Bangladesh Delta
 Built on the confluence of 3 mighty
Rivers- the Ganges, the Brahmaputra
and the Meghna;
 Largest dynamic delta of the world
 Around 405 Rivers: 57 Trans-boundary
(54 with India and 3 with Myanmar);
 93% catchment area lies outside
Bangladesh with annual sediment load
of 1.0 to 1.4 billion tons;
 Abundance of water in wet season but
scarcity of water in dry season.
 Bangladesh is one of the most
vulnerable country to accelerated sea
level rise (SLR)
 SLR can cause changes in morphology,
water availability and flooding 2
Bangladesh Delta Plan 2100
 It is a long-term, holistic, integrated and scenario
based plan
3
Delta Opportunities
Highly fertile land -
• Agricultural land: 65%
• Forest lands: 17%
• Urban areas: 8%
• Water and wetlands: 10%.
Plentiful rivers (more than 400 nos.) -
• Water bodies about 4.70 million ha;
• Access to the Bay of Bengal up to 1.125 million sq. km.
Open access to sea is a huge advantage -
• It could serve the needs of growing internal trade and
commerce;
• Could become a regional hub for international sea
transportation.
Inland Water Transport (around 6000 km) -
• Easiest, environment friendly and cheapest mode of
transportation;
• Almost all districts are connected with each other;
• The Industrial/Growth centers nearby rivers.
The Sundarbans -
• The largest natural mangrove forest;
• Unique ecosystem covers an area of 577,000 ha of
which 401,600 ha land and remaining 175,400 ha is
under water.
Unique ecological settings –
• There are 2 Ramsar sites, 9 Ecological Critically Areas, 17
National Parks, 20 Wildlife Sanctuaries, 8 Eco-parks and 2
Botanical Gardens.
• Important five ECAs are as below:
 Hakaluki Haor (18,382 ha),
 Tanguar Haor (9727 ha),
 Sonadia Island (4,916 ha),
 St Martin’s Island (590 ha),
 Teknaf Peninsula (10,465 ha);
• Over 800 species of wildlife identified in ECAs.
4
Delta Challenges
Bangladesh Delta have many challenges:
 Rising Temperatures
 Changing Rainfall
 Increased Flooding
 Droughts
 River Erosion
 Sea level rise (SLR) and consequent Salinity Intrusion
 Cyclones and Storm Surges
 Water Logging
 Sedimentation
 Trans-boundary Challenges.
5
1. Baseline Analysis: Challenges and Opportunities (24 Baseline Studies: Annex-1)
The studies are related to :
• Climate Change, Natural Resources, Environment and Ecology;
• Investment and Finance, Governance, Knowledge etc.
2. Setting the Vision and Goals
3. Scenario Development
• Various plausible future scenarios based environmental, socio-economic and policy factors
• Scenario based strategy development
4. Strategy Development based on ADM Principle
• Sectoral strategies (for Water Resources, Land, Agriculture, IWT, Urban and Rural water Supply
and Sanitation)
• National Strategies (for Flood Risk Management, Fresh water etc.)
5. Investment Plan
• Macro-requirements: Hotspot wise, Cross cutting
• Project Prioritization Criteria
• Financing Arrangements and Mechanisms.
6. Implementation Framework
• Delta Commission and Delta Fund
• RBM&E Framework
• Knowledge Management.
Bangladesh Delta Plan 2100: Approaches
6
Six (6) Hotspot areas have been identified :
1. Coastal Zone
2. Barind and Drought Prone Areas
3. Haor and Flash Flood Areas
4. Chittagong Hill Tracts and Coast
5. Major Rivers and Adjoining Areas
6. Urban Areas
The remaining area is identified as Cross-cutting areas
characterized by a combination of issues and
challenges e.g. floods, drought, river bank erosion,
sedimentation, groundwater depletion, water
pollution and water supply and sanitation issues.
Hotspots: Planning Units of BDP 2100
7
Delta Vision & Goals
Delta Vision:
Ensure long term water and food security, economic growth and environmental sustainability; while effectively coping
with natural disasters, Climate Change and other delta issues through robust, adaptive and integrated strategies, and
equitable water governance.
Higher Level Goals:
Goal 1: Eliminate Extreme Poverty by 2030
Goal 2: Achieve Upper Middle Income Country (UMIC) status by 2030
Delta Plan Goals:
Goal 1: Ensure safety from floods and climate change related disasters
Goal 2: Ensure water security and efficiency of water usages
Goal 3: Ensure sustainable and integrated river systems and estuaries management
Goal 4: Conserve and preserve wetlands and ecosystems and promote their wise use
Goal 5: Develop effective institutions and equitable governance for in country and trans-boundary WR management
Goal 6:Achieve optimal use of land and water resources
8
Paradigm Shift to Adaptive Delta Management
As per the ADM methods- analytical framework, plausible scenarios, strategies and adaptive pathways have
