ELECTRICAL SUPPLY SYSTEM
SEWERAGE MANAGEMENT SYSTEM
Electrical By Law - Electricity Supply Act 1997
(Act 477) Pu (A) 38/94 Electricity Regulation 1974
Regulation 15 Apparatus, Conductor, Accessory, etc.
1. Any apparatus, conductor or accessory for the purpose
of connection to an installation shall be sufficient in size,
power and number to serve the purpose, which is intended
and shall be constructed installed, arranged, protected,
worked and maintained in such a manner to prevent danger.
Regulation 16 Switch, Switch fuse, Fuse Switch, Circuit Breaker,
Contractor, Fuse, etc.
Any fuse or circuit breaker shall be
(a) Constructed and arranged in such a manner so as to
break the current when it exceeds a given value for the
sufficient time to prevent danger and
(b) Constructed, guarded or placed in a manner as to
prevent danger of over heating, from scattering of hot
metal or other substance.
Reasoning:
Appliances in the building might require high voltage of
electricity. Thus the size of the wire is increased to allow
larger supply of power to be channeled.
Sewerage System By Law
(Law of Malaysia Act 133, Street, Building, and Drainage Act 1974)
Under Law of Malaysia Act 133, no water pipe, stack pipe or downspout
used for the convening surface from any premises shall be used or be
permitted to serve or to act as ventilating shaft to any drain/sewer.
Compliance of Building Law of Malaysia, the installation and design of
sanitary place is safe, so that the disposal of waste can be directed out
of the premises safely without threatening the health of occupants.
Vent stack openings should be 900mm above the roof to avoid stain
and ease of expulsion.
Reasoning:
UPVC is used for the waste pipe as it is more durable and cost efficient.
CHAN PIN QI | 0314676 | MR RITZAL
Air Conditioner Ceiling Fan Downlight Wall Light
Suspended LightBallordExhaust Fan(Ceiling)Double Switch Socket
Main Hole Floor Trap Vent Cowl Waste Pipe
Exhaust Fan (wall)
Building By Laws. (n.d.).
Retrieved October 3, 2015.from
http://lawnet.sarawak.gov.my/lawnet_file/Subsidiary/SUB_BuildingByLawSchedule.pdf
Laws of Malaysia. (2006).
Retrieved from http://www.agc.gov.my/Akta/Vol. 3/Act 133 Teks 1 (1-50).pdf
ELECTRICITY SUPPLY ACT 1990 [ACT 447] P.U.(A) 38/94 ELECTRICITY REGULATIONS 1994
Incorporating latest amendments - 431/ 2003. (n.d.).
Retrieved from http://www.st.gov.my/index.php/policies/regulations/electricity-regulations-1994.html
Reference
Ground Floor Plan (NTS)
First Floor Plan (NTS)
Schematic Drawing (NTS)
Second Floor Plan (NTS)
First Floor Plan (NTS) SecondFloor Plan (NTS)
HOT & COLD WATER SUPPLY SYSTEM
STORMWATER DRAINAGE SYSTEM
UBBL By Law – 84 Dampness
Suitable measure shall be taken to prevent the penetration
of dampness and moisture into the building.
UBBL By Law – 89 Chase
A chase is made in a wall for pipes and other service facilities
shall leave the wall at the back of the chase no less than 100mm
thick in the external wall, and not less than 100mm thick in a party
wall, and shall not be under 200mm.
UBBL By Law – 123 pipe and Service Ducts
Allow adequate space for the accommodation of the pipes, cables,
or conducts and of the crossing of the branches and main together
with support and fixings.
Reasoning:
Valves are placed at many points to ensure easier repair work and
also for inspection.
Law of Malaysia Act 133- Street, Drainage and Building Act 1974
Section 56- Drain Water Pipes not to be used As Soil Pipe
No pipe used carrying off rainwater from any roof shall be used
for the purpose of carrying off the soil or drainage from any privy
or water closet.
Section 57- Water Pipes,etc. Not to be used as Ventilating Shafts
Water pipe, stack pipe or down spout used for covering surface
water from any premises shall be used or permitted to serve or
to act as ventilating shaft to any drain or sewer.
Section 61- Ventilating Pipes or Sewers
The local authority may erect or fix to any building such as pipes
as are necessary for the proper ventilation of the drains and
sewers belonging to it.
CHAN PIN QI | 0314676 | MR RITZAL
Water Sink Shower Head Stop Cork Gate Valve Water Tank
Water MeterBathtubToilet BowlUPVC PipeCopper Pipe
Roof Plan (NTS) Schematic Drawing (NTS)
Ground Floor Plan (NTS)
Second Floor Plan (NTS)
Schematic Drawing (NTS)
First Floor Plan (NTS)

