CBTC fitting strategies and challenges for maintenance vehiclesSYSTRA
The global deployment of CBTC technology in mass transit transportation system is slowly but surely stepping into the infrastructure maintenance vehicles operation, raising the question about the automation level required for these specific rolling stock vehicles.
Depending on the chosen automation levels, the effort level required to overcome the technical challenges requires proper assessment. Undertaking a multi-disciplinary criteria approach analysis with the right level of expertise at the early stages of the project will ensure that the investments will adequately meet the needs of the end users.
CBTC Communications Based Train Control conference March 12th 2014 James Nesbitt
Transport industry leaders create a common voice on critical Communications Based Train Control challenges and solutions on March12th 2014 in London. Addressing implementation, cost and maintenance, risk assessments and interoperability challenges from an engineering, technical and strategic planning perspective, you wont want to miss this highly informative networking opportunity
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Shyam Raman
The research service provides an analysis of the European urban rail rolling stock market and focuses on the trends and technologies to be used. The study segments the market by metro, light rail and APM systems and identifies the opportunities for new rolling stock in each of these segments. It further provides an in-depth trend and scenario based forecast by segment .
CBTC fitting strategies and challenges for maintenance vehiclesSYSTRA
The global deployment of CBTC technology in mass transit transportation system is slowly but surely stepping into the infrastructure maintenance vehicles operation, raising the question about the automation level required for these specific rolling stock vehicles.
Depending on the chosen automation levels, the effort level required to overcome the technical challenges requires proper assessment. Undertaking a multi-disciplinary criteria approach analysis with the right level of expertise at the early stages of the project will ensure that the investments will adequately meet the needs of the end users.
CBTC Communications Based Train Control conference March 12th 2014 James Nesbitt
Transport industry leaders create a common voice on critical Communications Based Train Control challenges and solutions on March12th 2014 in London. Addressing implementation, cost and maintenance, risk assessments and interoperability challenges from an engineering, technical and strategic planning perspective, you wont want to miss this highly informative networking opportunity
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Shyam Raman
The research service provides an analysis of the European urban rail rolling stock market and focuses on the trends and technologies to be used. The study segments the market by metro, light rail and APM systems and identifies the opportunities for new rolling stock in each of these segments. It further provides an in-depth trend and scenario based forecast by segment .
Folder exploring the main challenges faced by Brazilian freight/cargo railroads in 2012. Content produced by Newsday Consultoria for ANTF, Brazil's freight train association.
Presentationrailways 120309144032-phpapp02Durga Rai
REPUBLICA
KATHMANDU, March 8: The government has completed final preparation to establish the Department of Railway (DoR) with the vision of developing 4000 km railway line across the country within 20 years.
The Ministry of Physical Planning and Works (MoPPW), which will oversee the DoR upon its formation, recently finalized the Organization and Management (O&M) survey and sent it to the Ministry of General Administration (MoGA) to forward it to the cabinet for approval.
The government decided to form the DoR to speed up the process of constructing different railway project across the country.
Ram Kumar Lamsal, who was involved in preparing O&M survey, said the DoR would have a total of 35 staffers, including three joint-secretaries, seven under-secretaries, 12 section officers and 13 non-gazetted officers. Annual budget for the department has been estimated at Rs 7.5 million.
"The Department of Railway will be formally established once the cabinet approves the O&M survey," said Lamsal, who is heading the Railway Project that is overseeing railway related works under stop-gap basis.
The Ministry of Finance has already given its consent to form the department. Upon formation, the department will oversee construction and management of railway, metro rail, ropeways and cable car lines in the country.
Lamsal, who is also a joint-secretary at MoPPW, said the department has set a vision of increasing railway line to 4,000 km, including the East-West Railway, Kathmandu-Pokhara Railway, Kathmandu-Tibet Railway and railway lines that connect major bordering towns of India and Nepal, within 20 years.
"We have also set a target of building 150 km metro line in the Kathmandu Valley, extend existing ropeway to 1,500 km and establish at least 60 cable car lines within the period," Lamsal told Republica on Monday.
