Electricity Supply Act 1997 (Act 447) P.U.(A)38/94 Electricity Regulations 1994
Regulation 15
Apparatus, conductor, accessory or apparatus that is exposed to weather, water, corrosion,
undue heating or use in inflammable surroundings or in an explosive atmosphere shall be
constructed or protected in such a manner as to prevent danger.
Regulation 16
Switch, switch fuse, fuse switch, circuit breaker, contractor, fuse or circuit breaker shall be
constructed and arranged in such a manner so as to break the current when it exceeds a
given value for such a sufficient time to prevent danger or overheating, arcing or from the
scattering of hot metal or other substances or enclose.
Project 1 Application of
Building Services Elaine Bong Poh Hui //
0310432
Electrical Supply System
Stormwater Drainage System Laws of Malaysia Act 133, Street Drainage and Building Act 1947
Regulation 54 Cleansing and emptying surface and storm water drains, etc.
(2) The local authority may, with the sanction of the State Authority, cause all or any of such
surface and storm water drains, culverts, gutters and water-courses to communicate with and
be emptied into the sea or other fit place, or may cause the refuse from the same to be
conveyed by a proper channel to the most convenient site for its deposit, and may sell or
otherwise dispose of the said refuse for any agricultural or other purposes as are deemed
expedient so that it shall not become a nuisance.
Regulation 56 Rain-water pipes not to be used as soil pipes
(1) No pipe used for the carrying off of rain water from any roof shall be used for the purpose
of carrying off the soil or drainage from any privy or water-closet or any sullage water.
Ground Floor Plan // NTS
First Floor Plan // NTS
Electric Meter Distribution Board LED 24W
Downlight Switch 13A Switch
Socket Outlet
Kitchen Chandelier LED Wall Light Ceiling Fan Air Conditioner
Gutter and DownpipeRoof Plan // NTS
Sewage and Sanitary System Laws of Malaysia Act 133, Street Drainage and Building /act 1947
(1) No water-pipe, stack-pipe or down spout used for conveying surface water from any
premises shall be used or be permitted to serve or to act as a ventilating shaft to any
drain or sewer.
Reasoning
The installation and the design of the sanitary place is safe, so that the disposal waste could
be directed out of the building safely, without threatening the health of occupants.
Cold Water and Hot Water Supply System
UBBL BY-LAW
84. Suitable measures should be taken to prevent penetration of dampness and moisture
into the building.
89. A chase made in wall for pipes and other services facilities shall leave the wall at the
back of the chase, not less than 100mm thick in external wall and not less than 100mm
thick in party wall and shall not be wider than 200mm.
123. (2) The access openings to ducts or enclosures shall be long enough and suitably
placed to enable lengths of pipe to be installed and removed.
Project 1 Application of
Building Services Elaine Bong Poh Hui //
0310432
Vent Pipe Gully PipeManhole Cover S Trap
Ground Floor Plan // NTS
Floor Trap
Ground Floor Plan // NTS
Cold Water
Tank
Hot Water
Tank
Water Meter Stop Cock Gate Valve Ball Valve Cold Water and Hot Water Supply System
Schematic Diagram
Sewage and Sanitary Schematic Diagram
Reference
china-ogpe.com,. (2014). Gate Valve. Retrieved from http://www.china-ogpe.com/catalog/19/gate_valve_214_16.html
Citrad,. (2014). LED 24W Downlight. Retrieved from http://www.citrad.com/wp-content/uploads/2014/04/LED-24W-
Downlight1.jpg
Focus Technology Co., Ltd.,. (2014). Socket Outlet. Retrieved from http://image.made-in-
china.com/2f0j00ISPTGLeCgEkn/13A-Switched-Socket-Outlet-S86K1Z3F-S86K2Z3F-.jpg
Gil-Lec Electrical Wholesalers Ltd.,. (2014). Switch. Retrieved from
http://lgcdn.gillec.co.uk/media/catalog/product/cache/1/image/9df78eab33525d08d6e5fb8
d2 7136e95/m/k/mk-logic-architrave-switch-1gang-k4841whi.jpg
Perbadanan Putrajaya,. (2014). Uniform Building By-Laws 1984. Malaysia: MDC Publishers Sdn Bhd.
Plumb 24/7,. (2014). What is subsoil drainage? - Professional Plumbing Services. Professional Plumbing Services.
Retrieved 27 November 2014, from http://www.plumb247.co.za/what-is-subsoil-drainage/
Stein, B., Reynolds, J., & McGuinness, W. (1992). Mechanical and electrical equipment for buildings. New York: J. Wiley
& Sons.

