SlideShare a Scribd company logo
-M.SENTHIL KUMAR, AP/CSE
-III – CSE
-VI – EVEN SEM (2015-16)
GE6757 - TOTAL QUALITY
MANAGEMENT
(Regulation 2013)
Subject
Name:
TOTAL QUALITY
MANAGEMENT
Subject
Code:
GE67
57
Unit No: 3
Year: III Branch: CSE
Faculty
Name:
M.SENTHIL KUMAR
Topic
No.
Topic Name
Sources
*Mode of
teaching
Real life /
Real time
Application
s
Cumulative
Period
Chapter
No
Page
No
17.1
The Seven Traditional Tools
of Quality(Check sheet,
Pareto Chart, Flow chart,
Cause & Effect Diagram)
W1 --- PPT
Mercedes
Benz
13
17.2
The Seven Traditional Tools
of Quality(Histogram,
Scatter Diagram, Control
Chart)
W1 --- PPT 14
18.1
New Management Tools
(Affinity diagram, Inter-
relationship diagram, Tree
T1 443 PPT
Ford
Customer
care
15TQM by ... M.Senthil
Kumar
2
18.2
New Management Tools
(Prioritization matrices,
PDPC, Arrow Diagram)
T1 443 PPT
Ford
Customer
care
16
19.1
Six Sigma – Concepts &
Methodology
T1 147
VIDE
O
Toyota and
Honda 17
19.2
Six Sigma – Applications
to manufacturing
T1 149
VIDE
O
Toyota
and
Honda
18
20
Service Sector including
IT
T1 223 BB
IBM’s -
Service
19
21.1
Bench marking – Reason
to bench mark
T1 207 PPT Bell
Telephone
Laboratorie
s
20
21.2
Bench marking –
Benchmarking process
T1 207 PPT 21
22.1 FMEA – Stages T1 377 BB
IBM’s
Customer
Relationshi
22
TQM by ... M.Senthil
Kumar
3
home
TQM by M.Senthil Kumar5 home
The Seven Traditional Tools of Quality
Check Sheet
Pareto chart
Flow chart
Cause and Effect
Diagram
Histogram
Scatter Diagram
Control chart
TQM by ... M.Senthil Kumar
• Check sheet is a Form/Document used to collect
data in real time at the location where the data is
generated.
• Central tool for Quality Assurance programs.
• Specially useful for operational procedures.
• Could be derived from the flowchart and fishbone
diagrams.
6 home
Check Sheet
TQM by ... M.Senthil Kumar7 home
TQM by ... M.Senthil Kumar
• A Pareto Chart is a type of chart that contains both
bars and line graph, where individual values are
represented in descending order by bars and the
cumulative total represented by the line graph.
• A graph to identify and plot problems /defects in
descending order of frequency.
• Principle of Pareto chart is: 80% of problems stem
from 20% of the various causes.
8 home
Pareto chart
TQM by ... M.Senthil Kumar
9 home
Flow Chart
TQM by ... M.Senthil Kumar10
• A Flow Chart is a type of diagram that represents an
algorithm, workflow (or) process, showing the steps
as boxes of various kinds and their order by
connecting them with arrows.
• A Pictorial representation of describing a process
used to plan stages of a project or program.
home
TQM by ... M.Senthil Kumar11 home
TQM by ... M.Senthil Kumar
• Also known as ISHIKAWA diagram and Fishbone
diagram.
• A diagram showing the cause of a certain event.
(i.e.) used to identify potential factors causing an
overall effect, also used to see all possible causes of
a result and hopefully find the root causes of
imperfection.
• It is called as fish-bone diagram because its shape is
similar to side view of a fish skeleton.
12 home
Cause and Effect Diagram
TQM by ... M.Senthil Kumar
13 home
TQM by ... M.Senthil Kumar14
• It is a graphic summary of variation in a set of data and an
estimate estimate of the probability distribution of a
continuous variable (quantitative variable).
• A One uses the graph to show frequency distributions. It
looks very much like a bar chart.
• Sometimes it is said to be derived from the Ancient
Greek ἱστός (histos) – "anything set upright“
and γράμμα (gramma) – "drawing, record, writing". It is
also said that Karl Pearson, who introduced the term in
1891, derived the name from "historical diagram".
home
Histogram
TQM by ... M.Senthil Kumar15 home
•A scatter diagram is effectively a line graph with no line