The to-be-formed department will also complete the Detailed Project Report (DPR) of Janakpur-Bardibas railway line and bring the Nepal Railways Company under the purview of the MoPPW. Existing acts specify the Ministry of Labor and Transport Management as the authority to oversee works related to railway.
Incheon International Airport is the largest airport in South Korea and is one of the largest airports in the world. It is located on an artificially created piece of land between two islands.
The airport is equipped with the latest technology and follows the concept of Green, Art, and Smart.
This slide is a case study of the airport to detail about the structures present in the airport from the Civil Engineering aspect.
Folder exploring the main challenges faced by Brazilian freight/cargo railroads in 2012. Content produced by Newsday Consultoria for ANTF, Brazil's freight train association.
Presentationrailways 120309144032-phpapp02Durga Rai
REPUBLICA
KATHMANDU, March 8: The government has completed final preparation to establish the Department of Railway (DoR) with the vision of developing 4000 km railway line across the country within 20 years.
The Ministry of Physical Planning and Works (MoPPW), which will oversee the DoR upon its formation, recently finalized the Organization and Management (O&M) survey and sent it to the Ministry of General Administration (MoGA) to forward it to the cabinet for approval.
The government decided to form the DoR to speed up the process of constructing different railway project across the country.
Ram Kumar Lamsal, who was involved in preparing O&M survey, said the DoR would have a total of 35 staffers, including three joint-secretaries, seven under-secretaries, 12 section officers and 13 non-gazetted officers. Annual budget for the department has been estimated at Rs 7.5 million.
"The Department of Railway will be formally established once the cabinet approves the O&M survey," said Lamsal, who is heading the Railway Project that is overseeing railway related works under stop-gap basis.
The Ministry of Finance has already given its consent to form the department. Upon formation, the department will oversee construction and management of railway, metro rail, ropeways and cable car lines in the country.
Lamsal, who is also a joint-secretary at MoPPW, said the department has set a vision of increasing railway line to 4,000 km, including the East-West Railway, Kathmandu-Pokhara Railway, Kathmandu-Tibet Railway and railway lines that connect major bordering towns of India and Nepal, within 20 years.
"We have also set a target of building 150 km metro line in the Kathmandu Valley, extend existing ropeway to 1,500 km and establish at least 60 cable car lines within the period," Lamsal told Republica on Monday.
The to-be-formed department will also complete the Detailed Project Report (DPR) of Janakpur-Bardibas railway line and bring the Nepal Railways Company under the purview of the MoPPW. Existing acts specify the Ministry of Labor and Transport Management as the authority to oversee works related to railway.
Incheon International Airport is the largest airport in South Korea and is one of the largest airports in the world. It is located on an artificially created piece of land between two islands.
The airport is equipped with the latest technology and follows the concept of Green, Art, and Smart.
This slide is a case study of the airport to detail about the structures present in the airport from the Civil Engineering aspect.
National Strategy Document on Revitalising, Upgrading, Renovating and Enabling Deteriorated and Underutilised Urban Fabrics - Third Expert Meeting of the Regional Slum Upgrading Working Group (RSUWG) - 29th. of November to the 1st. of December 2015 in Laleh International Hotel, Tehran, I.R. of Iran
6th International Disaster and Risk Conference IDRC 2016 Integrative Risk Management - Towards Resilient Cities. 28 August - 01 September 2016 in Davos, Switzerland
There are more live projects in Infrastructure in the ME region than anywhere else. Opportunities are rising with total expenditure that can reach 100 billion USD in roads, rails projects alone as PPP and EPC. This paper highlights some of the major projects in the region and active consortiums involved.
THE POINT WISE TOPICS TO BE COVERED IN PRESENTATION AS BELOW
-Urban transport system of Jaipur metro
-System used in metro
-Regulation for metro construction and operation
-Fare structure and all other methods used in worldwide metros
-Visual report of metro station visit
Research presentation by visiting academic Dr Michael Poku-Boansi, Senior Lecturer at the Department of Planning, KNUST, Kumasi, Ghana and member of the Ghana Institute of Planners (GIP).
