ENVIRONMENTAL IMPACT
ASSESSTMENT OF
“UITM SENTRAL”
INTRODUCTION
 PROJECT TITTLE
This Environmental Impact Assessment (EIA) report has
been prepared for:
“PROPOSED “UITM SENTRAL” FOR UITM SHAH ALAM”
 PROJECT LOCATION
This project are located in sec.1 in Shah Alam and the site
proposed for this project are in “ UiTM Bus Terminal
Parking” besides the second main entrance of UiTM.
INTRODUCTION
 Project Proponent
Project proponent is the UiTM.
The academic Affairs Division (BHEA)
Level 4, Chancellery Tuanku Syed Sirajuddin,
University Technology MARA (UiTM) Malaysia,
Shah Alam, Selangor.
INTRODUCTION
 Project Contractor
Pacifist Development Sdn Bhd,
Unit 1-1, Ground Floor, Menara Promenade,
No.189, Jalan Tun Razak,
50400 Kuala Lumpur.
 EIA Consultant
Enviro-LIFT Services Sdn Bhd
6-B, Jalan Astaka L U8/L,
Bukit Jelutong Business & Technology Centre,
40150 Shah Alam,
Selangor Darul Ehsan.
INTRODUCTION
 Undergraduates are required to prepare a proposal to the
Development Office UiTM, Shah Alam. Among the
elements to be considered for development are:
 Accessibility
 Circulation/parking
 Public Amenities
 Security/Main Lounge/Multipurpose Convention Hall
 Facility for Disable
 Commercial areas/Bistro/ATM/Retail Areas, Café, Restaurant
 Sanitary System and Health
 Leisure Area/Sport Facilities/Gymnasium/Recreational Facilities
 IT Center/Child Care Center/R&D Center
 Residence Hotel/Hotel
 Green Building Certification
 Others ( suitable add-on components which complement the
concept development)
PROJECT REQUIREMENTPROJECTREQUIREMENT
 To ensure the concept of the proposed project does not contradict
any development plans, policies or any decisions of the
Government of Malaysia.
 To ensure EIA study under the legal requirement as stated in
section 34A, Environmental Quality Act, 1974 in respect to the
EIA for Prescribed Activity.
 To identify the suitability of the site location for development
project through the site visits and analysis of the existing
information.
EIA OBJECTIVESEIAOBJECTIVES
 To predict the arising environmental issues due to the
development works that conducted at the site location.
 To evaluate the measures in protecting and mitigating
environmental problems simultaneously to resolve socio
economic issues.
 To communicate the information gathered in the EIA study with
the parties involves in the project in order to obtain approval
from the authority.
EIA OBJECTIVESEIAOBJECTIVES
 Based on the Department of Environment shown
that, overall index air quality at (Shah Alam) is good.
So these places have no problem with air quality.
EXISTING ENVIRONMENT
Air Quality Status
2014
AIRQUALITYIMPACT
 The location for the proposed Uitm Sentral site are at “Bus
Parking Terminal” and is located near the drainage ditch
connecting rainwater and water from the UiTM
transported to nearby storm drains before the diverted a
nearby river (Klang river).
WATERQUALITYIMPACT EXISTING ENVIRONMENT
Analytical results obtained
showed the river water
quality of Sungai Klang
generally falls within Class
III and in good condition
 Noise levels are measured at the site.
 The main source of noise coming from the main road
nearby. Maximum noise levels occurring in the
morning and evening for the increased number of
vehicles on the road.
NOISELEVEL EXISTING ENVIRONMENT
Causes
 Air pollution during construction comes from
road dust, plant and machineries, of which
the leading pollutants are carbon monoxide
and hydrocarbons.
Action
 As roads within the project area will be cleaned
and sprinkled at regular intervals to reduce
fugitive dust.
 Strengthen maintenance of transportation
vehicles, so as to ensure a discharge of vehicle
exhaust gas according to relevant standards.
EIA DURING CONSTRUCTIONAIRQUALITY
DUST EIA DURING CONSTRUCTION
Causes
 pollutions on ambient air by the proposed
project include mainly dusts from surface
levelling at the construction site, movements
of transportation vehicles and their
loading/unloading of construction materials,
earthwork by construction machinery and
temporary piling of spoils
Action
 Enclosure walls with a height of 2 meters or above will be
built around the construction site.
 A water ditch shall be made at the exit to and from the
construction site, so as to reduce the amount of earth on
tires of vehicle to and from the construction site.
 Covers will be made on materials to be transported or
they will be transported by enclosed vehicles, routes of
transportation vehicles shall avoid residential quarters
and other environmentally sensitive areas, and vehicle
speed shall also be limited.
Causes
 Suspended solid due to soil run off due to
heavy rain.
 Fuel. (oil spill from the plant and
machineries on site is also discharged into
the drain during rain)
Action
 Run off water from construction site will be routed
to a temporary sedimentation tank for settlement
of suspended solids.
WATERQUALITY EIA DURING CONSTRUCTION
NOISE EIA DURING CONSTRUCTION
Causes
 Noises in connection with the project include noise
by operating port machinery and noise by
transportation vehicles.
Action
 Hoarding around the site
 Limits on working hours
 Service vehicles and machineries regularly
 replacing exhaust systems as soon as they become
noisy
 turning off engines when they are not in use
SOLIDWASTE EIA DURING CONSTRUCTION
Causes
 Waste material on site that are not properly
maintained.
Action
 Control the disposal of waste at the site need to be
done for the purpose of avoiding contamination of
soil and groundwater.
 Proposed Project can be implemented at the
proposed site without creating significant
adverse impacts on the environment.
 If all of the action proposed to be made and
applied at the project site pollution levels in the
surrounding area the project can be reduced.
CONCLUSIONCONCLUSION

