EIA OF NAVI MUMBAI
INTERNATIONAL AIRPORT
(NMIA)
7/28/2014 1
Made by :
Monika arora
B.Plan
6th sem
Content
7/28/2014 2
2. Project Description
• Analysis of Alternative Sites
• Location and Geography
• Description of Environment
• Project Activities
1. Introduction
• Mumbai
• Navi Mumbai
• Need of NMIA project?
5. Disaster management plan
6.Conclusions
3.Impacts of the project
• Positive impacts
• Negative impacts
4.Mitigation measures
Mumbai
7/28/2014 3
• Mumbai developed by British
and nurtured by Local
Mumbaikars.
• Earlier comprised of 7 isle now a
metro city
• Financial capital of the country
• Busiest and 1 of the rapidly
growing city in world.
Navi Mumbai
• Navi Mumbai is being developed as a counter
magnet to the main city to achieve the goal of
de-congestion of Mumbai
• CIDCO developed a new town Navi Mumbai of
area 344 sq. km.
• Its Asias largest planned and developed city for
population 2 million and 0.8 million jobs.
• high-tech Jawaharlal Nehru Port (JNPT)
catering to International Container Cargo
traffic at Nhava-Sheva is located on the
southern side of the city.
7/28/2014 4
Need of NMIA project?• Mumbai contributes about 40% of total net domestic product of Maharashtra.
• The share of manufacturing sector employment is expected to decline from 35
% to 27% and share of tertiary sector employment is expected to increase from
64% to 72%.
• City is shifting from traditional manufacturing activities to trading and service
activities.
• There is a need of increasing the capacity of airport as the existing Sahar airport
(domestic) and CSIA (international) are not sufficient.
7/28/2014 5
• Mumbai handles (23%) caters for the highest air
passenger
• Mumbai airport at Santacruz is the busiest airport in the
country and handles approx. 23% of total passengers, 31% of
Cargo traffic and 18% of aircraft movement in the country.
Navi Mumbai site
• Located near Panvel town about 45 kms from the
CBD of Belapur.
• 2 runways are planned. Phase wise development is
adopted to meet the air travel demand.
• The site is also proposed to be accessed from Mumbai
by high-speed water transportation system abutting
airport site.
7/28/2014 6
Location and Geography• Located at Panvel taluka, Raigad Dist.
Maharashtra.
• Present site is majorly CIDCO owned and
remaining is private which will be acquired
for airport development.
• SH54, NH4B, Aamra Marg (Running on the
Boundary of Airport site).
• Panvel creek, Gadhi river, Taloja river and
Ulwe river running along and through the
boundary of the airport.
• Ulwe hill – RL 82 Mts. within the site.
• Elephanta at a distance of 13 Kms. West
• Seismic zone :Zone-III as per IS: 1893 (Part-I)
2002.
• Study area falls in coastal region of Konkan
area.
• Panvel 1.5 kms. on Central Rly./Konkan Rly.
Khandeshwar – 1 km. suburban Rly..
7/28/2014 7
The study area is about 10 kms
in radius around the airport site.
Description Of Environment
• Study area covers the district of Thane and Panvel.
• Climate is hot and humid.
• it is included in Deccan Trap where all the balastic
compositions are surrounded by large no. Of dykes.
• Taloja river and Kasadi river in the North, Kalundri and Gadhi
river in the East and Ulwe river in the South.
• The physico-chemical parameters ranges value within the
prescribed standard except the BOD and nutrients.
• A total of 58 species of birds, 46 animals, 23 aquatic animals
and maximum of 198 plant were found in study area.
• There is no forest area in the project area.
7/28/2014 8
Description Of Environment
• 50% of project area is open land, salt marshes cover another 25%,
10% under mangrove forest, rain fed agriculture occupies 7% area
rest is man-made things in the project area.
• Open land:
– hilly terrain extending NW and is towards the SW end of the proposed runway.
• Salt marshes:
– more common in the Eastern region of the site of proposed airport than in the
west.
– Used for Prawn culture and are also man made.
– No life as anaerobic condition prevails.
• Mangroves:
– Avicennia marina more dominant species found here.
• Agricultural Land:
– rain fed agriculture in mansoon else barren land.
– Brick making also observed.
7/28/2014 9
7/28/2014 10
Description Of Environment
• area includes places of
historical importance
such as:
– The Elephanta Caves.
– Karnala Bird
Sanctuary.
– Matheran Eco-
sensitive Zone.
7/28/2014 11
Project Activites
• Project area is about
2054 Ha.
• Airport zone is about
1615 Ha. Consisting of
1200 Ha. For
aeronautical activity and
415 Ha. For non-
aeronautical activity.
• Remaining area is there
for utility services.
7/28/2014 12
Positive Impacts
• Project will facilitate the fast movement of man and materials, thereby
fostering trade and commerce.