Abstract:
Research indicates that transport services in cities in developing countries are mostly informal and include the use of rickety and low occupancy vehicles such as minibuses, taxis, motorcycles and vans, operated by private groups or individuals. Due to this classification, two schools of thought have emerged. The first suggests that these informal transport service sector operators in most cases operate outside the officially sanctioned public transport sector and as a result should be regarded as nuisance due to its disorganised nature, calling for public intervention and occasional eradication. Given its disorganised nature, informal transport service operators are identified with urban problems including low level of services, high rates of collision and accidents, increased congestion in cities, erratic scheduling and services, inadequate and lack of capacity and evasion of taxes and fees. In contrast, the other school of thought supports and emphasises the critical role these private operators play in meeting the mobility demand of the urban population, as in some jurisdictions (e.g., Ghana, Kenya, and Senegal) provide over 50% of transport services. Public transport service provision in Ghana has undergone several transformations since pre-colonial times, both structured and disorganised development. However, to avoid the gradual decay of public transport service provision in Ghana, the government of Ghana since 2005 has initiated plans to introduce Bus Rapid Transit (BRT) services as a way of improving efficiency in public transport services. The Ghana UTP seeks to among other things to improve mobility within Ghana’s urban centres and to shift to more environmentally-sustainable transport modes and lower transport-related GHG emissions. Although the BRT project is yet to be fully roll out, its implementation is already facing some resistance from the informal public transport operators due to, a large extent, mistrust between the informal public transport operators and the government. The informal public transport operators consider this government intervention (BRT) as a strategy to make their operations inefficient and unpopular among Ghanaians. As a result, previous attempts to implement the project have failed, regardless of the potential benefits of the BRT. The purpose of my research is to explore ways of transition the uncoordinated informal public transport service operations in Ghana into a formal public transport service sector.
The Dubai Metro Map depicts a diagram of the city's metro system, which serves an important purpose. There are almost three million people living there. It is 4,114 km2 in size. Dubai's economic status has risen dramatically during the last many years.
International Refereed Journal of Engineering and Science (IRJES)irjes
International Refereed Journal of Engineering and Science (IRJES) is a leading international journal for publication of new ideas, the state of the art research results and fundamental advances in all aspects of Engineering and Science. IRJES is a open access, peer reviewed international journal with a primary objective to provide the academic community and industry for the submission of half of original research and applications
Video analytics for public safety solutions
Senior Researcher
Media Systems Research Department,
Center for Technology Innovation - Systems Eng.
Hitachi, Ltd., Research & Development Group
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
2. SPEAKER BIO
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
2
ESSAM SELIM
Free Lancer Consultant for Railways, Metro
32 Years in Oil & Gas Fields (13 years in Abu Dhabi)
6 Years Egyptian Railways & Metro
3 Years Free Lancer Consultant
E mail Address: esaelim@ibisegypt.com
3. WITH A POPULATION OF APPROXIMATELY 20 MILLION, CAIRO IS ONE OF THE MOST DENSELY POPULATED CITIES IN AFRICA CAIRO METRO TO ACCOMMODATE 80 % OF CAIRO TRANSPORTATION NEEDS
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
3
CAIRO METRO OF SIX LINES TO ACCOMMODATE THE EVER-GROWING POPULATION OF CAIRO
4. CAIRO METRO
The first of only two full-fledged metro systems in Africa, and the Arab World. The system consists of three operational lines.
Egypt celebrated the 25th anniversary (Silver Jubilee) of operating the first line last year,
Operated by a Private Company fully owned by National Authority of Tunnel
Carrying daily an estimated three million passengers
The lines use standard gauge (1435 mm).
The ticket price is EGP 1.00 for each journey, about GBP 0.12, EUR 0.14, or USD 0.18 (expected to be raised shortly)
The middle two cars (4th and 5th) of each train are reserved for women (the 5th car becomes a mixed use after 21:00).