More Related Content

What's hot

Environmental aspects and impacts
Environmental aspects and impactsEnvironmental aspects and impacts
Environmental aspects and impacts
Bishnu Koirala
 
ISO 14001 2015 7 requirements
ISO 14001 2015 7 requirementsISO 14001 2015 7 requirements
ISO 14001 2015 7 requirements
Nigel Leehane
 
Municipal solid waste management in malaysia
Municipal solid waste management in malaysiaMunicipal solid waste management in malaysia
Municipal solid waste management in malaysia
Nurul Izyan
 
Occupational safety and health act 1994 (act 514)
Occupational safety and health act 1994 (act 514)Occupational safety and health act 1994 (act 514)
Occupational safety and health act 1994 (act 514)
University of Science Malaysia
 
Chapter 3 - OSHA Management
Chapter 3 - OSHA ManagementChapter 3 - OSHA Management
Chapter 3 - OSHA Management
Politeknik Kuching Sarawak
 
Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)
Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)
Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)
Mohd Firrdhaus Mohd Sahabuddin
 
Environmental Management System
 Environmental Management System Environmental Management System
Environmental Management System
Akshay Jain
 
Safety Week Activity Report
Safety Week Activity ReportSafety Week Activity Report
Safety Week Activity Report
Syed Owais Mukhtar
 
Schedule waste management in Malaysia
Schedule waste management in Malaysia Schedule waste management in Malaysia
Schedule waste management in Malaysia
AnisSyafiqahAmar
 
Legal register
Legal registerLegal register
Legal register
Mirza Saifullah Baig
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
shiva constructions
 
Sitaram1
Sitaram1Sitaram1
Sitaram1
sitaramayya
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
MuhammadAdliHamdan
 
Waste Management .pptx
Waste Management .pptxWaste Management .pptx
Waste Management .pptx
ImaNur7
 
Extended producer responsibility by K D Bhardwaj
Extended producer responsibility by K D BhardwajExtended producer responsibility by K D Bhardwaj
Extended producer responsibility by K D Bhardwaj
Rojarsharin
 
Nadopod
NadopodNadopod
Nadopod
Daryl Lee
 
Module 2 Legislation of OSH in Malaysia
Module 2 Legislation of OSH in MalaysiaModule 2 Legislation of OSH in Malaysia
Module 2 Legislation of OSH in Malaysia
Norrazman Zaiha Zainol
 
