This document discusses the building services systems for a school building, including the water supply, electrical, sewerage/sanitary, and rainwater drainage systems. Diagrams and drawings are provided to illustrate the proposed layout and components of each system, including water meters, distribution boards, floor drains, downpipes, and more. Regulations and standards are referenced to ensure each system meets code requirements. The conclusion evaluates how site conditions informed the system designs and the learning experience of considering all technical building service aspects.
WATER LEAK DETECTION.
As part of our commitment to saving clients money, H2O Building Services will carry out a water leak investigation as part of a site survey. Our experts use the very latest techniques to detect even the tiniest of leaks. If any are detected, we will recommend action to make water leak repairs which will stop the water waste and save you money on your water and waste water bills
Creations Engineering offers HVAC, Electrical,Plumbing(Design & Drafting) courses for fresh Mechanical, Electrical and Civil Engineers and Experienced Engineers. If you are looking for MEP Training in Chennai. Call Us : 9940467226 / 9043067226
100% Job Placement For MEP Training Course. Hurry...!!!
Task
We are required to select a building as a case study project.
Observe the building services systems taught in this module.
The case study building - PKNS Complex, Shah Alam
WATER LEAK DETECTION.
As part of our commitment to saving clients money, H2O Building Services will carry out a water leak investigation as part of a site survey. Our experts use the very latest techniques to detect even the tiniest of leaks. If any are detected, we will recommend action to make water leak repairs which will stop the water waste and save you money on your water and waste water bills
Creations Engineering offers HVAC, Electrical,Plumbing(Design & Drafting) courses for fresh Mechanical, Electrical and Civil Engineers and Experienced Engineers. If you are looking for MEP Training in Chennai. Call Us : 9940467226 / 9043067226
100% Job Placement For MEP Training Course. Hurry...!!!
Task
We are required to select a building as a case study project.
Observe the building services systems taught in this module.
The case study building - PKNS Complex, Shah Alam
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
1. !
BUILDING SERVICES (BLD60903/ARC2423)
PROJECT 2: BUILDING SERVICES DIARY
Electrical Supply System
Water Supply System
Sewerage and Sanitary System
Rainwater/ Surface Drainage System
Ahmad Ashraf 0317744
Tutor: Ar. Sateerah
2. TABLE OF CONTENTS
1.0 ABSTRACT
1.1 BUILDING INTRODUCTION
2.0 INFORMATION AND DATA
2.1 WATER SUPPLY SYSTEM
2.2 ELECTRICAL SUPPLY SYSTEM
2.3 SEWERAGE AND SANITARY SUPPLY SYSTEM
2.4 RAINWATER/ SURFACE WATER MANAGEMENT
3.0 DRAWINGS
3.1 SITE PLAN
3.2 GROUND FLOOR PLAN
3.3 ROOF PLAN
3.4 REFLECTED CEILING PLAN
3.5 SCHEMATIC DIAGRAM
4.0 CONCLUSION
5.0 REFERENCES
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!1
3. 1.0 ABSTRACT
Project 2 is an individual assignment on the application of basic building services to a
domestic sized building. This exercise requires us to demonstrate our understanding on the
application of such systems by producing technical drawings of the necessary services.
We touched on the basic services of safety in our previous project, while this conducti study is
routed to the service/sanitary aspects of a building’s network. Picking up from our studio final
assignment, we are to form and implement these services cohesively into the school.
UBBLs and By Laws are included to maintain strict order, ensuring comfort and safety for the
surroundings and it’s tenants.
2.1 BUILDING INTRODUCTION
The studied building is conceived around a conceptual cluster of classrooms and spaces,
meant to break the mould of the most literal definition of ‘school’. Hence, a more elaborate
form and building fabric, requiring prefabrication of materials and parts. In the case of this
particular school, the plinth placement on uneven ground and varying finished floor levels
takes away a guided system, posing a challenge in properly assessing probable routes and
solutions to plumbing and wiring.
Along the boundary of the site is where a public drain is situated, where surface and rain water
from the building can be discharged into. Sewerage pipings are by permission from the
PBAPP for underground sewage tapping.