• support employment generation, CM outlined that around 1lakh direct jobs
and around 4lakh indirect jobs due to this project.
• Pressure on other airport at Santacruz will be eased.
• offer increased accessibility, which in turn fuels the tourism sector which
causes more money flows into the local economy.
• raising the standard of living of the people in the region. provides a thrust
to the GDP of the local region, having a positively impact on the national
economy.
• it will handle 60 million passengers/year which is much smaller than the
international standard of 100 million passengers/year so there is always
possibilities of expansion.
7/28/2014 13
Impacts due to NMIA Location
• Removal of Mangroves & Biodiversity:
– With the project intervention, A total of 161.50 ha of mangroves (though in
degraded form) will be lost due to the project.
• Tree clearance:
– There is no forest in the project site area, though there are naturally growing
trees/plants/vegetation in the area.
– This project will result in loss of all vegetation in the project site.
• Roads and infrastruture:
– two impacts namely the over concretization and
– diversion of agricultural land leading to issues of land use change and food
security.
– Though the surface soil is being stripped off for brick making.
• Water ways connectivity:
– stress on the surrounding marine ecosystem and fishing.
• Rehabilitation:
– Ten settlements approx 15000 people will be affected due to the project.
7/28/2014 14
Impacts due to NMIA Project
Design
• Training of Gadhi River:
– The impacts of channelization on the aquatic
community mainly arise due to clearing and
removal of vegetation.
– Siltation affects aquatic vegetation by
increasing the turbidity of water.
– loss and reduction in the number of organisms.
• Diversion of Ulwe River:
7/28/2014 15
Impact Due To Construction
Phase
• Employment, Migration and Settlement:
– stress in the area surrounding the project in terms of water requirement,
power, increased ecological footprint, increased requirement for health
and educational facilities and changes in the land use pattern and local
culture.
• Siting of construction camp for construction:
– stress on the local ecological resources
• Leveling of site:
– leveling process would lead to an intense / heavy quantity of dust
which would raises the SPM levels in the vicinity.
– the noise levels would be high due to the machinery used for leveling.
• Safety of Workers
• Construction Activity
7/28/2014 16
Impacts during Operation Phase
of NMIA
• Operation of airport:
– two major impacts
include that of air
emissions and noise.
• Surface Traffic:
– air quality is affected
– Noise also is affected
• Employment,
Migration &
Settlement:
7/28/2014 17
MITIGATION MEASURES
7/28/2014 18
Air sector
• Appropriate dust suppression measures will
be implemented within the project site.
• Background air quality of all transport
corridors will be maintained by reducing
idling time and control on emissions.
• Aerobridges would be used for passenger
transportation
7/28/2014 19
Biodiversity and Forests
• CIDCO has planned to take up approx 350 Ha. of
plantation of mangroves against the 161.50 Ha. Loss.
• The channelization activities are designed to keep flow
characteristics as close to the original natural flow.
• compensatory vegetation and plantation programme will
be undertaken within the airport area
• contamination of estuarine body would occur mostly
during the construction phase due to resuspension of
sediments or dust from construction site, both of which
are temporary.
• There was no wildlife, observed during the field survey.
Disaster management plan
• Natural Disasters:
– earthquake
– flood
– storms/cyclone
– cloud burst/lightning/extreme
weather conditions
– Fire
• Terror Attack, Plane Hijack,
Sabotage
• A highly equiped airport is
developed to counter all the
calamities and disasters.
• Aircraft Accident Related
Disasters:
– aircraft accident at airport
– aircraft accident off airport
– Hazardous material emergency,
hydrocarbon spills (ATF)
followed by vapour dispersion
and pool fire
– fire
7/28/2014 20
Conclusion
• The project is necessary and
should be given a nod.
• Development is necessary, but
development along with
environment is acceptable.
• So adopt sustainable
development.
• Human imagination is
touching sky, sky is part of
environment so better
preserve for imagination
hence future.
• Go green.
7/28/2014 21
Reference
• Google
• Wikipedia
• Maharashtra pollution control board
• CIDCO
• CESE, IIT Bombay
• LBG-INECO-RITES Consortium, USA
• Central Water and Power Research Station (CWPRS),
Pune
• Ground water Survey & Development Agency
(GSDA), Govt. of Maharashtra.
7/28/2014 22
7/28/2014 23