- i.e. the point intersections between the two data sets are
plotted but no attempt is made to physically draw a line.
•A type of mathematical diagram using Cartesian
coordinates to display values for typically
two variables for a set of data.
•Sometimes it is called as scatter plot or scatter graph.
TQM by ... M.Senthil Kumar16 home
Scatter Diagram
-3
-2
-1
0
1
2
3
4
0 2 4 6 8
ExampleofScatterdiagram
Percentage of students attended special class
Students Satisfaction Scores
Satisfation
score
TQM by ... M.Senthil Kumar17 home
•Also called Shewhart charts or process-
behavior charts, in statistical process control are
tools used to determine if a manufacturing
or business process is in a state of statistical
control.
•The control chart is a graph used to study how a
process changes over time. Data are plotted in time
order.
•A control chart always has a central line for the
average, an upper line for the upper control limit
and a lower line for the lower control limit.TQM by ... M.Senthil Kumar18 home
Control Chart
TQM by ... M.Senthil Kumar19
home
TQM by M.Senthil Kumar20 home
The New Management Tools of Quality
Affinity Diagram
Inter-relationship
diagram
Tree Diagram
Matrix diagrams
Prioritization Matices
PDPC
Activity Network
Diagram
home
Affinity Diagram
•Also Called as affinity chart, K–J method Variation,
thematic analysis.
•An Affinity Diagram is a special type of
brainstorming process that is used for organizing
large groups of information into meaningful
categories. It helps us to clarify and make sense of a
large or complex problem .
TQM by ... M.Senthil Kumar22 home
Gift for all
Pen drive
Stationary
Items
Sweet box
TQM by ... M.Senthil Kumar23
Process
 Record each idea on cards or notes
 Look for ideas that seem to be related
 Sort cards into groups until all cards have been used.
Tour to Ooty
Enough
Amount
Celebration
at Ooty
New Year Celebration
in SSCE
home
Inter-Relationship Diagraph
•Shows cause–and–effect relationships. The
process of creating a relations diagram helps
a group analyze the natural links between
different aspects of a complex situation.
•Also called Network diagram or relations
diagram.
TQM by ... M.Senthil Kumar24 home
TQM by ... M.Senthil Kumar25 home
Example of Inter-relations diagram for identifying the potential causes
of late delivery:
• ‘Poor scheduling practices’ (6 outgoing arrows),
• ‘Late order from customer’ (5 outgoing arrows),
and
Tree Diagram
TQM by ... M.Senthil Kumar26
home
•Also called systematic diagram, tree
analysis, analytical tree, hierarchy diagram.
•Used to break down broad categories into
finer and finer levels of detail.
•It can map levels of detail of tasks that are
required to accomplish a goal or task.
TQM by ... M.Senthil Kumar27
Process
 Develop a statement of the goal.
 Ask a question that will lead you to the next level of
detail.
 Brainstorm all possible answers. Write each idea in a line
below. Show links between the tiers with arrows.
 Do a “necessary and sufficient” check. Are all the items at
this level necessary for the one on the level above?
 Each of the new idea statements now becomes the subject:
a goal, objective or problem statement.
 Continue to turn each new idea into a subject statement
and ask the question, till you reach a root cause.
 Do a “necessary and sufficient” check of the entire
diagram. Are all the items necessary for the objective?
home
TQM by ... M.Senthil Kumar28
Enter a
shop
Vanilla
Nuts
Sprinkles
Straw Berry
Nuts
Sprinkles
Chocalate
Nuts
Sprinkles
home
Goal/Objective is to eat ice-cream with
toppings
Statement of
the goal
Subject of the
Goal
Matrix Diagram
•This tool shows the relationship between items. At each
intersection a relationship is either absent or present. It then