Roof raising: adding clear height to existing buildings
Roof raising: adding clear height to existing buildingsRoof raising: adding clear height to existing buildings
Roof raising: adding clear height to existing buildings
rooflifters
 
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL  MANUALHEALTH, SAFETY AND ENVIRONMENTAL  MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
Dwarika Bhushan Sharma
 

What's hot (20)

Environmental aspects and impacts
Environmental aspects and impactsEnvironmental aspects and impacts
Environmental aspects and impacts
 
ISO 14001 2015 7 requirements
ISO 14001 2015 7 requirementsISO 14001 2015 7 requirements
ISO 14001 2015 7 requirements
 
Municipal solid waste management in malaysia
Municipal solid waste management in malaysiaMunicipal solid waste management in malaysia
Municipal solid waste management in malaysia
 
Occupational safety and health act 1994 (act 514)
Occupational safety and health act 1994 (act 514)Occupational safety and health act 1994 (act 514)
Occupational safety and health act 1994 (act 514)
 
Chapter 3 - OSHA Management
Chapter 3 - OSHA ManagementChapter 3 - OSHA Management
Chapter 3 - OSHA Management
 
Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)
Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)
Industry Code of Practice ob Indoor Air Quality 2010 (DOSH MALAYSIA)
 
Environmental Management System
 Environmental Management System Environmental Management System
Environmental Management System
 
Safety Week Activity Report
Safety Week Activity ReportSafety Week Activity Report
Safety Week Activity Report
 
Schedule waste management in Malaysia
Schedule waste management in Malaysia Schedule waste management in Malaysia
Schedule waste management in Malaysia
 
Unit8 konkrit ringan
Unit8  konkrit ringanUnit8  konkrit ringan
Unit8 konkrit ringan
 
Legal register
Legal registerLegal register
Legal register
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
Sitaram1
Sitaram1Sitaram1
Sitaram1
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
Waste Management .pptx
Waste Management .pptxWaste Management .pptx
Waste Management .pptx
 
Extended producer responsibility by K D Bhardwaj
Extended producer responsibility by K D BhardwajExtended producer responsibility by K D Bhardwaj
Extended producer responsibility by K D Bhardwaj
 
Nadopod
NadopodNadopod
Nadopod
 
Module 2 Legislation of OSH in Malaysia
Module 2 Legislation of OSH in MalaysiaModule 2 Legislation of OSH in Malaysia
Module 2 Legislation of OSH in Malaysia
 
Roof raising: adding clear height to existing buildings
Roof raising: adding clear height to existing buildingsRoof raising: adding clear height to existing buildings
Roof raising: adding clear height to existing buildings
 
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL  MANUALHEALTH, SAFETY AND ENVIRONMENTAL  MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
 

Viewers also liked

Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
Istiak Asif
 
Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA)
Monika Arora
 
Playmobile noise-test
Playmobile noise-testPlaymobile noise-test
Playmobile noise-test
Tim Becker
 
Proposal defence rehearsal
Proposal defence rehearsalProposal defence rehearsal
Proposal defence rehearsal
鈞維 莊
 
2010 EIA Presentation to KPAC
2010 EIA Presentation to KPAC2010 EIA Presentation to KPAC
2010 EIA Presentation to KPAC
Jay Younger
 
US EIA Report: Propane Situation Update - Feb 5, 2014
US EIA Report: Propane Situation Update - Feb 5, 2014US EIA Report: Propane Situation Update - Feb 5, 2014
US EIA Report: Propane Situation Update - Feb 5, 2014
Marcellus Drilling News
 
Dba proposal defence
Dba proposal defenceDba proposal defence
Dba proposal defence
Quan Risk
 
EIA report Lalibela1
EIA report Lalibela1EIA report Lalibela1
EIA report Lalibela1
Misigana Hidata
 
Noise Monitoring
Noise Monitoring  Noise Monitoring
Noise Monitoring
Hardik Kalal
 
System(board level) noise figure analysis and optimization
System(board level) noise figure analysis and optimizationSystem(board level) noise figure analysis and optimization
System(board level) noise figure analysis and optimization
criterion123
 
