Dr David Young (Research Funding Development Manager)
                         Research and Business Services




                                                          1
Introductions
Where are you?
          Aims
     Structure
     Handouts




             2
Research funding landscape
         Discussion 1
  How to find and apply for
       research funding
            Break
Playing the research funding
            game
       Discussion 2 & 3
           Exercise
Final questions and follow-up




                                3
Apologies for brevity
Please ask questions




                    4
Dual support
        Funders and remits
Current policy and strategic
                 directions




                           5
Research is funded in two ways:
          HEFCE QR block grant
 Research grants and contracts




                              6
• RAE/REF
QR Block          • Relatively predictable
                  • Flexible

 Grant            • Long-term
                  • £1.9bn




Research             • Range of funders
                     • Competitive
grants &             • Mainly shorter-term
                     • Relatively inflexible

contracts            • £4.4bn




       Figures for 2010/11 for UK HE sector from HESA


                                                        7
QR Block
 Grant            •£2.4M

Research
grants &             •£4.4M
contracts

       Figures for 2010/11 for Northumbria from
       University’s financial statements/HEFCE

                                                  8
7 councils
Different remits but increasing
                      crossover
Mix of calls: some open, some
                       targeted
    From “blue sky” to applied
   Collaborative and individual
  Competitive and prestigious
           £1,558M in 2010/11




                               9
e.g. DEFRA, MOD
      (CDE), NIHR, DFID, NHS
Generally much more targeted
      Generally more applied
   Generally tighter deadlines
           £807M in 2010/11




                            10
Consultancy and contract
                   research
   Meeting the needs of the
                    business
       Can be good pay-off…
…but check contracts and IPR
          £293M in 2010/11




                          11
e.g.
Wellcome, Leverhulme, CRUK, J
              oseph Rowntree
         Vast range of funders
           From small to huge
       From targeted to open
  Independent of government
          Don’t pay overheads
            £920M in 2010/11




                             12
e.g. British Academy, Royal
   Society, Royal Academy of
                  Engineering
Part-funded by parliamentary
grant, but more independent
       than Research Councils
Mix of fellowships, prizes and
                        grants
 Competitive and prestigious




                            13
Framework Programme 7 -
                          €50bn
   International collaboration…
   …but some individual grants
                       available
Can be time-consuming to write
       Success rates vary widely
             £513M in 2010/11




                              14
700


600


500


400                                                     Research grants
                                                        Studentships
300                                                     Fellowships
                                                        TOTAL
                                                                          The Big Squeeze…
200


100


  0
      2010/11   2011/12   2012/13   2013/14   2014/15


  EPSRC spend by type of award over current spending review period




                                                                                             15
Impact
         Longer and larger
      Interdisciplinary and
              collaborative
Solving “grand challenges”
 Concentration of funding
    Demand management




                         16
Be realistic
                Be informed
               Be innovative
                 Be rigorous
                 Be targeted
               Be connected
Be prepared: know the game




                            17
Target Practice: finding the right funder for you




                                                    18
Finding funding
Research application process




                          19
Go to:
http://researchprofessional.com
                         Register
                           Log in
                  Funding search
                        Practice!
              Set up email alerts




                               20
UKRO: http://www.ukro.ac.uk/
               RDInfo/Funding:
  http://www.rdfunding.org.uk/
         Research Support Blog
                (Northumbria):
http://research.northumbria.ac.
                    uk/support/
    The Nugget (Northumbria):
http://www.northumbria.ac.uk/
researchandconsultancy/sa/fun
                  ding/nugget/




                             21
Find funding    Peer review and
                                       Revise draft
opportunity        feedback



                     Draft bid       RBS coordinates
Read guidance   (including budget   bid registration &
                with RBS support)        approval



  Contact
 RBS/School     Contact partners    Sign off & submit!
administrator




                                                         22
23
…back in 10 mins




              24
The bottom line
 Learning the game
       Discussion 2
 Raising your game
       Discussion 3
Mastering the game




                      25
A well written and constructed
    proposal won’t necessarily
 mean that poor research gets
                      funded…
     …but a poorly written and
   poorly constructed proposal
often prevents good research
                getting funded




                          26
This is a competition: “It’s not a
             test; it’s a contest”




                                27
Research project structure:
                     Who?
                    What?
                     How?
                  (…Why?)