gives information about the relationship, such as its strength,
the roles played by various individuals or measurements.
•Shows the relationship between two, three or four
groups of information.
• The most common type in matrix diagram for using 7
management tools in planning is L-Shaped matrix.
•L-shaped matrix is for 2-variables.
TQM by ... M.Senthil Kumar29 home
L-shaped 2 groups A<->B (or A<->A)
T-shaped 3 groups B <->A<->C but not B<->C
Y-shaped 3 groups A<->B<->C<->A
C-shaped 3 groups All three simultaneously (3-D)
X-shaped 4 groups
A <-> B <-> C <-> D <-> A
but not A <-> C or B <->D
Roof-
shaped
1 group
A <-> A when also A <-> B in L
or TTQM by ... M.Senthil Kumar
30
Six Different shaped Matrices are:
home
Customer A Customer B Customer C
Requirement
1
♣ √ ♣
Requirement
2
√
♣ ♣
Requirement
3
♣ √ √
Example for L-Shaped matrix
TQM by ... M.Senthil Kumar31
home
Prioritization Matrices
TQM by ... M.Senthil Kumar32
 This tool is used to prioritize items and describe them in
terms of weighted criteria. It uses a combination of tree
and matrix diagramming techniques to do a pair-wise
evaluation of items and to narrow down options to the
most desired or most effective.
 This tools prioritize issues, tasks, characteristics based on
weighted criteria using a combination of tree and matrix
diagram techniques. Once prioritized, effective decisions
can be made.
home
Year
Single
arrear
Two Arrear
Three
Arrear
Total
IV CSE 18 10 12 40
III CSE 8 6 4 18
II CSE 6 4 2 12
Result analysis for the Dept of CSE
TQM by ... M.Senthil Kumar33
home
PDPC – Process Decision Program Chart
TQM by ... M.Senthil Kumar
34
A useful way of planning is to break down tasks into a
hierarchy, using a Tree Diagram.
The PDPC extends the tree diagram a couple of levels to
identify risks and countermeasures for the bottom level tasks.
Different shaped boxes are used to highlight risks and
identify possible countermeasures.
The PDPC is similar to the Failure Modes and Effects
Analysis (FMEA) in that both identify risks,
consequences of failure, and contingency actions; the
FMEA also rates relative risk levels for each potential
failure point.
• identifying what can go wrong (failure mode or risks)
• consequences of that failure (effect or consequence)
• possible countermeasures (risk mitigation action plan)
home
TQM by ... M.Senthil Kumar35
home
What if?
Objective
Plan
symposium
Presentatio
n
Speakers
Late
Have a
Substitute
Audio/Video
Fails
Have Back up Use AV -
Person
Registratio
n
Activity Network Diagram
TQM by ... M.Senthil Kumar36
Also called as Arrow diagram, network diagram, activity
chart, node diagram, CPM (critical path method) chart.
This tool is used to plan the appropriate sequence or schedule
for a set of tasks and related subtasks. It is used when subtasks
must occur in parallel.
Shows the required order of tasks in a project or process, the
best schedule for the entire project, and potential scheduling
and resource pro
 Two Types
• Arrow on Node.
• Arrow on Arrow.
home
TQM by ... M.Senthil Kumar37
home
Eg: showing the project turn-over in an
organization
TQM by ... M.Senthil
Kumar
38
 Set of techniques and tools for continuous process
improvement.
 Statistically oriented approach to process improvement,
designed to reach a quality level of less than 3.4 Defects Per
Million Opportunities (DPMO) for Critical-To-Quality
(CTQ) characteristics in a manufacturing or service process.
 Data-driven approach and methodology for eliminating
defects (driving toward six standard deviations between the
mean and the nearest specification limit) in any process –
from manufacturing to transactional and from product to
service.
home
SIX SIGMA (Ϭ)
TQM by ... M.Senthil Kumar39
What is Six Sigma?
Types of Six Sigma
Lean Six Sigma.
home