Noise monitoring
Noise monitoringNoise monitoring
Noise monitoring
Nor Faizah Mohamad Zaki
 
Proposal defence format
Proposal defence formatProposal defence format
Proposal defence format
Adil Mehmoood
 
EIA-Final-Report (1)
EIA-Final-Report (1)EIA-Final-Report (1)
EIA-Final-Report (1)
Katherine Schwartz
 
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri LankaAn Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
Pabasara Gunawardane
 
"IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG...
"IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG..."IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG...
"IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG...
Neeraj Parashar
 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airport
Vivekanand Prasad Moril
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
vandana bharti
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
Dhawal Kataria
 
Noise Pollution
Noise PollutionNoise Pollution
Noise Pollution
GAURAV. H .TANDON
 
Sample project -Marketing Management
Sample project -Marketing Management Sample project -Marketing Management
Sample project -Marketing Management
Mamta Narula
 

Viewers also liked (20)

Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
 
Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA)
 
Playmobile noise-test
Playmobile noise-testPlaymobile noise-test
Playmobile noise-test
 
Proposal defence rehearsal
Proposal defence rehearsalProposal defence rehearsal
Proposal defence rehearsal
 
2010 EIA Presentation to KPAC
2010 EIA Presentation to KPAC2010 EIA Presentation to KPAC
2010 EIA Presentation to KPAC
 
US EIA Report: Propane Situation Update - Feb 5, 2014
US EIA Report: Propane Situation Update - Feb 5, 2014US EIA Report: Propane Situation Update - Feb 5, 2014
US EIA Report: Propane Situation Update - Feb 5, 2014
 
Dba proposal defence
Dba proposal defenceDba proposal defence
Dba proposal defence
 
EIA report Lalibela1
EIA report Lalibela1EIA report Lalibela1
EIA report Lalibela1
 
Noise Monitoring
Noise Monitoring  Noise Monitoring
Noise Monitoring
 
System(board level) noise figure analysis and optimization
System(board level) noise figure analysis and optimizationSystem(board level) noise figure analysis and optimization
System(board level) noise figure analysis and optimization
 
Noise monitoring
Noise monitoringNoise monitoring
Noise monitoring
 
Proposal defence format
Proposal defence formatProposal defence format
Proposal defence format
 
EIA-Final-Report (1)
EIA-Final-Report (1)EIA-Final-Report (1)
EIA-Final-Report (1)
 
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri LankaAn Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
 
"IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG...
"IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG..."IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG...
"IMPACT OF COAL BED METHANE MINING IN KORBA AND RAIGARH DISTRICT OF CHHATTISG...
 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airport
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
 
Noise Pollution
Noise PollutionNoise Pollution
Noise Pollution
 
Sample project -Marketing Management
Sample project -Marketing Management Sample project -Marketing Management
Sample project -Marketing Management
 

Similar to ENVIRONMENTAL IMPACT ASSESSTMENT OF

KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
MNIT,JAIPUR
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
Mayur Rahangdale
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
XingYue0907
 
HSE Engineer
HSE EngineerHSE Engineer
JIJIN UPDATED CV
JIJIN UPDATED CVJIJIN UPDATED CV
JIJIN UPDATED CV
Jijin Varghese
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
atiq amin
 
EIA report on thermal power project
EIA report on thermal power projectEIA report on thermal power project
EIA report on thermal power project
Ahsan Nazir
 
IRJET- Self-Cleaning of Street by Sewage Treated Water using Street Stud
IRJET-  	  Self-Cleaning of Street by Sewage Treated Water using Street StudIRJET-  	  Self-Cleaning of Street by Sewage Treated Water using Street Stud
IRJET- Self-Cleaning of Street by Sewage Treated Water using Street Stud
IRJET Journal
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
Dr Deepak Kumar Tripathi
 
IRJET- Designing and Fabrication of Crash Barrier
IRJET- Designing and Fabrication of Crash BarrierIRJET- Designing and Fabrication of Crash Barrier
IRJET- Designing and Fabrication of Crash Barrier
IRJET Journal
 