                         28
Principal Investigator
      Co-investigator
             Partners




                    29
Research problems/questions
               Methodology
                   Outputs
                   Impacts




                         30
Budget
 Project plan
Management




           31
Funders issue calls for proposals
  These can be open or targeted
    The call will include guidance
notes on context and how to put
         the application together
  It may also tell you the review
                            criteria
   YOU MUST: address the remit
   YOU MUST: follow these rules




                                  32
Lay summary/abstract
        Aims & objectives
  Academic beneficiaries
      Pathways to impact
         Case for support
     Staff responsibilities
Justification of resources
                       CVs




                         33
Help! I’m a researcher: overcoming
           barriers to your research




                                       34
Following the rules is not
                   enough…
…you need to answer “why?”




                           35
“National importance”
What is the risk of not funding
                 this research?




                             36
Matching the funder’s strategic
                         remit




                             37
Could anyone else do this?
 What is unique or innovative
        about your approach?
Identify weakness and get the
           right team in place




                            38
What is timely about your
                research?




                       39
It’s not rocket science: the art of the
                     project summary




                                          40
It’s not a research paper!
                  Get to the point!
              Justify, justify, justify
 No details on plan/methodology
              Watch your language
             Spelling and grammar
Inconsistencies between sections
    Promising too much/too little
        Ignoring funder priorities
          Tell a convincing “story”




                                     41
Ask someone else to read your
  proposal before you submit!
…and not just read, but critique




                              42
43
Summing up: writing up your own
                research project




                                   44
Friday 1st June, 2pm-5pm
     Wednesday 20th June, 9am-12pm
                                To book:
 laura2.mcmahon@northumbria.ac.uk
      Email completed outlines to me:
    david.g.young@northumbria.ac.uk
At least three days before your session




                                   45
…any questions?




             46
Welcome Mat by Jeni Rodger (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/kittymghee/4437368431/
Plans by Jeff Hitchcock (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/arbron/1043115842/
Time by lett (CC BY 2.0)
http://www.flickr.com/photos/07anycolouryoulike/4536619509/
Binoculars portrait by gerlos (CC BY-SA 2.0)
http://www.flickr.com/photos/gerlos/3119891607/
Money by 401K (CC BY-SA 2.0)
http://www.flickr.com/photos/68751915@N05/6848823919/
Swindon by cinto2 (CC BY-NC 2.0)
http://www.flickr.com/photos/cinto2/544510546/
The House of Commons by UK Parliament (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/uk_parliament/4642915654/
Factory by Biczzz (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/biczzz/1570699867/
Collection Box by Leo Reynolds (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/lwr/7496500/
Graduation Day by Jase Curtis (CC BY 2.0)
http://www.flickr.com/photos/25722571@N08/6385852693/

                                                   47
European flags flying in front of the Berlaymont by TPCOM (CC BY-NC-ND)
http://www.flickr.com/photos/tpcom/3246111473/
Signpost by thepicturedrome (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/55637931@N03/6334628811/
Hope by Darren Tunnicliff (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/darrentunnicliff/4232232092/
Bullseye by nicole cho (CC BY-NC 2.0)
http://www.flickr.com/photos/nchoz/243216008
Magnifying Glass by Rafael Anderson Gonzales Mendoza (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/andercismo/2349098787/
G Love and the special sauces by Janellie (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/janellie23/5671495178/
Question Mark by Ryan Milani (CC BY 2.0)
http://www.flickr.com/photos/51029297@N00/5275403364/
Coffee Cup by Doug Wheller (CC BY-NC 2.0)
http://www.flickr.com/photos/doug88888/2953428679/
Chess by Konstantin Lazorkin (CC BY-NC 2.0)
http://www.flickr.com/photos/slayer23/2508790690/
Lily and lines by timlewisnm (CC BY-SA 2.0)
http://www.flickr.com/photos/gozalewis/3489734986/