More Related Content

What's hot

7 tools of quality
7 tools of quality7 tools of quality
7 tools of quality
Farah Amreen
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
Marwa Abo-Amra
 
Seven statistical tools of quality
Seven statistical tools of qualitySeven statistical tools of quality
Seven statistical tools of quality
Balaji Tamilselvam
 
Industrial quality management
Industrial quality managementIndustrial quality management
Industrial quality managementselinasimpson0701
 
Statistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality ManagementStatistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality Management
Aniket Joshi
 
7 quality control tools
7 quality  control tools7 quality  control tools
7 quality control tools
Vima Mali
 
Production and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsProduction and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality Tools
Dr. John V. Padua
 
Histogram
HistogramHistogram
Histogram
Sun Technologies
 
Run Chart
Run ChartRun Chart
Run Chart
ahmad bassiouny
 
New 7 Management Tools
New 7 Management ToolsNew 7 Management Tools
New 7 Management Tools
venkatasirish
 
Continuous quality management
Continuous quality managementContinuous quality management
Continuous quality managementselinasimpson341
 
Career in quality management
Career in quality managementCareer in quality management
Career in quality managementselinasimpson341
 
Liner programming on Management Science
Liner programming on Management ScienceLiner programming on Management Science
Liner programming on Management ScienceAbdul Motaleb
 
Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic Tools
Madeleine Lee
 

What's hot (20)

Tqm Tool2
Tqm Tool2Tqm Tool2
Tqm Tool2
 
7 tools of quality
7 tools of quality7 tools of quality
7 tools of quality
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Seven statistical tools of quality
Seven statistical tools of qualitySeven statistical tools of quality
Seven statistical tools of quality
 
7 QC Tools
7 QC Tools7 QC Tools
7 QC Tools
 
Industrial quality management
Industrial quality managementIndustrial quality management
Industrial quality management
 
Statistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality ManagementStatistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality Management
 
Quality management gurus
Quality management gurusQuality management gurus
Quality management gurus
 
7 quality control tools
7 quality  control tools7 quality  control tools
7 quality control tools
 
Customer quality management
Customer quality managementCustomer quality management
Customer quality management
 
Production and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsProduction and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality Tools
 
Histogram
HistogramHistogram
Histogram
 
Run Chart
Run ChartRun Chart
Run Chart
 
Lean quality management
Lean quality managementLean quality management
Lean quality management
 
New 7 Management Tools
New 7 Management ToolsNew 7 Management Tools
New 7 Management Tools
 
Continuous quality management
Continuous quality managementContinuous quality management
Continuous quality management
 
Career in quality management
Career in quality managementCareer in quality management
Career in quality management
 
Liner programming on Management Science
Liner programming on Management ScienceLiner programming on Management Science
Liner programming on Management Science
 
Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic Tools
 
Management quality system
Management quality systemManagement quality system
Management quality system
 

Similar to Ge6757 unit2

Tqm unit 4
Tqm unit 4Tqm unit 4
New quality management tools
New quality management toolsNew quality management tools
New quality management tools
Jesu Santiagu
 
new quality tools
 new quality tools new quality tools
new quality tools
palanivendhan
 
Business Analytics Final.pdf
Business Analytics Final.pdfBusiness Analytics Final.pdf
Business Analytics Final.pdf
NIMMANAGANTI RAMAKRISHNA
 
Unit 3 TQM Tools.ppt
Unit 3 TQM Tools.pptUnit 3 TQM Tools.ppt
Unit 3 TQM Tools.ppt
J.S Senthilkumaar
 
Continuos improvement tools ii
Continuos improvement tools iiContinuos improvement tools ii
Continuos improvement tools iiDEPROCESS
 
New Quality Tools
New Quality ToolsNew Quality Tools
New Quality Tools
Palanivel rajan
 
APPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATION
APPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATIONAPPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATION
APPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATIONSyed Raza Imam
 
New Quality Tools in total quality management
New Quality Tools in total quality managementNew Quality Tools in total quality management
New Quality Tools in total quality management
Tamilselvan S
 
quality tools.ppt
quality tools.pptquality tools.ppt
quality tools.ppt
AnonymoushdXKzBhoN
 
Useful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingUseful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence Consulting
Operational Excellence Consulting
 
17053257 implementing-tqm-in-education
17053257 implementing-tqm-in-education17053257 implementing-tqm-in-education
17053257 implementing-tqm-in-education
lostwithabhi
 
Quality control methods
Quality control methodsQuality control methods
Quality control methods
Mohamed Sharique Vellikan
 
