EXCAVATORS
1 Submitted by:
Karthik V (MT15CTM006)
Faisal V A (MT15CTM004)
EXCAVATORS:
 An excavator has been defined as a power-driven
digging machine, usually mounted on crawler
tracks.
 The major types of excavators used in construction
include hydraulically powered excavators and the
members of the crane-shovel family.
 However, dozers and scrapers are also capable of
excavating soil and rock.
2
HISTORY
1.FIRST APPEARED IN LATE 1700’S/EARLY 1800’S
2.IN 1990 HAD A LONG CONVENTIONAL COUNTER
WEIGHT ON REAR END
4
CRAWLER EXCAVATOR
CRAWLER EXCAVATOR RUNS ON TWO ENDLESS TRACKS
(CHAIN WHEEL SYSTEM).
THESE TYPES OF EXCAVATORS ARE USED IN HILLY AREAS
WHERE RISKS OF SLIDING OF MACHINERY ARE ON THE VERGE.
CRAWLER TYPE EXCAVATOR HAS LOW GROUND PRESSURE
BECAUSE OF SPREADING OF LOAD ON LARGE AREA.
THEREFORE, IT IS ALSO USED WHERE SOIL SUPPORT IS WEAK.
6
WHEEL EXCAVATOR
Wheel excavator runs on wheels and are
used for excavation and loading of dump
trucks and most of the time it is only used
for plain ground operations. Because of
wheel, it is not suitable for hilly areas due to
low grip value to the ground.
7
•POWER SHOVEL EXCAVATORS
•BACK HOE EXCAVATOR
•FRONT SHOVEL EXCAVATOR
THREE TYPES...
POWER SHOVEL EXCAVATOR
 Long-lasting and useful class of earth moving equipment
 Capable of excavating all types of earth except hard rock
 Size of power shovel varies from 0.375-1.05m3
 It may be crawler mounted or wheel mounted shovels
8
9
Crawler mounted shovel:
Low speed
Effective in unstable soil
Wheel mounted shovel:
Higher speed
Effective only in firm ground
Power shovel efficiency depends on:
 Class of material
 Depth of cutting
 Angle of swing
 Job conditions
 Management conditions
 Size of hauling units
 Skill of the operator
 Physical condition of the shovel 10
11
Applications:
 Suitable for close range work
 Capable of digging very hard materials & remove big
boulders
 Used in digging in gravel banks , clay pits , digging cuts
in road works , road-side berms etc.
12
BACK HOE EXCAVATOR
 Also known as hoe , back shovel & pull shovel
 Used to excavate below the natural surface on which it rests
 Hoes used to excavate trenches , pits for basemants & grading works
 Used to establish natural slopes
13
 In strom drain and utility work the hoe can perform the
trench excavation and can handle the pipe by eliminating
a second machine
 There are special buckets for everything from light sand
to hard rock digging
14
Parts of a back hoe excavator
15
16
IDEAL PRODUCTION:
 Size of bucket (Q)
 Cycle time(T)=Lt +St +Dt +Rt
 Fill factor(F) (Table 9.1)
 Efficiency Factor(E)
 Height & Swing Factor (Table 9.2)
 Volume Correction Vc
 Production (lcy/hr) =
3600sec/hr∗Q∗F∗E
T∗V 𝐶
Applications:
 Suitable for digging below the machine level
 Effectively used to dress or trim the surface avoiding the use of
manual effort for dressing the excavated surface
18
FRONT SHOVEL EXCAVATOR
19
Track system
FRONT EXCAVATOR
 Used predominately for hard digging above track level
and loading haul units
 Loading of shot rock will be a typical application
 Shovel is capable of developing a high break out force
 The material being excavated should be such that it will
stand with a fairly vertical face
20
FRONT SHOVEL EXCAVATOR
 High excavation rate due to unique front shovel and side
tip operation
 Prolec laser system enables excavation to a more
accurate level – resulting in quicker excavation rates
while reducing the chance of over-digging
21
 Improved track quality due to the excavation action
(pushing into spoil rather than pulling it back)
 Fewer machine controllers on site meaning less risk and
safer operations
22
23
24
25
Factors afecting shovel excavators are:
 Class of material
 Height of cut
 Angle of swing
 Size of houling units
 Operator skill
 Physical conditions of the shovel
26
CALCULATING SHOVEL PRODUCTION
 Four elements in the production cycle of a shovel
are:
 Load bucket
 Swing the load
 Dump load
 Return swing
IDEAL PRODUCTION:
 Size of bucket (Q)
 Cycle time(T)=Lt +St +Dt +Rt
 Fill factor(F) (Table 9.1)
 Efficiency Factor(E)
 Height & Swing Factor (Table 9.2)
 Production (lcy/hr) =
3600sec/hr∗Q∗F∗Height & swing factor ∗E
T(sec/cycle)
29

