.
• Initially overdesign of dam overflows was associated with advantages in
capacity.
• However the increase in discharge coefficients Cd for H+ >1 is relatively
small, but the decrease of minimum pressure, Pm, is significant.
• Overdesigning, thus adds to the cavitation potential.
• Generally, one assumes an incipient pressure head: m.
6
.
7



vi
p
38
• The limit head, HL , for incipient cavitation to occur is
• The constant  was introduced to account for additional effects, such as the
variability of pvi with
 
   

 /
1 vi
-1
L p


 H
H
H+

H+
Domain of Abecasis
39
Overflow Gates
• The overflow structure has a hydraulic behavior that the discharge increases
significantly with the head on the overflow crest.
• Overflow may be regulated to a desired or prescribed reservoir level using
gates.
• The head on the turbines may be increased compared to ungated overflow.
• During the floods, if the reservoir is full, the gates are completely open to
promote the overflow.
• The hydraulics of gates on overflow structures involves three major
problems to be considered:
 Discharge characteristics
 Crest pressure distribution
 Gate vibration
Currently most large dams are equipped with gates for a flexible operation.
40
The advantages of gates at overflow structure are:
• Variation of reservoir level,
• Flood control,
• Benefit from higher storage level.
The disadvantages are:
• Potential danger of malfunction,
• Additional cost, and maintenance.
Depending on the size of the dam and its location, one would prefer the
gates for:
• Large dams,
• Large floods, and
• Easy access for gate operation.
41
Three types of gates are currently favored:
• Hinged flap gates,
• Vertical lift gates,
• Radial gates.
Flap Gate Vertical Gate Radial Gate
42
• The flaps are used for a small head of some meters, and may span over a
considerable length.
• The vertical gate can be very high but requires substantial slots, a heavy
lifting device, and unappealing superstructure.
• The radial gates are most frequently used for medium or large overflow
structures because of
 their simple construction,
 the modest force required for operation and
 absence of gate slots.
• They may be up to 20m X 20m, or also 12 m high and 40 m wide. The radial
gate is limited by the strength of the trunnion bearings.
43
• For safety reasons, there should be a number of moderately sized gates
rather than a few large gates.
• For the overflow design, it is customary to assume that the largest gate is
out of operation.
• The regulation is ensured by hoist or by hydraulic jacks driven by electric
motors.
• Stand-by diesel-electric generators should be provided if power failures are
likely.
44
Bottom pressure profile
45
46
4.2.2 Side Channel
47
• Side channels are often considered at sites where:
 a narrow gorge does not allow sufficient width for the frontal overflow,
 impact forces and scour are a problem in case of arch dams,
 a dam spillway is not feasible, such as in the case of an earth dam,
 when a different location at the dam site yields a simpler connection to
the stilling basin.
• Side channels consist of a frontal type of overflow structure and a spillway
with axis parallel to the overflow crest.
 The specific discharge of overflow structure is normally limited to 10
m3/s/m, but for lengths of over 100 m.
 The overflow head is limited to say 3 m.
 Not equipped with gates.
Hydraulic design
48
The 1D equation for the free surface profile can be derived from momentum
considerations (Chow 1959)
49
• The shaft type spillway has proved to be economical, provided the diversion
tunnel can be used as a tailrace. The main elements are:
 The intake,
 The vertical shaft with a bend,
 The almost horizontal spillway tunnel, and,
 Energy dissipator.
• Air by aeration conduits is provided in order to prevent cavitation.
• Also, to account for flood safety, only non-submerged flow is allowed such
that free surface flow occurs along the entire structure, from the intake to the
dissipator.
• Used for dams with small to medium design discharges (<1000 m3/s).
• The structure has a circular standard-crested overfall
4.2.3 Morning Glory Overfall
Elements of a shaft spillway
50
Morning Glory Overfall
51
• Morning Glory Overfall is advantageous when:
 seismic action is small,
 the horizontal spillway may be connected to the existing diversion channel,
 floating debris is insignificant,
 space for the overflow structure is limited,
 geologic conditions are excellent against settlement, and
• Location of the Morning Glory
 The intake is prone to rotational approach flow, which should be inhibited
with a selected location of the shaft relative to the reservoir topography and
the dam axis.
 The radial flow may be improved with piers positioned on overfall crest.
52
Crest shape
• The shape of the Morning Glory overfall is a logical extension of the standard
overfall crest. Experiments were performed on circular sharp crested weir.
Circular weir Morning Glory crest detail
• All quantities referring to the weir are over barred.
• The overflow head relative to the sharp crest is 𝐻 and the coordinate system
(𝑥, 𝑧 ) is located at the weir crest. 53
Discharge
• The discharge over a Morning Glory overfall structure is in analogy with the
straight-crested overfall
Q = Cd 2R (2gH3)1/2
Cd = 0.515 [1 - 0.20(H/R)]
for the range of 0.2 ≤ H/R ≤ 0.5
• An initial value of H or R may be assumed for a fixed H/R ratio to start the
computations.
• Shaft radius Rs can be determined from
Rs = 1 + 0.1R (in meters)
54