Statistics for Manager.pdf
Statistics for Manager.pdfStatistics for Manager.pdf
Statistics for Manager.pdf
SachinJamakhandi
 
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
SRIKUMAR BIRADAR
 
OR
OROR
Six sigma pedagogy
Six sigma pedagogySix sigma pedagogy
Six sigma pedagogy
MallikarjunRaoPanaba
 
Six sigma
Six sigma Six sigma
Bms course outline
Bms course outlineBms course outline
Bms course outline
Shravan Reddy
 
Quality Control Tools for Problem Solving
Quality Control Tools for Problem SolvingQuality Control Tools for Problem Solving
Quality Control Tools for Problem Solving
D&H Engineers
 

Similar to Ge6757 unit2 (20)

Tqm unit 4
Tqm unit 4Tqm unit 4
Tqm unit 4
 
New quality management tools
New quality management toolsNew quality management tools
New quality management tools
 
new quality tools
 new quality tools new quality tools
new quality tools
 
Business Analytics Final.pdf
Business Analytics Final.pdfBusiness Analytics Final.pdf
Business Analytics Final.pdf
 
Unit 3 TQM Tools.ppt
Unit 3 TQM Tools.pptUnit 3 TQM Tools.ppt
Unit 3 TQM Tools.ppt
 
Continuos improvement tools ii
Continuos improvement tools iiContinuos improvement tools ii
Continuos improvement tools ii
 
New Quality Tools
New Quality ToolsNew Quality Tools
New Quality Tools
 
APPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATION
APPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATIONAPPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATION
APPLICATION OF TOOLS OF QUALITY IN ENGINEERING EDUCATION
 
New Quality Tools in total quality management
New Quality Tools in total quality managementNew Quality Tools in total quality management
New Quality Tools in total quality management
 
quality tools.ppt
quality tools.pptquality tools.ppt
quality tools.ppt
 
Useful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingUseful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence Consulting
 
17053257 implementing-tqm-in-education
17053257 implementing-tqm-in-education17053257 implementing-tqm-in-education
17053257 implementing-tqm-in-education
 
Quality control methods
Quality control methodsQuality control methods
Quality control methods
 
Statistics for Manager.pdf
Statistics for Manager.pdfStatistics for Manager.pdf
Statistics for Manager.pdf
 
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
 
OR
OROR
OR
 
Six sigma pedagogy
Six sigma pedagogySix sigma pedagogy
Six sigma pedagogy
 
Six sigma
Six sigma Six sigma
Six sigma
 
Bms course outline
Bms course outlineBms course outline
Bms course outline
 
Quality Control Tools for Problem Solving
Quality Control Tools for Problem SolvingQuality Control Tools for Problem Solving
Quality Control Tools for Problem Solving
 

More from Sree sowdambika College of Engineering

Process capability
Process capabilityProcess capability
Taguchi quality loss function
Taguchi quality loss functionTaguchi quality loss function
Taguchi quality loss function
Sree sowdambika College of Engineering
 
Tpm performance measure
Tpm performance measureTpm performance measure
Qfd
QfdQfd
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deployment
Sree sowdambika College of Engineering
 
Cs6303 unit2
Cs6303 unit2 Cs6303 unit2
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES IIGE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
Sree sowdambika College of Engineering
 
Ge6757 tqm tools and techniques i
Ge6757   tqm tools and techniques iGe6757   tqm tools and techniques i
Ge6757 tqm tools and techniques i
Sree sowdambika College of Engineering
 
CS6303 - Computer Architecture
CS6303 - Computer ArchitectureCS6303 - Computer Architecture
CS6303 - Computer Architecture
Sree sowdambika College of Engineering
 
Ge6757 - Total Quality Management
Ge6757 - Total Quality ManagementGe6757 - Total Quality Management
Ge6757 - Total Quality Management
Sree sowdambika College of Engineering
 

More from Sree sowdambika College of Engineering (14)

Qfd example
Qfd   exampleQfd   example
Qfd example
 
Iso 9000 2000
Iso 9000 2000Iso 9000 2000
Iso 9000 2000
 
Iso 14000
Iso 14000Iso 14000
Iso 14000
 
Process capability
Process capabilityProcess capability
Process capability
 
Taguchi quality loss function
Taguchi quality loss functionTaguchi quality loss function
Taguchi quality loss function
 