More Related Content

What's hot

URDPFI - 2016
URDPFI - 2016URDPFI - 2016
URDPFI - 2016
ARYAN GUPTA
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabad
Pratham Pincha
 
Jaipur master plan review
Jaipur master plan reviewJaipur master plan review
Jaipur master plan review
vikashsaini78
 
TOD in India
TOD in IndiaTOD in India
Environmental impact assessment case study
Environmental impact assessment case studyEnvironmental impact assessment case study
Environmental impact assessment case study
Kundan Sanap
 
EIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOREIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOR
Mohd Ahmed Naim Shaikh
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
Anchal Garg
 
MUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONMUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGION
Intekhab Alam
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
ChandanPadhi3
 
Nirvana hills project-Case Study
Nirvana hills project-Case StudyNirvana hills project-Case Study
Nirvana hills project-Case Study
╚»Śăńğĩť Βăńĩķ«╝
 
Town planning schemes
Town planning schemesTown planning schemes
Town planning schemes
SakshiGadakh
 
Neighbourhood planning
Neighbourhood planningNeighbourhood planning
Neighbourhood planning
College Of Engineering, Pune
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
SHAHUL HAMEED KAMAL
 
3.5 structure, dpp subject plan
3.5 structure, dpp subject plan3.5 structure, dpp subject plan
3.5 structure, dpp subject plan
Sachin PatiL
 
Mumford
MumfordMumford
Mumford
trudykatz
 
Restoring Natural Drainage System of Delhi
Restoring Natural Drainage System of DelhiRestoring Natural Drainage System of Delhi
Restoring Natural Drainage System of Delhi
Iram Aziz
 
Master plan and land use
Master plan and land useMaster plan and land use
Master plan and land use
Shourya Puri
 
Urban renewal
Urban renewalUrban renewal
Urban renewal
Satyam Rai
 
NMT infrastructure: bicycle based transit oriented development
NMT infrastructure: bicycle based transit oriented development NMT infrastructure: bicycle based transit oriented development
NMT infrastructure: bicycle based transit oriented development
Tristan Wiggill
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
Ar. M. Senthil [ senthilmani ]
 

What's hot (20)

URDPFI - 2016
URDPFI - 2016URDPFI - 2016
URDPFI - 2016
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabad
 
Jaipur master plan review
Jaipur master plan reviewJaipur master plan review
Jaipur master plan review
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
Environmental impact assessment case study
Environmental impact assessment case studyEnvironmental impact assessment case study
Environmental impact assessment case study
 
EIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOREIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOR
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
MUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONMUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGION
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Nirvana hills project-Case Study
Nirvana hills project-Case StudyNirvana hills project-Case Study
Nirvana hills project-Case Study
 
Town planning schemes
Town planning schemesTown planning schemes
Town planning schemes
 
Neighbourhood planning
Neighbourhood planningNeighbourhood planning
Neighbourhood planning
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
3.5 structure, dpp subject plan
3.5 structure, dpp subject plan3.5 structure, dpp subject plan
3.5 structure, dpp subject plan
 
Mumford
MumfordMumford
Mumford
 
Restoring Natural Drainage System of Delhi
Restoring Natural Drainage System of DelhiRestoring Natural Drainage System of Delhi
Restoring Natural Drainage System of Delhi
 
Master plan and land use
Master plan and land useMaster plan and land use
Master plan and land use
 