More Related Content

What's hot

Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENT
vikas verma
 
Excavator machinepptx
Excavator machinepptxExcavator machinepptx
Power shovel
Power shovelPower shovel
Power shovel
Anand Kumar
 
Trucks and Hauling Equipment
Trucks and Hauling EquipmentTrucks and Hauling Equipment
Trucks and Hauling Equipment
Construction Tech. and Mgmt., VNIT Nagpur
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
Parth Desani
 
Tunneling & Drilling Equipments
Tunneling & Drilling EquipmentsTunneling & Drilling Equipments
Tunneling & Drilling Equipments
Rajarshi Patty
 
1.2.1.dumpers
1.2.1.dumpers1.2.1.dumpers
Pile and pile driving equipments
Pile and pile driving equipmentsPile and pile driving equipments
Pile and pile driving equipments
Construction Tech. and Mgmt., VNIT Nagpur
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
A Makwana
 
CLAM SHELL BUCKETS
CLAM SHELL BUCKETSCLAM SHELL BUCKETS
CLAM SHELL BUCKETS
Sharmeesh Arvind
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
Kiran Goswami
 
Shovel excavator
Shovel excavatorShovel excavator
Shovel excavator
athulya cs
 
GRADERS
GRADERSGRADERS
GRADERS
Arslan1000
 
Earth moving equipments
Earth moving equipmentsEarth moving equipments
Earth moving equipments
Krishnagnr
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
Sagar Radadiya
 
Bulldozers
BulldozersBulldozers
Bulldozers
analjoshi
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
Jagriti Mandal
 
Construction equipment ppt
Construction equipment pptConstruction equipment ppt
Construction equipment ppt
DINESH TAMBE
 

What's hot (20)

Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENT
 
Excavator machinepptx
Excavator machinepptxExcavator machinepptx
Excavator machinepptx
 
Power shovel
Power shovelPower shovel
Power shovel
 
Trucks and Hauling Equipment
Trucks and Hauling EquipmentTrucks and Hauling Equipment
Trucks and Hauling Equipment
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Tunneling & Drilling Equipments
Tunneling & Drilling EquipmentsTunneling & Drilling Equipments
Tunneling & Drilling Equipments
 
1.2.1.dumpers
1.2.1.dumpers1.2.1.dumpers
1.2.1.dumpers
 
Pile and pile driving equipments
Pile and pile driving equipmentsPile and pile driving equipments
Pile and pile driving equipments
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
 
CLAM SHELL BUCKETS
CLAM SHELL BUCKETSCLAM SHELL BUCKETS
CLAM SHELL BUCKETS
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 
Shovel excavator
Shovel excavatorShovel excavator
Shovel excavator
 
GRADERS
GRADERSGRADERS
GRADERS
 
Earth moving equipments
Earth moving equipmentsEarth moving equipments
Earth moving equipments
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
Bulldozers
BulldozersBulldozers
Bulldozers
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
Construction equipment ppt
Construction equipment pptConstruction equipment ppt
Construction equipment ppt
 

Similar to Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)

construction equipment
construction equipment construction equipment
construction equipment
Purav Patel
 
PCM-crawler loaders
PCM-crawler loadersPCM-crawler loaders
PCM-crawler loaders
As Per Design
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
vikrantsingh170151
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipmentTareq Shreehah
 
Mine Power & Drainage System
Mine Power & Drainage SystemMine Power & Drainage System
Mine Power & Drainage System
Ghulam Mehdi
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
Pawankumarm65
 
chapter 4 construction equipments.pptx
chapter 4  construction equipments.pptxchapter 4  construction equipments.pptx
chapter 4 construction equipments.pptx
Dine38
 
construction equipment.pptx
construction equipment.pptxconstruction equipment.pptx
construction equipment.pptx
kingbutu
 
Coal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and MachinesCoal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and Machines
Charles Jojo Besitan
 