Tpm performance measure
Tpm performance measureTpm performance measure
Tpm performance measure
 
Qfd
QfdQfd
Qfd
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deployment
 
Cs6303 unit2
Cs6303 unit2 Cs6303 unit2
Cs6303 unit2
 
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES IIGE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
 
Benchmarking tqm
Benchmarking tqmBenchmarking tqm
Benchmarking tqm
 
Ge6757 tqm tools and techniques i
Ge6757   tqm tools and techniques iGe6757   tqm tools and techniques i
Ge6757 tqm tools and techniques i
 
CS6303 - Computer Architecture
CS6303 - Computer ArchitectureCS6303 - Computer Architecture
CS6303 - Computer Architecture
 
Ge6757 - Total Quality Management
Ge6757 - Total Quality ManagementGe6757 - Total Quality Management
Ge6757 - Total Quality Management
 

Recently uploaded

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

Ge6757 unit2

  • 1. -M.SENTHIL KUMAR, AP/CSE -III – CSE -VI – EVEN SEM (2015-16) GE6757 - TOTAL QUALITY MANAGEMENT (Regulation 2013)
  • 2. Subject Name: TOTAL QUALITY MANAGEMENT Subject Code: GE67 57 Unit No: 3 Year: III Branch: CSE Faculty Name: M.SENTHIL KUMAR Topic No. Topic Name Sources *Mode of teaching Real life / Real time Application s Cumulative Period Chapter No Page No 17.1 The Seven Traditional Tools of Quality(Check sheet, Pareto Chart, Flow chart, Cause & Effect Diagram) W1 --- PPT Mercedes Benz 13 17.2 The Seven Traditional Tools of Quality(Histogram, Scatter Diagram, Control Chart) W1 --- PPT 14 18.1 New Management Tools (Affinity diagram, Inter- relationship diagram, Tree T1 443 PPT Ford Customer care 15TQM by ... M.Senthil Kumar 2
  • 3. 18.2 New Management Tools (Prioritization matrices, PDPC, Arrow Diagram) T1 443 PPT Ford Customer care 16 19.1 Six Sigma – Concepts & Methodology T1 147 VIDE O Toyota and Honda 17 19.2 Six Sigma – Applications to manufacturing T1 149 VIDE O Toyota and Honda 18 20 Service Sector including IT T1 223 BB IBM’s - Service 19 21.1 Bench marking – Reason to bench mark T1 207 PPT Bell Telephone Laboratorie s 20 21.2 Bench marking – Benchmarking process T1 207 PPT 21 22.1 FMEA – Stages T1 377 BB IBM’s Customer Relationshi 22 TQM by ... M.Senthil Kumar 3
  • 5. TQM by M.Senthil Kumar5 home The Seven Traditional Tools of Quality Check Sheet Pareto chart Flow chart Cause and Effect Diagram Histogram Scatter Diagram Control chart
  • 6. TQM by ... M.Senthil Kumar • Check sheet is a Form/Document used to collect data in real time at the location where the data is generated. • Central tool for Quality Assurance programs. • Specially useful for operational procedures. • Could be derived from the flowchart and fishbone diagrams. 6 home Check Sheet
  • 7. TQM by ... M.Senthil Kumar7 home
  • 8. TQM by ... M.Senthil Kumar • A Pareto Chart is a type of chart that contains both bars and line graph, where individual values are represented in descending order by bars and the cumulative total represented by the line graph. • A graph to identify and plot problems /defects in descending order of frequency. • Principle of Pareto chart is: 80% of problems stem from 20% of the various causes. 8 home Pareto chart
  • 9. TQM by ... M.Senthil Kumar 9 home
  • 10. Flow Chart TQM by ... M.Senthil Kumar10 • A Flow Chart is a type of diagram that represents an algorithm, workflow (or) process, showing the steps as boxes of various kinds and their order by connecting them with arrows. • A Pictorial representation of describing a process used to plan stages of a project or program. home
  • 11. TQM by ... M.Senthil Kumar11 home
  • 12. TQM by ... M.Senthil Kumar • Also known as ISHIKAWA diagram and Fishbone diagram. • A diagram showing the cause of a certain event. (i.e.) used to identify potential factors causing an overall effect, also used to see all possible causes of a result and hopefully find the root causes of imperfection. • It is called as fish-bone diagram because its shape is similar to side view of a fish skeleton. 12 home Cause and Effect Diagram
  • 13. TQM by ... M.Senthil Kumar 13 home