More Related Content

What's hot

Building services report
Building services report Building services report
Building services report
Soh Shing
 
Compiled
CompiledCompiled
Compiled
Shane Ah
 
B services-final-report
B services-final-reportB services-final-report
B services-final-report
jernjack
 
Building services-report
Building services-reportBuilding services-report
Building services-report
ZIyeeTan
 
BS 2 Building services-bangsar-village-1
BS 2 Building services-bangsar-village-1BS 2 Building services-bangsar-village-1
BS 2 Building services-bangsar-village-1
Est
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
Jeanne Hoo
 
Building service-final-report
Building service-final-reportBuilding service-final-report
Building service-final-report
kimberlywjs
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf
杉 江紫
 
BUILDING SERVICES final
BUILDING SERVICES finalBUILDING SERVICES final
BUILDING SERVICES final
Claire Zhuangg
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)
Chee Lee
 
Building Services
Building ServicesBuilding Services
Building Services
Teck Wei
 
Building services report
Building services reportBuilding services report
Building services report
Canisius Bong
 
Building services final report
Building services final reportBuilding services final report
Building services final report
Afiq Knick
 
Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus //
Lovie Tey
 
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
Angeline KH
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2
Nge Chen
 
BS2 REPORT
BS2 REPORTBS2 REPORT
BS2 REPORT
Joshua Chua
 
Building Services Project 1 Final Report
Building Services Project 1 Final ReportBuilding Services Project 1 Final Report
Building Services Project 1 Final Report
jisunfoo
 
Building services group report
Building services group report Building services group report
Building services group report
XingYue0907
 
BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report
Vicky Lee
 

What's hot (20)

Building services report
Building services report Building services report
Building services report
 
Compiled
CompiledCompiled
Compiled
 
B services-final-report
B services-final-reportB services-final-report
B services-final-report
 
Building services-report
Building services-reportBuilding services-report
Building services-report
 
BS 2 Building services-bangsar-village-1
BS 2 Building services-bangsar-village-1BS 2 Building services-bangsar-village-1
BS 2 Building services-bangsar-village-1
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Building service-final-report
Building service-final-reportBuilding service-final-report
Building service-final-report
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf
 
BUILDING SERVICES final
BUILDING SERVICES finalBUILDING SERVICES final
BUILDING SERVICES final
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)
 
Building Services
Building ServicesBuilding Services
Building Services
 
Building services report
Building services reportBuilding services report
Building services report
 
Building services final report
Building services final reportBuilding services final report
Building services final report
 
Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus //
 
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2
 
BS2 REPORT
BS2 REPORTBS2 REPORT
BS2 REPORT
 
Building Services Project 1 Final Report
Building Services Project 1 Final ReportBuilding Services Project 1 Final Report
Building Services Project 1 Final Report
 
Building services group report
Building services group report Building services group report
Building services group report
 
BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report
 

Similar to Building service Project 1

Final board services
Final board servicesFinal board services
Final board services
Christiody Lim
 
Building services project 2
Building services project 2Building services project 2
Building services project 2
XingYue0907
 
Building service board
Building service boardBuilding service board
Building service board
Elaine Bong
 
B service project 2
B service project 2B service project 2
B service project 2
- -
 
Service report
Service reportService report
Service report
yenweizheng
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
Bolin Loong
 
Project 2 building services anith (2)
Project 2 building services anith (2)Project 2 building services anith (2)
Project 2 building services anith (2)
Anith Syazlin
 
A2 colour service p2
A2 colour service p2A2 colour service p2
A2 colour service p2
Teo Kean Hui
 
Project 2 final
Project 2 finalProject 2 final
Project 2 final
Noor Syahirah Abdul Aziz
 
Project 2 finallllllll
Project 2 finallllllllProject 2 finallllllll
Project 2 finallllllll
Noor Syahirah Abdul Aziz
 
Journal with Drawings
Journal with DrawingsJournal with Drawings
Journal with Drawings
Nik Munawwar Nik Din
 
Bs2
Bs2Bs2
Bs2
Bs2Bs2
School Services
School ServicesSchool Services
School Services
Ashraf Ahmad
 
B.Service Report
B.Service ReportB.Service Report
B.Service Report
KimberlyAussie
 
Electrical Safety - Class.ppt
Electrical Safety - Class.pptElectrical Safety - Class.ppt
Electrical Safety - Class.ppt
amit173203
 
