EIA is a process of evaluating the likely environmental impacts of a proposed project or development, taking into account inter-related socio-economic, cultural and human-health impacts, both beneficial and adverse.
EIA 1994 and the further amendments are explained i.e. 2006 and 2020.
Environmental impact assessment (EIA)
In India any person who desires to undertake any new project or the expansion or modernization of any existing industry or project should submit a Rapid Environmental Impact Assessment report along with application to the secretary, Ministry of Environment and Forests (MoEF), New Delhi. Basic types of EIA being practiced are given below.
Rapid Environmental Impact Assessment (REIA)
Comprehensive Environmental Impact Assessment (CEIA)
Strategic Environmental Impact Assessment (SEIA)
Sectoral Environment Impact Assessment
Regional Environmental Impact Assessment
Environmental Impact Assessment Notification in India
EIA is of comparatively recent origin in India and has become an integral part of Environmental Management by EIA notification of 1994 and its subsequent amendments by Ministry of Environment & Forests (MoEF), Govt. of India. The notification specifies 30 categories of projects with potential risks to degrade the Environment.
Purposes of EIA
EIA is a process with several important purposes, which can be categorized as follows:
To facilitate decision-making For the decision-maker, for example the local authority, it provides a systematic examination of the environmental implications of a proposed action, and sometimes alternatives, before a decision is taken
To aid in the formation of development EIA can be of great benefit to them, since it can provide a framework for considering location and design issues and environmental issues in parallel. It can be an aid to the formulation of developmental actions, indicating areas where the project can be modified to minimize or eliminate altogether the adverse impacts on the environment.
To be an instrument for sustainable development The key characteristics of sustainable development include maintaining the overall quality of life, maintaining continuing access to natural resources and avoiding lasting environmental damage.
Principle of EIA
The Benefits of Environmental Assessment
Categorization of projects and activities
Environmental Clearance (EC)
Environment impact Assessment (EIA) in Ugandakayondo alex
The definition of an EIA, its purpose, The lead agency involved, the various stages undertaken and where or not EIA is needed. the presentation summarizes the EIA process in Uganda.
Environmental assessment is the assessment of the environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action.
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
An Educational presentation on Enviromental Assessment
A short introduction over what is EIA, its objectives, its process advantages and challeges Kenya and the world.
Enviromental Impact Assessment (EIA) is a process which ensures that allenviromental mattersare taken into account in the early stages of the project that is at planning process.
All aspects of the project are taken into consideration e.g technical,economical and traditional aspects , impact on local people and biodiversity
Economic, social and environmental change is inherent to development. Whilst development aims to bring about positive change it can lead to conflicts.
In the past, the promotion of economic growth as the motor for increased well-being was the main development thrust with little sensitivity to adverse social or environmental impacts.
The need to avoid adverse impacts and to ensure long term benefits led to the concept of sustainability.
Environmental impact assessment (EIA) can be defined as the systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs, or legislative actions relative to the physical, chemical, biological, cultural, and socioeconomic components of the total environment.
To disclose significant environmental effects of proposed projects to decision-makers and the public.
ii) To identify ways to avoid or reduce environmental damage.
iii) To prevent adverse environmental impacts by requiring implementation of feasible alternatives or mitigation measuresEnvironmental clearance or the ‘go ahead’ signal is granted by the Impact Assessment Agency in the Ministry of Environment and Forests, Government of India.
All projects that require clearance from central government can be broadly categorized into the following:-
(1) Industries ..\Unit 1 notes\Environmental Clearance.docx
(2) Mining
(3) Thermal power plants
(4) River valley projects
(5) Infrastructure and CRZ (Coastal Regulation Zone)
(6) Nuclear power projects
Baseline information is important reference point for conducting EIA.
The term "baseline" refers to the collection of background information on the biophysical, social and economic settings proposed project area.
Baseline data are collected for two main purposes:
to provide a description of the status and trends of environmental factors (e.g., air pollutant concentrations) against which predicted changes can be compared and evaluated in terms of importance, and
to provide a means of detecting actual change by monitoring once a project has been initiated
important to establish mechanisms by identifying projects which requires EIA, and this process of selection of project is referred to as "Screening“
Scoping is to determine what should be the coverage or scope of the EIA study for a project proposal as having potentially significant environmental impactsEnvironmental impact assessment (EIA) can be defined as the systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs, or legislative actions relative to the physical, chemical, biological, cultural, and socioeconomic components of the total environment.
