INTRODUCTION
Environmental Impact Assessment (EIA) is a process which
ensures that all environmental matters are taken into account
quite early in the project at planning process itself.
It takes into consideration not only technical and economic
considerations but also, traditional aspects like impact on
local people, biodiversity etc.
EIA is intended to prevent or minimize potentially
adverse environmental impacts and enhance the
overall quality of a project. The main benefits
and advantages of EIA are:
Lower project costs in the long-term
Increased project acceptance
Improved project design
WHY EIA?
The EIA Directive requires projects likely to
have significant effects on the Environment
by virtue of their nature, size or location to
undergo an environmental assessment before
the competent authority in question grants
consent.
The EIA Directive defines a project as the
execution of construction works or of other
installations or schemes,
other interventions in the natural
surroundings and landscape including those
involving the extraction of mineral resources.
THE EIA DIRECTIVE
The EIA should identify, describe and assess
the direct and indirect effects of a project on
the following factors:
Human beings
Fauna and flora
Soil, Water & Air
Climate and the landscape
Material Assets
Cultural Heritage
Interaction between all above factors
EIA therefore should have a very strong social
dimension
Started in 1976-77, when Planning Commission asked
Department of Science & Technology to examine River
Valley Projects from environmental angle
Till 1994, Environmental Clearance from Central
Government was an administrative decision which lacked
legislative support.
On 27th
January 1994, Union Ministry of Environment &
Forests, GOI under Environment (Protection) Act 1986,
promulgated EIA notification making Environment
clearance mandatory for expansion or modernization of
any activity or for setting up new projects listed in
Schedule one of the notification, which have been
amended more than 12 times.
HISTORY OF EIA IN INDIA
9
PROJECTS UNDERGOING EIA
Environment Impact Assessment
EIA Clearance required
Total EIA clearance is required for 32 categories of developmental
works broadly categorized into following industrial sectors:
Mining
Thermal power plant
River valley
Infrastructure (Road, highway, ports, harbour, airports,
Industries including very small electroplating or foundry units)
Certain activities permissible under Coastal Regulation Zone Act 1991,
also require similar clearance
Flow chart representing the process of EIA
Screening
Initial Environmental
Examination (IEE)
EIA Not
Required
EIA
Required
Monitoring
EIA Audit and
Evaluation
IEE
Review
Scoping/
Terms of
Reference
Full-Scale
EIA
Evaluate
Options
EIA Not
Approved
EIA
Review
Decision
Making
EIA
Approved
Screening
• It would be time consuming and a waste of
resources for all proposed projects and activities
to undergo EIA
• Not all development projects require an EIA, as
some projects may not pose an environmental
threat
• Screening is the process used to determine
whether a proposed project or activity requires
an EIA and, if so, what level of environmental
review is necessary.
14
Prepare the work plan for the initial
environmental examination (IEE)
Project type on project
screening checklist?
Get specific IAA
requirements
Project scale above the
screening threshold?
Project located in a critical
area?
IAA funding, or any other
special circumstances?
NO
No initial
environmental
examination
required (IEE)
Screening Flow Chart
Will the project be funded
by an IAA?
Initial Environment Examination
Environment Examination
 Initial environmental examination (IEE) is
intended as a low-cost environmental evaluation
that makes use of information already available.
It boost up the process of EIA and lead the
matter to further assistance.
IEE in the Overall EIA Process
Project
Screening
Identifies projects that
typically contain potential
significant issues
Initial Environmental Examination
1. Identifies potential significant
environmental issues associated
with a project
2. Grades effects and identifies actual
Significant Environmental Issues
(SEIs)
3. Resolves simple SEIs
4. Recommends further action for
resolving outstanding SEIs
Full-Scale EIA or Other
Additional Study
Resolves any remaining
significant environmental issues
Scoping
 A process of interaction between government
agencies and project proponents
 Identifies:
– spatial and temporal boundaries for the EIA
– important issues and concern
– information necessary for decision making
– significant effects and factors to be considered
– Establishes terms for reference of full scale
EIA
Scoping
IEE
Project
Proceeds
according to
terms of IEE
Terms of Reference
1. Background
2. Impact Issues
Significant Issues
Relevant Resources
Report Formatting
3. Work Plan
When/Who/How of Task Completion
Full-Scale
EIA
IEE Review:
All potential
SEIs resolved
Full-Scale EIA Overview
Input = Outstanding SEIs from IEE(initial
environment examination).
Assessment phase:
– Qualitative/quantitative analysis of SEI
– SEI impact significance
Mitigation development phase:
– Select appropriate mitigation measures
– Residual impact significance
EIA overview
Qualitative Quantitative
 Checklists
 Matrices
 Risk Assessment
 Network
 Overlays/GIS
 Expert Systems
 Risk assessment
Decision Making
• The challenge of making the final decision on
implementing a project is observed.
• Decision are taken at all stages during the EIA
process and the outcome will be based on these
decisions.
• If a large scale project falls under the jurisdiction
of countries with comparable national EIA
procedures,it should be feasible to be more
ambitious in organising EIA Transboundary..
Monitoring
 In legislation there is a often demand for
environmental reporting when treating
permits to activities with large EIA.
 This stage involves improvement and
mitigational measures to put forward EIA.
 It also involves elements of assessing
risks and hazard management.
Audit and Evaluation
• This is the final stage of EIA.
• Audit consists opinions and corrections of
the report which are submitted in front of
decision making committee.
• It also reveals that whether EIA is
necessary or not for the report submitted,if
necessary what are the measures taken in
order to overcome the drawbacks and
hazards..
Uses of EIA
 Systematic evaluation of a eco friendly
project.
 Risk and hazard assessment.
 Impact identification.
 Monitoring of impact and advice.
 Development control
 Project development
 SEA(strategic environmental
assessment) and permit.
CONCLUSION
 EIA is an important tool in assuring that
projects and plans will not give adverse
impact on the environment.
 The use of EIA has developed
throughout the world and may different
applications exists.
 EIA process thus could not only prevent
costs due to environmental aspects but also
prevent possible public opinions and protest
against a project.
Reference
• Arya,D.S:1991,Trends of urbanisation and
its impact on environment.
•Arya,D.S.and Abbasi,S.A:1992 A new
software package as aid in Environmental
Management proceedings of ENVIPRO-
92.
27
T H A N K Y O U