                                                     48
Hurdles by Julie Vuitton (CC BY 2.0)
http://www.flickr.com/photos/julie-v/4638951855/
Molecule by Simon Goldenberg (CC BY-ND 2.0)
http://www.flickr.com/photos/simon999/2731507778/
The ILGWU women's basketball team at the Bronx Branch Athletic Club by Kheel
Center (CC BY 2.0)
http://www.flickr.com/photos/kheelcenter/5279013761/
Question mark by Ciccio Pizzettaro (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/cicciopizzettaro/4297936934/
Anyone understand spreadsheets…? by Simon James (CC BY-SA 2.0)
http://www.flickr.com/photos/bearpark/2882102644/
Recent purchase: megaphone by Gene Han (CC BY-NC 2.0)
http://www.flickr.com/photos/larimdame/2575986601/
Passport application by Ben Ward (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/benward/2248330869/
Communication by P Shanks (CC BY-NC 2.0)
http://www.flickr.com/photos/pshanks/411196422/
Rules of the Inn 1786 by Dan Brady (CC BY 2.0)
http://www.flickr.com/photos/djbrady/1205847589/
Skills by Delarge (CC BY-NC 2.0)
http://www.flickr.com/photos/delarge/3786268069/



                                                    49
Roller skating high jump by Zoulou (Free art license)
http://commons.wikimedia.org/wiki/File:Roller-skating-high-jump-zoulou.jpg
Interval running (race track) 16 by Michael Lokner (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/lokner/3740260369/
Ready Steady Go by purplemattfish (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/purplemattfish/3020016417/
1950’s Rocket Ship by studio hades (Public Domain)
http://openclipart.org/detail/157477/1950s-rocket-ship--by-studio_hades
Trap by Tom Heller (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/tomopteris/5173028844/
Exam by Alberto G (CC BY 2.0)
http://www.flickr.com/photos/albertogp123/5843577306/
Outline juggling by Pedro Moura Pinheiro (CC BY-NC-SA 2.0)
http://www.flickr.com/photos/pedromourapinheiro/2122754745/
Writing by Tony Hall (CC BY-ND 2.0)
http://www.flickr.com/photos/anotherphotograph/2276607037/
Workshop by Heinrich-Böll-Stiftung (CC BY-SA 2.0)
http://www.flickr.com/photos/boellstiftung/5803926253/
Thank you by Russ Morris (CC BY-NC-ND 2.0)
http://www.flickr.com/photos/russmorris/2486506322/