More Related Content

What's hot (20)

Energy dissipation - irrigation engineering
Energy dissipation - irrigation engineeringEnergy dissipation - irrigation engineering
Energy dissipation - irrigation engineering
 
5 Reservoir Planning
5 Reservoir Planning5 Reservoir Planning
5 Reservoir Planning
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Spillways
SpillwaysSpillways
Spillways
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
 
Spillways
SpillwaysSpillways
Spillways
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
Khosla theory
Khosla theoryKhosla theory
Khosla theory
 
Types of spillways
Types of spillwaysTypes of spillways
Types of spillways
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Chapter 8:Hydraulic Jump and its characterstics
Chapter 8:Hydraulic Jump and its charactersticsChapter 8:Hydraulic Jump and its characterstics
Chapter 8:Hydraulic Jump and its characterstics
 
Orifice and mouthpieces
Orifice and mouthpieces Orifice and mouthpieces
Orifice and mouthpieces
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
CH-2.pptx
CH-2.pptxCH-2.pptx
CH-2.pptx
 
Spillways
SpillwaysSpillways
Spillways
 

Similar to 4 spillways

Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwayssaibabu48
 
7.Canal_Outlets.ppt
7.Canal_Outlets.ppt7.Canal_Outlets.ppt
7.Canal_Outlets.pptimmanzaidi
 
7.Canal_Outlets.ppt
7.Canal_Outlets.ppt7.Canal_Outlets.ppt
7.Canal_Outlets.pptimmanzaidi
 
Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfChapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfAbdanurJihad
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipatorsBinu Karki
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirssush_vyas
 
WRE II canal structures
WRE II canal structuresWRE II canal structures
WRE II canal structuresMitaliShelke
 
design of hydraulic controls and structures
design of hydraulic  controls and structuresdesign of hydraulic  controls and structures
design of hydraulic controls and structuresavirup naskar
 
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxSewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxPriyaTalwar8
 
Cve 471 4 spillways
Cve 471   4 spillwaysCve 471   4 spillways
Cve 471 4 spillwayssaibabu48
 
07 Open Channels.ppt
07 Open Channels.ppt07 Open Channels.ppt
07 Open Channels.pptzaid519176
 
Spillways &amp; energy dissipator
Spillways &amp; energy dissipatorSpillways &amp; energy dissipator
Spillways &amp; energy dissipatorSAGAR RAUT
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptxDawit Girma
 

Similar to 4 spillways (20)

Lecture 1 free overfall and ogee
Lecture 1 free overfall and ogeeLecture 1 free overfall and ogee
Lecture 1 free overfall and ogee
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
 
7.Canal_Outlets.ppt
7.Canal_Outlets.ppt7.Canal_Outlets.ppt
7.Canal_Outlets.ppt
 
7.Canal_Outlets.ppt
7.Canal_Outlets.ppt7.Canal_Outlets.ppt
7.Canal_Outlets.ppt
 
Lecture 0 design of spilways an overview
Lecture 0 design of spilways an overviewLecture 0 design of spilways an overview
Lecture 0 design of spilways an overview
 
Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfChapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Ch-3.pptx
Ch-3.pptxCh-3.pptx
Ch-3.pptx
 