been developed for 50 to 100 years mainly considering various uncertainties including climate change. In line
with those, interventions have been proposed mainly up to 2030 and in some cases up to 2040. Thus,
interventions have been proposed based on back casting analysis.
Note: Back casting is a planning method that starts with defining a desirable future and then works backwards to
identify policies and programs that will connect the future to the present.
9
10
Delta Scenarios
Framework for Strategy Development
Strategies are developed (at national and hotspot scales) for:
• Water Resources,
• Land Resources,
• Agriculture,
• IWT,
• Urban and Rural WASH.
Preferred Strategy (national / hotspot)
High level strategy to realise the Delta Goals
Sub-strategies
Theme specific strategies
Projects
Set of short and mid-
term actions are needed
to realise sub-strategy
Hierarchy of preferred strategy, sub-strategies and
projects
Time Frame of BDP Strategy 11
 A ‘Delta Act’ is needed to be enacted for providing a sound legal coverage for the
long-term nature of BDP 2100 including establishment of the Delta Commission and
Delta Fund.
• GOB has a plan to allocate about 2% of GDP per annum to the Delta Fund gradually –
as indicated in the 7th Five Year Plan. At present, this amount is around US$ 4.0 billion
annually (10-12% of the Annual Budget and about 30% of ADP).
Reform of Governance and Institutions for ADM: Bangladesh Delta Fund
12
Bangla-Dutch Research Initiative on Flood Risk
Management and Morphological Assessment
Prediction of Morphological Evolution of the
Meghna Estuary
• Prof. Dr. Monowar Hossain
• Mr. Zahir-ul-Haque Khan, MSc
• Mr. Rubayat Alam, MSc
• Prof. Dr. Dano Roelvink
• Dr. Ali Dastgheib
• Mr. Johan Reyns, MSc
IWM UNESCO-IHE
Prediction of river and coastal morphology; planning of river training,
infrastructure development, river dredging and disaster management etc.
Sedimentation: Loss of navigability, water -loggingRiver erosion: loss of productive land;
The project consists of the following theme:
• Morphological assessment of the Meghna Estuary consequent
to sea-level rise
The specific objective is:
• To study the morphological changes in the Meghna estuary
due to sea-level rise consequent to climate change
Project Theme and Objective
Advanced modelling tools
MIKE21 FM
• Flexible mesh model
• Easy to generate grid for complex
areas
• So far only used for short-term
sedimentation and erosion
• Proprietary software
Delft3D 4 Suite
• Curvilinear grid
• More difficult to represent
network of channels
• Extensive experience in long-term
morphology modelling
• Free, open-source software
Combining strengths of both institutes and model systems
Study
Area
Chandpur
Bathymetry and Mesh
Developed bathymetry in MIKE21 FM model
Bathymetry and Mesh
Grid developed in Delft3D 4 Suite using two domain
Bhairab Bazar
Baruria
Bay of Bengal
16o Latitude Line
India
Myanmar
Model setup
• MIKE21 FM:
• full timeseries, run over 10 years
• only mud
• Delft3D 4 Suite:
• schematized tidal boundaries and river discharge hydrograph
• morphological speedup
• sand and mud combined
Calibration and Validation of the Model
Developed bathymetry in MIKE21 FM model Ramgati
Tajimuddin
Long Term Simulation by Delft3D 4 Suite
• Water Level data of 1982-2012 at Baruria and 1985-2009 for
Bhairab bazar were collected
• Discharge time series data were generated using rating curves
• Finally, boundaries were generated using input reduction
technique
Baruria [m]
Jan
2000
Feb
2000
Mar
2000
Apr
2000
May
2000
Jun
2000
Jul
2000
Aug
2000
Sep
2000
Oct
2000
Nov
2000
Dec
2000
Jan
2001
Date and Time
0
20000
40000
60000
80000
100000
120000
140000
160000
Discharge(cumec)
Generated Boundary for Long Term Morphology
Generated BoundaryDischarge from Rating Curve
10-year simulation, present situation
Delft3D 4 Suite, overall pattern
Erosion (blue) and
sedimentation (red)
Huge
sedimentation,
flood plains not
taken into
account
Erosion (blue) and
sedimentation (red)
10-year simulation, present situation
detail at mouth of Meghna
Sandwip
Urir
Jahazer
Hatiya
Monpura
Bhola
Effect of
sea
level
rise
More
sedimentation
closer to coast
and upstream
Less
sedimentation /
more erosion
closer to coast
and upstream
Possible development in 50 years
Initial Final
Outlook
• In near future, we will be able to use such models to predict:
• Expected natural development and land reclamation potential
• Effect of sea level rise and upstream flow conditions
• Effects of polderization and changing management techniques
THANK YOU