More Related Content

Similar to manunath1-copy-170405123133 (1).pdf

Environmental management
Environmental managementEnvironmental management
Environmental management
munyemanaemmanuel
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
KANTHARAJAN GANESAN
 
Environmental impact assessment
Environmental impact assessment Environmental impact assessment
Environmental impact assessment
BiplobDas38
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
Royallity Vishwanath
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
Angom Baleshwor
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
Royallity Vishwanath
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
School of planning and architecture
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
GAURAV. H .TANDON
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
Adilah Anuar
 
Question
QuestionQuestion
Question
tp jayamohan
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
Dr. Subramanyam Revanuru
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
Palash Mehar
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
ArunAngadi5
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga2
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga2
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 

Similar to manunath1-copy-170405123133 (1).pdf (20)

Environmental management
Environmental managementEnvironmental management
Environmental management
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
 
Environmental impact assessment
Environmental impact assessment Environmental impact assessment
Environmental impact assessment
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
 
Question
QuestionQuestion
Question
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 

More from ChandanLawrence

3d printing seminar ppt-1.pptx
3d printing seminar ppt-1.pptx3d printing seminar ppt-1.pptx
3d printing seminar ppt-1.pptx
ChandanLawrence
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptx
ChandanLawrence
 
DOC-20220909-WA0098..pptx
DOC-20220909-WA0098..pptxDOC-20220909-WA0098..pptx
DOC-20220909-WA0098..pptx
ChandanLawrence
 