Central electricity authority regulations wikipedia
Central electricity authority regulations   wikipediaCentral electricity authority regulations   wikipedia
Central electricity authority regulations wikipedia
suryadeepzala1
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
shacjhow
 
Diary Report
Diary ReportDiary Report
Diary Report
Chong Chin Pin
 
Platero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptxPlatero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptx
JayCanobar
 

Similar to Building service Project 1 (20)

Final board services
Final board servicesFinal board services
Final board services
 
Building services project 2
Building services project 2Building services project 2
Building services project 2
 
Building service board
Building service boardBuilding service board
Building service board
 
B service project 2
B service project 2B service project 2
B service project 2
 
Service report
Service reportService report
Service report
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
 
Project 2 building services anith (2)
Project 2 building services anith (2)Project 2 building services anith (2)
Project 2 building services anith (2)
 
A2 colour service p2
A2 colour service p2A2 colour service p2
A2 colour service p2
 
Project 2 final
Project 2 finalProject 2 final
Project 2 final
 
Project 2 finallllllll
Project 2 finallllllllProject 2 finallllllll
Project 2 finallllllll
 
Journal with Drawings
Journal with DrawingsJournal with Drawings
Journal with Drawings
 
Bs2
Bs2Bs2
Bs2
 
Bs2
Bs2Bs2
Bs2
 
School Services
School ServicesSchool Services
School Services
 
B.Service Report
B.Service ReportB.Service Report
B.Service Report
 
Electrical Safety - Class.ppt
Electrical Safety - Class.pptElectrical Safety - Class.ppt
Electrical Safety - Class.ppt
 
Central electricity authority regulations wikipedia
Central electricity authority regulations   wikipediaCentral electricity authority regulations   wikipedia
Central electricity authority regulations wikipedia
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
 
Diary Report
Diary ReportDiary Report
Diary Report
 
Platero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptxPlatero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptx
 

More from Pinkie95

Bb science project 2
Bb science project 2Bb science project 2
Bb science project 2
Pinkie95
 
Cognitive mapping
Cognitive mapping Cognitive mapping
Cognitive mapping
Pinkie95
 
World view and personal value statement
World view and personal value statement World view and personal value statement
World view and personal value statement
Pinkie95
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
Pinkie95
 
Asian architecture case study
Asian architecture case study Asian architecture case study
Asian architecture case study
Pinkie95
 
Building Structure Project 2 Individual
Building Structure Project 2 Individual Building Structure Project 2 Individual
Building Structure Project 2 Individual
Pinkie95
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2
Pinkie95
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
Pinkie95
 
Macibai joyee (2) (1) (2)
Macibai joyee (2) (1) (2)Macibai joyee (2) (1) (2)
Macibai joyee (2) (1) (2)
Pinkie95
 
Business report
Business reportBusiness report
Business report
Pinkie95
 
6
66
5
55
7
77
8
88
9
99
4
44
2
22
3
33
1
11
Report 3
Report 3Report 3
Report 3
Pinkie95
 

More from Pinkie95 (20)

Bb science project 2
Bb science project 2Bb science project 2
Bb science project 2
 
Cognitive mapping
Cognitive mapping Cognitive mapping
Cognitive mapping
 
World view and personal value statement
World view and personal value statement World view and personal value statement
World view and personal value statement
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
 
Asian architecture case study
Asian architecture case study Asian architecture case study
Asian architecture case study
 
Building Structure Project 2 Individual
Building Structure Project 2 Individual Building Structure Project 2 Individual
Building Structure Project 2 Individual
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Macibai joyee (2) (1) (2)
Macibai joyee (2) (1) (2)Macibai joyee (2) (1) (2)
Macibai joyee (2) (1) (2)
 
Business report
Business reportBusiness report
Business report
 
6
66
6
 
5
55
5
 
7
77
7
 
8
88
8
 
9
99
9
 
4
44
4
 
2
22
2
 
3
33
3
 
1
11
1
 
Report 3
Report 3Report 3
Report 3
 

Recently uploaded

RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
deepaannamalai16
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
National Information Standards Organization (NISO)
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
S. Raj Kumar
 
Nutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour TrainingNutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour Training
melliereed
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Denish Jangid
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
Steve Thomason
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
nitinpv4ai
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
National Information Standards Organization (NISO)
 

Recently uploaded (20)

RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
 
Nutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour TrainingNutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour Training
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
 