050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators
 
unit-3.pdf
unit-3.pdfunit-3.pdf
unit-3.pdf
 
SPILLWAYS.pdf
SPILLWAYS.pdfSPILLWAYS.pdf
SPILLWAYS.pdf
 
weirs
weirsweirs
weirs
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirs
 
WRE II canal structures
WRE II canal structuresWRE II canal structures
WRE II canal structures
 
design of hydraulic controls and structures
design of hydraulic  controls and structuresdesign of hydraulic  controls and structures
design of hydraulic controls and structures
 
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxSewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
 
Cve 471 4 spillways
Cve 471   4 spillwaysCve 471   4 spillways
Cve 471 4 spillways
 
07 Open Channels.ppt
07 Open Channels.ppt07 Open Channels.ppt
07 Open Channels.ppt
 
Spillways &amp; energy dissipator
Spillways &amp; energy dissipatorSpillways &amp; energy dissipator
Spillways &amp; energy dissipator
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptx
 

More from saibabu48

Design of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netDesign of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netsaibabu48
 
Sr bolted and welded conviction
Sr bolted and welded convictionSr bolted and welded conviction
Sr bolted and welded convictionsaibabu48
 
Iii design-of-steel-structures-unit-1
Iii design-of-steel-structures-unit-1Iii design-of-steel-structures-unit-1
Iii design-of-steel-structures-unit-1saibabu48
 
Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2saibabu48
 
Ce 6603-dss-qb
Ce 6603-dss-qbCe 6603-dss-qb
Ce 6603-dss-qbsaibabu48
 
Ce6603 design of steel structures qb
Ce6603 design of steel structures qbCe6603 design of steel structures qb
Ce6603 design of steel structures qbsaibabu48
 
Dss notebook pdf someones
Dss notebook pdf someonesDss notebook pdf someones
Dss notebook pdf someonessaibabu48
 
29 30-31-spillway gatespp20121003
29 30-31-spillway gatespp2012100329 30-31-spillway gatespp20121003
29 30-31-spillway gatespp20121003saibabu48
 
9fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate02
9fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate029fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate02
9fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate02saibabu48
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636saibabu48
 
Unit 4-canal
Unit 4-canalUnit 4-canal
Unit 4-canalsaibabu48
 
Unit 4-canal lining
Unit 4-canal liningUnit 4-canal lining
Unit 4-canal liningsaibabu48
 
Types of forces
Types of forcesTypes of forces
Types of forcessaibabu48
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth damssaibabu48
 
Sprinkler irrigation
Sprinkler irrigationSprinkler irrigation
Sprinkler irrigationsaibabu48
 
Retaing wall
Retaing wallRetaing wall
Retaing wallsaibabu48
 

More from saibabu48 (20)

Design of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netDesign of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.net
 
Sr bolted and welded conviction
Sr bolted and welded convictionSr bolted and welded conviction
Sr bolted and welded conviction
 
Iii design-of-steel-structures-unit-1
Iii design-of-steel-structures-unit-1Iii design-of-steel-structures-unit-1
Iii design-of-steel-structures-unit-1
 
Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2
 
Ce 6603-dss-qb
Ce 6603-dss-qbCe 6603-dss-qb
Ce 6603-dss-qb
 
Ce6603 design of steel structures qb
Ce6603 design of steel structures qbCe6603 design of steel structures qb
Ce6603 design of steel structures qb
 
Dss notebook pdf someones
Dss notebook pdf someonesDss notebook pdf someones
Dss notebook pdf someones
 
29 30-31-spillway gatespp20121003
29 30-31-spillway gatespp2012100329 30-31-spillway gatespp20121003
29 30-31-spillway gatespp20121003
 
9fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate02
9fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate029fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate02
9fc1684e e872-4d1a-b54e-254f07c47009-150123191452-conversion-gate02
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636
 
Unit 4-canal
Unit 4-canalUnit 4-canal
Unit 4-canal
 
Unit 4-canal lining
Unit 4-canal liningUnit 4-canal lining
Unit 4-canal lining
 
Types of forces
Types of forcesTypes of forces
Types of forces
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
 
Sprinkler irrigation
Sprinkler irrigationSprinkler irrigation
Sprinkler irrigation
 
Spillways
SpillwaysSpillways
Spillways
 
Spillways
SpillwaysSpillways
Spillways
 
Spillway
SpillwaySpillway
Spillway
 
Retaing wall
Retaing wallRetaing wall
Retaing wall
 
New
NewNew
New
 

Recently uploaded

(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一
(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一
(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一Fi sss
 
Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)
Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)
Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)kojalkojal131
 
VIP Kolkata Call Girl Jadavpur 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jadavpur 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jadavpur 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jadavpur 👉 8250192130 Available With Roomdivyansh0kumar0
 
Gwal Pahari Call Girls 9873940964 Book Hot And Sexy Girls
Gwal Pahari Call Girls 9873940964 Book Hot And Sexy GirlsGwal Pahari Call Girls 9873940964 Book Hot And Sexy Girls
Gwal Pahari Call Girls 9873940964 Book Hot And Sexy Girlshram8477
 
ΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ Ξ
ΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ ΞΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ Ξ
ΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ Ξlialiaskou00
 
Chocolate Milk Flavorful Indulgence to RD UHT Innovations.pptx
Chocolate Milk Flavorful Indulgence to RD UHT Innovations.pptxChocolate Milk Flavorful Indulgence to RD UHT Innovations.pptx
Chocolate Milk Flavorful Indulgence to RD UHT Innovations.pptxRD Food
 
VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130
VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130
VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130Suhani Kapoor
 
Russian Call Girls in Nashik Riya 7001305949 Independent Escort Service Nashik
Russian Call Girls in Nashik Riya 7001305949 Independent Escort Service NashikRussian Call Girls in Nashik Riya 7001305949 Independent Escort Service Nashik
Russian Call Girls in Nashik Riya 7001305949 Independent Escort Service Nashikranjana rawat
 
(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...ranjana rawat
 
Assessment on SITXINV007 Purchase goods.pdf
Assessment on SITXINV007 Purchase goods.pdfAssessment on SITXINV007 Purchase goods.pdf
Assessment on SITXINV007 Purchase goods.pdfUMER979507
 
thanksgiving dinner and more information
thanksgiving dinner and more informationthanksgiving dinner and more information
thanksgiving dinner and more informationlialiaskou00
 
Papular No 1 Online Istikhara Amil Baba Pakistan Amil Baba In Karachi Amil B...
Papular No 1 Online Istikhara Amil Baba Pakistan  Amil Baba In Karachi Amil B...Papular No 1 Online Istikhara Amil Baba Pakistan  Amil Baba In Karachi Amil B...
Papular No 1 Online Istikhara Amil Baba Pakistan Amil Baba In Karachi Amil B...Authentic No 1 Amil Baba In Pakistan
 
VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...
VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...
VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...Suhani Kapoor
 
Russian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls in Nashik Ila 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Ila 7001305949 Independent Escort Service NashikCall Girls in Nashik Ila 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Ila 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?
如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?
如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?t6tjlrih
 
Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012rehmti665
 

Recently uploaded (20)

9953330565 Low Rate Call Girls In Sameypur-Bodli Delhi NCR
9953330565 Low Rate Call Girls In Sameypur-Bodli Delhi NCR9953330565 Low Rate Call Girls In Sameypur-Bodli Delhi NCR
9953330565 Low Rate Call Girls In Sameypur-Bodli Delhi NCR
 
(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一
(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一
(办理学位证)加州大学圣塔芭芭拉分校毕业证成绩单原版一比一
 
Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)
Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)
Dubai Call Girls Drilled O525547819 Call Girls Dubai (Raphie)
 
VIP Kolkata Call Girl Jadavpur 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jadavpur 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jadavpur 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jadavpur 👉 8250192130 Available With Room
 
Gwal Pahari Call Girls 9873940964 Book Hot And Sexy Girls
Gwal Pahari Call Girls 9873940964 Book Hot And Sexy GirlsGwal Pahari Call Girls 9873940964 Book Hot And Sexy Girls
Gwal Pahari Call Girls 9873940964 Book Hot And Sexy Girls
 
ΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ Ξ
ΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ ΞΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ Ξ
ΦΑΓΗΤΟ ΤΕΛΕΙΟ ΞΞΞΞΞΞΞ ΞΞΞΞΞΞ ΞΞΞΞ ΞΞΞΞ Ξ
 
Chocolate Milk Flavorful Indulgence to RD UHT Innovations.pptx
Chocolate Milk Flavorful Indulgence to RD UHT Innovations.pptxChocolate Milk Flavorful Indulgence to RD UHT Innovations.pptx
Chocolate Milk Flavorful Indulgence to RD UHT Innovations.pptx
 
VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130
VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130
VIP Call Girls Service Secunderabad Hyderabad Call +91-8250192130
 
Russian Call Girls in Nashik Riya 7001305949 Independent Escort Service Nashik
Russian Call Girls in Nashik Riya 7001305949 Independent Escort Service NashikRussian Call Girls in Nashik Riya 7001305949 Independent Escort Service Nashik
Russian Call Girls in Nashik Riya 7001305949 Independent Escort Service Nashik
 
(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(PRIYANKA) Katraj Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
 
Assessment on SITXINV007 Purchase goods.pdf
Assessment on SITXINV007 Purchase goods.pdfAssessment on SITXINV007 Purchase goods.pdf
Assessment on SITXINV007 Purchase goods.pdf
 
thanksgiving dinner and more information
thanksgiving dinner and more informationthanksgiving dinner and more information
thanksgiving dinner and more information
 
Papular No 1 Online Istikhara Amil Baba Pakistan Amil Baba In Karachi Amil B...
Papular No 1 Online Istikhara Amil Baba Pakistan  Amil Baba In Karachi Amil B...Papular No 1 Online Istikhara Amil Baba Pakistan  Amil Baba In Karachi Amil B...
Papular No 1 Online Istikhara Amil Baba Pakistan Amil Baba In Karachi Amil B...
 
young Whatsapp Call Girls in Vivek Vihar 🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Vivek Vihar 🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Vivek Vihar 🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Vivek Vihar 🔝 9953056974 🔝 escort service
 
VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...
VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...
VIP Russian Call Girls in Noida Deepika 8250192130 Independent Escort Service...
 
Russian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Devyani Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nashik Ila 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Ila 7001305949 Independent Escort Service NashikCall Girls in Nashik Ila 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Ila 7001305949 Independent Escort Service Nashik
 
Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Ghitorni Delhi 💯Call Us 🔝8264348440🔝
 
如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?
如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?
如何办韩国SKKU文凭,成均馆大学毕业证学位证怎么辨别?
 
Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Laxmi Nagar Delhi reach out to us at ☎ 9711199012
 