Environmental impact assessment (EIA) can be defined as the systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs, or legislative actions relative to the physical, chemical, biological, cultural, and socioeconomic components of the total environment EIA
EIA is a process of evaluating the likely environmental impacts of a proposed project or development, taking into account inter-related socio-economic, cultural and human-health impacts, both beneficial and adverse.
EIA 1994 and the further amendments are explained i.e. 2006 and 2020.
Environmental impact assessment (EIA)
In India any person who desires to undertake any new project or the expansion or modernization of any existing industry or project should submit a Rapid Environmental Impact Assessment report along with application to the secretary, Ministry of Environment and Forests (MoEF), New Delhi. Basic types of EIA being practiced are given below.
Rapid Environmental Impact Assessment (REIA)
Comprehensive Environmental Impact Assessment (CEIA)
Strategic Environmental Impact Assessment (SEIA)
Sectoral Environment Impact Assessment
Regional Environmental Impact Assessment
Environmental Impact Assessment Notification in India
EIA is of comparatively recent origin in India and has become an integral part of Environmental Management by EIA notification of 1994 and its subsequent amendments by Ministry of Environment & Forests (MoEF), Govt. of India. The notification specifies 30 categories of projects with potential risks to degrade the Environment.
Purposes of EIA
EIA is a process with several important purposes, which can be categorized as follows:
To facilitate decision-making For the decision-maker, for example the local authority, it provides a systematic examination of the environmental implications of a proposed action, and sometimes alternatives, before a decision is taken
To aid in the formation of development EIA can be of great benefit to them, since it can provide a framework for considering location and design issues and environmental issues in parallel. It can be an aid to the formulation of developmental actions, indicating areas where the project can be modified to minimize or eliminate altogether the adverse impacts on the environment.
To be an instrument for sustainable development The key characteristics of sustainable development include maintaining the overall quality of life, maintaining continuing access to natural resources and avoiding lasting environmental damage.
Principle of EIA
The Benefits of Environmental Assessment
Categorization of projects and activities
Environmental Clearance (EC)
Environment impact Assessment (EIA) in Ugandakayondo alex
The definition of an EIA, its purpose, The lead agency involved, the various stages undertaken and where or not EIA is needed. the presentation summarizes the EIA process in Uganda.
Environmental assessment is the assessment of the environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action.
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
An Educational presentation on Enviromental Assessment
A short introduction over what is EIA, its objectives, its process advantages and challeges Kenya and the world.
Enviromental Impact Assessment (EIA) is a process which ensures that allenviromental mattersare taken into account in the early stages of the project that is at planning process.
All aspects of the project are taken into consideration e.g technical,economical and traditional aspects , impact on local people and biodiversity
Economic, social and environmental change is inherent to development. Whilst development aims to bring about positive change it can lead to conflicts.
In the past, the promotion of economic growth as the motor for increased well-being was the main development thrust with little sensitivity to adverse social or environmental impacts.
The need to avoid adverse impacts and to ensure long term benefits led to the concept of sustainability.
Environmental impact assessment (EIA) can be defined as the systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs, or legislative actions relative to the physical, chemical, biological, cultural, and socioeconomic components of the total environment.
To disclose significant environmental effects of proposed projects to decision-makers and the public.
ii) To identify ways to avoid or reduce environmental damage.
iii) To prevent adverse environmental impacts by requiring implementation of feasible alternatives or mitigation measuresEnvironmental clearance or the ‘go ahead’ signal is granted by the Impact Assessment Agency in the Ministry of Environment and Forests, Government of India.
All projects that require clearance from central government can be broadly categorized into the following:-
(1) Industries ..\Unit 1 notes\Environmental Clearance.docx
(2) Mining
(3) Thermal power plants
(4) River valley projects
(5) Infrastructure and CRZ (Coastal Regulation Zone)
(6) Nuclear power projects
Baseline information is important reference point for conducting EIA.
