 Technical Audit (TA) is an audit performed by an
auditor, engineer or subject-matter expert evaluates
deficiencies or areas of improvement in a process,
system or proposal. Technical audit covers the technical
aspects of the project implemented in the organization
Primary Objective
 To produce a report by the auditor of his
opinion of the truth and fairness of relevant
statements so that any person reading and
using them can belief in them.
Secondary objective
 To detect Error and Fraud.
 To prevent Errors and Fraud by the
deterrent and moral effect of audit.
Planning & Design
Procurement or Purchase
Implementation
Impact of Project
 Improvement in internal control systems to
mitigate the potential risk.
 Improvement in the quality of service.
 Assurance of Revenue.
 Transparent and cost effective procurement
of goods and services.
 Completion of project on time.
 Reduction of project cost and annual
operating cost.
 Helps re-scheduling of project activities.
 Performance improvement of a system
 Staffing the Audit team.
 Creating an audit project plan: TOR ,
checklist.
 Laying groundwork for audit.
 Analyzing audit result.
 Shearing audit result.
 Writing audit result: Documentation
 Dealing with resistance to audit
recommendations
 Building on ongoing audit programs.
Environment, Transport and Works Bureau
Technical Circular (Works);
 Works Branch Technical Circulars/Works
Bureau Technical Circulars;
 Financial Circulars;
 Departmental Technical Circulars
/Instructions;
 Relevant Building/Engineering Manuals
and/or Handbooks;
 Relevant General Conditions of Contract;
 Relevant General Specifications and
Standard Drawings;
 Relevant Standard Method of Measurement;
 Contract Documents and Supplementary
Agreements (if any);
 Consultancy Agreements; and
 Any other relevant written policies, circulars,
instructions or procedures which the Contract
Adviser considers appropriate.
There are lots of technical checklists out
there. And with good reason—technical
audit require inspecting many different
things in many different places. Checklists
are perfect. They are simple tools with lots
of benefits. Checklists are:
1. Comprehensive: Remember you to check
2. Productive: What to do next?
3. Communicable.
 Audit report most contain the following topics.
A. Executive summery
B. Background information
C. Description of Project
D. Statement on Auditing Standards
E. Result: interviews, data analysis, Checklist
etc.
F. Recommendation: Include condition ,
criteria, causes, effects.
 ISO 9001:2008 – Quality Management System
 ISO 14001:2004- Environment Management
System
 OHSAS 18001:2007- Occupational Health &
Safety Management System
 ISM – International Safety Management Code
 ISO 29001:2010- Quality Standards Specific to Oil,
Gas & Petrochemical Industry
 HSE Manuals
 Integrated Management Systems
 HR Manuals
 The main purpose of this audit was to ensure that
accounts receivable are being managed fairly,
efficiently and effectively.
 Audit criteria and techniques were developed in
order to gather sufficient information on these
subjects. The methodology used consisted
primarily of interviews, data analysis, and a
review of the relevant documentation.
 However, the management framework for
accounts receivable has certain gaps, and steps
should be taken by management in order to
improve its efficiency

More Related Content

What's hot

PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACPPMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
Dr. Pankaj Sharma PgMP,PMP,PMI-ACP, LSSMBB
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
Serdar Temiz
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
Edureka!
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL
pmSPECFramework
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
Amjad Idries
 
Project Execution
Project ExecutionProject Execution
Project Execution
megat zainurul anuar
 
Project quality management
Project quality managementProject quality management
Project quality management
Mohammad Ashraf Khan, PMP
 
Project audit & closure
Project audit & closureProject audit & closure
Project audit & closure
Gopalakrishnan P
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
university(kust)
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
Mohamed Amin
 
2. project initiation
2. project initiation2. project initiation
2. project initiation
Mad Jutt
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
Nathan Petralia
 
Procurement Plan
Procurement PlanProcurement Plan
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
Oleksa Stelmakh
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
BhuWan Khadka
 
project management
project managementproject management
project management
Sanchita Siromoni
 
PMP Exam Prep 2021 free sample module 1
PMP Exam Prep 2021  free sample module 1PMP Exam Prep 2021  free sample module 1
PMP Exam Prep 2021 free sample module 1
EVOLVE for Instructors Materials
 
Project quality management.ppt msm
Project quality management.ppt msmProject quality management.ppt msm
Project quality management.ppt msm
Development Associates Link International (DALI) Inc
 
Project quality management
Project quality managementProject quality management
Project quality management
Mohammad Ashraf Khan, PMP
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
MECandPMV
 

What's hot (20)

PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACPPMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Project audit & closure
Project audit & closureProject audit & closure
Project audit & closure
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
2. project initiation
2. project initiation2. project initiation
2. project initiation
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 
Procurement Plan
Procurement PlanProcurement Plan
Procurement Plan
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 
project management
project managementproject management
project management
 
PMP Exam Prep 2021 free sample module 1
PMP Exam Prep 2021  free sample module 1PMP Exam Prep 2021  free sample module 1
PMP Exam Prep 2021 free sample module 1
 
Project quality management.ppt msm
Project quality management.ppt msmProject quality management.ppt msm
Project quality management.ppt msm
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 

Similar to Technical Audit

Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
Henmaidi Alfian
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
ssuserf2880f
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
Paul Morffew
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
Doreen Yeo
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
manik980318
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
Addisu15
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
SAJJAD KHUDHUR ABBAS
 
Quality audit slideshare
Quality audit slideshare Quality audit slideshare
Quality audit slideshare
chaitrali1995
 
Basic concepts of quality assurance
Basic concepts of quality assuranceBasic concepts of quality assurance
Basic concepts of quality assurance
sonaliph
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
AhtashamArshad4
 
AUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxAUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptx
Mohamed Fazil M
 
Lecture 2 19-2
Lecture 2 19-2Lecture 2 19-2
Lecture 2 19-2
Dom Mike
 
Unit-I Introduction
Unit-I  IntroductionUnit-I  Introduction
Unit-I Introduction
Dr.Raja R
 
Give Your Company the Competitive Edge by Means of an IT Audit
Give Your Company the Competitive Edge by Means of an IT AuditGive Your Company the Competitive Edge by Means of an IT Audit
Give Your Company the Competitive Edge by Means of an IT Audit
EES Africa (Pty) Ltd
 
Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing Presentation
Vernon Benjamin
 
JohanCVJuly2015
JohanCVJuly2015JohanCVJuly2015
JohanCVJuly2015
Johan van Zyl
 
Project Management For Good Procurement Practices
Project Management For Good Procurement PracticesProject Management For Good Procurement Practices
Project Management For Good Procurement Practices
tjcornish
 
Total quality control
Total quality controlTotal quality control
Total quality control
Aakash Bhongade
 
2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College Sector2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College Sector
Nikhat Rasheed
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
Ezevillo Zim
 

Similar to Technical Audit (20)

Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Quality audit slideshare
Quality audit slideshare Quality audit slideshare
Quality audit slideshare
 
Basic concepts of quality assurance
Basic concepts of quality assuranceBasic concepts of quality assurance
Basic concepts of quality assurance
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
AUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxAUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptx
 
Lecture 2 19-2
Lecture 2 19-2Lecture 2 19-2
Lecture 2 19-2
 
Unit-I Introduction
Unit-I  IntroductionUnit-I  Introduction
Unit-I Introduction
 
Give Your Company the Competitive Edge by Means of an IT Audit
Give Your Company the Competitive Edge by Means of an IT AuditGive Your Company the Competitive Edge by Means of an IT Audit
Give Your Company the Competitive Edge by Means of an IT Audit
 
Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing Presentation
 
JohanCVJuly2015
JohanCVJuly2015JohanCVJuly2015
JohanCVJuly2015
 
Project Management For Good Procurement Practices
Project Management For Good Procurement PracticesProject Management For Good Procurement Practices
Project Management For Good Procurement Practices
 
Total quality control
Total quality controlTotal quality control
Total quality control
 
2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College Sector2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College Sector
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
 

More from Subhash sapkota

Goal 16:The sustainable development goals
Goal 16:The sustainable development goalsGoal 16:The sustainable development goals
Goal 16:The sustainable development goals
Subhash sapkota
 
Labor based vs Equipment based rural road construction technology
Labor based vs Equipment based rural road construction technologyLabor based vs Equipment based rural road construction technology
Labor based vs Equipment based rural road construction technology
Subhash sapkota
 
Aprropirate Technology for Rural Area
Aprropirate Technology for Rural AreaAprropirate Technology for Rural Area
Aprropirate Technology for Rural Area
Subhash sapkota
 
Multiple Criteria for Decision
Multiple Criteria for DecisionMultiple Criteria for Decision
Multiple Criteria for Decision
Subhash sapkota
 
Decision making process
Decision making processDecision making process
Decision making process
Subhash sapkota
 
Enviroment scanning
Enviroment scanningEnviroment scanning
Enviroment scanning
Subhash sapkota
 
Poverty stickness
Poverty sticknessPoverty stickness
Poverty stickness
Subhash sapkota
 
Economic development
Economic developmentEconomic development
Economic development
Subhash sapkota
 
