This document discusses pre-installation impact evaluation of industrial energy efficiency projects. The key advantages are better evaluation quality, realization rates, and fewer surprises due to early evaluator involvement in project engineering review, baseline characterization, and pre-installation metering. Potential costs include additional labor and calendar delays. The document provides examples of how pre-installation evaluation works in practice and case studies with both benefits and challenges.