More Related Content

What's hot

Lecture-2 Environmental Laws and Policies in Bangladesh - Copy
Lecture-2 Environmental Laws and Policies in Bangladesh - CopyLecture-2 Environmental Laws and Policies in Bangladesh - Copy
Lecture-2 Environmental Laws and Policies in Bangladesh - Copy
Shankor Paul
 
Coastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zoneCoastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zone
Hemant Chandravanshi
 
National water policy__2012_
National water policy__2012_National water policy__2012_
National water policy__2012_
Siddharth Laxman
 

What's hot (20)

River bank erosion in bangladesh
River bank erosion in bangladeshRiver bank erosion in bangladesh
River bank erosion in bangladesh
 
Climate change coastal zone of bangladesh
Climate change coastal zone of bangladeshClimate change coastal zone of bangladesh
Climate change coastal zone of bangladesh
 
Bangladesh Climate Vulnerability: Floods and Cyclones
Bangladesh Climate Vulnerability: Floods and CyclonesBangladesh Climate Vulnerability: Floods and Cyclones
Bangladesh Climate Vulnerability: Floods and Cyclones
 
Flood Management in Bangladesh
Flood Management in Bangladesh Flood Management in Bangladesh
Flood Management in Bangladesh
 
Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...
Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...
Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...
 
Locational importance of bangladesh
Locational importance of bangladeshLocational importance of bangladesh
Locational importance of bangladesh
 
Coastal geography of Bangladesh
Coastal geography of BangladeshCoastal geography of Bangladesh
Coastal geography of Bangladesh
 
Lecture-2 Environmental Laws and Policies in Bangladesh - Copy
Lecture-2 Environmental Laws and Policies in Bangladesh - CopyLecture-2 Environmental Laws and Policies in Bangladesh - Copy
Lecture-2 Environmental Laws and Policies in Bangladesh - Copy
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
 
Coastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zoneCoastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zone
 
Wetlands of bangladesh
Wetlands of bangladeshWetlands of bangladesh
Wetlands of bangladesh
 
Laws and Policies on Climate Change in Bangladesh
Laws and Policies on Climate Change in BangladeshLaws and Policies on Climate Change in Bangladesh
Laws and Policies on Climate Change in Bangladesh
 
Disaster Management in Bangladesh: Risk Reduction and Challenges
Disaster Management in Bangladesh: Risk Reduction and ChallengesDisaster Management in Bangladesh: Risk Reduction and Challenges
Disaster Management in Bangladesh: Risk Reduction and Challenges
 
Environmental management acts and policies in bangladesh
Environmental management acts and policies in bangladeshEnvironmental management acts and policies in bangladesh
Environmental management acts and policies in bangladesh
 
Presentation on bangladesh environmental policy (1992)
Presentation on  bangladesh environmental policy (1992)Presentation on  bangladesh environmental policy (1992)
Presentation on bangladesh environmental policy (1992)
 
