Durgapur chemicals ltd. (DCL) was incorporated on 31 July
1963 as a public sector company wholly owned by the
Government of West Bengal.




          It presently has mainly the following plants:



                           1.   Caustic Soda plant
                           2.   Monochloro Benzene plant
                           3.   Stable Bleaching Powder plant
                           4.   Sodium Pentacholorophenate plant
                           5.   Hydrochloric acid plant
DCL produces bleaching powder having specification of Grade-1,
strength of 34-36% available chlorine with capacity of 15ton/day.

The plant has some of the modern technologies such as:
1. Special designed jacketed chlorination reactor;
2. Screw conveyer;
3. Bucket elevator;
4. Rotary air lock;
5. Dust return screw conveyer;
6. Cyclone separator and dust collector.
RAW MATERIALS:

       2. Liquid chlorine –purity of 99.5%

1. Hydrated lime- from Jodhpur Rajasthan. (size
      250-300 mesh having 80±1% purity.)
CHEMICAL RXN. INVOLVED:



 Ca(OH ) 2 Cl2            Ca(OCl )Cl H 2O
 2Ca(OH ) 2 2Cl2            Ca(ClO) 2 CaCl2 2H 2O


Reaction occurs under vacuum in the reactor.

The reactor has scrapper having 40 arms
rotating with the help of spur gear and pinion
arrangement connected to a motor having
capacity of 100 hp.
Reaction is carried out at 55-60ºC.
PROCESS DESCRIPTION




STEPS:
1. The lime feeding and transporting process.
2. The chlorination , drying and cooling process
3. Packing of the product
4. Water regeneration system
THE LIME FEEDING AND TRANSPORTING PROCESS.

         godown


storage hopper(D-411) consisting of a rotary air lock(RAL)


                               with help of one inclined screw conveyer (CY-462)
  bucket elevator(CY-465)      & one horizontal conveyer (CY-463) (moisture
                               content of slaked lime 1-1.5%)


                               From one storage hopper and one screw
bucket elevator(CY-465)        conveyer (CY-412),



bucket elevator(CY-418)
                               Through a screw conveyer (CY-459)
                               Approximately 30-45 min. are needed to charge 4.5-4.8 MT
Charge hopper (D-419)          The charge hopper is provided with electromagnetic impact
                               vibrator
CHLORINATION, DRYING AND COOLING PROCESS:




This process consists of one specially designed,
horizontally mounted, cylindrical, insulated, jacketed
chlorination reactor. Reaction is batch type, reactor has
scrapper assemblies (40 arms in four rows), attached
motor has a capacity of 100hp with 900 rpm, which is
reduced to 9 rpm for the reactor vessel, with the help of a
reduction gear, a spur gear and pinion system.
Before chlorination starts the reactor should be under complete
vacuum .Slaked lime is fed by opening the slide gate consisting of a
electromagnetic vibrator. Chlorine is fed from the longer sides of the
reactor consisting of four inlets & is controlled by flow monitoring
integrator (FIQ-421). The vessel is provided with one temperature & one
inlet pressure indicator. Generally a vacuum of 660-680 mm Hg is
maintained. Chlorine should be fed to the reactor until the fall in
vacuum is not more than 20 mm Hg.



   Chlorine is fed roughly as follows:

   15min @ 3MT/hr until 700kg of chlorine at 670-680mm Hg.

   15min @ 2MT/hr until 1200kg of chlorine at 670-680mm Hg.

   30min @ 0.8-1MT/hr until 1600kg of chlorine at 670-680mm Hg.

   30min @ 0.8MT/hr until 2400kg of chlorine at 670-680mm Hg.
The chlorination reaction requires about 2.5-3hrs for
completion.
The inside chlorine pressure is checked by pressure indicators
and any loss
of chlorine is identified by change of color of the absorbing 10-
12% caustic solution circulating through the vacuum
condenser from green to dark red.