Urban renewal
Urban renewalUrban renewal
Urban renewal
 
NMT infrastructure: bicycle based transit oriented development
NMT infrastructure: bicycle based transit oriented development NMT infrastructure: bicycle based transit oriented development
NMT infrastructure: bicycle based transit oriented development
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 

Viewers also liked

Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
Istiak Asif
 
ENVIRONMENTAL IMPACT ASSESSTMENT OF
ENVIRONMENTAL IMPACT ASSESSTMENT OFENVIRONMENTAL IMPACT ASSESSTMENT OF
ENVIRONMENTAL IMPACT ASSESSTMENT OF
Shabella Shahuri
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
Dhawal Kataria
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
Poornananda Kumar
 
Singapore free trade agreements
Singapore free trade agreementsSingapore free trade agreements
Singapore free trade agreements
debtcollecction
 
Signage design for Mumbai International & Domestic Airport
Signage design for Mumbai International & Domestic AirportSignage design for Mumbai International & Domestic Airport
Signage design for Mumbai International & Domestic Airport
parul_gupta
 
Navi Mumbai Project management
Navi Mumbai Project management  Navi Mumbai Project management
Navi Mumbai Project management
Prateek Nigam
 
ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...
ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...
ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...
Engineers Australia
 
Ryan khargar, navi mumbai
Ryan khargar, navi mumbaiRyan khargar, navi mumbai
Ryan khargar, navi mumbai
engineeringwatch
 
Law presentation
Law presentationLaw presentation
Law presentation
Rachit Shiv
 
The Impact of External Events on Singapore
The Impact of External Events on SingaporeThe Impact of External Events on Singapore
The Impact of External Events on Singapore
theracie
 
Environmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated ResortEnvironmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated Resort
November Tan
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
Vikrant Sabat
 
Chhatrapati Shivaji International Airport, Mumbai - Terminal 2
Chhatrapati Shivaji International Airport, Mumbai - Terminal 2Chhatrapati Shivaji International Airport, Mumbai - Terminal 2
Chhatrapati Shivaji International Airport, Mumbai - Terminal 2
Mitesh Gupta
 
5. global tourism impacts
5. global tourism  impacts5. global tourism  impacts
5. global tourism impacts
MissST
 
Earthquake resistance structures
Earthquake resistance structuresEarthquake resistance structures
Earthquake resistance structures
vaibhav Jaiswal
 
Design and construction of highway (flexible pavement
Design and construction of highway (flexible pavementDesign and construction of highway (flexible pavement
Design and construction of highway (flexible pavement
suraj vishwakarma
 
1. global tourism introduction
1. global tourism  introduction1. global tourism  introduction
1. global tourism introduction
MissST
 
construction of flexible pavement
construction of flexible pavementconstruction of flexible pavement
construction of flexible pavement
Rafi Khan
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
AJINKYA THAKRE
 

Viewers also liked (20)

Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
 
ENVIRONMENTAL IMPACT ASSESSTMENT OF
ENVIRONMENTAL IMPACT ASSESSTMENT OFENVIRONMENTAL IMPACT ASSESSTMENT OF
ENVIRONMENTAL IMPACT ASSESSTMENT OF
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
Singapore free trade agreements
Singapore free trade agreementsSingapore free trade agreements
Singapore free trade agreements
 
Signage design for Mumbai International & Domestic Airport
Signage design for Mumbai International & Domestic AirportSignage design for Mumbai International & Domestic Airport
Signage design for Mumbai International & Domestic Airport
 
Navi Mumbai Project management
Navi Mumbai Project management  Navi Mumbai Project management
Navi Mumbai Project management
 
ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...
ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...
ICWES15 - Rules for the Povision of Earthquake Resistance in Small Buildings ...
 