Forests in bangladesh and their conservation
Forests in bangladesh and their conservationForests in bangladesh and their conservation
Forests in bangladesh and their conservation
 
National water policy__2012_
National water policy__2012_National water policy__2012_
National water policy__2012_
 
Integrated coastal zone management md. yousuf gazi
Integrated coastal zone management md. yousuf gaziIntegrated coastal zone management md. yousuf gazi
Integrated coastal zone management md. yousuf gazi
 
Ganga action plan: As a case study in Environmental Legislation
Ganga action plan: As a case study in Environmental LegislationGanga action plan: As a case study in Environmental Legislation
Ganga action plan: As a case study in Environmental Legislation
 
Maritime Boundary of Bangladesh
Maritime Boundary of BangladeshMaritime Boundary of Bangladesh
Maritime Boundary of Bangladesh
 

Similar to DSD-INT 2017 Bangladesh Delta Plan 2100 - Prediction of Morphological Evolution of the Meghna & Meta-modelling for decision support - Khan

Shankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology RecordShankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology Record
shankaraiah, N
 
Water Resources Management Financing in Indonesia
Water Resources Management Financing in IndonesiaWater Resources Management Financing in Indonesia
Water Resources Management Financing in Indonesia
GWP SOUTHEAST ASIA
 
Cambodia finacing water resources management in cambodia report (1) copy
Cambodia  finacing water resources management in cambodia report (1)   copyCambodia  finacing water resources management in cambodia report (1)   copy
Cambodia finacing water resources management in cambodia report (1) copy
GWP SOUTHEAST ASIA
 
Water Resources Management Financing in cambodia
Water Resources Management Financing in cambodiaWater Resources Management Financing in cambodia
Water Resources Management Financing in cambodia
GWP SOUTHEAST ASIA
 
Hydropower Development on the Mekong and 3S
 Hydropower Development on the Mekong and 3S  Hydropower Development on the Mekong and 3S
Hydropower Development on the Mekong and 3S
stimson
 

Similar to DSD-INT 2017 Bangladesh Delta Plan 2100 - Prediction of Morphological Evolution of the Meghna & Meta-modelling for decision support - Khan (20)

Bangladesh Delta Plan.pdf
Bangladesh Delta Plan.pdfBangladesh Delta Plan.pdf
Bangladesh Delta Plan.pdf
 
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
 
BDP 2100.pptx
BDP 2100.pptxBDP 2100.pptx
BDP 2100.pptx
 
Need For Water Management
Need For Water ManagementNeed For Water Management
Need For Water Management
 
The se san and nam theun nam kading hydropower dam cascades
The se san and nam theun nam kading hydropower dam cascadesThe se san and nam theun nam kading hydropower dam cascades
The se san and nam theun nam kading hydropower dam cascades
 
Shankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology RecordShankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology Record
 
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
 
Status of Groundwater Resources Governance Sudan: Nubian Sandstone Project
Status of Groundwater Resources Governance Sudan:  Nubian Sandstone ProjectStatus of Groundwater Resources Governance Sudan:  Nubian Sandstone Project
Status of Groundwater Resources Governance Sudan: Nubian Sandstone Project
 
Water Resources Management Financing in Indonesia
Water Resources Management Financing in IndonesiaWater Resources Management Financing in Indonesia
Water Resources Management Financing in Indonesia
 
DSD-SEA 2019 Application of Mathematical Modelling Tools in Water Resource M...
DSD-SEA 2019 Application of  Mathematical Modelling Tools in Water Resource M...DSD-SEA 2019 Application of  Mathematical Modelling Tools in Water Resource M...
DSD-SEA 2019 Application of Mathematical Modelling Tools in Water Resource M...
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
PP GWGM-final
PP GWGM-finalPP GWGM-final
PP GWGM-final
 
NSDF_SANBI CONFERENCE 3 AUG.pptx
NSDF_SANBI CONFERENCE 3 AUG.pptxNSDF_SANBI CONFERENCE 3 AUG.pptx
NSDF_SANBI CONFERENCE 3 AUG.pptx
 
Gef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue presGef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue pres
 