   DRYING PROCESS
 Once the reaction is completed, steam at 1-1.5kg/m² is
 circulated from top to bottom
 through four steam inlet pipes for drying of the final product after
 stripping off all the water in the
 jacket. This process needs 2-2.5hrs for completion at 78 to 80ºC.
 Condensed steam is removed from the jacket through common
 header for cooling water inlet.
COOLING PROCESS




After drying the product is cooled by circulating cooling
water through the jacket for 1.5-2hrs to reduce the inlet
temperature to 35-40ºC. Altogether there are four steam
inlet and four cooling water inlet pipes are connected
respectively at the top and bottom of the jacket.
OTHER EQUIPMENTS:



A vapor hood with a slide door and a seal is provided in the center of
the reactor for charging slaked lime to the reactor.
Next to vapor hood a horizontally mounted Dust Return Screw
Conveyer(DRSC) is provided for returning the major portion of dust
carried by the vapors to the reactor and is connected with steam
jacket to avoid condensation and jamming.
After DRSC, the particulate solids and gases are sent through a vacuum
pipe to a barometric condenser which has one tail pipe and one
overflow pipe.
PACKING OF THE PRODUCT



The finished product is discharged through bottle seal opening of the
reactor into the chain conveyer to flow freely by gravity. The SBP is
transferred to a SBP hopper(D-430) by chain conveyer (CY-427).
It is next sent to a pulveriser unit and then to a cyclone separator to
separate desired sized product particles. Below the pulveriser is one
motor of capacity 50hp connected for easy separation and
transportation of particulate solids.
The bleaching powder is packed into double inner lined HDPE bags
having capacity of 25 kg each.
Also there is a facility to collect the dust in a dust collector from which
the dust is collected and sent back to the packing unit.
WATER REGENERATION SYSTEM




The vapors along with the unabsorbed chlorine from the reactor are
condensed in the barometric condenser (BC-423). Firstly the gases
pass through vacuum pipe through pipe by water ring vacuum
pump(VP-424A or VP-424B) and is absorbed in 10-12% caustic
solution. It is disposed or treated to purify the chlorinated water.
USES AND CONSUMPTION OF BLEACHING POWDER


     Stable Bleaching powder is used in a number of areas
     affecting public health as well as some industrial processes
     for treatment and washing processes.
     Some of the uses are:


1. For water purification.
2. In carpet industry for bleaching and finishing.
3. In paper and pulp industry as bleaching agent.
4. In leather industry as disinfectant material & also for making
   cotton used for medical purpose.
5. For sewage disposal, mosquito and epidemics control and
   general hygiene.
Durgapur chemicals limited

More Related Content

What's hot

Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Talal Khan
 
Urea plant NFL Intern report
Urea plant NFL Intern reportUrea plant NFL Intern report
Urea plant NFL Intern report
Dharmendra Choudhary
 
Refinery process-description
Refinery process-descriptionRefinery process-description
Refinery process-description
Ming Deng Chai
 
Refinery basics
Refinery basicsRefinery basics
Refinery basics
Arnab Chakraborty
 
catalytic isomerization
catalytic isomerizationcatalytic isomerization
catalytic isomerization
translateds
 
CATALYTIC REFORMING
CATALYTIC REFORMINGCATALYTIC REFORMING
CATALYTIC REFORMING
translateds
 
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZIHIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
wina kauzi
 
Oil refinery processes 14 th jan
Oil refinery processes 14 th janOil refinery processes 14 th jan
Oil refinery processes 14 th jan
Probodh Mallick
 
CCR PFD-2
CCR PFD-2CCR PFD-2
PRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLPRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPL
Ankit Devatwal
 
Refining Process
Refining ProcessRefining Process
Refining Process
Mubarik Rao
 
4746 4750.output
4746 4750.output4746 4750.output
4746 4750.output
j1075017
 
Oil Refineries in Karachi Sanjrani
Oil Refineries  in Karachi    SanjraniOil Refineries  in Karachi    Sanjrani
Oil Refineries in Karachi Sanjrani
FALAM Environmental Consultant and Services.
 