4 spillways

  • 1. 4. DESIGN OF SPILLWAYS A reservoir will overflow if its capacity is less than the difference between the volumes of inflow and outflow. A spillway is designed to prevent overtopping of a dam at a place that is not designed for overflow. Principal function of a spillway is to pass down the surplus water from the reservoir into the downstream river. Spillway is a safety structure against dam overtopping. A spillway is used to maintain optimum reservoir levels before and during flood-control operations by releasing excess flood water. 40 % of the dam failure hazards is due to inadequate spillway capacity. 1
  • 2. 2
  • 3. Classification of spillways according to the most prominent feature • Ogee spillway • Chute spillway • Side channel spillway • Shaft spillway • Siphon spillway • Straight drop or overfall spillway • Tunnel/Culvert spillway • Labyrinth spillway • Stepped spillway 3
  • 4. Aspects involved in spillway design • Hydrology  Estimation of inflow discharge  Selection of spillway design flood  Determination of frequency of spillway use • Topography and geology  Type and location of spillway • Utility and operational aspects  Serviceability • Constructional and structural aspects  Cost-effectiveness 4
  • 5. 5 • After a spillway control device and its dimensions have been selected, the maximum spillway discharge and the maximum reservoir water level should be determined by flood routing. • Other components of the spillway can then be proportioned to conform to the required capacity and to the specific site conditions and a complete layout of the spillway can be established. • Cost estimates of the spillway and the dam should be made. • Comparisons of various combinations of spillway capacity and dam height for an assumed spillway type, and of alternative types of spillways allow selection of an economical spillway type. • Ungated-gated spillways
  • 6. 6
  • 7. • The lifespan of a dam is of the order of 100 years. • The design discharge may be related to the maximum flood discharge that may occur within this period. • Probability of occurrence of a discharge that can seriously damage the system should be minimum. As an example (depending on project size and country regulations) : • For optimum flow conditions observed. • For some adverse flow conditions may be tolerated, but there should be no damage. • For minor damage may be tolerated but system should not fail. Q100 Q1000 Q10000 4.1 Design Discharge of Spillway 7
  • 8. • Another approach is based on the concept of probable maximum flood (PMF). The most extreme combination of basic parameters is chosen, and no return period is specified. • This design flood has to be diverted without a dam breaching. • Often, a full reservoir level is assumed and all intakes for power plants etc. are blocked, and (N-1) spillway outlets are in operation. • Whether the bottom outlet can be accounted for diversion is a question, but there is a tendency to include it in the approach. 8
  • 9. 4.2 Overflow Structures • Depending on the site conditions and hydraulic particularities an overflow structure can be of various designs:  Frontal overflow,  Side-channel overflow, and  Shaft overflow. • Other types of structures such as labyrinth spillway use a frontal overflow but with a crest consisting of successive triangles or trapezoids in plan view. • Still another type is the orifice spillway in the arch dam. • The non-frontal overflow type of spillways are used for small and intermediate discharges, typically up to design floods of 1000 m3/s. 9
  • 10. Frontal Overflow Side Overflow Shaft Overflow 10
  • 11. 11 • The frontal type of overflow is a standard overflow structure, both due to simplicity and direct connection of reservoir to tailwater. It can normally be used in both arch and gravity dams. • The frontal overflow can easily be extended with gates and piers to regulate the reservoir level, and to improve the approach flow to spillway. • Gated overflows of 20 m gate height and more have been constructed, with a capacity of 200 m3/s per unit width. Such overflows are thus suited for medium and large dams, with large floods to be conveyed to the tailwater. • Particular attention has to be paid to cavitation due to immense heads that may generate pressure below the vapor pressure in the crest domain. 4.2.1 Frontal Overflow
  • 15. 15 • The gate piers have to be carefully shaped in order to obtain a symmetric approach flow. • The downstream of frontal overflow may have various shapes. Usually, a spillway is connected to the overfall crest as a transition between overflow and energy dissipator. • The crest may abruptly end in arch dams to include a falling nappe that impinges on the tailwater. • Another design uses a cascade spillway to dissipate energy right away from the crest end to the tailwater, such that a reduced stilling basin is needed. • The standard design involves a smooth spillway that convey flow with a high velocity either directly to the stilling basin, or to a trajectory bucket.
  • 16. 16
  • 17. Crest Shapes Overflow structures of different shapes are: 1. Straight (standard) 2. Curved 3. Polygonal 4. Labyrinth The labyrinth structure has an increased overflow capacity with respect to the width of the structure. Plan view 17