Presentation 4: Mitigation Strategies
Presentation 4: Mitigation StrategiesPresentation 4: Mitigation Strategies
Presentation 4: Mitigation Strategies
 
7. Cox1
7. Cox17. Cox1
7. Cox1
 
Cambodia finacing water resources management in cambodia report (1) copy
Cambodia  finacing water resources management in cambodia report (1)   copyCambodia  finacing water resources management in cambodia report (1)   copy
Cambodia finacing water resources management in cambodia report (1) copy
 
Water Resources Management Financing in cambodia
Water Resources Management Financing in cambodiaWater Resources Management Financing in cambodia
Water Resources Management Financing in cambodia
 
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
 
Hydropower Development on the Mekong and 3S
 Hydropower Development on the Mekong and 3S  Hydropower Development on the Mekong and 3S
Hydropower Development on the Mekong and 3S
 

More from Deltares

More from Deltares (20)

DSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - KroonDSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
 
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin RodriguezDSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
 
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - TanerDSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
 
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - RoozeDSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
 
DSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - WardDSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
 
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
 
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
 
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
 
DSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - JeukenDSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
 
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - MullerDSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
 
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - RomeroDSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
 
DSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - BakkerDSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
 
DSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van EngelenDSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van Engelen
 
DSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - DavidsDSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - Davids
 
DSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - LangevinDSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - Langevin
 
DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2
 
DSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - SnippenDSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - Snippen
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
 
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
 

Recently uploaded

Recently uploaded (20)

top nidhi software solution freedownload
top nidhi software solution freedownloadtop nidhi software solution freedownload
top nidhi software solution freedownload
 
AI/ML Infra Meetup | Perspective on Deep Learning Framework
AI/ML Infra Meetup | Perspective on Deep Learning FrameworkAI/ML Infra Meetup | Perspective on Deep Learning Framework
AI/ML Infra Meetup | Perspective on Deep Learning Framework
 
2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx
 
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoamOpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
 
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
 
AI/ML Infra Meetup | Reducing Prefill for LLM Serving in RAG
AI/ML Infra Meetup | Reducing Prefill for LLM Serving in RAGAI/ML Infra Meetup | Reducing Prefill for LLM Serving in RAG
AI/ML Infra Meetup | Reducing Prefill for LLM Serving in RAG
 
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.ILBeyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
 
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
 
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERRORTROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
 
First Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User EndpointsFirst Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User Endpoints
 
BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
 
Agnieszka Andrzejewska - BIM School Course in Kraków
Agnieszka Andrzejewska - BIM School Course in KrakówAgnieszka Andrzejewska - BIM School Course in Kraków
Agnieszka Andrzejewska - BIM School Course in Kraków
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
 
Enhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdfEnhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdf
 
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume MontevideoVitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume Montevideo
 
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
 
A Comprehensive Appium Guide for Hybrid App Automation Testing.pdf
A Comprehensive Appium Guide for Hybrid App Automation Testing.pdfA Comprehensive Appium Guide for Hybrid App Automation Testing.pdf
A Comprehensive Appium Guide for Hybrid App Automation Testing.pdf
 
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
 

DSD-INT 2017 Bangladesh Delta Plan 2100 - Prediction of Morphological Evolution of the Meghna & Meta-modelling for decision support - Khan