C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020
David Seow
 
aniruddh training report
aniruddh training reportaniruddh training report
aniruddh training report
Aniruddh Singh Shekhawat
 
Catalytic reforming process
Catalytic reforming processCatalytic reforming process
Catalytic reforming process
Ihsan Wassan
 
Petro refinery basics
Petro refinery basicsPetro refinery basics
Petro refinery basics
H Janardan Prabhu
 
Hydrotreating process
Hydrotreating processHydrotreating process
Hydrotreating process
translateds
 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processes
Jithu John
 
Refinery processes by Muhammad Fahad Ansari
Refinery processes by  Muhammad Fahad AnsariRefinery processes by  Muhammad Fahad Ansari
Refinery processes by Muhammad Fahad Ansari
fahadansari131
 

What's hot (20)

Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
 
Urea plant NFL Intern report
Urea plant NFL Intern reportUrea plant NFL Intern report
Urea plant NFL Intern report
 
Refinery process-description
Refinery process-descriptionRefinery process-description
Refinery process-description
 
Refinery basics
Refinery basicsRefinery basics
Refinery basics
 
catalytic isomerization
catalytic isomerizationcatalytic isomerization
catalytic isomerization
 
CATALYTIC REFORMING
CATALYTIC REFORMINGCATALYTIC REFORMING
CATALYTIC REFORMING
 
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZIHIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
 
Oil refinery processes 14 th jan
Oil refinery processes 14 th janOil refinery processes 14 th jan
Oil refinery processes 14 th jan
 
CCR PFD-2
CCR PFD-2CCR PFD-2
CCR PFD-2
 
PRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLPRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPL
 
Refining Process
Refining ProcessRefining Process
Refining Process
 
4746 4750.output
4746 4750.output4746 4750.output
4746 4750.output
 
Oil Refineries in Karachi Sanjrani
Oil Refineries  in Karachi    SanjraniOil Refineries  in Karachi    Sanjrani
Oil Refineries in Karachi Sanjrani
 
C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020
 
aniruddh training report
aniruddh training reportaniruddh training report
aniruddh training report
 
Catalytic reforming process
Catalytic reforming processCatalytic reforming process
Catalytic reforming process
 
Petro refinery basics
Petro refinery basicsPetro refinery basics
Petro refinery basics
 
Hydrotreating process
Hydrotreating processHydrotreating process
Hydrotreating process
 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processes
 
Refinery processes by Muhammad Fahad Ansari
Refinery processes by  Muhammad Fahad AnsariRefinery processes by  Muhammad Fahad Ansari
Refinery processes by Muhammad Fahad Ansari
 

Similar to Durgapur chemicals limited

Final internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptxFinal internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptx
Adisanu
 
An insight into spray pulsed reactor through mathematical modeling of catalyt...
An insight into spray pulsed reactor through mathematical modeling of catalyt...An insight into spray pulsed reactor through mathematical modeling of catalyt...
An insight into spray pulsed reactor through mathematical modeling of catalyt...
Siluvai Antony Praveen
 
Sludge thickening and stabilization processes
Sludge thickening and stabilization processes  Sludge thickening and stabilization processes
Sludge thickening and stabilization processes
Natthu Shrirame
 
ITTEHAD CHEMICAL INTERNSHIP REPORT
  ITTEHAD CHEMICAL INTERNSHIP REPORT   ITTEHAD CHEMICAL INTERNSHIP REPORT
ITTEHAD CHEMICAL INTERNSHIP REPORT
Malik Hamid
 
technical-packages.pdf |Goel scientific | Canada
technical-packages.pdf |Goel scientific | Canadatechnical-packages.pdf |Goel scientific | Canada
technical-packages.pdf |Goel scientific | Canada
GoelScientific1
 
Quick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcuQuick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcu
Ahmed Abd ElKader
 
DelayedCokingPoster-022608LR
DelayedCokingPoster-022608LRDelayedCokingPoster-022608LR
DelayedCokingPoster-022608LR
Chris Jones
 