  • 19. • In order to have a symmetric downstream flow, and to accommodate gates, the rectangular cross section is used almost throughout. • The longitudinal section of the overflow can be a) Broad-crested. b) Circular crested, or c) Standard crest shape (ogee-type) • For heads larger than 3 m, the standard overflow shape should be used. • Although its cost is higher than the other crest shapes, advantages result both in capacity and safety against cavitation damage. Broad crested Circular crested Ogee crested (Standard) 19 Standard Crest Shape
  • 20. 20 • When the flow over a structure involves curved streamlines with the origin of curvature below the flow, the gravity component of a fluid element is reduced by the centrifugal force. • If the curvature is sufficiently large, the internal pressure may drop below the atmospheric pressure and even attain values below the vapor pressure for large structures. • Then cavitation may occur with a potential cavitation damage. As discussed, the overflow structure is very important for the dam safety. Therefore, such conditions are unacceptable. • For medium and large overflow structures, the crest is shaped so as to conform the lower surface of the nappe from a sharp-crested weir.
  • 21. Flow over a sharp-crested weir 21
  • 22. 22
  • 23. 23
  • 25. The radii of the upstream crest profile are: The origins of curvature O1, O2, and O3, as well as the transition points P1, P2, and P3, for the upstream quadrant are; Point O1 O2 O3 P1 P2 P3 x/Hd 0.00 -0.105 -0.242 -0.175 -0.276 -0.2818 z/Hd 0.500 0.219 0.136 0.032 0.115 0.136 04 . 0 , 20 . 0 , 50 . 0 3 2 1    d d d H R H R H R 25
  • 26. • The downstream quadrant crest shape was originally proposed by Craeger as: • This shape is used up to so-called tangency point with a transition to the straight-crested spillway. • The disadvantage of USCE crest shape is the abrupt change of curvature at locations P1 to P3 and at the origin. Such a crest geometry can not be used for computational approaches due to the curvature discontinuities. • The crest shape given above for vertical spillways for which the velocity of approach is zero, i.e.; for Hd /P→0, where P is the height of the spillway. In general, the shape of the crest depends on:  The design head Hd,  The inclination of the upstream face,  The height of the overflow section above the floor of the entrance channel (which influences the velocity of approach to the crest). 0 for x , 50 . 0 85 . 1           d d H x H z 26
  • 27. Discharge Characteristics The discharge over an ogee crest is given by the formula: where: Q = discharge Cd = discharge coefficient L = overflow crest length H = total head on the crest The discharge coefficient is influenced by a number of factors:  The depth of approach  Relation of actual crest shape to the ideal nappe shape  Upstream face slope  Downstream apron interface  Downstream submergence 1/2 d LH(2gH) C Q  27
  • 28.            H H 3 3 2 Cd 5 9 4 1 For H+  0, the overflow is shallow and almost hydrostatic pressure occurs. Then overflow depth is equal to the critical depth and the discharge coefficient is Cd = 0.385. For the design flow H+ = 1 and Cd = 0.495. The discharge coefficient may be written as function of relative head up to H+ = H/Hd = 3 28
  • 30. • Crest piers and abutments cause contraction of the flow, reduction in the effective length of the crest, and cause reduction in discharge. where L = Effective length of the crest for calculating discharge L’ = Net length of the crest N = number of piers Kp = Pier contraction coefficient Ka = Abutment contraction coefficient He = Total head on the crest Kp = 0.2 for square abutments Kp = 0.1 for abutments rounded by radius between (0.15~0.5)Hd Kp = 0. for abutments rounded by radius >0.5Hd 30 e a p ' )H K NK L L    ( 2
  • 31. H+ 31 Round nose Pointed nose Pier contraction coefficients
  • 32. • Tailwater end of an overflow pier corresponds to an abrupt expansion of flow. • Because the spillway flow is supercritical, standing shock waves have their origins at the pier ends, which will propagate all along the chute. • In order to suppress pier waves two designs are available: Either sharpening the pier end both in width and height, or Continue with the pier as a dividing wall along the chute • Both designs are not ideal, because even a slim pier end perturbs the flow and dividing walls may be costly especially for long spillways. 32
  • 33. Free Surface Profile • The free surface over an overflow structure is important in relation to freeboard design and for gated flow • A generalized approach for plane flow over standard-shaped overflow crest can be written as: • for -2 < X /(H+)1.1 < +2 • where S = s / Hd, X = x / Hd • The surface elevation s is referred to the crest level upstream from the crest origin, and to the bottom elevation downstream from the crest.   6 / ) ( 75 . 0 1 . 1 X H S    H+ 33
  • 34. Bottom pressure characteristics • The bottom pressure distribution pb(x) is important, because it yields:  an index for the potential danger of cavitation damage, and  the location where piers can end without inducing separation of flow. The nondimensionalized bottom pressure heads (Pb = pb/Hd ) for various H+ values are shown in figures below. H+ Plane flow Axial btwn. piers H+ 34
  • 35. • The most severe pressure minima along the piers due to significant streamline curvature effects. H+ Along piers 35
  • 36.   H p P H H P m m d m  / / 1    where 43 . 0 0 0 ) 1 / ( tan 9 . 0 /    d d H H H x X  36
  • 37. Minimum bottom pressure index Discharge coefficient Crest bottom pressure index Location of atmospheric bottom pressure H+ H+ H+ H+ 37