                                                     50

Developing a successful research grant application

  • 1.
    Dr David Young(Research Funding Development Manager) Research and Business Services 1
  • 2.
    Introductions Where are you? Aims Structure Handouts 2
  • 3.
    Research funding landscape Discussion 1 How to find and apply for research funding Break Playing the research funding game Discussion 2 & 3 Exercise Final questions and follow-up 3
  • 4.
  • 5.
    Dual support Funders and remits Current policy and strategic directions 5
  • 6.
    Research is fundedin two ways: HEFCE QR block grant Research grants and contracts 6
  • 7.
    • RAE/REF QR Block • Relatively predictable • Flexible Grant • Long-term • £1.9bn Research • Range of funders • Competitive grants & • Mainly shorter-term • Relatively inflexible contracts • £4.4bn Figures for 2010/11 for UK HE sector from HESA 7
  • 8.
    QR Block Grant •£2.4M Research grants & •£4.4M contracts Figures for 2010/11 for Northumbria from University’s financial statements/HEFCE 8
  • 9.
    7 councils Different remitsbut increasing crossover Mix of calls: some open, some targeted From “blue sky” to applied Collaborative and individual Competitive and prestigious £1,558M in 2010/11 9
  • 10.
    e.g. DEFRA, MOD (CDE), NIHR, DFID, NHS Generally much more targeted Generally more applied Generally tighter deadlines £807M in 2010/11 10
  • 11.
    Consultancy and contract research Meeting the needs of the business Can be good pay-off… …but check contracts and IPR £293M in 2010/11 11
  • 12.
    e.g. Wellcome, Leverhulme, CRUK,J oseph Rowntree Vast range of funders From small to huge From targeted to open Independent of government Don’t pay overheads £920M in 2010/11 12
  • 13.
    e.g. British Academy,Royal Society, Royal Academy of Engineering Part-funded by parliamentary grant, but more independent than Research Councils Mix of fellowships, prizes and grants Competitive and prestigious 13
  • 14.
    Framework Programme 7- €50bn International collaboration… …but some individual grants available Can be time-consuming to write Success rates vary widely £513M in 2010/11 14
  • 15.
    700 600 500 400 Research grants Studentships 300 Fellowships TOTAL The Big Squeeze… 200 100 0 2010/11 2011/12 2012/13 2013/14 2014/15 EPSRC spend by type of award over current spending review period 15
  • 16.
    Impact Longer and larger Interdisciplinary and collaborative Solving “grand challenges” Concentration of funding Demand management 16
  • 17.
    Be realistic Be informed Be innovative Be rigorous Be targeted Be connected Be prepared: know the game 17
  • 18.
    Target Practice: findingthe right funder for you 18
  • 19.
  • 20.
    Go to: http://researchprofessional.com Register Log in Funding search Practice! Set up email alerts 20
  • 21.
    UKRO: http://www.ukro.ac.uk/ RDInfo/Funding: http://www.rdfunding.org.uk/ Research Support Blog (Northumbria): http://research.northumbria.ac. uk/support/ The Nugget (Northumbria): http://www.northumbria.ac.uk/ researchandconsultancy/sa/fun ding/nugget/ 21
  • 22.