Ankush Jindal
Ankush JindalAnkush Jindal
Ankush Jindal
ankushjindal26
 
Ankush Jindal Chemical Engg. Dept. NIT Hamirpur
Ankush Jindal Chemical Engg. Dept. NIT HamirpurAnkush Jindal Chemical Engg. Dept. NIT Hamirpur
Ankush Jindal Chemical Engg. Dept. NIT Hamirpur
ankushjindal26
 
Nitin
NitinNitin
Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...
Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...
Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...
Hudhaib Al-Allatti
 
Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02
Sashi Sharma
 
KRISHNA(200103040)_IR_PPT.pptx
KRISHNA(200103040)_IR_PPT.pptxKRISHNA(200103040)_IR_PPT.pptx
KRISHNA(200103040)_IR_PPT.pptx
adityaraaj1
 
Sunil- Thermal Power Plant
Sunil- Thermal Power PlantSunil- Thermal Power Plant
Sunil- Thermal Power Plant
Sunil8889
 
Term paper on bioenergy and biorefining process
Term paper on bioenergy and biorefining processTerm paper on bioenergy and biorefining process
Term paper on bioenergy and biorefining process
Md.Hafizur Rahman
 
Larnaca Waste Water Treatment
Larnaca Waste Water Treatment Larnaca Waste Water Treatment
Larnaca Waste Water Treatment
Lykeio Agiou Georgiou
 
CO2 EOR Pilot Project
CO2 EOR Pilot ProjectCO2 EOR Pilot Project
CO2 EOR Pilot Project
Ahmed Nour
 
Chapter 5b -_cracking_ffcu
Chapter 5b -_cracking_ffcuChapter 5b -_cracking_ffcu
Chapter 5b -_cracking_ffcu
Helena Francis
 
IRJET- Pickling Line Fume Control with Wet Scrubber
IRJET-  	  Pickling Line Fume Control with Wet ScrubberIRJET-  	  Pickling Line Fume Control with Wet Scrubber
IRJET- Pickling Line Fume Control with Wet Scrubber
IRJET Journal
 
Summer training presentation on gujarat ambuja exports ltd
Summer training presentation on gujarat ambuja exports ltdSummer training presentation on gujarat ambuja exports ltd
Summer training presentation on gujarat ambuja exports ltd
Aabid Khan
 

Similar to Durgapur chemicals limited (20)

Final internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptxFinal internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptx
 
An insight into spray pulsed reactor through mathematical modeling of catalyt...
An insight into spray pulsed reactor through mathematical modeling of catalyt...An insight into spray pulsed reactor through mathematical modeling of catalyt...
An insight into spray pulsed reactor through mathematical modeling of catalyt...
 
Sludge thickening and stabilization processes
Sludge thickening and stabilization processes  Sludge thickening and stabilization processes
Sludge thickening and stabilization processes
 
ITTEHAD CHEMICAL INTERNSHIP REPORT
  ITTEHAD CHEMICAL INTERNSHIP REPORT   ITTEHAD CHEMICAL INTERNSHIP REPORT
ITTEHAD CHEMICAL INTERNSHIP REPORT
 
technical-packages.pdf |Goel scientific | Canada
technical-packages.pdf |Goel scientific | Canadatechnical-packages.pdf |Goel scientific | Canada
technical-packages.pdf |Goel scientific | Canada
 
Quick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcuQuick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcu
 
DelayedCokingPoster-022608LR
DelayedCokingPoster-022608LRDelayedCokingPoster-022608LR
DelayedCokingPoster-022608LR
 
Ankush Jindal
Ankush JindalAnkush Jindal
Ankush Jindal
 
Ankush Jindal Chemical Engg. Dept. NIT Hamirpur
Ankush Jindal Chemical Engg. Dept. NIT HamirpurAnkush Jindal Chemical Engg. Dept. NIT Hamirpur
Ankush Jindal Chemical Engg. Dept. NIT Hamirpur
 
Nitin
NitinNitin
Nitin
 
Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...
Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...
Eng. Hossam Nassar - The Application of Anaerobic Thermal Desorption Unit for...
 
Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02
 
KRISHNA(200103040)_IR_PPT.pptx
KRISHNA(200103040)_IR_PPT.pptxKRISHNA(200103040)_IR_PPT.pptx
KRISHNA(200103040)_IR_PPT.pptx
 
Sunil- Thermal Power Plant
Sunil- Thermal Power PlantSunil- Thermal Power Plant
Sunil- Thermal Power Plant
 
Term paper on bioenergy and biorefining process
Term paper on bioenergy and biorefining processTerm paper on bioenergy and biorefining process
Term paper on bioenergy and biorefining process
 
Larnaca Waste Water Treatment
Larnaca Waste Water Treatment Larnaca Waste Water Treatment
Larnaca Waste Water Treatment
 
CO2 EOR Pilot Project
CO2 EOR Pilot ProjectCO2 EOR Pilot Project
CO2 EOR Pilot Project
 
Chapter 5b -_cracking_ffcu
Chapter 5b -_cracking_ffcuChapter 5b -_cracking_ffcu
Chapter 5b -_cracking_ffcu
 
IRJET- Pickling Line Fume Control with Wet Scrubber
IRJET-  	  Pickling Line Fume Control with Wet ScrubberIRJET-  	  Pickling Line Fume Control with Wet Scrubber
IRJET- Pickling Line Fume Control with Wet Scrubber
 
Summer training presentation on gujarat ambuja exports ltd
Summer training presentation on gujarat ambuja exports ltdSummer training presentation on gujarat ambuja exports ltd
Summer training presentation on gujarat ambuja exports ltd
 

Recently uploaded

BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
Chevonnese Chevers Whyte, MBA, B.Sc.
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 

Recently uploaded (20)

BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 

Durgapur chemicals limited

  • 1. A PRESENTATION ON VOCATIONAL TRAINING IN DURGAPUR CHEMICALS LIMITED 15thJune to 14th July BY- SATYAGHOSH MAURYA 09/CHE/04
  • 2. Durgapur chemicals ltd. (DCL) was incorporated on 31 July 1963 as a public sector company wholly owned by the Government of West Bengal. It presently has mainly the following plants: 1. Caustic Soda plant 2. Monochloro Benzene plant 3. Stable Bleaching Powder plant 4. Sodium Pentacholorophenate plant 5. Hydrochloric acid plant
  • 3. DCL produces bleaching powder having specification of Grade-1, strength of 34-36% available chlorine with capacity of 15ton/day. The plant has some of the modern technologies such as: 1. Special designed jacketed chlorination reactor; 2. Screw conveyer; 3. Bucket elevator; 4. Rotary air lock; 5. Dust return screw conveyer; 6. Cyclone separator and dust collector.
  • 4. RAW MATERIALS: 2. Liquid chlorine –purity of 99.5% 1. Hydrated lime- from Jodhpur Rajasthan. (size 250-300 mesh having 80±1% purity.)
  • 5. CHEMICAL RXN. INVOLVED: Ca(OH ) 2 Cl2 Ca(OCl )Cl H 2O 2Ca(OH ) 2 2Cl2 Ca(ClO) 2 CaCl2 2H 2O Reaction occurs under vacuum in the reactor. The reactor has scrapper having 40 arms rotating with the help of spur gear and pinion arrangement connected to a motor having capacity of 100 hp. Reaction is carried out at 55-60ºC.
  • 6. PROCESS DESCRIPTION STEPS: 1. The lime feeding and transporting process. 2. The chlorination , drying and cooling process 3. Packing of the product 4. Water regeneration system
  • 7.
  • 8. THE LIME FEEDING AND TRANSPORTING PROCESS. godown storage hopper(D-411) consisting of a rotary air lock(RAL) with help of one inclined screw conveyer (CY-462) bucket elevator(CY-465) & one horizontal conveyer (CY-463) (moisture content of slaked lime 1-1.5%) From one storage hopper and one screw bucket elevator(CY-465) conveyer (CY-412), bucket elevator(CY-418) Through a screw conveyer (CY-459) Approximately 30-45 min. are needed to charge 4.5-4.8 MT Charge hopper (D-419) The charge hopper is provided with electromagnetic impact vibrator
  • 9. CHLORINATION, DRYING AND COOLING PROCESS: This process consists of one specially designed, horizontally mounted, cylindrical, insulated, jacketed chlorination reactor. Reaction is batch type, reactor has scrapper assemblies (40 arms in four rows), attached motor has a capacity of 100hp with 900 rpm, which is reduced to 9 rpm for the reactor vessel, with the help of a reduction gear, a spur gear and pinion system.
  • 10. Before chlorination starts the reactor should be under complete vacuum .Slaked lime is fed by opening the slide gate consisting of a electromagnetic vibrator. Chlorine is fed from the longer sides of the reactor consisting of four inlets & is controlled by flow monitoring integrator (FIQ-421). The vessel is provided with one temperature & one inlet pressure indicator. Generally a vacuum of 660-680 mm Hg is maintained. Chlorine should be fed to the reactor until the fall in vacuum is not more than 20 mm Hg. Chlorine is fed roughly as follows: 15min @ 3MT/hr until 700kg of chlorine at 670-680mm Hg. 15min @ 2MT/hr until 1200kg of chlorine at 670-680mm Hg. 30min @ 0.8-1MT/hr until 1600kg of chlorine at 670-680mm Hg. 30min @ 0.8MT/hr until 2400kg of chlorine at 670-680mm Hg.
  • 11. The chlorination reaction requires about 2.5-3hrs for completion. The inside chlorine pressure is checked by pressure indicators and any loss of chlorine is identified by change of color of the absorbing 10- 12% caustic solution circulating through the vacuum condenser from green to dark red. DRYING PROCESS Once the reaction is completed, steam at 1-1.5kg/m² is circulated from top to bottom through four steam inlet pipes for drying of the final product after stripping off all the water in the jacket. This process needs 2-2.5hrs for completion at 78 to 80ºC. Condensed steam is removed from the jacket through common header for cooling water inlet.
  • 12. COOLING PROCESS After drying the product is cooled by circulating cooling water through the jacket for 1.5-2hrs to reduce the inlet temperature to 35-40ºC. Altogether there are four steam inlet and four cooling water inlet pipes are connected respectively at the top and bottom of the jacket.
  • 13. OTHER EQUIPMENTS: A vapor hood with a slide door and a seal is provided in the center of the reactor for charging slaked lime to the reactor. Next to vapor hood a horizontally mounted Dust Return Screw Conveyer(DRSC) is provided for returning the major portion of dust carried by the vapors to the reactor and is connected with steam jacket to avoid condensation and jamming. After DRSC, the particulate solids and gases are sent through a vacuum pipe to a barometric condenser which has one tail pipe and one overflow pipe.
  • 14. PACKING OF THE PRODUCT The finished product is discharged through bottle seal opening of the reactor into the chain conveyer to flow freely by gravity. The SBP is transferred to a SBP hopper(D-430) by chain conveyer (CY-427). It is next sent to a pulveriser unit and then to a cyclone separator to separate desired sized product particles. Below the pulveriser is one motor of capacity 50hp connected for easy separation and transportation of particulate solids. The bleaching powder is packed into double inner lined HDPE bags having capacity of 25 kg each. Also there is a facility to collect the dust in a dust collector from which the dust is collected and sent back to the packing unit.
  • 15. WATER REGENERATION SYSTEM The vapors along with the unabsorbed chlorine from the reactor are condensed in the barometric condenser (BC-423). Firstly the gases pass through vacuum pipe through pipe by water ring vacuum pump(VP-424A or VP-424B) and is absorbed in 10-12% caustic solution. It is disposed or treated to purify the chlorinated water.
  • 16. USES AND CONSUMPTION OF BLEACHING POWDER Stable Bleaching powder is used in a number of areas affecting public health as well as some industrial processes for treatment and washing processes. Some of the uses are: 1. For water purification. 2. In carpet industry for bleaching and finishing. 3. In paper and pulp industry as bleaching agent. 4. In leather industry as disinfectant material & also for making cotton used for medical purpose. 5. For sewage disposal, mosquito and epidemics control and general hygiene.