  • 38. Cavitation Design Standard overflow with H+ < 1 under designed H+ > 1 over designed and thus sub atmospheric bottom pressures. • Initially overdesign of dam overflows was associated with advantages in capacity. • However the increase in discharge coefficients Cd for H+ >1 is relatively small, but the decrease of minimum pressure, Pm, is significant. • Overdesigning, thus adds to the cavitation potential. • Generally, one assumes an incipient pressure head: m. 6 . 7    vi p 38
  • 39. • The limit head, HL , for incipient cavitation to occur is • The constant  was introduced to account for additional effects, such as the variability of pvi with         / 1 vi -1 L p    H H H+  H+ Domain of Abecasis 39
  • 40. Overflow Gates • The overflow structure has a hydraulic behavior that the discharge increases significantly with the head on the overflow crest. • Overflow may be regulated to a desired or prescribed reservoir level using gates. • The head on the turbines may be increased compared to ungated overflow. • During the floods, if the reservoir is full, the gates are completely open to promote the overflow. • The hydraulics of gates on overflow structures involves three major problems to be considered:  Discharge characteristics  Crest pressure distribution  Gate vibration Currently most large dams are equipped with gates for a flexible operation. 40
  • 41. The advantages of gates at overflow structure are: • Variation of reservoir level, • Flood control, • Benefit from higher storage level. The disadvantages are: • Potential danger of malfunction, • Additional cost, and maintenance. Depending on the size of the dam and its location, one would prefer the gates for: • Large dams, • Large floods, and • Easy access for gate operation. 41
  • 42. Three types of gates are currently favored: • Hinged flap gates, • Vertical lift gates, • Radial gates. Flap Gate Vertical Gate Radial Gate 42
  • 43. • The flaps are used for a small head of some meters, and may span over a considerable length. • The vertical gate can be very high but requires substantial slots, a heavy lifting device, and unappealing superstructure. • The radial gates are most frequently used for medium or large overflow structures because of  their simple construction,  the modest force required for operation and  absence of gate slots. • They may be up to 20m X 20m, or also 12 m high and 40 m wide. The radial gate is limited by the strength of the trunnion bearings. 43
  • 44. • For safety reasons, there should be a number of moderately sized gates rather than a few large gates. • For the overflow design, it is customary to assume that the largest gate is out of operation. • The regulation is ensured by hoist or by hydraulic jacks driven by electric motors. • Stand-by diesel-electric generators should be provided if power failures are likely. 44
  • 47. 47 • Side channels are often considered at sites where:  a narrow gorge does not allow sufficient width for the frontal overflow,  impact forces and scour are a problem in case of arch dams,  a dam spillway is not feasible, such as in the case of an earth dam,  when a different location at the dam site yields a simpler connection to the stilling basin. • Side channels consist of a frontal type of overflow structure and a spillway with axis parallel to the overflow crest.  The specific discharge of overflow structure is normally limited to 10 m3/s/m, but for lengths of over 100 m.  The overflow head is limited to say 3 m.  Not equipped with gates.
  • 48. Hydraulic design 48 The 1D equation for the free surface profile can be derived from momentum considerations (Chow 1959)
  • 49. 49 • The shaft type spillway has proved to be economical, provided the diversion tunnel can be used as a tailrace. The main elements are:  The intake,  The vertical shaft with a bend,  The almost horizontal spillway tunnel, and,  Energy dissipator. • Air by aeration conduits is provided in order to prevent cavitation. • Also, to account for flood safety, only non-submerged flow is allowed such that free surface flow occurs along the entire structure, from the intake to the dissipator. • Used for dams with small to medium design discharges (<1000 m3/s). • The structure has a circular standard-crested overfall 4.2.3 Morning Glory Overfall
  • 50. Elements of a shaft spillway 50
  • 52. • Morning Glory Overfall is advantageous when:  seismic action is small,  the horizontal spillway may be connected to the existing diversion channel,  floating debris is insignificant,  space for the overflow structure is limited,  geologic conditions are excellent against settlement, and • Location of the Morning Glory  The intake is prone to rotational approach flow, which should be inhibited with a selected location of the shaft relative to the reservoir topography and the dam axis.  The radial flow may be improved with piers positioned on overfall crest. 52
  • 53. Crest shape • The shape of the Morning Glory overfall is a logical extension of the standard overfall crest. Experiments were performed on circular sharp crested weir. Circular weir Morning Glory crest detail • All quantities referring to the weir are over barred. • The overflow head relative to the sharp crest is 𝐻 and the coordinate system (𝑥, 𝑧 ) is located at the weir crest. 53
  • 54. Discharge • The discharge over a Morning Glory overfall structure is in analogy with the straight-crested overfall Q = Cd 2R (2gH3)1/2 Cd = 0.515 [1 - 0.20(H/R)] for the range of 0.2 ≤ H/R ≤ 0.5 • An initial value of H or R may be assumed for a fixed H/R ratio to start the computations. • Shaft radius Rs can be determined from Rs = 1 + 0.1R (in meters) 54