    Find funding Peer review and Revise draft opportunity feedback Draft bid RBS coordinates Read guidance (including budget bid registration & with RBS support) approval Contact RBS/School Contact partners Sign off & submit! administrator 22
  • 23.
  • 24.
  • 25.
    The bottom line Learning the game Discussion 2 Raising your game Discussion 3 Mastering the game 25
  • 26.
    A well writtenand constructed proposal won’t necessarily mean that poor research gets funded… …but a poorly written and poorly constructed proposal often prevents good research getting funded 26
  • 27.
    This is acompetition: “It’s not a test; it’s a contest” 27
  • 28.
    Research project structure: Who? What? How? (…Why?) 28
  • 29.
    Principal Investigator Co-investigator Partners 29
  • 30.
    Research problems/questions Methodology Outputs Impacts 30
  • 31.
  • 32.
    Funders issue callsfor proposals These can be open or targeted The call will include guidance notes on context and how to put the application together It may also tell you the review criteria YOU MUST: address the remit YOU MUST: follow these rules 32
  • 33.
    Lay summary/abstract Aims & objectives Academic beneficiaries Pathways to impact Case for support Staff responsibilities Justification of resources CVs 33
  • 34.
    Help! I’m aresearcher: overcoming barriers to your research 34
  • 35.
    Following the rulesis not enough… …you need to answer “why?” 35
  • 36.
    “National importance” What isthe risk of not funding this research? 36
  • 37.
    Matching the funder’sstrategic remit 37
  • 38.
    Could anyone elsedo this? What is unique or innovative about your approach? Identify weakness and get the right team in place 38
  • 39.
    What is timelyabout your research? 39
  • 40.
    It’s not rocketscience: the art of the project summary 40
  • 41.
    It’s not aresearch paper! Get to the point! Justify, justify, justify No details on plan/methodology Watch your language Spelling and grammar Inconsistencies between sections Promising too much/too little Ignoring funder priorities Tell a convincing “story” 41
  • 42.
    Ask someone elseto read your proposal before you submit! …and not just read, but critique 42
  • 43.
  • 44.
    Summing up: writingup your own research project 44
  • 45.
    Friday 1st June,2pm-5pm Wednesday 20th June, 9am-12pm To book: laura2.mcmahon@northumbria.ac.uk Email completed outlines to me: david.g.young@northumbria.ac.uk At least three days before your session 45
  • 46.
  • 47.
    Welcome Mat byJeni Rodger (CC BY-NC-SA 2.0) http://www.flickr.com/photos/kittymghee/4437368431/ Plans by Jeff Hitchcock (CC BY-NC-ND 2.0) http://www.flickr.com/photos/arbron/1043115842/ Time by lett (CC BY 2.0) http://www.flickr.com/photos/07anycolouryoulike/4536619509/ Binoculars portrait by gerlos (CC BY-SA 2.0) http://www.flickr.com/photos/gerlos/3119891607/ Money by 401K (CC BY-SA 2.0) http://www.flickr.com/photos/68751915@N05/6848823919/ Swindon by cinto2 (CC BY-NC 2.0) http://www.flickr.com/photos/cinto2/544510546/ The House of Commons by UK Parliament (CC BY-NC-ND 2.0) http://www.flickr.com/photos/uk_parliament/4642915654/ Factory by Biczzz (CC BY-NC-SA 2.0) http://www.flickr.com/photos/biczzz/1570699867/ Collection Box by Leo Reynolds (CC BY-NC-SA 2.0) http://www.flickr.com/photos/lwr/7496500/ Graduation Day by Jase Curtis (CC BY 2.0) http://www.flickr.com/photos/25722571@N08/6385852693/ 47