Advance Construction equipment's reports
Advance Construction equipment's reports Advance Construction equipment's reports
Advance Construction equipment's reports
ssuser061280
 
construction equipments.pptx
construction equipments.pptxconstruction equipments.pptx
construction equipments.pptx
zaindeen6
 
Trenching machine
Trenching machineTrenching machine
Trenching machine
sravankumarreddy9
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniques
sunilighare
 
POWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITYPOWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITY
COACHINGCLASSTUITION
 
EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTS
sauravchandel1
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptx
surekha1287
 
Auxiliary equipment
Auxiliary equipmentAuxiliary equipment
Introduction to excavator
Introduction to excavatorIntroduction to excavator
Introduction to excavator
AmeerHamzakhanbaba
 
Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment
debasdessie
 

Similar to Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V) (20)

construction equipment
construction equipment construction equipment
construction equipment
 
HEAVY MACHINERIES ASSINGMENT
HEAVY MACHINERIES ASSINGMENTHEAVY MACHINERIES ASSINGMENT
HEAVY MACHINERIES ASSINGMENT
 
PCM-crawler loaders
PCM-crawler loadersPCM-crawler loaders
PCM-crawler loaders
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
Mine Power & Drainage System
Mine Power & Drainage SystemMine Power & Drainage System
Mine Power & Drainage System
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
chapter 4 construction equipments.pptx
chapter 4  construction equipments.pptxchapter 4  construction equipments.pptx
chapter 4 construction equipments.pptx
 
construction equipment.pptx
construction equipment.pptxconstruction equipment.pptx
construction equipment.pptx
 
Coal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and MachinesCoal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and Machines
 
Advance Construction equipment's reports
Advance Construction equipment's reports Advance Construction equipment's reports
Advance Construction equipment's reports
 
construction equipments.pptx
construction equipments.pptxconstruction equipments.pptx
construction equipments.pptx
 
Trenching machine
Trenching machineTrenching machine
Trenching machine
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniques
 
POWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITYPOWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITY
 
EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTS
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptx
 
Auxiliary equipment
Auxiliary equipmentAuxiliary equipment
Auxiliary equipment
 
Introduction to excavator
Introduction to excavatorIntroduction to excavator
Introduction to excavator
 
Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment
 

More from Construction Tech. and Mgmt., VNIT Nagpur

INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
Construction Tech. and Mgmt., VNIT Nagpur
 
Fire safety arrangement
Fire safety arrangementFire safety arrangement
hot and cold weather concreting
hot and cold weather concretinghot and cold weather concreting
hot and cold weather concreting
Construction Tech. and Mgmt., VNIT Nagpur
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Marine operations
Marine operationsMarine operations
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Cranes
CranesCranes
Earth Compaction Equipment
Earth Compaction EquipmentEarth Compaction Equipment
Earth Compaction Equipment
Construction Tech. and Mgmt., VNIT Nagpur
 
Construction equipments and methods
Construction equipments and methodsConstruction equipments and methods
Construction equipments and methods
Construction Tech. and Mgmt., VNIT Nagpur
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
Construction Tech. and Mgmt., VNIT Nagpur
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
Construction Tech. and Mgmt., VNIT Nagpur
 

More from Construction Tech. and Mgmt., VNIT Nagpur (12)

INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Fire safety arrangement
Fire safety arrangementFire safety arrangement
Fire safety arrangement
 
hot and cold weather concreting
hot and cold weather concretinghot and cold weather concreting
hot and cold weather concreting
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Marine operations
Marine operationsMarine operations
Marine operations
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Cranes
CranesCranes
Cranes
 
Earth Compaction Equipment
Earth Compaction EquipmentEarth Compaction Equipment
Earth Compaction Equipment
 
Construction Equipment
 Construction Equipment  Construction Equipment
Construction Equipment
 
Construction equipments and methods
Construction equipments and methodsConstruction equipments and methods
Construction equipments and methods
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 

Recently uploaded

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 

Recently uploaded (20)

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 

Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)