EIA report
EIA reportEIA report
EIA report
nandan_bhanvadia
 
Khaled CV
Khaled CVKhaled CV
Khaled CV
khaled ahmed
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
NABIL NASSAR
 
Internship report at Indian Oil Corporation Limited
Internship report at Indian Oil Corporation LimitedInternship report at Indian Oil Corporation Limited
Internship report at Indian Oil Corporation Limited
AdityaDiwakar3
 
IRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab ShelterIRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab Shelter
IRJET Journal
 
Khaled HSE
Khaled HSEKhaled HSE
Khaled HSE
khaled ahmed
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
Rakshita Raghunath
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
hemanth kumar
 
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
zubeditufail
 
Al04602259263
Al04602259263Al04602259263
Al04602259263
IJERA Editor
 

Similar to ENVIRONMENTAL IMPACT ASSESSTMENT OF (20)

KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
HSE Engineer
HSE EngineerHSE Engineer
HSE Engineer
 
JIJIN UPDATED CV
JIJIN UPDATED CVJIJIN UPDATED CV
JIJIN UPDATED CV
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
 
EIA report on thermal power project
EIA report on thermal power projectEIA report on thermal power project
EIA report on thermal power project
 
IRJET- Self-Cleaning of Street by Sewage Treated Water using Street Stud
IRJET-  	  Self-Cleaning of Street by Sewage Treated Water using Street StudIRJET-  	  Self-Cleaning of Street by Sewage Treated Water using Street Stud
IRJET- Self-Cleaning of Street by Sewage Treated Water using Street Stud
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
IRJET- Designing and Fabrication of Crash Barrier
IRJET- Designing and Fabrication of Crash BarrierIRJET- Designing and Fabrication of Crash Barrier
IRJET- Designing and Fabrication of Crash Barrier
 
EIA report
EIA reportEIA report
EIA report
 
Khaled CV
Khaled CVKhaled CV
Khaled CV
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
Internship report at Indian Oil Corporation Limited
Internship report at Indian Oil Corporation LimitedInternship report at Indian Oil Corporation Limited
Internship report at Indian Oil Corporation Limited
 
IRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab ShelterIRJET- Analysis of Flood Resistant Rehab Shelter
IRJET- Analysis of Flood Resistant Rehab Shelter
 
Khaled HSE
Khaled HSEKhaled HSE
Khaled HSE
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
 