The term "baseline" refers to the collection of background information on the biophysical, social and economic settings proposed project area.
Baseline data are collected for two main purposes:
to provide a description of the status and trends of environmental factors (e.g., air pollutant concentrations) against which predicted changes can be compared and evaluated in terms of importance, and
to provide a means of detecting actual change by monitoring once a project has been initiated
important to establish mechanisms by identifying projects which requires EIA, and this process of selection of project is referred to as "Screening“
Scoping is to determine what should be the coverage or scope of the EIA study for a project proposal as having potentially significant environmental impactsEnvironmental impact assessment (EIA) can be defined as the systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs, or legislative actions relative to the physical, chemical, biological, cultural, and socioeconomic components of the total environment.
Environmental impact assessment (EIA) can be defined as the systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs, or legislative actions relative to the physical, chemical, biological, cultural, and socioeconomic components of the total environment EIA
EIA is an important tool to make sure the healthy of our environment. It helps us to sustain our environment healthy for long run as well as benifit for our human as much as possible
Environmental Impact Assessment (EIA) is the formal process used to predict the environmental consequences (positive or negative) of a plan, policy, program, or project prior to the decision to move forward with the proposed action. Formal impact assessments may be governed by rules of administrative procedure regarding public participation and documentation of decision making, and may be subject to judicial review. An impact assessment may propose measures to adjust impacts to acceptable levels or to investigate new technological solutions (Encyclopedia, 2015).
1) EIA – Definition, History and Objective.
2) Reasons for using EIA
3) Key elements of EIA
4) Benefits of an EIA
5) Major Environmental Issues
6) PROCEDURE FOR EIA
7) IMPACT OF A PROPOSED PAPER INDUSTRY
8) Impact Mitigation
9) Key components of Monitoring
10) Public Involvement in the EIA Steps
11) Hierarchy in EIA
12)Impact indicators
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA) is a systematic and integrative process for considering possible impacts prior to a decision being taken on whether or not a proposal should be given approval to proceed. (Wood 2003)
EIA is an important tool to make sure the healthy of our environment. It helps us to sustain our environment healthy for long run as well as benifit for our human as much as possible
Environmental Impact Assessment (EIA) is the formal process used to predict the environmental consequences (positive or negative) of a plan, policy, program, or project prior to the decision to move forward with the proposed action. Formal impact assessments may be governed by rules of administrative procedure regarding public participation and documentation of decision making, and may be subject to judicial review. An impact assessment may propose measures to adjust impacts to acceptable levels or to investigate new technological solutions (Encyclopedia, 2015).
1) EIA – Definition, History and Objective.
2) Reasons for using EIA
3) Key elements of EIA
4) Benefits of an EIA
5) Major Environmental Issues
6) PROCEDURE FOR EIA
7) IMPACT OF A PROPOSED PAPER INDUSTRY
8) Impact Mitigation
9) Key components of Monitoring
10) Public Involvement in the EIA Steps
11) Hierarchy in EIA
12)Impact indicators
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA) is a systematic and integrative process for considering possible impacts prior to a decision being taken on whether or not a proposal should be given approval to proceed. (Wood 2003)
Latino Buying Power - May 2024 Presentation for Latino CaucusDanay Escanaverino
Unlock the potential of Latino Buying Power with this in-depth SlideShare presentation. Explore how the Latino consumer market is transforming the American economy, driven by their significant buying power, entrepreneurial contributions, and growing influence across various sectors.
**Key Sections Covered:**
1. **Economic Impact:** Understand the profound economic impact of Latino consumers on the U.S. economy. Discover how their increasing purchasing power is fueling growth in key industries and contributing to national economic prosperity.
2. **Buying Power:** Dive into detailed analyses of Latino buying power, including its growth trends, key drivers, and projections for the future. Learn how this influential group’s spending habits are shaping market dynamics and creating opportunities for businesses.
3. **Entrepreneurial Contributions:** Explore the entrepreneurial spirit within the Latino community. Examine how Latino-owned businesses are thriving and contributing to job creation, innovation, and economic diversification.