Ryan khargar, navi mumbai
Ryan khargar, navi mumbaiRyan khargar, navi mumbai
Ryan khargar, navi mumbai
 
Law presentation
Law presentationLaw presentation
Law presentation
 
The Impact of External Events on Singapore
The Impact of External Events on SingaporeThe Impact of External Events on Singapore
The Impact of External Events on Singapore
 
Environmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated ResortEnvironmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated Resort
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
 
Chhatrapati Shivaji International Airport, Mumbai - Terminal 2
Chhatrapati Shivaji International Airport, Mumbai - Terminal 2Chhatrapati Shivaji International Airport, Mumbai - Terminal 2
Chhatrapati Shivaji International Airport, Mumbai - Terminal 2
 
5. global tourism impacts
5. global tourism  impacts5. global tourism  impacts
5. global tourism impacts
 
Earthquake resistance structures
Earthquake resistance structuresEarthquake resistance structures
Earthquake resistance structures
 
Design and construction of highway (flexible pavement
Design and construction of highway (flexible pavementDesign and construction of highway (flexible pavement
Design and construction of highway (flexible pavement
 
1. global tourism introduction
1. global tourism  introduction1. global tourism  introduction
1. global tourism introduction
 
construction of flexible pavement
construction of flexible pavementconstruction of flexible pavement
construction of flexible pavement
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
 

Similar to Eia of Navi Mumbai International Airport (NMIA)

EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
vikas rahangdale
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
Md. Mahmudor Rahman
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
KANTHARAJAN GANESAN
 
Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - Rajasthan
Udip Das
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
RaghuGhu1
 
EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project  EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project
Saurabh Gupta
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
Abhishek Rajput
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Himanshu Goyal
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
ssuser65cc68
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
John M Riggs
 
Crz goals purpose & act
Crz goals  purpose & actCrz goals  purpose & act
Crz goals purpose & act
Puspendu Samanta
 
Aees summit 2014 bulk infrastructure planning for mixed use developments – co...
Aees summit 2014 bulk infrastructure planning for mixed use developments – co...Aees summit 2014 bulk infrastructure planning for mixed use developments – co...
Aees summit 2014 bulk infrastructure planning for mixed use developments – co...
AEES_AEEN
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
Lokesh Saini
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
Arvind Kumar
 
File287
File287File287
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
Ayesha Akhtar
 
Water Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinWater Resources Management in Brantas River Basin
Water Resources Management in Brantas River Basin
Putika Ashfar Khoiri
 
EIA training for Environmental Management Plan
EIA training for Environmental Management PlanEIA training for Environmental Management Plan
EIA training for Environmental Management Plan
Abid Hussainy
 
Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
ICEM - International Centre for Environmental Management
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience Mekong
Water, Land and Ecosystems (WLE)
 

Similar to Eia of Navi Mumbai International Airport (NMIA) (20)

EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - Rajasthan
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
 
EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project  EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
Crz goals purpose & act
Crz goals  purpose & actCrz goals  purpose & act
Crz goals purpose & act
 
Aees summit 2014 bulk infrastructure planning for mixed use developments – co...
Aees summit 2014 bulk infrastructure planning for mixed use developments – co...Aees summit 2014 bulk infrastructure planning for mixed use developments – co...
Aees summit 2014 bulk infrastructure planning for mixed use developments – co...
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
 
File287
File287File287
File287
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
 
Water Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinWater Resources Management in Brantas River Basin
Water Resources Management in Brantas River Basin
 
EIA training for Environmental Management Plan
EIA training for Environmental Management PlanEIA training for Environmental Management Plan
EIA training for Environmental Management Plan
 
Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience Mekong
 

Recently uploaded

Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
Robin Haunschild
 
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdfWhy Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Ben Linders
 
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
OECD Directorate for Financial and Enterprise Affairs
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
artemacademy2
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
gpww3sf4
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
OECD Directorate for Financial and Enterprise Affairs
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
samililja
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
amekonnen
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
SkillCertProExams
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
Frederic Leger
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Rosie Wells
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
1990 Media
 
Burning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdfBurning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdf
kkirkland2
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
gharris9
 
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
OECD Directorate for Financial and Enterprise Affairs
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
ToshihiroIto4
 

Recently uploaded (20)

Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
 
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdfWhy Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
 
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
 
Burning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdfBurning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdf
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
 
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
 

Eia of Navi Mumbai International Airport (NMIA)