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
 
Al04602259263
Al04602259263Al04602259263
Al04602259263
 

ENVIRONMENTAL IMPACT ASSESSTMENT OF

  • 2. INTRODUCTION  PROJECT TITTLE This Environmental Impact Assessment (EIA) report has been prepared for: “PROPOSED “UITM SENTRAL” FOR UITM SHAH ALAM”  PROJECT LOCATION This project are located in sec.1 in Shah Alam and the site proposed for this project are in “ UiTM Bus Terminal Parking” besides the second main entrance of UiTM. INTRODUCTION
  • 3.  Project Proponent Project proponent is the UiTM. The academic Affairs Division (BHEA) Level 4, Chancellery Tuanku Syed Sirajuddin, University Technology MARA (UiTM) Malaysia, Shah Alam, Selangor. INTRODUCTION
  • 4.  Project Contractor Pacifist Development Sdn Bhd, Unit 1-1, Ground Floor, Menara Promenade, No.189, Jalan Tun Razak, 50400 Kuala Lumpur.  EIA Consultant Enviro-LIFT Services Sdn Bhd 6-B, Jalan Astaka L U8/L, Bukit Jelutong Business & Technology Centre, 40150 Shah Alam, Selangor Darul Ehsan. INTRODUCTION
  • 5.  Undergraduates are required to prepare a proposal to the Development Office UiTM, Shah Alam. Among the elements to be considered for development are:  Accessibility  Circulation/parking  Public Amenities  Security/Main Lounge/Multipurpose Convention Hall  Facility for Disable  Commercial areas/Bistro/ATM/Retail Areas, Café, Restaurant  Sanitary System and Health  Leisure Area/Sport Facilities/Gymnasium/Recreational Facilities  IT Center/Child Care Center/R&D Center  Residence Hotel/Hotel  Green Building Certification  Others ( suitable add-on components which complement the concept development) PROJECT REQUIREMENTPROJECTREQUIREMENT
  • 6.  To ensure the concept of the proposed project does not contradict any development plans, policies or any decisions of the Government of Malaysia.  To ensure EIA study under the legal requirement as stated in section 34A, Environmental Quality Act, 1974 in respect to the EIA for Prescribed Activity.  To identify the suitability of the site location for development project through the site visits and analysis of the existing information. EIA OBJECTIVESEIAOBJECTIVES
  • 7.  To predict the arising environmental issues due to the development works that conducted at the site location.  To evaluate the measures in protecting and mitigating environmental problems simultaneously to resolve socio economic issues.  To communicate the information gathered in the EIA study with the parties involves in the project in order to obtain approval from the authority. EIA OBJECTIVESEIAOBJECTIVES
  • 8.  Based on the Department of Environment shown that, overall index air quality at (Shah Alam) is good. So these places have no problem with air quality. EXISTING ENVIRONMENT Air Quality Status 2014 AIRQUALITYIMPACT
  • 9.  The location for the proposed Uitm Sentral site are at “Bus Parking Terminal” and is located near the drainage ditch connecting rainwater and water from the UiTM transported to nearby storm drains before the diverted a nearby river (Klang river). WATERQUALITYIMPACT EXISTING ENVIRONMENT Analytical results obtained showed the river water quality of Sungai Klang generally falls within Class III and in good condition
  • 10.  Noise levels are measured at the site.  The main source of noise coming from the main road nearby. Maximum noise levels occurring in the morning and evening for the increased number of vehicles on the road. NOISELEVEL EXISTING ENVIRONMENT
  • 11. Causes  Air pollution during construction comes from road dust, plant and machineries, of which the leading pollutants are carbon monoxide and hydrocarbons. Action  As roads within the project area will be cleaned and sprinkled at regular intervals to reduce fugitive dust.  Strengthen maintenance of transportation vehicles, so as to ensure a discharge of vehicle exhaust gas according to relevant standards. EIA DURING CONSTRUCTIONAIRQUALITY
  • 12. DUST EIA DURING CONSTRUCTION Causes  pollutions on ambient air by the proposed project include mainly dusts from surface levelling at the construction site, movements of transportation vehicles and their loading/unloading of construction materials, earthwork by construction machinery and temporary piling of spoils Action  Enclosure walls with a height of 2 meters or above will be built around the construction site.  A water ditch shall be made at the exit to and from the construction site, so as to reduce the amount of earth on tires of vehicle to and from the construction site.  Covers will be made on materials to be transported or they will be transported by enclosed vehicles, routes of transportation vehicles shall avoid residential quarters and other environmentally sensitive areas, and vehicle speed shall also be limited.
  • 13. Causes  Suspended solid due to soil run off due to heavy rain.  Fuel. (oil spill from the plant and machineries on site is also discharged into the drain during rain) Action  Run off water from construction site will be routed to a temporary sedimentation tank for settlement of suspended solids. WATERQUALITY EIA DURING CONSTRUCTION
  • 14. NOISE EIA DURING CONSTRUCTION Causes  Noises in connection with the project include noise by operating port machinery and noise by transportation vehicles. Action  Hoarding around the site  Limits on working hours  Service vehicles and machineries regularly  replacing exhaust systems as soon as they become noisy  turning off engines when they are not in use
  • 15. SOLIDWASTE EIA DURING CONSTRUCTION Causes  Waste material on site that are not properly maintained. Action  Control the disposal of waste at the site need to be done for the purpose of avoiding contamination of soil and groundwater.
  • 16.  Proposed Project can be implemented at the proposed site without creating significant adverse impacts on the environment.  If all of the action proposed to be made and applied at the project site pollution levels in the surrounding area the project can be reduced. CONCLUSIONCONCLUSION