Building service Project 1

  • 1. ELECTRICAL SUPPLY SYSTEM SEWERAGE MANAGEMENT SYSTEM Electrical By Law - Electricity Supply Act 1997 (Act 477) Pu (A) 38/94 Electricity Regulation 1974 Regulation 15 Apparatus, Conductor, Accessory, etc. 1. Any apparatus, conductor or accessory for the purpose of connection to an installation shall be sufficient in size, power and number to serve the purpose, which is intended and shall be constructed installed, arranged, protected, worked and maintained in such a manner to prevent danger. Regulation 16 Switch, Switch fuse, Fuse Switch, Circuit Breaker, Contractor, Fuse, etc. Any fuse or circuit breaker shall be (a) Constructed and arranged in such a manner so as to break the current when it exceeds a given value for the sufficient time to prevent danger and (b) Constructed, guarded or placed in a manner as to prevent danger of over heating, from scattering of hot metal or other substance. Reasoning: Appliances in the building might require high voltage of electricity. Thus the size of the wire is increased to allow larger supply of power to be channeled. Sewerage System By Law (Law of Malaysia Act 133, Street, Building, and Drainage Act 1974) Under Law of Malaysia Act 133, no water pipe, stack pipe or downspout used for the convening surface from any premises shall be used or be permitted to serve or to act as ventilating shaft to any drain/sewer. Compliance of Building Law of Malaysia, the installation and design of sanitary place is safe, so that the disposal of waste can be directed out of the premises safely without threatening the health of occupants. Vent stack openings should be 900mm above the roof to avoid stain and ease of expulsion. Reasoning: UPVC is used for the waste pipe as it is more durable and cost efficient. CHAN PIN QI | 0314676 | MR RITZAL Air Conditioner Ceiling Fan Downlight Wall Light Suspended LightBallordExhaust Fan(Ceiling)Double Switch Socket Main Hole Floor Trap Vent Cowl Waste Pipe Exhaust Fan (wall) Building By Laws. (n.d.). Retrieved October 3, 2015.from http://lawnet.sarawak.gov.my/lawnet_file/Subsidiary/SUB_BuildingByLawSchedule.pdf Laws of Malaysia. (2006). Retrieved from http://www.agc.gov.my/Akta/Vol. 3/Act 133 Teks 1 (1-50).pdf ELECTRICITY SUPPLY ACT 1990 [ACT 447] P.U.(A) 38/94 ELECTRICITY REGULATIONS 1994 Incorporating latest amendments - 431/ 2003. (n.d.). Retrieved from http://www.st.gov.my/index.php/policies/regulations/electricity-regulations-1994.html Reference Ground Floor Plan (NTS) First Floor Plan (NTS) Schematic Drawing (NTS) Second Floor Plan (NTS) First Floor Plan (NTS) SecondFloor Plan (NTS)
  • 2. HOT & COLD WATER SUPPLY SYSTEM STORMWATER DRAINAGE SYSTEM UBBL By Law – 84 Dampness Suitable measure shall be taken to prevent the penetration of dampness and moisture into the building. UBBL By Law – 89 Chase A chase is made in a wall for pipes and other service facilities shall leave the wall at the back of the chase no less than 100mm thick in the external wall, and not less than 100mm thick in a party wall, and shall not be under 200mm. UBBL By Law – 123 pipe and Service Ducts Allow adequate space for the accommodation of the pipes, cables, or conducts and of the crossing of the branches and main together with support and fixings. Reasoning: Valves are placed at many points to ensure easier repair work and also for inspection. Law of Malaysia Act 133- Street, Drainage and Building Act 1974 Section 56- Drain Water Pipes not to be used As Soil Pipe No pipe used carrying off rainwater from any roof shall be used for the purpose of carrying off the soil or drainage from any privy or water closet. Section 57- Water Pipes,etc. Not to be used as Ventilating Shafts Water pipe, stack pipe or down spout used for covering surface water from any premises shall be used or permitted to serve or to act as ventilating shaft to any drain or sewer. Section 61- Ventilating Pipes or Sewers The local authority may erect or fix to any building such as pipes as are necessary for the proper ventilation of the drains and sewers belonging to it. CHAN PIN QI | 0314676 | MR RITZAL Water Sink Shower Head Stop Cork Gate Valve Water Tank Water MeterBathtubToilet BowlUPVC PipeCopper Pipe Roof Plan (NTS) Schematic Drawing (NTS) Ground Floor Plan (NTS) Second Floor Plan (NTS) Schematic Drawing (NTS) First Floor Plan (NTS)