Calculating the maximum allowable
earth fault loop impedance.
Earth loop impedance is calculated using the following formulae,
(BS7671 2008 clause 411.4.5).
Zs x Ia ≤ Uo
Where:
Zs is the earth fault loop impedance in ohms (Ω).
Uo is the nominal line voltage to earth in volts (V).
Ia is the current in Amperes (A) required to trip the circuit
breaker for the relevant disconnection time.
Schneider Electric 2
- Buildings Division – Neville Watkins – March 2009
Current required to trip the circuit breaker (Ia).
● The current required to trip the circuit breaker (Ia) is required to calculate the Zs
value for the circuit.
● To determine Ia the disconnection time for the circuit is required. The
disconnection times for 230V systems are as follows;
● 0.4sec - for portable equipment.
● 5.0sec - for fixed equipment.
● The relevant disconnection time is plotted on the tripping curve so that Ia can
be obtained.
● Note: The maximum tripping time (higher tolerance limit) must be used on the
tripping curve.
An example for a 20A type D MCB is shown on the following slide.
Schneider Electric 3
- Buildings Division – Neville Watkins – March 2009
Schneider Electric 4
- Buildings Division – Neville Watkins – March 2009
Calculating the Zs value when Ia is known.
●The Zs value is calculated as follows (BS7671 2008 clause 411.4.5).
● As seen on the previous slide, the current required to trip the circuit breaker
can be measured from the tripping curve. e.g. a disconnection time of 5 sec
is required, therefore the current required to trip the MCB = 156A (Ia).
● The nominal voltage to earth is 230V (Uo).
● The maximum Zs is calculated using the following formulae:- Zs x Ia ≤ Uo
Max Zs = Uo / Ia
230V / 156A = 1.47ohms
Therefore for a 20A Type D MCB the maximum Zs allowable for a 5 second
disconnection time is 1.47 ohms.

More Related Content

What's hot

Fault Calculations
Fault CalculationsFault Calculations
Fault Calculations
michaeljmack
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
Partha Parida
 
Electrical lighting design and calculations
Electrical lighting design and calculationsElectrical lighting design and calculations
Electrical lighting design and calculations
Musaib ul Hassan Bhat
 
4 fuses
4 fuses4 fuses
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
Chandan Singh
 
ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)
AB Amit
 
Cable sizing to withstand short circuit current
Cable sizing to withstand short circuit currentCable sizing to withstand short circuit current
Cable sizing to withstand short circuit current
Leonardo ENERGY
 
Per unit systems in power systems
Per unit systems in power systemsPer unit systems in power systems
Per unit systems in power systems
anoopeluvathingal
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology
wessam alaslmi
 
HV testing of insulator
HV testing of insulatorHV testing of insulator
HV testing of insulator
Jawad Ali
 
Ac distribution system
Ac distribution systemAc distribution system
Ac distribution system
Daffodil International University
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nadir Baloch
 
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
Dr. Rohit Babu
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
Shanid Pazhamkavil
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
Binit Das
 
Lightening Arrester.pptx
Lightening Arrester.pptxLightening Arrester.pptx
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
jbpatel7290
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
Vinod Srivastava
 
Ac motor winding
Ac motor windingAc motor winding
Ac motor winding
Muhammad Atta-ul-Ghaffar
 
relay-distance relay basics
relay-distance relay basicsrelay-distance relay basics
relay-distance relay basics
अनिल कुमावत
 

What's hot (20)

Fault Calculations
Fault CalculationsFault Calculations
Fault Calculations
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
Electrical lighting design and calculations
Electrical lighting design and calculationsElectrical lighting design and calculations
Electrical lighting design and calculations
 
4 fuses
4 fuses4 fuses
4 fuses
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
 
ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)
 
Cable sizing to withstand short circuit current
Cable sizing to withstand short circuit currentCable sizing to withstand short circuit current
Cable sizing to withstand short circuit current
 
Per unit systems in power systems
Per unit systems in power systemsPer unit systems in power systems
Per unit systems in power systems
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology
 
HV testing of insulator
HV testing of insulatorHV testing of insulator
HV testing of insulator
 
Ac distribution system
Ac distribution systemAc distribution system
Ac distribution system
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
Lightening Arrester.pptx
Lightening Arrester.pptxLightening Arrester.pptx
Lightening Arrester.pptx
 
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
 
Ac motor winding
Ac motor windingAc motor winding
Ac motor winding
 
relay-distance relay basics
relay-distance relay basicsrelay-distance relay basics
relay-distance relay basics
 

Similar to Earth Fault Loop Impedance Summary.ppt

Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems Safety
Talia Carbis
 
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated SubstationModeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
IRJET Journal
 
SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415
Patrick Volluz
 
40220140507002
4022014050700240220140507002
40220140507002
IAEME Publication
 
40220140507002
4022014050700240220140507002
40220140507002
IAEME Publication
 
Introduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.pptIntroduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.ppt
Ahmed Ramadan
 