  • 1. Bangladesh Delta Plan 2100: Prediction of Morphological Evolution of Meghna Estuary, and Metamodel for decision support Zahir-ul Haque Khan, Director,IWM Willem Van Deursen, Deltares
  • 2. Bangladesh Delta  Built on the confluence of 3 mighty Rivers- the Ganges, the Brahmaputra and the Meghna;  Largest dynamic delta of the world  Around 405 Rivers: 57 Trans-boundary (54 with India and 3 with Myanmar);  93% catchment area lies outside Bangladesh with annual sediment load of 1.0 to 1.4 billion tons;  Abundance of water in wet season but scarcity of water in dry season.  Bangladesh is one of the most vulnerable country to accelerated sea level rise (SLR)  SLR can cause changes in morphology, water availability and flooding 2
  • 3. Bangladesh Delta Plan 2100  It is a long-term, holistic, integrated and scenario based plan 3
  • 4. Delta Opportunities Highly fertile land - • Agricultural land: 65% • Forest lands: 17% • Urban areas: 8% • Water and wetlands: 10%. Plentiful rivers (more than 400 nos.) - • Water bodies about 4.70 million ha; • Access to the Bay of Bengal up to 1.125 million sq. km. Open access to sea is a huge advantage - • It could serve the needs of growing internal trade and commerce; • Could become a regional hub for international sea transportation. Inland Water Transport (around 6000 km) - • Easiest, environment friendly and cheapest mode of transportation; • Almost all districts are connected with each other; • The Industrial/Growth centers nearby rivers. The Sundarbans - • The largest natural mangrove forest; • Unique ecosystem covers an area of 577,000 ha of which 401,600 ha land and remaining 175,400 ha is under water. Unique ecological settings – • There are 2 Ramsar sites, 9 Ecological Critically Areas, 17 National Parks, 20 Wildlife Sanctuaries, 8 Eco-parks and 2 Botanical Gardens. • Important five ECAs are as below:  Hakaluki Haor (18,382 ha),  Tanguar Haor (9727 ha),  Sonadia Island (4,916 ha),  St Martin’s Island (590 ha),  Teknaf Peninsula (10,465 ha); • Over 800 species of wildlife identified in ECAs. 4
  • 5. Delta Challenges Bangladesh Delta have many challenges:  Rising Temperatures  Changing Rainfall  Increased Flooding  Droughts  River Erosion  Sea level rise (SLR) and consequent Salinity Intrusion  Cyclones and Storm Surges  Water Logging  Sedimentation  Trans-boundary Challenges. 5
  • 6. 1. Baseline Analysis: Challenges and Opportunities (24 Baseline Studies: Annex-1) The studies are related to : • Climate Change, Natural Resources, Environment and Ecology; • Investment and Finance, Governance, Knowledge etc. 2. Setting the Vision and Goals 3. Scenario Development • Various plausible future scenarios based environmental, socio-economic and policy factors • Scenario based strategy development 4. Strategy Development based on ADM Principle • Sectoral strategies (for Water Resources, Land, Agriculture, IWT, Urban and Rural water Supply and Sanitation) • National Strategies (for Flood Risk Management, Fresh water etc.) 5. Investment Plan • Macro-requirements: Hotspot wise, Cross cutting • Project Prioritization Criteria • Financing Arrangements and Mechanisms. 6. Implementation Framework • Delta Commission and Delta Fund • RBM&E Framework • Knowledge Management. Bangladesh Delta Plan 2100: Approaches 6
  • 7. Six (6) Hotspot areas have been identified : 1. Coastal Zone 2. Barind and Drought Prone Areas 3. Haor and Flash Flood Areas 4. Chittagong Hill Tracts and Coast 5. Major Rivers and Adjoining Areas 6. Urban Areas The remaining area is identified as Cross-cutting areas characterized by a combination of issues and challenges e.g. floods, drought, river bank erosion, sedimentation, groundwater depletion, water pollution and water supply and sanitation issues. Hotspots: Planning Units of BDP 2100 7
  • 8. Delta Vision & Goals Delta Vision: Ensure long term water and food security, economic growth and environmental sustainability; while effectively coping with natural disasters, Climate Change and other delta issues through robust, adaptive and integrated strategies, and equitable water governance. Higher Level Goals: Goal 1: Eliminate Extreme Poverty by 2030 Goal 2: Achieve Upper Middle Income Country (UMIC) status by 2030 Delta Plan Goals: Goal 1: Ensure safety from floods and climate change related disasters Goal 2: Ensure water security and efficiency of water usages Goal 3: Ensure sustainable and integrated river systems and estuaries management Goal 4: Conserve and preserve wetlands and ecosystems and promote their wise use Goal 5: Develop effective institutions and equitable governance for in country and trans-boundary WR management Goal 6:Achieve optimal use of land and water resources 8