  • 1. EIA OF NAVI MUMBAI INTERNATIONAL AIRPORT (NMIA) 7/28/2014 1 Made by : Monika arora B.Plan 6th sem
  • 2. Content 7/28/2014 2 2. Project Description • Analysis of Alternative Sites • Location and Geography • Description of Environment • Project Activities 1. Introduction • Mumbai • Navi Mumbai • Need of NMIA project? 5. Disaster management plan 6.Conclusions 3.Impacts of the project • Positive impacts • Negative impacts 4.Mitigation measures
  • 3. Mumbai 7/28/2014 3 • Mumbai developed by British and nurtured by Local Mumbaikars. • Earlier comprised of 7 isle now a metro city • Financial capital of the country • Busiest and 1 of the rapidly growing city in world.
  • 4. Navi Mumbai • Navi Mumbai is being developed as a counter magnet to the main city to achieve the goal of de-congestion of Mumbai • CIDCO developed a new town Navi Mumbai of area 344 sq. km. • Its Asias largest planned and developed city for population 2 million and 0.8 million jobs. • high-tech Jawaharlal Nehru Port (JNPT) catering to International Container Cargo traffic at Nhava-Sheva is located on the southern side of the city. 7/28/2014 4
  • 5. Need of NMIA project?• Mumbai contributes about 40% of total net domestic product of Maharashtra. • The share of manufacturing sector employment is expected to decline from 35 % to 27% and share of tertiary sector employment is expected to increase from 64% to 72%. • City is shifting from traditional manufacturing activities to trading and service activities. • There is a need of increasing the capacity of airport as the existing Sahar airport (domestic) and CSIA (international) are not sufficient. 7/28/2014 5 • Mumbai handles (23%) caters for the highest air passenger • Mumbai airport at Santacruz is the busiest airport in the country and handles approx. 23% of total passengers, 31% of Cargo traffic and 18% of aircraft movement in the country.
  • 6. Navi Mumbai site • Located near Panvel town about 45 kms from the CBD of Belapur. • 2 runways are planned. Phase wise development is adopted to meet the air travel demand. • The site is also proposed to be accessed from Mumbai by high-speed water transportation system abutting airport site. 7/28/2014 6
  • 7. Location and Geography• Located at Panvel taluka, Raigad Dist. Maharashtra. • Present site is majorly CIDCO owned and remaining is private which will be acquired for airport development. • SH54, NH4B, Aamra Marg (Running on the Boundary of Airport site). • Panvel creek, Gadhi river, Taloja river and Ulwe river running along and through the boundary of the airport. • Ulwe hill – RL 82 Mts. within the site. • Elephanta at a distance of 13 Kms. West • Seismic zone :Zone-III as per IS: 1893 (Part-I) 2002. • Study area falls in coastal region of Konkan area. • Panvel 1.5 kms. on Central Rly./Konkan Rly. Khandeshwar – 1 km. suburban Rly.. 7/28/2014 7 The study area is about 10 kms in radius around the airport site.
  • 8. Description Of Environment • Study area covers the district of Thane and Panvel. • Climate is hot and humid. • it is included in Deccan Trap where all the balastic compositions are surrounded by large no. Of dykes. • Taloja river and Kasadi river in the North, Kalundri and Gadhi river in the East and Ulwe river in the South. • The physico-chemical parameters ranges value within the prescribed standard except the BOD and nutrients. • A total of 58 species of birds, 46 animals, 23 aquatic animals and maximum of 198 plant were found in study area. • There is no forest area in the project area. 7/28/2014 8
  • 9. Description Of Environment • 50% of project area is open land, salt marshes cover another 25%, 10% under mangrove forest, rain fed agriculture occupies 7% area rest is man-made things in the project area. • Open land: – hilly terrain extending NW and is towards the SW end of the proposed runway. • Salt marshes: – more common in the Eastern region of the site of proposed airport than in the west. – Used for Prawn culture and are also man made. – No life as anaerobic condition prevails. • Mangroves: – Avicennia marina more dominant species found here. • Agricultural Land: – rain fed agriculture in mansoon else barren land. – Brick making also observed. 7/28/2014 9
  • 11. Description Of Environment • area includes places of historical importance such as: – The Elephanta Caves. – Karnala Bird Sanctuary. – Matheran Eco- sensitive Zone. 7/28/2014 11
  • 12. Project Activites • Project area is about 2054 Ha. • Airport zone is about 1615 Ha. Consisting of 1200 Ha. For aeronautical activity and 415 Ha. For non- aeronautical activity. • Remaining area is there for utility services. 7/28/2014 12