More Related Content

Similar to Building service board

Building service Project 1
Building service Project 1Building service Project 1
Building service Project 1
Pinkie95
 
Project 2 building services anith (2)
Project 2 building services anith (2)Project 2 building services anith (2)
Project 2 building services anith (2)
Anith Syazlin
 
School Services
School ServicesSchool Services
School Services
Ashraf Ahmad
 
Service report
Service reportService report
Service report
yenweizheng
 
A2 colour service p2
A2 colour service p2A2 colour service p2
A2 colour service p2
Teo Kean Hui
 
Journal with Drawings
Journal with DrawingsJournal with Drawings
Journal with Drawings
Nik Munawwar Nik Din
 
Project 2 finallllllll
Project 2 finallllllllProject 2 finallllllll
Project 2 finallllllll
Noor Syahirah Abdul Aziz
 
Project 2 final
Project 2 finalProject 2 final
Project 2 final
Noor Syahirah Abdul Aziz
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
Bolin Loong
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
shacjhow
 
B.Service Report
B.Service ReportB.Service Report
B.Service Report
KimberlyAussie
 
plumbing principles.pdf
plumbing principles.pdfplumbing principles.pdf
plumbing principles.pdf
VigneshWaran770976
 
Building Services Project 1 Board
Building Services Project 1 BoardBuilding Services Project 1 Board
Building Services Project 1 Board
KohSungJie
 
plumbing ppt.pptx
plumbing ppt.pptxplumbing ppt.pptx
plumbing ppt.pptx
shashanksreddy
 
Bs2
Bs2Bs2
Bs2
Bs2Bs2
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Pratap Bhunia
 
PLUMBING 1.ppt
PLUMBING 1.pptPLUMBING 1.ppt
PLUMBING 1.ppt
norielcastro
 
Platero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptxPlatero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptx
JayCanobar
 

Similar to Building service board (20)

Building service Project 1
Building service Project 1Building service Project 1
Building service Project 1
 
Project 2 building services anith (2)
Project 2 building services anith (2)Project 2 building services anith (2)
Project 2 building services anith (2)
 
School Services
School ServicesSchool Services
School Services
 
Service report
Service reportService report
Service report
 
A2 colour service p2
A2 colour service p2A2 colour service p2
A2 colour service p2
 
Journal with Drawings
Journal with DrawingsJournal with Drawings
Journal with Drawings
 
Project 2 finallllllll
Project 2 finallllllllProject 2 finallllllll
Project 2 finallllllll
 
Project 2 final
Project 2 finalProject 2 final
Project 2 final
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
 
B.Service Report
B.Service ReportB.Service Report
B.Service Report
 
plumbing principles.pdf
plumbing principles.pdfplumbing principles.pdf
plumbing principles.pdf
 
Building Services Project 1 Board
Building Services Project 1 BoardBuilding Services Project 1 Board
Building Services Project 1 Board
 
plumbing ppt.pptx
plumbing ppt.pptxplumbing ppt.pptx
plumbing ppt.pptx
 
Bs2
Bs2Bs2
Bs2
 
Bs2
Bs2Bs2
Bs2
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
PLUMBING 1.ppt
PLUMBING 1.pptPLUMBING 1.ppt
PLUMBING 1.ppt
 
The plumbing code
The plumbing codeThe plumbing code
The plumbing code
 
Platero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptxPlatero_Electrical_Safety_Audit.PPT.pptx
Platero_Electrical_Safety_Audit.PPT.pptx
 