40220140507001
4022014050700140220140507001
40220140507001
IAEME Publication
 
40220140507001
4022014050700140220140507001
40220140507001
IAEME Publication
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
michaeljmack
 
Current Transformers parameter design and graphs - size and design requirements
Current Transformers parameter design and graphs - size and design requirementsCurrent Transformers parameter design and graphs - size and design requirements
Current Transformers parameter design and graphs - size and design requirements
ssuser39bdb9
 
Electrical Power Systems 3 phase apparatus
Electrical Power Systems 3 phase apparatusElectrical Power Systems 3 phase apparatus
Electrical Power Systems 3 phase apparatus
Mubarek Kurt
 
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) ContactorsABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
Thorne & Derrick International
 
Vignettes in Grounding
Vignettes in GroundingVignettes in Grounding
Vignettes in Grounding
michaeljmack
 
ETAP - Arc flash introduction
ETAP - Arc flash introductionETAP - Arc flash introduction
ETAP - Arc flash introduction
Himmelstern
 
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET Journal
 
Shortcircuit-IEC.pdf
Shortcircuit-IEC.pdfShortcircuit-IEC.pdf
Shortcircuit-IEC.pdf
Wilfredo870952
 
Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...
NSW Environment and Planning
 
Substation overview
Substation overviewSubstation overview
Substation overview
BHAGWAN PRASAD
 
Substationoverview
Substationoverview Substationoverview
Substationoverview
sailusree
 
Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...
Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...
Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...
IOSR Journals
 

Similar to Earth Fault Loop Impedance Summary.ppt (20)

Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems Safety
 
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated SubstationModeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
 
SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415
 
40220140507002
4022014050700240220140507002
40220140507002
 
40220140507002
4022014050700240220140507002
40220140507002
 
Introduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.pptIntroduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.ppt
 
40220140507001
4022014050700140220140507001
40220140507001
 
40220140507001
4022014050700140220140507001
40220140507001
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
 
Current Transformers parameter design and graphs - size and design requirements
Current Transformers parameter design and graphs - size and design requirementsCurrent Transformers parameter design and graphs - size and design requirements
Current Transformers parameter design and graphs - size and design requirements
 
Electrical Power Systems 3 phase apparatus
Electrical Power Systems 3 phase apparatusElectrical Power Systems 3 phase apparatus
Electrical Power Systems 3 phase apparatus
 
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) ContactorsABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
 
Vignettes in Grounding
Vignettes in GroundingVignettes in Grounding
Vignettes in Grounding
 
ETAP - Arc flash introduction
ETAP - Arc flash introductionETAP - Arc flash introduction
ETAP - Arc flash introduction
 
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
 
Shortcircuit-IEC.pdf
Shortcircuit-IEC.pdfShortcircuit-IEC.pdf
Shortcircuit-IEC.pdf
 
Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Substationoverview
Substationoverview Substationoverview
Substationoverview
 
Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...
Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...
Refurbishment of a Three-Phase Induction Motor Reflecting Local Voltage Condi...
 

Recently uploaded

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
shahdabdulbaset
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 

Recently uploaded (20)

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 

Earth Fault Loop Impedance Summary.ppt

  • 1. Schneider Electric 1 - Buildings Division – Neville Watkins – March 2009 Calculating the maximum allowable earth fault loop impedance. Earth loop impedance is calculated using the following formulae, (BS7671 2008 clause 411.4.5). Zs x Ia ≤ Uo Where: Zs is the earth fault loop impedance in ohms (Ω). Uo is the nominal line voltage to earth in volts (V). Ia is the current in Amperes (A) required to trip the circuit breaker for the relevant disconnection time.
  • 2. Schneider Electric 2 - Buildings Division – Neville Watkins – March 2009 Current required to trip the circuit breaker (Ia). ● The current required to trip the circuit breaker (Ia) is required to calculate the Zs value for the circuit. ● To determine Ia the disconnection time for the circuit is required. The disconnection times for 230V systems are as follows; ● 0.4sec - for portable equipment. ● 5.0sec - for fixed equipment. ● The relevant disconnection time is plotted on the tripping curve so that Ia can be obtained. ● Note: The maximum tripping time (higher tolerance limit) must be used on the tripping curve. An example for a 20A type D MCB is shown on the following slide.
  • 3. Schneider Electric 3 - Buildings Division – Neville Watkins – March 2009
  • 4. Schneider Electric 4 - Buildings Division – Neville Watkins – March 2009 Calculating the Zs value when Ia is known. ●The Zs value is calculated as follows (BS7671 2008 clause 411.4.5). ● As seen on the previous slide, the current required to trip the circuit breaker can be measured from the tripping curve. e.g. a disconnection time of 5 sec is required, therefore the current required to trip the MCB = 156A (Ia). ● The nominal voltage to earth is 230V (Uo). ● The maximum Zs is calculated using the following formulae:- Zs x Ia ≤ Uo Max Zs = Uo / Ia 230V / 156A = 1.47ohms Therefore for a 20A Type D MCB the maximum Zs allowable for a 5 second disconnection time is 1.47 ohms.