  • 13. Positive Impacts • Project will facilitate the fast movement of man and materials, thereby fostering trade and commerce. • support employment generation, CM outlined that around 1lakh direct jobs and around 4lakh indirect jobs due to this project. • Pressure on other airport at Santacruz will be eased. • offer increased accessibility, which in turn fuels the tourism sector which causes more money flows into the local economy. • raising the standard of living of the people in the region. provides a thrust to the GDP of the local region, having a positively impact on the national economy. • it will handle 60 million passengers/year which is much smaller than the international standard of 100 million passengers/year so there is always possibilities of expansion. 7/28/2014 13
  • 14. Impacts due to NMIA Location • Removal of Mangroves & Biodiversity: – With the project intervention, A total of 161.50 ha of mangroves (though in degraded form) will be lost due to the project. • Tree clearance: – There is no forest in the project site area, though there are naturally growing trees/plants/vegetation in the area. – This project will result in loss of all vegetation in the project site. • Roads and infrastruture: – two impacts namely the over concretization and – diversion of agricultural land leading to issues of land use change and food security. – Though the surface soil is being stripped off for brick making. • Water ways connectivity: – stress on the surrounding marine ecosystem and fishing. • Rehabilitation: – Ten settlements approx 15000 people will be affected due to the project. 7/28/2014 14
  • 15. Impacts due to NMIA Project Design • Training of Gadhi River: – The impacts of channelization on the aquatic community mainly arise due to clearing and removal of vegetation. – Siltation affects aquatic vegetation by increasing the turbidity of water. – loss and reduction in the number of organisms. • Diversion of Ulwe River: 7/28/2014 15
  • 16. Impact Due To Construction Phase • Employment, Migration and Settlement: – stress in the area surrounding the project in terms of water requirement, power, increased ecological footprint, increased requirement for health and educational facilities and changes in the land use pattern and local culture. • Siting of construction camp for construction: – stress on the local ecological resources • Leveling of site: – leveling process would lead to an intense / heavy quantity of dust which would raises the SPM levels in the vicinity. – the noise levels would be high due to the machinery used for leveling. • Safety of Workers • Construction Activity 7/28/2014 16
  • 17. Impacts during Operation Phase of NMIA • Operation of airport: – two major impacts include that of air emissions and noise. • Surface Traffic: – air quality is affected – Noise also is affected • Employment, Migration & Settlement: 7/28/2014 17
  • 19. Air sector • Appropriate dust suppression measures will be implemented within the project site. • Background air quality of all transport corridors will be maintained by reducing idling time and control on emissions. • Aerobridges would be used for passenger transportation 7/28/2014 19 Biodiversity and Forests • CIDCO has planned to take up approx 350 Ha. of plantation of mangroves against the 161.50 Ha. Loss. • The channelization activities are designed to keep flow characteristics as close to the original natural flow. • compensatory vegetation and plantation programme will be undertaken within the airport area • contamination of estuarine body would occur mostly during the construction phase due to resuspension of sediments or dust from construction site, both of which are temporary. • There was no wildlife, observed during the field survey.
  • 20. Disaster management plan • Natural Disasters: – earthquake – flood – storms/cyclone – cloud burst/lightning/extreme weather conditions – Fire • Terror Attack, Plane Hijack, Sabotage • A highly equiped airport is developed to counter all the calamities and disasters. • Aircraft Accident Related Disasters: – aircraft accident at airport – aircraft accident off airport – Hazardous material emergency, hydrocarbon spills (ATF) followed by vapour dispersion and pool fire – fire 7/28/2014 20
  • 21. Conclusion • The project is necessary and should be given a nod. • Development is necessary, but development along with environment is acceptable. • So adopt sustainable development. • Human imagination is touching sky, sky is part of environment so better preserve for imagination hence future. • Go green. 7/28/2014 21
  • 22. Reference • Google • Wikipedia • Maharashtra pollution control board • CIDCO • CESE, IIT Bombay • LBG-INECO-RITES Consortium, USA • Central Water and Power Research Station (CWPRS), Pune • Ground water Survey & Development Agency (GSDA), Govt. of Maharashtra. 7/28/2014 22