4. **Workforce Statistics:** Gain insights into the role of Latino workers in the American labor market. Review statistics on employment rates, occupational distribution, and the economic contributions of Latino professionals across various industries.
5. **Media Consumption:** Understand the media consumption habits of Latino audiences. Discover their preferences for digital platforms, television, radio, and social media. Learn how these consumption patterns are influencing advertising strategies and media content.
6. **Education:** Examine the educational achievements and challenges within the Latino community. Review statistics on enrollment, graduation rates, and fields of study. Understand the implications of education on economic mobility and workforce readiness.
7. **Home Ownership:** Explore trends in Latino home ownership. Understand the factors driving home buying decisions, the challenges faced by Latino homeowners, and the impact of home ownership on community stability and economic growth.
This SlideShare provides valuable insights for marketers, business owners, policymakers, and anyone interested in the economic influence of the Latino community. By understanding the various facets of Latino buying power, you can effectively engage with this dynamic and growing market segment.
Equip yourself with the knowledge to leverage Latino buying power, tap into their entrepreneurial spirit, and connect with their unique cultural and consumer preferences. Drive your business success by embracing the economic potential of Latino consumers.
**Keywords:** Latino buying power, economic impact, entrepreneurial contributions, workforce statistics, media consumption, education, home ownership, Latino market, Hispanic buying power, Latino purchasing power.
when will pi network coin be available on crypto exchange.DOT TECH
There is no set date for when Pi coins will enter the market.
However, the developers are working hard to get them released as soon as possible.
Once they are available, users will be able to exchange other cryptocurrencies for Pi coins on designated exchanges.
But for now the only way to sell your pi coins is through verified pi vendor.
Here is the telegram contact of my personal pi vendor
@Pi_vendor_247
how to swap pi coins to foreign currency withdrawable.DOT TECH
As of my last update, Pi is still in the testing phase and is not tradable on any exchanges.
However, Pi Network has announced plans to launch its Testnet and Mainnet in the future, which may include listing Pi on exchanges.
The current method for selling pi coins involves exchanging them with a pi vendor who purchases pi coins for investment reasons.
If you want to sell your pi coins, reach out to a pi vendor and sell them to anyone looking to sell pi coins from any country around the globe.
Below is the contact information for my personal pi vendor.
Telegram: @Pi_vendor_247
What price will pi network be listed on exchangesDOT TECH
The rate at which pi will be listed is practically unknown. But due to speculations surrounding it the predicted rate is tends to be from 30$ — 50$.
So if you are interested in selling your pi network coins at a high rate tho. Or you can't wait till the mainnet launch in 2026. You can easily trade your pi coins with a merchant.
A merchant is someone who buys pi coins from miners and resell them to Investors looking forward to hold massive quantities till mainnet launch.
I will leave the telegram contact of my personal pi vendor to trade with.
@Pi_vendor_247
Resume
• Real GDP growth slowed down due to problems with access to electricity caused by the destruction of manoeuvrable electricity generation by Russian drones and missiles.
• Exports and imports continued growing due to better logistics through the Ukrainian sea corridor and road. Polish farmers and drivers stopped blocking borders at the end of April.
• In April, both the Tax and Customs Services over-executed the revenue plan. Moreover, the NBU transferred twice the planned profit to the budget.
• The European side approved the Ukraine Plan, which the government adopted to determine indicators for the Ukraine Facility. That approval will allow Ukraine to receive a EUR 1.9 bn loan from the EU in May. At the same time, the EU provided Ukraine with a EUR 1.5 bn loan in April, as the government fulfilled five indicators under the Ukraine Plan.
• The USA has finally approved an aid package for Ukraine, which includes USD 7.8 bn of budget support; however, the conditions and timing of the assistance are still unknown.
• As in March, annual consumer inflation amounted to 3.2% yoy in April.
• At the April monetary policy meeting, the NBU again reduced the key policy rate from 14.5% to 13.5% per annum.
• Over the past four weeks, the hryvnia exchange rate has stabilized in the UAH 39-40 per USD range.