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
4
10/26/2014
5. 10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
5
FUTURE LINES Line 4: FROM NASR CITY TO ABBASYA, GIZA AND EL AHRAM LINE 5 FROM NASR CITY TO PORT SAID STREET AND SHUBRA EL KHEIMA C) LINE 6 : FROM SHUBRA EL KHEIMA VIA EL AHRAM, TO MAADI
6. CAIRO METRO
Line 1 (Helwan - El Marg), completed in 1987, 42.5km long with 33 stations. It covers the Egyptian capital from north to south.
Line 2, (Shobra El Kheima - El Mounib) constructed in two phases, first in 1997 and the other in 2004. It is 21km long and serves 20 stations from the north to the south-west, covering the district of Shubra and the pyramids of Giza.
Line 3 (Imbaba / Mohandiseen - Cairo Int'l Airport) will be 43km long with 34 stations, of which 28 will be underground. The line will connect Cairo Airport in the east to Imbaba and Mohandisseen in the west, crossing the downturn area and Heliopolis. The Mohandisseen area will be connected to the main line going to Imbaba.
Line 4 (October-Oasis Highway - the Police Academy) is expected to operate between Haram District in the east and New Cairo district in the west.
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
6
7. LINE 3 PLAN & SPECIFICATIONS
Line 3 will be 43km long with 34 stations, of which 28 will be underground.
Construction began in 2007, with the first section opened on February 21, 2012.
Tunnel by bored tunnel & stations by cut & cover]
Plan to be fully operational by October 2019.
Expected to add 1.8 M passengers per day[
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
7
10/26/2014
8. PROJECT CONSORTIUM
The contract was awarded to a consortium led by Vinci Construction Grand Projects, a French construction company, which holds a 28.5% stake in the consortium, was given the civil engineering package of the contract in January 2007. Other parties in the consortium include Arab Contractors (27.5%), Bouygues (26%) and local company Orascom Construction Industries (18%).
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
8
10/26/2014
9. CAIRO METRO LINE 3
Extends from the northwest of Greater Cairo at Imbaba to the northeast of Heliopolis and Cairo International Airport.
It crosses River Nile twice at western branch Kit Kat & Zamalek & eastern branch Zamalek & downtown Cairo
The total length of the line is approximately 43 km, 28.1 km underground and the rest is on grade & planned in four phases.
The project includes a main workshop adjacent to the western terminal & light repair workshop at the middle at Abbasia
The line will use trains manufactured in Japan by Kinki Sharyo Co. and Toshiba Corp
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
9
10/26/2014
10. LINE 3 MAP
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
10
10/26/2014
11. ROUTE OF LINE 3
From Cairo International Airport, to Imbaba in the west, passing through Heliopolis, Abbasiya, Attaba and Zamalek. In addition a branch from Kit Kat Square to Mohandeseen.
The total length of Line 3 will be about 43.5 Km. It will have 34 Stations
28.1 km is an underground section and the rest is on grade and will be implemented in four phase
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
11
10/26/2014
12. SIGNALING & COMMUNICATIONS
The signaling and telecommunications system will be provided by a consortium led by Alstom Equipment. The total value of the signaling and telecommunications contract is €29.8m.
Other parties in the consortium include the Thales Group and Orascom. For the stations, Alstom will provide URBALIS 200 integrated signaling and train-control information system. It will include a control system, switches and signaling equipment.
The Automatic Train Control and interlocking will be provided by Alstom Units in France, while the locally manufactured products, including the Automatic Train Supervision, will be provided by CASCO. ALSTOM Transport Service Shanghai will supply local services for the project
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
12
13. PHASE 1 (ATTABA – ABASIA) (OPENED)
It consist of 5 underground Stations about 4.3 Km, an interchange with Line 2 at Attaba station, the construction took 4 years started in 2007 and opened in February 2012
The line was inaugurated less than six months behind the original planned opening date and in time for a revised target, after facing significant tunneling problems in 2009, as well as the political upheaval that began in 2011.
Technical challenges for contractors include waterlogged ground and cramped conditions for above-ground work
Stations are 150m long, located at a depth of 14m to 58m. The tunnel will have a diameter of 9.4m
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
13
10/26/2014
14. PHASE 2 (ABASIA - AL-AHRAM) (OPENED)
This Phase consist of 4 underground Stations, 7.7 Km length, started in 2009 to be completed in 2013
It comprises different packages for civil, electromechanical and railway works. The contract for civil engineering works has been awarded to Vinci for $323m. Orascom Construction has been awarded contracts worth $140m for civil, electromechanical and railway works.