More from Elaine Bong

Bechtlerconstruction2 140718020052-phpapp02
Bechtlerconstruction2 140718020052-phpapp02Bechtlerconstruction2 140718020052-phpapp02
Bechtlerconstruction2 140718020052-phpapp02
Elaine Bong
 
Merged document
Merged documentMerged document
Merged document
Elaine Bong
 
Finalbtech 1
Finalbtech 1Finalbtech 1
Finalbtech 1
Elaine Bong
 
B science project 2
B science project 2B science project 2
B science project 2
Elaine Bong
 
A2 final boards
A2 final boardsA2 final boards
A2 final boards
Elaine Bong
 
bscience Board
bscience Boardbscience Board
bscience Board
Elaine Bong
 
B.science report 1.2
B.science report 1.2B.science report 1.2
B.science report 1.2
Elaine Bong
 
precedent
precedentprecedent
precedent
Elaine Bong
 
Both (1)
Both (1)Both (1)
Both (1)
Elaine Bong
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
Elaine Bong
 
Towards a new architecture
Towards a new architectureTowards a new architecture
Towards a new architecture
Elaine Bong
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4
Elaine Bong
 
Preschool proposal
Preschool proposalPreschool proposal
Preschool proposal
Elaine Bong
 
Contradictory levels the double functioning element final
Contradictory levels the double functioning element finalContradictory levels the double functioning element final
Contradictory levels the double functioning element final
Elaine Bong
 
Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine Bong
 
3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architecture3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architecture
Elaine Bong
 
Structure report
Structure reportStructure report
Structure report
Elaine Bong
 
Bridge report
Bridge reportBridge report
Bridge report
Elaine Bong
 
Bservices report
Bservices reportBservices report
Bservices report
Elaine Bong
 
Completed aa photobook 2.0
Completed aa photobook 2.0Completed aa photobook 2.0
Completed aa photobook 2.0
Elaine Bong
 

More from Elaine Bong (20)

Bechtlerconstruction2 140718020052-phpapp02
Bechtlerconstruction2 140718020052-phpapp02Bechtlerconstruction2 140718020052-phpapp02
Bechtlerconstruction2 140718020052-phpapp02
 
Merged document
Merged documentMerged document
Merged document
 
Finalbtech 1
Finalbtech 1Finalbtech 1
Finalbtech 1
 
B science project 2
B science project 2B science project 2
B science project 2
 
A2 final boards
A2 final boardsA2 final boards
A2 final boards
 
bscience Board
bscience Boardbscience Board
bscience Board
 
B.science report 1.2
B.science report 1.2B.science report 1.2
B.science report 1.2
 
precedent
precedentprecedent
precedent
 
Both (1)
Both (1)Both (1)
Both (1)
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Towards a new architecture
Towards a new architectureTowards a new architecture
Towards a new architecture
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4
 
Preschool proposal
Preschool proposalPreschool proposal
Preschool proposal
 
Contradictory levels the double functioning element final
Contradictory levels the double functioning element finalContradictory levels the double functioning element final
Contradictory levels the double functioning element final
 
Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)
 
3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architecture3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architecture
 
Structure report
Structure reportStructure report
Structure report
 
Bridge report
Bridge reportBridge report
Bridge report
 
Bservices report
Bservices reportBservices report
Bservices report
 
Completed aa photobook 2.0
Completed aa photobook 2.0Completed aa photobook 2.0
Completed aa photobook 2.0
 

Recently uploaded

678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 

Recently uploaded (20)