USDA Loans in California: A Comprehensive Overview.pptxmarketing367770
USDA Loans in California: A Comprehensive Overview
If you're dreaming of owning a home in California's rural or suburban areas, a USDA loan might be the perfect solution. The U.S. Department of Agriculture (USDA) offers these loans to help low-to-moderate-income individuals and families achieve homeownership.
Key Features of USDA Loans:
Zero Down Payment: USDA loans require no down payment, making homeownership more accessible.
Competitive Interest Rates: These loans often come with lower interest rates compared to conventional loans.
Flexible Credit Requirements: USDA loans have more lenient credit score requirements, helping those with less-than-perfect credit.
Guaranteed Loan Program: The USDA guarantees a portion of the loan, reducing risk for lenders and expanding borrowing options.
Eligibility Criteria:
Location: The property must be located in a USDA-designated rural or suburban area. Many areas in California qualify.
Income Limits: Applicants must meet income guidelines, which vary by region and household size.
Primary Residence: The home must be used as the borrower's primary residence.
Application Process:
Find a USDA-Approved Lender: Not all lenders offer USDA loans, so it's essential to choose one approved by the USDA.
Pre-Qualification: Determine your eligibility and the amount you can borrow.
Property Search: Look for properties in eligible rural or suburban areas.
Loan Application: Submit your application, including financial and personal information.
Processing and Approval: The lender and USDA will review your application. If approved, you can proceed to closing.
USDA loans are an excellent option for those looking to buy a home in California's rural and suburban areas. With no down payment and flexible requirements, these loans make homeownership more attainable for many families. Explore your eligibility today and take the first step toward owning your dream home.
how to sell pi coins in South Korea profitably.DOT TECH
Yes. You can sell your pi network coins in South Korea or any other country, by finding a verified pi merchant
What is a verified pi merchant?
Since pi network is not launched yet on any exchange, the only way you can sell pi coins is by selling to a verified pi merchant, and this is because pi network is not launched yet on any exchange and no pre-sale or ico offerings Is done on pi.
Since there is no pre-sale, the only way exchanges can get pi is by buying from miners. So a pi merchant facilitates these transactions by acting as a bridge for both transactions.
How can i find a pi vendor/merchant?
Well for those who haven't traded with a pi merchant or who don't already have one. I will leave the telegram id of my personal pi merchant who i trade pi with.
Tele gram: @Pi_vendor_247
#pi #sell #nigeria #pinetwork #picoins #sellpi #Nigerian #tradepi #pinetworkcoins #sellmypi
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
what is the future of Pi Network currency.DOT TECH
The future of the Pi cryptocurrency is uncertain, and its success will depend on several factors. Pi is a relatively new cryptocurrency that aims to be user-friendly and accessible to a wide audience. Here are a few key considerations for its future:
Message: @Pi_vendor_247 on telegram if u want to sell PI COINS.
1. Mainnet Launch: As of my last knowledge update in January 2022, Pi was still in the testnet phase. Its success will depend on a successful transition to a mainnet, where actual transactions can take place.
2. User Adoption: Pi's success will be closely tied to user adoption. The more users who join the network and actively participate, the stronger the ecosystem can become.
3. Utility and Use Cases: For a cryptocurrency to thrive, it must offer utility and practical use cases. The Pi team has talked about various applications, including peer-to-peer transactions, smart contracts, and more. The development and implementation of these features will be essential.
4. Regulatory Environment: The regulatory environment for cryptocurrencies is evolving globally. How Pi navigates and complies with regulations in various jurisdictions will significantly impact its future.
5. Technology Development: The Pi network must continue to develop and improve its technology, security, and scalability to compete with established cryptocurrencies.
6. Community Engagement: The Pi community plays a critical role in its future. Engaged users can help build trust and grow the network.
7. Monetization and Sustainability: The Pi team's monetization strategy, such as fees, partnerships, or other revenue sources, will affect its long-term sustainability.
It's essential to approach Pi or any new cryptocurrency with caution and conduct due diligence. Cryptocurrency investments involve risks, and potential rewards can be uncertain. The success and future of Pi will depend on the collective efforts of its team, community, and the broader cryptocurrency market dynamics. It's advisable to stay updated on Pi's development and follow any updates from the official Pi Network website or announcements from the team.
how can I sell my pi coins for cash in a pi APPDOT TECH
You can't sell your pi coins in the pi network app. because it is not listed yet on any exchange.