  • 48.
    European flags flyingin front of the Berlaymont by TPCOM (CC BY-NC-ND) http://www.flickr.com/photos/tpcom/3246111473/ Signpost by thepicturedrome (CC BY-NC-SA 2.0) http://www.flickr.com/photos/55637931@N03/6334628811/ Hope by Darren Tunnicliff (CC BY-NC-ND 2.0) http://www.flickr.com/photos/darrentunnicliff/4232232092/ Bullseye by nicole cho (CC BY-NC 2.0) http://www.flickr.com/photos/nchoz/243216008 Magnifying Glass by Rafael Anderson Gonzales Mendoza (CC BY-NC-SA 2.0) http://www.flickr.com/photos/andercismo/2349098787/ G Love and the special sauces by Janellie (CC BY-NC-ND 2.0) http://www.flickr.com/photos/janellie23/5671495178/ Question Mark by Ryan Milani (CC BY 2.0) http://www.flickr.com/photos/51029297@N00/5275403364/ Coffee Cup by Doug Wheller (CC BY-NC 2.0) http://www.flickr.com/photos/doug88888/2953428679/ Chess by Konstantin Lazorkin (CC BY-NC 2.0) http://www.flickr.com/photos/slayer23/2508790690/ Lily and lines by timlewisnm (CC BY-SA 2.0) http://www.flickr.com/photos/gozalewis/3489734986/ 48
  • 49.
    Hurdles by JulieVuitton (CC BY 2.0) http://www.flickr.com/photos/julie-v/4638951855/ Molecule by Simon Goldenberg (CC BY-ND 2.0) http://www.flickr.com/photos/simon999/2731507778/ The ILGWU women's basketball team at the Bronx Branch Athletic Club by Kheel Center (CC BY 2.0) http://www.flickr.com/photos/kheelcenter/5279013761/ Question mark by Ciccio Pizzettaro (CC BY-NC-SA 2.0) http://www.flickr.com/photos/cicciopizzettaro/4297936934/ Anyone understand spreadsheets…? by Simon James (CC BY-SA 2.0) http://www.flickr.com/photos/bearpark/2882102644/ Recent purchase: megaphone by Gene Han (CC BY-NC 2.0) http://www.flickr.com/photos/larimdame/2575986601/ Passport application by Ben Ward (CC BY-NC-ND 2.0) http://www.flickr.com/photos/benward/2248330869/ Communication by P Shanks (CC BY-NC 2.0) http://www.flickr.com/photos/pshanks/411196422/ Rules of the Inn 1786 by Dan Brady (CC BY 2.0) http://www.flickr.com/photos/djbrady/1205847589/ Skills by Delarge (CC BY-NC 2.0) http://www.flickr.com/photos/delarge/3786268069/ 49
  • 50.
    Roller skating highjump by Zoulou (Free art license) http://commons.wikimedia.org/wiki/File:Roller-skating-high-jump-zoulou.jpg Interval running (race track) 16 by Michael Lokner (CC BY-NC-ND 2.0) http://www.flickr.com/photos/lokner/3740260369/ Ready Steady Go by purplemattfish (CC BY-NC-ND 2.0) http://www.flickr.com/photos/purplemattfish/3020016417/ 1950’s Rocket Ship by studio hades (Public Domain) http://openclipart.org/detail/157477/1950s-rocket-ship--by-studio_hades Trap by Tom Heller (CC BY-NC-SA 2.0) http://www.flickr.com/photos/tomopteris/5173028844/ Exam by Alberto G (CC BY 2.0) http://www.flickr.com/photos/albertogp123/5843577306/ Outline juggling by Pedro Moura Pinheiro (CC BY-NC-SA 2.0) http://www.flickr.com/photos/pedromourapinheiro/2122754745/ Writing by Tony Hall (CC BY-ND 2.0) http://www.flickr.com/photos/anotherphotograph/2276607037/ Workshop by Heinrich-Böll-Stiftung (CC BY-SA 2.0) http://www.flickr.com/photos/boellstiftung/5803926253/ Thank you by Russ Morris (CC BY-NC-ND 2.0) http://www.flickr.com/photos/russmorris/2486506322/ 50