Treaties between Nepal & India
Treaties between Nepal & IndiaTreaties between Nepal & India
Treaties between Nepal & India
Subhash sapkota
 
Water ressource assessment
Water ressource assessmentWater ressource assessment
Water ressource assessment
Subhash sapkota
 
EIA
EIAEIA

More from Subhash sapkota (11)

Goal 16:The sustainable development goals
Goal 16:The sustainable development goalsGoal 16:The sustainable development goals
Goal 16:The sustainable development goals
 
Labor based vs Equipment based rural road construction technology
Labor based vs Equipment based rural road construction technologyLabor based vs Equipment based rural road construction technology
Labor based vs Equipment based rural road construction technology
 
Aprropirate Technology for Rural Area
Aprropirate Technology for Rural AreaAprropirate Technology for Rural Area
Aprropirate Technology for Rural Area
 
Multiple Criteria for Decision
Multiple Criteria for DecisionMultiple Criteria for Decision
Multiple Criteria for Decision
 
Decision making process
Decision making processDecision making process
Decision making process
 
Enviroment scanning
Enviroment scanningEnviroment scanning
Enviroment scanning
 
Poverty stickness
Poverty sticknessPoverty stickness
Poverty stickness
 
Economic development
Economic developmentEconomic development
Economic development
 
Treaties between Nepal & India
Treaties between Nepal & IndiaTreaties between Nepal & India
Treaties between Nepal & India
 
Water ressource assessment
Water ressource assessmentWater ressource assessment
Water ressource assessment
 
EIA
EIAEIA
EIA
 

Recently uploaded

Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 

Recently uploaded (20)

Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 

Technical Audit

  • 2.  Technical Audit (TA) is an audit performed by an auditor, engineer or subject-matter expert evaluates deficiencies or areas of improvement in a process, system or proposal. Technical audit covers the technical aspects of the project implemented in the organization
  • 3. Primary Objective  To produce a report by the auditor of his opinion of the truth and fairness of relevant statements so that any person reading and using them can belief in them. Secondary objective  To detect Error and Fraud.  To prevent Errors and Fraud by the deterrent and moral effect of audit.
  • 4. Planning & Design Procurement or Purchase Implementation Impact of Project
  • 5.  Improvement in internal control systems to mitigate the potential risk.  Improvement in the quality of service.  Assurance of Revenue.  Transparent and cost effective procurement of goods and services.  Completion of project on time.  Reduction of project cost and annual operating cost.  Helps re-scheduling of project activities.  Performance improvement of a system
  • 6.  Staffing the Audit team.  Creating an audit project plan: TOR , checklist.  Laying groundwork for audit.  Analyzing audit result.  Shearing audit result.  Writing audit result: Documentation  Dealing with resistance to audit recommendations  Building on ongoing audit programs.
  • 7.
  • 8. Environment, Transport and Works Bureau Technical Circular (Works);  Works Branch Technical Circulars/Works Bureau Technical Circulars;  Financial Circulars;  Departmental Technical Circulars /Instructions;  Relevant Building/Engineering Manuals and/or Handbooks;
  • 9.  Relevant General Conditions of Contract;  Relevant General Specifications and Standard Drawings;  Relevant Standard Method of Measurement;  Contract Documents and Supplementary Agreements (if any);  Consultancy Agreements; and  Any other relevant written policies, circulars, instructions or procedures which the Contract Adviser considers appropriate.
  • 10. There are lots of technical checklists out there. And with good reason—technical audit require inspecting many different things in many different places. Checklists are perfect. They are simple tools with lots of benefits. Checklists are: 1. Comprehensive: Remember you to check 2. Productive: What to do next? 3. Communicable.
  • 11.
  • 12.
  • 13.
  • 14.  Audit report most contain the following topics. A. Executive summery B. Background information C. Description of Project D. Statement on Auditing Standards E. Result: interviews, data analysis, Checklist etc. F. Recommendation: Include condition , criteria, causes, effects.
  • 15.  ISO 9001:2008 – Quality Management System  ISO 14001:2004- Environment Management System  OHSAS 18001:2007- Occupational Health & Safety Management System  ISM – International Safety Management Code  ISO 29001:2010- Quality Standards Specific to Oil, Gas & Petrochemical Industry  HSE Manuals  Integrated Management Systems  HR Manuals
  • 16.
  • 17.  The main purpose of this audit was to ensure that accounts receivable are being managed fairly, efficiently and effectively.  Audit criteria and techniques were developed in order to gather sufficient information on these subjects. The methodology used consisted primarily of interviews, data analysis, and a review of the relevant documentation.  However, the management framework for accounts receivable has certain gaps, and steps should be taken by management in order to improve its efficiency