  • 1. EXCAVATORS 1 Submitted by: Karthik V (MT15CTM006) Faisal V A (MT15CTM004)
  • 2. EXCAVATORS:  An excavator has been defined as a power-driven digging machine, usually mounted on crawler tracks.  The major types of excavators used in construction include hydraulically powered excavators and the members of the crane-shovel family.  However, dozers and scrapers are also capable of excavating soil and rock. 2
  • 3. HISTORY 1.FIRST APPEARED IN LATE 1700’S/EARLY 1800’S 2.IN 1990 HAD A LONG CONVENTIONAL COUNTER WEIGHT ON REAR END
  • 4. 4
  • 5. CRAWLER EXCAVATOR CRAWLER EXCAVATOR RUNS ON TWO ENDLESS TRACKS (CHAIN WHEEL SYSTEM). THESE TYPES OF EXCAVATORS ARE USED IN HILLY AREAS WHERE RISKS OF SLIDING OF MACHINERY ARE ON THE VERGE. CRAWLER TYPE EXCAVATOR HAS LOW GROUND PRESSURE BECAUSE OF SPREADING OF LOAD ON LARGE AREA. THEREFORE, IT IS ALSO USED WHERE SOIL SUPPORT IS WEAK.
  • 6. 6 WHEEL EXCAVATOR Wheel excavator runs on wheels and are used for excavation and loading of dump trucks and most of the time it is only used for plain ground operations. Because of wheel, it is not suitable for hilly areas due to low grip value to the ground.
  • 7. 7 •POWER SHOVEL EXCAVATORS •BACK HOE EXCAVATOR •FRONT SHOVEL EXCAVATOR THREE TYPES...
  • 8. POWER SHOVEL EXCAVATOR  Long-lasting and useful class of earth moving equipment  Capable of excavating all types of earth except hard rock  Size of power shovel varies from 0.375-1.05m3  It may be crawler mounted or wheel mounted shovels 8
  • 9. 9 Crawler mounted shovel: Low speed Effective in unstable soil Wheel mounted shovel: Higher speed Effective only in firm ground
  • 10. Power shovel efficiency depends on:  Class of material  Depth of cutting  Angle of swing  Job conditions  Management conditions  Size of hauling units  Skill of the operator  Physical condition of the shovel 10
  • 11. 11
  • 12. Applications:  Suitable for close range work  Capable of digging very hard materials & remove big boulders  Used in digging in gravel banks , clay pits , digging cuts in road works , road-side berms etc. 12
  • 13. BACK HOE EXCAVATOR  Also known as hoe , back shovel & pull shovel  Used to excavate below the natural surface on which it rests  Hoes used to excavate trenches , pits for basemants & grading works  Used to establish natural slopes 13
  • 14.  In strom drain and utility work the hoe can perform the trench excavation and can handle the pipe by eliminating a second machine  There are special buckets for everything from light sand to hard rock digging 14
  • 15. Parts of a back hoe excavator 15
  • 16. 16
  • 17. IDEAL PRODUCTION:  Size of bucket (Q)  Cycle time(T)=Lt +St +Dt +Rt  Fill factor(F) (Table 9.1)  Efficiency Factor(E)  Height & Swing Factor (Table 9.2)  Volume Correction Vc  Production (lcy/hr) = 3600sec/hr∗Q∗F∗E T∗V 𝐶
  • 18. Applications:  Suitable for digging below the machine level  Effectively used to dress or trim the surface avoiding the use of manual effort for dressing the excavated surface 18
  • 20. FRONT EXCAVATOR  Used predominately for hard digging above track level and loading haul units  Loading of shot rock will be a typical application  Shovel is capable of developing a high break out force  The material being excavated should be such that it will stand with a fairly vertical face 20
  • 21. FRONT SHOVEL EXCAVATOR  High excavation rate due to unique front shovel and side tip operation  Prolec laser system enables excavation to a more accurate level – resulting in quicker excavation rates while reducing the chance of over-digging 21
  • 22.  Improved track quality due to the excavation action (pushing into spoil rather than pulling it back)  Fewer machine controllers on site meaning less risk and safer operations 22
  • 23. 23
  • 24. 24
  • 25. 25
  • 26. Factors afecting shovel excavators are:  Class of material  Height of cut  Angle of swing  Size of houling units  Operator skill  Physical conditions of the shovel 26
  • 27. CALCULATING SHOVEL PRODUCTION  Four elements in the production cycle of a shovel are:  Load bucket  Swing the load  Dump load  Return swing
  • 28. IDEAL PRODUCTION:  Size of bucket (Q)  Cycle time(T)=Lt +St +Dt +Rt  Fill factor(F) (Table 9.1)  Efficiency Factor(E)  Height & Swing Factor (Table 9.2)  Production (lcy/hr) = 3600sec/hr∗Q∗F∗Height & swing factor ∗E T(sec/cycle)
  • 29. 29