DOC-20220909-WA0100..pptx
DOC-20220909-WA0100..pptxDOC-20220909-WA0100..pptx
DOC-20220909-WA0100..pptx
ChandanLawrence
 
socialimpactassessment-140603025831-phpapp02-_2_.ppt
socialimpactassessment-140603025831-phpapp02-_2_.pptsocialimpactassessment-140603025831-phpapp02-_2_.ppt
socialimpactassessment-140603025831-phpapp02-_2_.ppt
ChandanLawrence
 
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
ChandanLawrence
 

More from ChandanLawrence (8)

3d printing seminar ppt-1.pptx
3d printing seminar ppt-1.pptx3d printing seminar ppt-1.pptx
3d printing seminar ppt-1.pptx
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptx
 
DOC-20220909-WA0098..pptx
DOC-20220909-WA0098..pptxDOC-20220909-WA0098..pptx
DOC-20220909-WA0098..pptx
 
SAHANA K C PPT.pptx
SAHANA K C PPT.pptxSAHANA K C PPT.pptx
SAHANA K C PPT.pptx
 
Adarsh P1.pptx
Adarsh P1.pptxAdarsh P1.pptx
Adarsh P1.pptx
 
DOC-20220909-WA0100..pptx
DOC-20220909-WA0100..pptxDOC-20220909-WA0100..pptx
DOC-20220909-WA0100..pptx
 
socialimpactassessment-140603025831-phpapp02-_2_.ppt
socialimpactassessment-140603025831-phpapp02-_2_.pptsocialimpactassessment-140603025831-phpapp02-_2_.ppt
socialimpactassessment-140603025831-phpapp02-_2_.ppt
 
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
 

Recently uploaded

Latino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino CaucusLatino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino Caucus
Danay Escanaverino
 
Webinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont BraunWebinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont Braun
FinTech Belgium
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
DOT TECH
 
一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理
一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理
一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理
ydubwyt
 
how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.
DOT TECH
 
What price will pi network be listed on exchanges
What price will pi network be listed on exchangesWhat price will pi network be listed on exchanges
What price will pi network be listed on exchanges
DOT TECH
 
Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024Monthly Economic Monitoring of Ukraine No. 232, May 2024
USDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptxUSDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptx
marketing367770
 
how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.
DOT TECH
 
innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...
innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...
innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...
Falcon Invoice Discounting
 
MERCHANTBANKING-PDF complete picture.pdf
MERCHANTBANKING-PDF complete picture.pdfMERCHANTBANKING-PDF complete picture.pdf
MERCHANTBANKING-PDF complete picture.pdf
Sudarshan Dakuru
 
what is the future of Pi Network currency.
what is the future of Pi Network currency.what is the future of Pi Network currency.
what is the future of Pi Network currency.
DOT TECH
 
Economics and Economic reasoning Chap. 1
Economics and Economic reasoning Chap. 1Economics and Economic reasoning Chap. 1
Economics and Economic reasoning Chap. 1
Fitri Safira
 
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
ydubwyt
 
Chương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdfChương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdf
va2132004
 
how can I sell my pi coins for cash in a pi APP
how can I sell my pi coins for cash in a pi APPhow can I sell my pi coins for cash in a pi APP
how can I sell my pi coins for cash in a pi APP
DOT TECH
 
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdfIsios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Henry Tapper
 
what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024
DOT TECH
 
Proposer Builder Separation Problem in Ethereum
Proposer Builder Separation Problem in EthereumProposer Builder Separation Problem in Ethereum
Proposer Builder Separation Problem in Ethereum
RasoulRamezanian1
 
how to sell pi coins in all Africa Countries.
how to sell pi coins in all Africa Countries.how to sell pi coins in all Africa Countries.
how to sell pi coins in all Africa Countries.
DOT TECH
 

Recently uploaded (20)

Latino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino CaucusLatino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino Caucus
 
Webinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont BraunWebinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont Braun
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
 
一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理
一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理
一比一原版UOL毕业证利物浦大学毕业证成绩单如何办理
 
how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.
 