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!2
4. 2.0 INFORMATION AND DATA
2.1 WATER SUPPLY SYSTEM
UBBL section 84
PREVENTION OF DAMPNESS
Good building design and maintenance need to be taken to prevent penetration of dampness into the
building.
UBBL section 89
CHASE
A chase made in a wall for pipes and other service facilities shall leave the walls at the back of the chase,
with not less than 100mm thick in the external walls and not less than 100mm thick in party walls and shall
not wider than 200mm.
UBBL section 123
PIPES AND SERVICES DUCTS
1.Adequate for the accommodation of pipes, cable or conduits and for crossings of branches and mains
together with support and fixing.
2.Sufficiently large to permit access to cleaning eyes, stop cocks and other controls there to enable repairs,
extensions and modifications to be made to each or all of the service accommodated.
Water meters are used to measure the volume of water
used by the buildings that are supplied with water by
public water supply system. They are also used at the
water source, well, or throughout a water system to
determine water flow through a particular portion of the
system.
A stop cock function is to regulate the flow of tap water
in services. It can be found at the junction of a water
main and the branch leading to an individual service,
also inside the structure, and are employed when
maintenance or emergency repairs are conducted.
1. Water Meter
!
2. Stop Cock
!
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!3
5. Gate valves are used to control and prevent the flow of
liquids.
A water tank is to stores water for distribution through a
water supply system.
Copper tubing is used for supply of hot and cold tap
water, and gives a higher level of corrosion resistance.
4. Water Tank
!
5. Copper Tubing
!
3. Gate Valve
!
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!4
6. 2.2 ELECTRICAL SUPPLY SYSTEM
ELECTRICAL SUPPLY ACT 1997 ACT-477
REGULATION 15- Apparatus, Conductor, Accessory, etc
1.Any conductor or apparatus that is exposed to weather, water, corrosion, under heating or used in
inflamation surroundings or in an explosive atmosphere shall be constructed installed, arranged, protected,
worked and maintained in such a manner as to prevent danger.
REGULATION 16- Switch, Switch Fuse, Fuse Switch, Circuit Beaker, Contractor, etc
3.Any fuse or circuit beaker shall be
A.Constructed and arranged in such a manner so as to break the current when it exceeds a given value for
a sufficient time to prevent danger.
B.Constructed, guarded or placed in a manned as to prevent danger of overheating. Arching from the
scattering or hot metal or other substance.
The ceiling fans in the buildings are specified
at 80cm wingspan, the optimum size for a
medium space, classrooms etc.
The building uses gang switches, ranging
from 1, to 4-gang switches. Those located in
long rooms are wired 2-way, with a set
located at each ends of the classroom.
1. Ceiling Fan
2. Gang Switch
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!5
7. A distribution board divides electrical power
feed into subsidiary circuits, while providing a
protective fuse or circuit breaker for each
circuit in a common enclosure.
An electricity meter, electric meter, electrical
meter, or energy meter is a device that
measures and record the amount of electric
energy used by a unit or an electrically
powered device.
These outlets are mainly located 110mm
above finished floor level. In the kitchen,
these are placed 1450mm above finished
floor level.
A recessed light is a light fixture that installed
into a hollow opening in a ceiling and
concentrates the light in a downward
direction as a broad floodlight or narrow
spotlight.
6. Recessed Lights
4. Meter Box
5. Standard Outlet
3. Distribution Box
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!6
8. 2.3 SEWERAGE AND SANITARY SYSTEM
LAWS OF MALAYSIA ACT 133
SECTION 56 ( 1 )
No pipe used for the carrying of rainwater from any roof shall be used for carrying off the soil or drainage
from any water closet or any sullage water.
SECTION 56 ( 2 )
No water pipe, stack pipe or downspout used for the conveying of surface water from any premises shall be
used to serve or to act as a ventilating shaft to any drain or sewer.
SECTION 61
The local authority may erect or fix to any building such as pipes as are necessary for the proper ventilation
of the drains and sewer belonging to it.
WATER SERVICES INDUSTRY ACT 2006
SECTION 63
The government may direct the owner or management of any premises to install or construct a private
sewerage system or septic for the premises.