The cost per kilometer is approximately $ 100 Million
Construction of railway tracks in joint venture Orascom Eurovia Travaux Ferroviaires (ETF), for a contract valued at approximately $24m. This package includes supplying and laying 14km of track and power rail in the tunnel.
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
14
10/26/2014
15. PHASE 3 (ATTABA- IMBABA - CAIRO UNIVERSITY)
It extends between Attaba , the center of Rod El Farag on the north and Cairo University on south , with total length of 17.7 km and 16 stations. This phase consists of 3 parts: 1 - Attaba - Kit Kat (two river Nile crossings) 2 - Kit Kat - Rod El Farag passing through the Imbaba 3 - Kit Kat - Cairo University passing through B. Dakrur the opposing conversions facilities for part 1 (Attaba- Kit Kat), planed to start in October 2013 not yet
Budget of this phase in LE 12 Billion using French loan of €900 Million Decision lately to postpone this phase after phase 4
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
15
10/26/2014
16. PHASE 4(AL-AHRAM - CAIRO AIRPORT)
It extends between Al-Ahram and Cairo Airport, with total length of 18 km, 10 stations, where 12 km is underground & 6 km is on grad . Decided to start with phase 4 to save mobilization cost of TBM
It is expected to be completed in four years, construction to start in 2014 & completed by 2018.
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
16
10/26/2014
17. UPDATE OF PHASES 3 & 4
Zamalak citizens opposed the Line 3 rout through their island from their own environmental prospective
NTA announced that an agreement is reached to dig tunnel deeper but the location of the station seems to be not yet agreed
TBM finished phase 2 where it is the start of phase 4,
to mobilize machine as per schedule to start 3, high cost
Decision made not to mobilize TBM and continuously to start phase 4
Phase 4 extended 6 km to Al Salam suburban
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
17
10/26/2014
18. LINE GEOGRAPHIC
the lines will have both at-grade and viaduct sections. After the underground El-Sudan station, the northern branch will rise on to a viaduct and run within the existing rail corridor on its way to Imbaba station, This sharing of Egyptian National Railways (ENR) land will avoid the problem of finding additional space in the crowded city. The line will stay on a viaduct until it has crossed the city ring road using an elevated, suspended bridge. After this, it will drop to grade level.
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
18
10/26/2014
19. TECHNICAL & POLITICAL CHALLENGES
line 3 was inaugurated less than six months behind the original planned opening date and in time for a revised target, after facing significant tunneling problems in 2009, as well as the political upheaval that began in 2011
The popular uprising in Egypt had limited impact, that continued almost uninterrupted throughout the occupation of Tahrir Square & other unrest beyond Cairo.
The French lead contractor, confirms that work stopped for just a few weeks in February 2011 before restarting with additional site security in early March.
Phase 2 opened in May 2014 about one year late
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
19
10/26/2014
20. EXAMPLES OF FACED TECHNICAL OBSTACLES
The underground utilities in Cairo is so complicated and causes too many delays to the project plan
Press Release by National Authority of Tunneling that Boring of 3rd line second phase ceased because dispute between Electrical Authority on estimated cost of redirecting their cables away of the metro route
The negotiation between the two authorities started 3 months ago Electrical authority exaggerated the cost as per the National Authority of Tunneling
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
20
21. FINANCE STATUS
The political instability is expected to have more of an effect on the financing of ongoing work and, particularly, the later phases of the line. These are currently being redesigned to save costs by using more above-ground running section
France provided a 280 million dollar loan for the second phase of the project to French companies involved in the project
France approved Loan of Euro 900 Million to finance phase three
Egypt seek LE 12 Billion to complete line 3
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
21
10/26/2014
22. EGYPT’S FOREIGN RESERVES DECLINES
Egypt's central bank says foreign currency reserves stood at $13.4 billion last month. That's a less than 1 percent decline from February, but the nation's reserves have fallen sharply from $36 billion since the popular uprising in 2011. The Egyptian government currently is in talks with the International Monetary Fund to secure a $4.8 billion loan to bolster the country's battered economy...