Editor's Notes

  • #3 Introductions and welcome to this session in the PG HEP Research module.What stage are people at in applying for funding: Who has applied before? Who has plans to apply? Who is just thinking about it?Inevitably some people will be further along than others, so some of this information will be old news to some of you…Aims: to develop an awareness of the research funding landscape, know how to submit an application and what support is available, develop an understanding of the different aspects of crafting a good quality application Structure of session: one plenary (this) plus practical follow-up which you need to book ontoHandout pack: Session plan; Group discussion exercises plus final exercise; Grant outline form for follow-up workshops
  • #4 Yourhandout pack has a session plan.
  • #5 Time is limited and this is a complex area, so apologies in advance for brevity. Many of the issues covered deserve their own workshops. RBS will be rolling out a series of related workshops over the next 6 months on different aspects covered in brief today, so please keep an eye on HR staff development.Please ask at the time if there’s something you don’t understand. I’ll also have a slot at the end for questions.
  • #10 AHRC,BBSRC,EPSRC,ESRC,MRC,NERC,STFCFrom EPSRC (£600M+/year) to AHRC (£100M/year)
  • #16 We need to be realistic about the funding environment we are operating in“Maintain = Reduce” DavidDelpy, CEO EPSRC commenting on recent EPSRC review of funding priorities. Many areas were “maintained”, but this means a 10-15% reduction in real terms if other areas are to grow……the only exception is FP7, where budgets are increasing until the end of the programme, and negotiations are underway over the budget for Horizon 2020 – but given current political events in Europe it may be difficult for them to get the increase that they need
  • #17 In that context here are the key policy and strategic issues facing potential applicants today. These mainly relate to UK Research Councils, but some are relevant to other funders, e.g. impact (EC), longer and larger (Wellcome), demand management (all funders as budgets are squeezed)
  • #18 Even though the funding environment is tough, there is hope for potential applicantsWe’re going to cover some of these points in detail today and in the next session: it’s about knowing the research funding gameRealistic: it’s about knowing which grants are available for you at your career stage, and planning for the next stageInformed: knowing the funder’s remit and how to address it; knowing what else has been funded and how your research fits with thatInnovative: increasingly funders are looking for innovative, cross-disciplinary approaches to themes, topics and issues; collaboration with others is often necessary to achieve thisRigorous: you must be able to carry out research to a high standard of quality and rigour; funders want to fund the best – well-trained researchers who are clear about what they want to achieve and can do it in a realistic timescale with reasonable and justified resourcesTargeted: don’t promise the earth; you need understand and explain your key research questions and why this funder is the best fit for this projectConnected: increasingly funders are looking for collaborative research; make sure you develop good connections both within and outside of academia, in the UK and overseas; look for ways to fund these collaborations as they may be very important to you in the futurePrepared: that’s what this session is about in part; also you need to make sure you plan ahead as far as possible – know which funders you are going to target and which calls; plan the actual application process well in advance – seek help and advice, leave time for unforeseen circumstances
  • #21 Research Professional is a comprehensive research news and funding database which also sends personalised email alerts to registered users. All research active members of staff should set up an account.You can access this from on campus without a password, as a guest, but you won’t be able to save any searches or set up your personalised email alerts.Register for an account if you haven’t done so already.Skip the induction and go straight to the home page. You can always take the induction again at a later date.You have a choice: you can either follow along by copying what I do on the main screen, or just watch and come back to it later using the quick reference handout that you’ve got.Structure of home page: pre-set searches, Outlook style.Practice funding search.Set up email alerts.
  • #23 This is a rough draft of the main stages involved in preparing a funding application at NorthumbriaBe aware that support is available at most of these stages via RBS or School administrator
  • #26 This part of the session will cover the key elements of a successful funding proposal drawing on examples often from UK Research Councils. Remember that not all funders are the same, and you should target the remit of the funder you’re applying to. However, many of the principles of constructing a good funding proposal are similar across different funders. That’s what we’ll be covering here.
  • #27 Review feedback regularly says of a research proposal “Good idea, but…”This session won’t mean that all of your research proposals are funded. It’s not a guarantee of success.The best it can do is give you tools, tips and strategies to plan and construct a good quality research proposal.It’s up to you to come up with a compelling research question
  • #28 http://socialscienceresearchfunding.co.uk/?p=359 application and assessment processes for unlimited goods (PhDs, driving licenses) and limited goods (jobs, grant applications). “You aren’t going to fail your driving test if there are better drivers than you, but your funding proposal may be rejected if there’s a better applicant than you.”Reviewers may well have a pile of applications to get through. They’re busy people, just like you – because they are you! – so they may not have the time they would like to give each application the detailed and thoughtful consideration they would like. They’ll be marking to review criteria, but will be looking for holes and weaknesses.The quote comes from an unnamed senior member of staff in the Canadian SSHRC (Social Science and Humanities Research Council)
  • #29 Different calls and funders will ask for this information in different ways, but at a basic level all funders want to know who is going to be doing the research; what are you going to do; and how are you going to do it.I’ll unpack each of these elements along with things to think about when writing a proposal.We’ll come back to the fourth question “Why?” later.