What price will pi network be listed on exchanges
What price will pi network be listed on exchangesWhat price will pi network be listed on exchanges
What price will pi network be listed on exchanges
 
Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024
 
USDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptxUSDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptx
 
how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.
 
innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...
innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...
innovative-invoice-discounting-platforms-in-india-empowering-retail-investors...
 
MERCHANTBANKING-PDF complete picture.pdf
MERCHANTBANKING-PDF complete picture.pdfMERCHANTBANKING-PDF complete picture.pdf
MERCHANTBANKING-PDF complete picture.pdf
 
what is the future of Pi Network currency.
what is the future of Pi Network currency.what is the future of Pi Network currency.
what is the future of Pi Network currency.
 
Economics and Economic reasoning Chap. 1
Economics and Economic reasoning Chap. 1Economics and Economic reasoning Chap. 1
Economics and Economic reasoning Chap. 1
 
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
 
Chương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdfChương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdf
 
how can I sell my pi coins for cash in a pi APP
how can I sell my pi coins for cash in a pi APPhow can I sell my pi coins for cash in a pi APP
how can I sell my pi coins for cash in a pi APP
 
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdfIsios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdf
 
what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024
 
Proposer Builder Separation Problem in Ethereum
Proposer Builder Separation Problem in EthereumProposer Builder Separation Problem in Ethereum
Proposer Builder Separation Problem in Ethereum
 
how to sell pi coins in all Africa Countries.
how to sell pi coins in all Africa Countries.how to sell pi coins in all Africa Countries.
how to sell pi coins in all Africa Countries.
 