The only way you can sell is by trading your pi coins with an investor (a person looking forward to hold massive amounts of pi coins before mainnet launch) .
You don't need to meet the investor directly all the trades are done with a pi vendor/merchant (a person that buys the pi coins from miners and resell it to investors)
I Will leave The telegram contact of my personal pi vendor, if you are finding a legitimate one.
@Pi_vendor_247
#pi network
#pi coins
#money
what is the best method to sell pi coins in 2024DOT TECH
The best way to sell your pi coins safely is trading with an exchange..but since pi is not launched in any exchange, and second option is through a VERIFIED pi merchant.
Who is a pi merchant?
A pi merchant is someone who buys pi coins from miners and pioneers and resell them to Investors looking forward to hold massive amounts before mainnet launch in 2026.
I will leave the telegram contact of my personal pi merchant to trade pi coins with.
@Pi_vendor_247
how to sell pi coins in all Africa Countries.DOT TECH
Yes. You can sell your pi network for other cryptocurrencies like Bitcoin, usdt , Ethereum and other currencies And this is done easily with the help from a pi merchant.
What is a pi merchant ?
Since pi is not launched yet in any exchange. The only way you can sell right now is through merchants.
A verified Pi merchant is someone who buys pi network coins from miners and resell them to investors looking forward to hold massive quantities of pi coins before mainnet launch in 2026.
I will leave the telegram contact of my personal pi merchant to trade with.
@Pi_vendor_247
2. CONTENTS
• INTRODUCTION
• EIA DIRECTIVE
• HISTORY OF EIA
• AIMS OF EIA
• PROJECTS UNDERGOING EIA
• PROCESS OF EIA
→SCREENING
→INITIAL ENVIRONMENT EXAMINATION
→SCOPING
→EIA OVERVIEW
→DECISION MAKING
→MONITORING AND AUDIT EVALUATION
• USES OF EIA
• CONCLUSION
• REFERENCE
3. INTRODUCTION
Environmental Impact Assessment (EIA) is a process which
ensures that all environmental matters are taken into account
quite early in the project at planning process itself.
It takes into consideration not only technical and economic
considerations but also, traditional aspects like impact on
local people, biodiversity etc.
4.
5. EIA is intended to prevent or minimize potentially
adverse environmental impacts and enhance the
overall quality of a project. The main benefits
and advantages of EIA are:
Lower project costs in the long-term
Increased project acceptance
Improved project design
WHY EIA?
6. The EIA Directive requires projects likely to
have significant effects on the Environment
by virtue of their nature, size or location to
undergo an environmental assessment before
the competent authority in question grants
consent.
The EIA Directive defines a project as the
execution of construction works or of other
installations or schemes,
other interventions in the natural
surroundings and landscape including those
involving the extraction of mineral resources.
THE EIA DIRECTIVE
7. The EIA should identify, describe and assess
the direct and indirect effects of a project on
the following factors:
Human beings
Fauna and flora
Soil, Water & Air
Climate and the landscape
Material Assets
Cultural Heritage
Interaction between all above factors
EIA therefore should have a very strong social
dimension
8. Started in 1976-77, when Planning Commission asked
Department of Science & Technology to examine River
Valley Projects from environmental angle
Till 1994, Environmental Clearance from Central
Government was an administrative decision which lacked
legislative support.
On 27th
January 1994, Union Ministry of Environment &
Forests, GOI under Environment (Protection) Act 1986,
promulgated EIA notification making Environment
clearance mandatory for expansion or modernization of
any activity or for setting up new projects listed in
Schedule one of the notification, which have been
amended more than 12 times.