SECTION 59
Requiring all premises in at all times properly drained for sewerage in accordance to the Act
by a sufficient private connection pipe communicating with a public sewer or public sewerage
system.
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!7
9. A floor drain is a plumbing fixture that is
installed on the floor of a structure, it is
designed to remove any standing water near
it. The floor around the trap is also sloped to
allow the water to flow to the drain.
A manhole is the opening to an underground
utility vault that used to house an access
p o i n t f o r m a k i n g c o n n e c t i o n s ,
inspection,valve adjustments or performing
maintenance on underground and buried
public utility.
A cowl is usually hood-shaped covering
connected to the sanitary services in a
building, an outlet of odors coming from the
system and prevent backflow.
2 gully traps are inserted under the wet
kitchen to accommodate the need of batch
cooking. One can act as a back up unit
should the need arise.
1. Floor Trap
4. Gully Trap
2. Manhole
3. Vent Cowl
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!8
10. A P-trap is installed under the sinks in the
bathroom and kitchens, it is a plumbing
fixture that traps debris that has drained from
the sink and prevents it from forming a clog
deep within the plumbing system, and stops
sewer gases from passing into the home.
5. P-Trap
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!9
11. 2.4 RAINWATER AND SURFACE WATER SYSTEM
WATER SERVICES INDUSTRY ACT 2006
SECTION 56 - Rainwater pipes not to be used as soil pipes
1.No pipe used for the carrying off rainwater from any roof shall be used for the purpose of carrying off the
soil or drainage from any privy or water closet.
SECTION 57 - Water pipes, etc, not to be used as ventilating shafts
1.No water pipe, stack pipe or down spout used for conveying surface water from any premises shall be
used or permitted to serve or to act as ventilating shaft to any drain or sewer.
SECTION 61 - Ventilating pipes to sewers.
1. The local authority may erect of fix to any building such as pipes as are necessary for the proper
ventilation of the drains and sewer belonging to it.
The rainwater downpipe is used in 2
instances in the building. From the roof
garden to the lower roof gutters, and from
there into the perimeter drains.
A rain gutter channel is a component of
water discharge system from the roof for a
building.
1. Rainwater Downpipe
2. Gutter
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!10
12. Numerous sumps are connected to the
perimeter drains of the building to avoid
harmful, unwanted discharges into the public
drains. These units help manage surface
water of the building.
Subsoil Drains are embedded along the
green roofs of the higher levels. Water
moves through a few layers of permeable
surfaces and gets directed into this piping
network. This network drops off water into
rainwater downpipes every 15 meters.
4. Subsoil Drain
3. Sump
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!11
13. 3.0 DRAWINGS
3.1 SITE PLAN
3.2 GROUND FLOOR PLAN
3.3 ROOF PLAN
3.4 REFLECTED CEILING PLAN
3.5 SCHEMATIC DIAGRAM
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!12
14. 4.0 CONCLUSION
Taking into account the steep topographical context of the site, gravity along the gradient is
used to our advantage in expelling waste into their respective channels. This reduces the
need for active drainage systems, where costs can be expended on various other things.
Having a green roof helps in providing an extension of the ground as a temporary water-
catchment. Studying green roofs and roof gardens provided me with extra knowledge
regarding the removal of unwanted surface water.
This report completed the set of components crucial to the ‘breathability’ of a building, in its
ability to circulate/excrete the various wastes it - and it’s tenants - produce. I also realised the
job scope of an architect, having to consider the most minute details and the need to have a
level of understanding of related departments (engineering, technicals etc.).
Technicalities aside, the cadding of the diagrams and schematics provided to be good practice
in maintaining good drawing practices and conventions.
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!13
15. 5.0 REFERENCES
● Chudley, Roy. 1988. Building Finishes, Fittings and Domestic Services. 2nd Edition.
Longman.
● Stein, Benjamin & Reynolds, John S. 2000. Mechanical and Electrical Equipment for
Buildings. New York, John Wiley.
● UBBL 1989.
BUILDING SERVICES | PROJECT 2: APPLICATIONS OF BUILDING SERVICES
!14