manunath1-copy-170405123133 (1).pdf

  • 2. CONTENTS • INTRODUCTION • EIA DIRECTIVE • HISTORY OF EIA • AIMS OF EIA • PROJECTS UNDERGOING EIA • PROCESS OF EIA →SCREENING →INITIAL ENVIRONMENT EXAMINATION →SCOPING →EIA OVERVIEW →DECISION MAKING →MONITORING AND AUDIT EVALUATION • USES OF EIA • CONCLUSION • REFERENCE
  • 3. INTRODUCTION Environmental Impact Assessment (EIA) is a process which ensures that all environmental matters are taken into account quite early in the project at planning process itself. It takes into consideration not only technical and economic considerations but also, traditional aspects like impact on local people, biodiversity etc.
  • 4.
  • 5. EIA is intended to prevent or minimize potentially adverse environmental impacts and enhance the overall quality of a project. The main benefits and advantages of EIA are: Lower project costs in the long-term Increased project acceptance Improved project design WHY EIA?
  • 6. The EIA Directive requires projects likely to have significant effects on the Environment by virtue of their nature, size or location to undergo an environmental assessment before the competent authority in question grants consent. The EIA Directive defines a project as the execution of construction works or of other installations or schemes, other interventions in the natural surroundings and landscape including those involving the extraction of mineral resources. THE EIA DIRECTIVE
  • 7. The EIA should identify, describe and assess the direct and indirect effects of a project on the following factors: Human beings Fauna and flora Soil, Water & Air Climate and the landscape Material Assets Cultural Heritage Interaction between all above factors EIA therefore should have a very strong social dimension
  • 8. Started in 1976-77, when Planning Commission asked Department of Science & Technology to examine River Valley Projects from environmental angle Till 1994, Environmental Clearance from Central Government was an administrative decision which lacked legislative support. On 27th January 1994, Union Ministry of Environment & Forests, GOI under Environment (Protection) Act 1986, promulgated EIA notification making Environment clearance mandatory for expansion or modernization of any activity or for setting up new projects listed in Schedule one of the notification, which have been amended more than 12 times. HISTORY OF EIA IN INDIA
  • 9. 9
  • 11.
  • 12. Environment Impact Assessment EIA Clearance required Total EIA clearance is required for 32 categories of developmental works broadly categorized into following industrial sectors: Mining Thermal power plant River valley Infrastructure (Road, highway, ports, harbour, airports, Industries including very small electroplating or foundry units) Certain activities permissible under Coastal Regulation Zone Act 1991, also require similar clearance
  • 13. Flow chart representing the process of EIA Screening Initial Environmental Examination (IEE) EIA Not Required EIA Required Monitoring EIA Audit and Evaluation IEE Review Scoping/ Terms of Reference Full-Scale EIA Evaluate Options EIA Not Approved EIA Review Decision Making EIA Approved
  • 14. Screening • It would be time consuming and a waste of resources for all proposed projects and activities to undergo EIA • Not all development projects require an EIA, as some projects may not pose an environmental threat • Screening is the process used to determine whether a proposed project or activity requires an EIA and, if so, what level of environmental review is necessary. 14
  • 15. Prepare the work plan for the initial environmental examination (IEE) Project type on project screening checklist? Get specific IAA requirements Project scale above the screening threshold? Project located in a critical area? IAA funding, or any other special circumstances? NO No initial environmental examination required (IEE) Screening Flow Chart Will the project be funded by an IAA?
  • 16. Initial Environment Examination Environment Examination  Initial environmental examination (IEE) is intended as a low-cost environmental evaluation that makes use of information already available. It boost up the process of EIA and lead the matter to further assistance.
  • 17. IEE in the Overall EIA Process Project Screening Identifies projects that typically contain potential significant issues Initial Environmental Examination 1. Identifies potential significant environmental issues associated with a project 2. Grades effects and identifies actual Significant Environmental Issues (SEIs) 3. Resolves simple SEIs 4. Recommends further action for resolving outstanding SEIs Full-Scale EIA or Other Additional Study Resolves any remaining significant environmental issues
  • 18. Scoping  A process of interaction between government agencies and project proponents  Identifies: – spatial and temporal boundaries for the EIA – important issues and concern – information necessary for decision making – significant effects and factors to be considered – Establishes terms for reference of full scale EIA
  • 19. Scoping IEE Project Proceeds according to terms of IEE Terms of Reference 1. Background 2. Impact Issues Significant Issues Relevant Resources Report Formatting 3. Work Plan When/Who/How of Task Completion Full-Scale EIA IEE Review: All potential SEIs resolved
  • 20. Full-Scale EIA Overview Input = Outstanding SEIs from IEE(initial environment examination). Assessment phase: – Qualitative/quantitative analysis of SEI – SEI impact significance Mitigation development phase: – Select appropriate mitigation measures – Residual impact significance
  • 21. EIA overview Qualitative Quantitative  Checklists  Matrices  Risk Assessment  Network  Overlays/GIS  Expert Systems  Risk assessment
  • 22. Decision Making • The challenge of making the final decision on implementing a project is observed. • Decision are taken at all stages during the EIA process and the outcome will be based on these decisions. • If a large scale project falls under the jurisdiction of countries with comparable national EIA procedures,it should be feasible to be more ambitious in organising EIA Transboundary..
  • 23. Monitoring  In legislation there is a often demand for environmental reporting when treating permits to activities with large EIA.  This stage involves improvement and mitigational measures to put forward EIA.  It also involves elements of assessing risks and hazard management.
  • 24. Audit and Evaluation • This is the final stage of EIA. • Audit consists opinions and corrections of the report which are submitted in front of decision making committee. • It also reveals that whether EIA is necessary or not for the report submitted,if necessary what are the measures taken in order to overcome the drawbacks and hazards..
  • 25. Uses of EIA  Systematic evaluation of a eco friendly project.  Risk and hazard assessment.  Impact identification.  Monitoring of impact and advice.  Development control  Project development  SEA(strategic environmental assessment) and permit.
  • 26. CONCLUSION  EIA is an important tool in assuring that projects and plans will not give adverse impact on the environment.  The use of EIA has developed throughout the world and may different applications exists.  EIA process thus could not only prevent costs due to environmental aspects but also prevent possible public opinions and protest against a project.
  • 27. Reference • Arya,D.S:1991,Trends of urbanisation and its impact on environment. •Arya,D.S.and Abbasi,S.A:1992 A new software package as aid in Environmental Management proceedings of ENVIPRO- 92. 27
  • 28. T H A N K Y O U