HISTORY OF EIA IN INDIA
12. Environment Impact Assessment
EIA Clearance required
Total EIA clearance is required for 32 categories of developmental
works broadly categorized into following industrial sectors:
Mining
Thermal power plant
River valley
Infrastructure (Road, highway, ports, harbour, airports,
Industries including very small electroplating or foundry units)
Certain activities permissible under Coastal Regulation Zone Act 1991,
also require similar clearance
13. Flow chart representing the process of EIA
Screening
Initial Environmental
Examination (IEE)
EIA Not
Required
EIA
Required
Monitoring
EIA Audit and
Evaluation
IEE
Review
Scoping/
Terms of
Reference
Full-Scale
EIA
Evaluate
Options
EIA Not
Approved
EIA
Review
Decision
Making
EIA
Approved
14. Screening
• It would be time consuming and a waste of
resources for all proposed projects and activities
to undergo EIA
• Not all development projects require an EIA, as
some projects may not pose an environmental
threat
• Screening is the process used to determine
whether a proposed project or activity requires
an EIA and, if so, what level of environmental
review is necessary.
14
15. Prepare the work plan for the initial
environmental examination (IEE)
Project type on project
screening checklist?
Get specific IAA
requirements
Project scale above the
screening threshold?
Project located in a critical
area?
IAA funding, or any other
special circumstances?
NO
No initial
environmental
examination
required (IEE)
Screening Flow Chart
Will the project be funded
by an IAA?
16. Initial Environment Examination
Environment Examination
Initial environmental examination (IEE) is
intended as a low-cost environmental evaluation
that makes use of information already available.
It boost up the process of EIA and lead the
matter to further assistance.
17. IEE in the Overall EIA Process
Project
Screening
Identifies projects that
typically contain potential
significant issues
Initial Environmental Examination
1. Identifies potential significant
environmental issues associated
with a project
2. Grades effects and identifies actual
Significant Environmental Issues
(SEIs)
3. Resolves simple SEIs
4. Recommends further action for
resolving outstanding SEIs
Full-Scale EIA or Other
Additional Study
Resolves any remaining
significant environmental issues
18. Scoping
A process of interaction between government
agencies and project proponents
Identifies:
– spatial and temporal boundaries for the EIA
– important issues and concern
– information necessary for decision making
– significant effects and factors to be considered
– Establishes terms for reference of full scale
EIA
19. Scoping
IEE
Project
Proceeds
according to
terms of IEE
Terms of Reference
1. Background
2. Impact Issues
Significant Issues
Relevant Resources
Report Formatting
3. Work Plan
When/Who/How of Task Completion
Full-Scale
EIA
IEE Review:
All potential
SEIs resolved
20. Full-Scale EIA Overview
Input = Outstanding SEIs from IEE(initial
environment examination).
Assessment phase:
– Qualitative/quantitative analysis of SEI
– SEI impact significance
Mitigation development phase:
– Select appropriate mitigation measures
– Residual impact significance
22. Decision Making
• The challenge of making the final decision on
implementing a project is observed.
• Decision are taken at all stages during the EIA
process and the outcome will be based on these
decisions.
• If a large scale project falls under the jurisdiction
of countries with comparable national EIA
procedures,it should be feasible to be more
ambitious in organising EIA Transboundary..
23. Monitoring
In legislation there is a often demand for
environmental reporting when treating
permits to activities with large EIA.
This stage involves improvement and
mitigational measures to put forward EIA.
It also involves elements of assessing
risks and hazard management.
24. Audit and Evaluation
• This is the final stage of EIA.
• Audit consists opinions and corrections of
the report which are submitted in front of
decision making committee.
• It also reveals that whether EIA is
necessary or not for the report submitted,if
necessary what are the measures taken in
order to overcome the drawbacks and
hazards..
25. Uses of EIA
Systematic evaluation of a eco friendly
project.
Risk and hazard assessment.
Impact identification.
Monitoring of impact and advice.
Development control
Project development
SEA(strategic environmental
assessment) and permit.
26. CONCLUSION
EIA is an important tool in assuring that
projects and plans will not give adverse
impact on the environment.
The use of EIA has developed
throughout the world and may different
applications exists.
EIA process thus could not only prevent
costs due to environmental aspects but also
prevent possible public opinions and protest
against a project.
27. Reference
• Arya,D.S:1991,Trends of urbanisation and
its impact on environment.
•Arya,D.S.and Abbasi,S.A:1992 A new
software package as aid in Environmental
Management proceedings of ENVIPRO-
92.
27