678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 

Building service board

  • 1. Electricity Supply Act 1997 (Act 447) P.U.(A)38/94 Electricity Regulations 1994 Regulation 15 Apparatus, conductor, accessory or apparatus that is exposed to weather, water, corrosion, undue heating or use in inflammable surroundings or in an explosive atmosphere shall be constructed or protected in such a manner as to prevent danger. Regulation 16 Switch, switch fuse, fuse switch, circuit breaker, contractor, fuse or circuit breaker shall be constructed and arranged in such a manner so as to break the current when it exceeds a given value for such a sufficient time to prevent danger or overheating, arcing or from the scattering of hot metal or other substances or enclose. Project 1 Application of Building Services Elaine Bong Poh Hui // 0310432 Electrical Supply System Stormwater Drainage System Laws of Malaysia Act 133, Street Drainage and Building Act 1947 Regulation 54 Cleansing and emptying surface and storm water drains, etc. (2) The local authority may, with the sanction of the State Authority, cause all or any of such surface and storm water drains, culverts, gutters and water-courses to communicate with and be emptied into the sea or other fit place, or may cause the refuse from the same to be conveyed by a proper channel to the most convenient site for its deposit, and may sell or otherwise dispose of the said refuse for any agricultural or other purposes as are deemed expedient so that it shall not become a nuisance. Regulation 56 Rain-water pipes not to be used as soil pipes (1) No pipe used for the carrying off of rain water from any roof shall be used for the purpose of carrying off the soil or drainage from any privy or water-closet or any sullage water. Ground Floor Plan // NTS First Floor Plan // NTS Electric Meter Distribution Board LED 24W Downlight Switch 13A Switch Socket Outlet Kitchen Chandelier LED Wall Light Ceiling Fan Air Conditioner Gutter and DownpipeRoof Plan // NTS
  • 2. Sewage and Sanitary System Laws of Malaysia Act 133, Street Drainage and Building /act 1947 (1) No water-pipe, stack-pipe or down spout used for conveying surface water from any premises shall be used or be permitted to serve or to act as a ventilating shaft to any drain or sewer. Reasoning The installation and the design of the sanitary place is safe, so that the disposal waste could be directed out of the building safely, without threatening the health of occupants. Cold Water and Hot Water Supply System UBBL BY-LAW 84. Suitable measures should be taken to prevent penetration of dampness and moisture into the building. 89. A chase made in wall for pipes and other services facilities shall leave the wall at the back of the chase, not less than 100mm thick in external wall and not less than 100mm thick in party wall and shall not be wider than 200mm. 123. (2) The access openings to ducts or enclosures shall be long enough and suitably placed to enable lengths of pipe to be installed and removed. Project 1 Application of Building Services Elaine Bong Poh Hui // 0310432 Vent Pipe Gully PipeManhole Cover S Trap Ground Floor Plan // NTS Floor Trap Ground Floor Plan // NTS Cold Water Tank Hot Water Tank Water Meter Stop Cock Gate Valve Ball Valve Cold Water and Hot Water Supply System Schematic Diagram Sewage and Sanitary Schematic Diagram Reference china-ogpe.com,. (2014). Gate Valve. Retrieved from http://www.china-ogpe.com/catalog/19/gate_valve_214_16.html Citrad,. (2014). LED 24W Downlight. Retrieved from http://www.citrad.com/wp-content/uploads/2014/04/LED-24W- Downlight1.jpg Focus Technology Co., Ltd.,. (2014). Socket Outlet. Retrieved from http://image.made-in- china.com/2f0j00ISPTGLeCgEkn/13A-Switched-Socket-Outlet-S86K1Z3F-S86K2Z3F-.jpg Gil-Lec Electrical Wholesalers Ltd.,. (2014). Switch. Retrieved from http://lgcdn.gillec.co.uk/media/catalog/product/cache/1/image/9df78eab33525d08d6e5fb8 d2 7136e95/m/k/mk-logic-architrave-switch-1gang-k4841whi.jpg Perbadanan Putrajaya,. (2014). Uniform Building By-Laws 1984. Malaysia: MDC Publishers Sdn Bhd. Plumb 24/7,. (2014). What is subsoil drainage? - Professional Plumbing Services. Professional Plumbing Services. Retrieved 27 November 2014, from http://www.plumb247.co.za/what-is-subsoil-drainage/ Stein, B., Reynolds, J., & McGuinness, W. (1992). Mechanical and electrical equipment for buildings. New York: J. Wiley & Sons.