  • 14. TQM by ... M.Senthil Kumar14 • It is a graphic summary of variation in a set of data and an estimate estimate of the probability distribution of a continuous variable (quantitative variable). • A One uses the graph to show frequency distributions. It looks very much like a bar chart. • Sometimes it is said to be derived from the Ancient Greek ἱστός (histos) – "anything set upright“ and γράμμα (gramma) – "drawing, record, writing". It is also said that Karl Pearson, who introduced the term in 1891, derived the name from "historical diagram". home Histogram
  • 15. TQM by ... M.Senthil Kumar15 home
  • 16. •A scatter diagram is effectively a line graph with no line - i.e. the point intersections between the two data sets are plotted but no attempt is made to physically draw a line. •A type of mathematical diagram using Cartesian coordinates to display values for typically two variables for a set of data. •Sometimes it is called as scatter plot or scatter graph. TQM by ... M.Senthil Kumar16 home Scatter Diagram
  • 17. -3 -2 -1 0 1 2 3 4 0 2 4 6 8 ExampleofScatterdiagram Percentage of students attended special class Students Satisfaction Scores Satisfation score TQM by ... M.Senthil Kumar17 home
  • 18. •Also called Shewhart charts or process- behavior charts, in statistical process control are tools used to determine if a manufacturing or business process is in a state of statistical control. •The control chart is a graph used to study how a process changes over time. Data are plotted in time order. •A control chart always has a central line for the average, an upper line for the upper control limit and a lower line for the lower control limit.TQM by ... M.Senthil Kumar18 home Control Chart
  • 19. TQM by ... M.Senthil Kumar19 home
  • 20. TQM by M.Senthil Kumar20 home The New Management Tools of Quality Affinity Diagram Inter-relationship diagram Tree Diagram Matrix diagrams Prioritization Matices PDPC Activity Network Diagram
  • 21. home
  • 22. Affinity Diagram •Also Called as affinity chart, K–J method Variation, thematic analysis. •An Affinity Diagram is a special type of brainstorming process that is used for organizing large groups of information into meaningful categories. It helps us to clarify and make sense of a large or complex problem . TQM by ... M.Senthil Kumar22 home
  • 23. Gift for all Pen drive Stationary Items Sweet box TQM by ... M.Senthil Kumar23 Process  Record each idea on cards or notes  Look for ideas that seem to be related  Sort cards into groups until all cards have been used. Tour to Ooty Enough Amount Celebration at Ooty New Year Celebration in SSCE home
  • 24. Inter-Relationship Diagraph •Shows cause–and–effect relationships. The process of creating a relations diagram helps a group analyze the natural links between different aspects of a complex situation. •Also called Network diagram or relations diagram. TQM by ... M.Senthil Kumar24 home
  • 25. TQM by ... M.Senthil Kumar25 home Example of Inter-relations diagram for identifying the potential causes of late delivery: • ‘Poor scheduling practices’ (6 outgoing arrows), • ‘Late order from customer’ (5 outgoing arrows), and
  • 26. Tree Diagram TQM by ... M.Senthil Kumar26 home •Also called systematic diagram, tree analysis, analytical tree, hierarchy diagram. •Used to break down broad categories into finer and finer levels of detail. •It can map levels of detail of tasks that are required to accomplish a goal or task.
  • 27. TQM by ... M.Senthil Kumar27 Process  Develop a statement of the goal.  Ask a question that will lead you to the next level of detail.  Brainstorm all possible answers. Write each idea in a line below. Show links between the tiers with arrows.  Do a “necessary and sufficient” check. Are all the items at this level necessary for the one on the level above?  Each of the new idea statements now becomes the subject: a goal, objective or problem statement.  Continue to turn each new idea into a subject statement and ask the question, till you reach a root cause.  Do a “necessary and sufficient” check of the entire diagram. Are all the items necessary for the objective? home