  • 9. Paradigm Shift to Adaptive Delta Management As per the ADM methods- analytical framework, plausible scenarios, strategies and adaptive pathways have been developed for 50 to 100 years mainly considering various uncertainties including climate change. In line with those, interventions have been proposed mainly up to 2030 and in some cases up to 2040. Thus, interventions have been proposed based on back casting analysis. Note: Back casting is a planning method that starts with defining a desirable future and then works backwards to identify policies and programs that will connect the future to the present. 9
  • 11. Framework for Strategy Development Strategies are developed (at national and hotspot scales) for: • Water Resources, • Land Resources, • Agriculture, • IWT, • Urban and Rural WASH. Preferred Strategy (national / hotspot) High level strategy to realise the Delta Goals Sub-strategies Theme specific strategies Projects Set of short and mid- term actions are needed to realise sub-strategy Hierarchy of preferred strategy, sub-strategies and projects Time Frame of BDP Strategy 11
  • 12.  A ‘Delta Act’ is needed to be enacted for providing a sound legal coverage for the long-term nature of BDP 2100 including establishment of the Delta Commission and Delta Fund. • GOB has a plan to allocate about 2% of GDP per annum to the Delta Fund gradually – as indicated in the 7th Five Year Plan. At present, this amount is around US$ 4.0 billion annually (10-12% of the Annual Budget and about 30% of ADP). Reform of Governance and Institutions for ADM: Bangladesh Delta Fund 12
  • 13. Bangla-Dutch Research Initiative on Flood Risk Management and Morphological Assessment Prediction of Morphological Evolution of the Meghna Estuary • Prof. Dr. Monowar Hossain • Mr. Zahir-ul-Haque Khan, MSc • Mr. Rubayat Alam, MSc • Prof. Dr. Dano Roelvink • Dr. Ali Dastgheib • Mr. Johan Reyns, MSc IWM UNESCO-IHE
  • 14. Prediction of river and coastal morphology; planning of river training, infrastructure development, river dredging and disaster management etc. Sedimentation: Loss of navigability, water -loggingRiver erosion: loss of productive land;
  • 15. The project consists of the following theme: • Morphological assessment of the Meghna Estuary consequent to sea-level rise The specific objective is: • To study the morphological changes in the Meghna estuary due to sea-level rise consequent to climate change Project Theme and Objective
  • 16. Advanced modelling tools MIKE21 FM • Flexible mesh model • Easy to generate grid for complex areas • So far only used for short-term sedimentation and erosion • Proprietary software Delft3D 4 Suite • Curvilinear grid • More difficult to represent network of channels • Extensive experience in long-term morphology modelling • Free, open-source software Combining strengths of both institutes and model systems
  • 18. Bathymetry and Mesh Developed bathymetry in MIKE21 FM model
  • 19. Bathymetry and Mesh Grid developed in Delft3D 4 Suite using two domain Bhairab Bazar Baruria Bay of Bengal 16o Latitude Line India Myanmar
  • 20. Model setup • MIKE21 FM: • full timeseries, run over 10 years • only mud • Delft3D 4 Suite: • schematized tidal boundaries and river discharge hydrograph • morphological speedup • sand and mud combined
  • 21. Calibration and Validation of the Model Developed bathymetry in MIKE21 FM model Ramgati Tajimuddin
  • 22. Long Term Simulation by Delft3D 4 Suite • Water Level data of 1982-2012 at Baruria and 1985-2009 for Bhairab bazar were collected • Discharge time series data were generated using rating curves • Finally, boundaries were generated using input reduction technique Baruria [m] Jan 2000 Feb 2000 Mar 2000 Apr 2000 May 2000 Jun 2000 Jul 2000 Aug 2000 Sep 2000 Oct 2000 Nov 2000 Dec 2000 Jan 2001 Date and Time 0 20000 40000 60000 80000 100000 120000 140000 160000 Discharge(cumec) Generated Boundary for Long Term Morphology Generated BoundaryDischarge from Rating Curve
  • 23. 10-year simulation, present situation Delft3D 4 Suite, overall pattern Erosion (blue) and sedimentation (red) Huge sedimentation, flood plains not taken into account
  • 24. Erosion (blue) and sedimentation (red) 10-year simulation, present situation detail at mouth of Meghna Sandwip Urir Jahazer Hatiya Monpura Bhola
  • 25. Effect of sea level rise More sedimentation closer to coast and upstream Less sedimentation / more erosion closer to coast and upstream
  • 26. Possible development in 50 years Initial Final