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
22
23. BY 2025, CAIRO METRO CARRIES 6.5 MILLION PASSENGERS A DAY.”
Construction of Line 4 is yet to begin, The route will begin at El-Malek El Saleh station on Line 1 and end at October-Oasis Highway station.
It is expected to add two more lines. Line 5 will be 20km connecting Nasr city to Port Said Street. It will be a half-circular line connecting to the other lines. Line 6 will extend from north south Shubra to Maadi, and will be 19km long.
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
23
10/26/2014
24. LINE 4 PLAN
Extends from the interactive station next to the workshop near Ring Road, north of Dream Land on the border province of October 6 Station via the Grand Egyptian Museum and then the Rmaia square, then EL-Haram Street, Giza Station of line 2 to ended at El- Malak El- Saleh station of line 1
JICA has recommended the execution of phase 1 in the distance between Remaya square up to El-Malek El- Saleh station of line no.1 while line4 will meet the route of line2 in Giza station for the service exchange between the two lines
Length of this phase is 19 km compose of 17 stations
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
24
25. PHASE 1 OF LINE 4 :
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
25
26. LINE 3
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
26
27. CAIRO METRO ACCOMMODATES 80% OF TRANSPORTATION NEEDS
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@IBISEGYPT.COM
27
28. Alexandria Metro future project
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
28
29. ALEXANDRIA METRO
Alexandria Metro Line shall extend from Abou-Qier (at the east) to K.P. 21 Matrouh Road (at the west) with a length of about 43 km. The Project phases shall be as follows.
* Phase 1:
from Abou-Qier Railway Station to Misr Station 21.5 km long. 18 Stations , 9 at-grade, 6 over track and 3 viaduct, with a maintenance workshop and rolling stock depot
* Phase 2:
*from Misr Station to Al-Max Station 8 km long, 6 underground stations
Phase 3:
from Al-Max Station to K.P. 21 Matrouh Road (at the west) 13.5 km long, 9 stations, 3 viaduct and 6 under-ground
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
29
30. LINE 5
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
30
31. LINE 5
The fifth Line of the Greater Cairo Metro " Nasr City - Heliopolis - El Sawah -Rod El Farag":
this line with a length of about 20 km , the total number of stations will be about 17 underground station.
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
31
32. LINE 6
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
32
33. LINE 6
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
33
This line starts from El Khosous , the East of Shubra Al Khiemah, El Sawah Square, then Port Said St. to cross above Line 1 at Ghamrah Station Until El-Sayeda Zeinab Square, to El Fustat Park to intersect with Line 4 , the New Maadi area next to the Satellite area with a length 30 km , 10 km of them on viaduct and about 20 km underground. The sixth line will include 24 Stations, , 4 elevated and 20 underground stations.
34. EXTENSION OF LINE 2 TO QALYOUB
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
34
The studies for this line will cost about 25 Million EGP, whereas the construction cost will be around 3 Billion EGP.
•Extension of Line 2 (El Mounib- Shubra Al Khiema) to Qalyoub.
•The Route, within the Right of Way of (Cairo – Alexandria Railways Line) so as to minimize the lands expropriation in the region.
•from Shubra Al Khiema station till the city of Qalyoub, The length of this Part is about 7 km.
•The extension will continue with an additional distance of about 1.8 km to reach the intermodal station, the total length of this extension will be 8.8 km.
•The studies for this line will cost about 25 Million EGP, whereas the construction cost will be around 3 Billion EGP
35. EXTENSION OF LINE 2 TO QALYOUB
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM
35
36. PORT SAID ROAD AND RAILWAY TUNNELS
This project consists of three tunnels two of them are road and the last for railway with an inner diameter of 10,8 meters and its outer diameter is 11,8 meter ,the maximum height is 5.5 meters
10/26/2014
ESSAM SELIM, CONSULTANT OF RAILWAYS & METRO, EASELIM@ IBISEGYPT.COM