  • 28. TQM by ... M.Senthil Kumar28 Enter a shop Vanilla Nuts Sprinkles Straw Berry Nuts Sprinkles Chocalate Nuts Sprinkles home Goal/Objective is to eat ice-cream with toppings Statement of the goal Subject of the Goal
  • 29. Matrix Diagram •This tool shows the relationship between items. At each intersection a relationship is either absent or present. It then gives information about the relationship, such as its strength, the roles played by various individuals or measurements. •Shows the relationship between two, three or four groups of information. • The most common type in matrix diagram for using 7 management tools in planning is L-Shaped matrix. •L-shaped matrix is for 2-variables. TQM by ... M.Senthil Kumar29 home
  • 30. L-shaped 2 groups A<->B (or A<->A) T-shaped 3 groups B <->A<->C but not B<->C Y-shaped 3 groups A<->B<->C<->A C-shaped 3 groups All three simultaneously (3-D) X-shaped 4 groups A <-> B <-> C <-> D <-> A but not A <-> C or B <->D Roof- shaped 1 group A <-> A when also A <-> B in L or TTQM by ... M.Senthil Kumar 30 Six Different shaped Matrices are: home
  • 31. Customer A Customer B Customer C Requirement 1 ♣ √ ♣ Requirement 2 √ ♣ ♣ Requirement 3 ♣ √ √ Example for L-Shaped matrix TQM by ... M.Senthil Kumar31 home
  • 32. Prioritization Matrices TQM by ... M.Senthil Kumar32  This tool is used to prioritize items and describe them in terms of weighted criteria. It uses a combination of tree and matrix diagramming techniques to do a pair-wise evaluation of items and to narrow down options to the most desired or most effective.  This tools prioritize issues, tasks, characteristics based on weighted criteria using a combination of tree and matrix diagram techniques. Once prioritized, effective decisions can be made. home
  • 33. Year Single arrear Two Arrear Three Arrear Total IV CSE 18 10 12 40 III CSE 8 6 4 18 II CSE 6 4 2 12 Result analysis for the Dept of CSE TQM by ... M.Senthil Kumar33 home
  • 34. PDPC – Process Decision Program Chart TQM by ... M.Senthil Kumar 34 A useful way of planning is to break down tasks into a hierarchy, using a Tree Diagram. The PDPC extends the tree diagram a couple of levels to identify risks and countermeasures for the bottom level tasks. Different shaped boxes are used to highlight risks and identify possible countermeasures. The PDPC is similar to the Failure Modes and Effects Analysis (FMEA) in that both identify risks, consequences of failure, and contingency actions; the FMEA also rates relative risk levels for each potential failure point. • identifying what can go wrong (failure mode or risks) • consequences of that failure (effect or consequence) • possible countermeasures (risk mitigation action plan) home
  • 35. TQM by ... M.Senthil Kumar35 home What if? Objective Plan symposium Presentatio n Speakers Late Have a Substitute Audio/Video Fails Have Back up Use AV - Person Registratio n
  • 36. Activity Network Diagram TQM by ... M.Senthil Kumar36 Also called as Arrow diagram, network diagram, activity chart, node diagram, CPM (critical path method) chart. This tool is used to plan the appropriate sequence or schedule for a set of tasks and related subtasks. It is used when subtasks must occur in parallel. Shows the required order of tasks in a project or process, the best schedule for the entire project, and potential scheduling and resource pro  Two Types • Arrow on Node. • Arrow on Arrow. home
  • 37. TQM by ... M.Senthil Kumar37 home Eg: showing the project turn-over in an organization
  • 38. TQM by ... M.Senthil Kumar 38  Set of techniques and tools for continuous process improvement.  Statistically oriented approach to process improvement, designed to reach a quality level of less than 3.4 Defects Per Million Opportunities (DPMO) for Critical-To-Quality (CTQ) characteristics in a manufacturing or service process.  Data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process – from manufacturing to transactional and from product to service. home SIX SIGMA (Ϭ)
  • 39. TQM by ... M.Senthil Kumar39 What is Six Sigma? Types of Six Sigma Lean Six Sigma. home