  • #30 Almost every project should have a PI – this is the person ultimately responsible for the research. If it’s a small project, there may only be a PI carrying out the research, but in a larger project the PI may be responsible for managing staff, coordinating partners, supervising project students, managing the budget, etc. So it’s important to get this element right, and to clearly communicate the PI’s skills and experience which make him/her suitable for this project.Co-Is are part of the project team – may be based at the same institution or a different one. Who you choose – and whether you have them at all – will depend on the funding call and the project. It may be that the call requires a team of investigators. It may be that you need expertise that you don’t have. Choice of Co-I is critical to cover all the bases.Partners are usually other individuals or organisations that have committed to support or participate in the project in some way. Be aware of funder-specific rules here as “partner” can mean different things to different funders. In a Research Council application, for example, it usually refers to a non-academic organisation which stands to participate or benefit from the research. Typically a partner would be expected to contribute something to the research, which may be in-kind staff time, but more than simply a cheerleader for the project.
  • #31 One of the most important questions to answer in your application: research problems/questions must be clear and concise. They must fit the remit of the call, and should be ambitious but don’t promise the earth.Applications often fall down on methodology – it’s one of the easiest elements for time-pressed reviewers to pick holes in. You not only need to clearly state what you intend to do, you also need to justify your methodological choices: Why a series of semi-structured interviews? Why running this statistical analysis? Why this number of participants? Why carry out a pilot study in this environment? Etc.Outputs – what is going to be the end product of this project? Probably there will be a series of outputs, such as journal articles, workshop or conference papers, a website, database, a report for policymakers, a best practice guide for community groups. The outputs should fit the methodology and the aims of the project – if you plan to engage businesses for example, it would be a good idea to produce an output relevant to this user group, in addition to the more academic outputs you will also produce. It’s important to think about the content of the output as well as the dissemination mechanism (e.g. what will the journal papers be about – to which journals?)Impacts outside of academia are increasingly important, particularly for Research Councils. It’s important to note that these are not simply limited to economic impacts – social and cultural impact counts as well. You’ll need to think about ways of engaging potential end users of your research, from policymakers to businesses, community groups to hospitals, industry to local authorities. It shouldn’t just be a passing nod to these groups – you’ll need to explain how your project will engage them and transfer knowledge or make an impact on their day to day lives.
  • #32 Budgeting is often the part that gets left until last, or the part that researchers feel least comfortable with, especially if you’ve never managed a budget or run a project before. But it’s too important to leave until last, and it’s not as difficult as it appears! RBS and/or School Admin will support you, but you need to be aware of the issues – particularly funding limits and what you can request. Last minute budget changes can and do have an impact on other parts of the bid, e.g. methodology, partners, Co-Is, etc.Plan: think about timescales and milestones. What is each person going to be doing? It’s all very well asking for an RA full-time for three years, but is there enough for them to do for that time? Sometimes funders will ask you to include this as part of your case for support, other times it could be a separate appendix.Management: what is the management structure going to be – this will relate to the size and complexity of the project. If it’s just you, then there won’t be any need for steering groups etc. but on larger scale, multipartner international projects, you will need to think very carefully about this element.
  • #34 The application will often be completed online, and you may also need to prepare attachments in Word according to a template in the guidance notes. This is the case for both Research Councils and European bids, for example. If the application is online, there may well be an online approval process, so take care to allow enough time for this to go through. Also worth noting is that you can and should use sub-headings in the online application to structure your text.Here are a few of the key sections/attachmentsof most application forms.
  • #36 This is about justifying the need for and resultant benefits of your project – for the state of the art, society at large, a particular industrial sector. Whatever it is, you need to identify that need and communicate it throughout the application.
  • #37 EPSRC have recently introduced this criterion in all research grants. They’re asking researchers to situate their research in the context of other research nationally and look ahead 10-50 years to explain what effect it might have. Not difficult, then(!) But where EPSRC go, other research councils often follow (cf. demand management) so even if EPSRC is not your bread and butter, it’s worth thinking about this.In any case, it’s always worth asking yourself the question: “what would happen if this research isn’t funded?” What insights would be lost, which user groups would not be impacted?
  • #39 Know your field: what’s been funded in the past and why is your approach better?Perhaps you have links to user groups that are unique, perhaps you want to cross disciplinary boundaries in a way that is different to others working in your field, perhaps your theoretical approach or research question is different. Whatever it is, find your USP and sell it!You can’t be an expert in everything. You need to be ruthless in identifying any weaknesses. For example, if you want to communicate your research to a certain user group, but don’t have any links to them consider recruiting a Co-I with contacts or develop some contacts and get them on board as partners in your application.
  • #40 It’s not always possible, but it helps if you can identify a timely event or pressing need for the research to take place – for instance, an anniversary or event of some kind, the Olympics, extinction of a species, a pressing social or economic problem, an urgent environmental issue, a legal or policy change that needs urgent action, etc.
  • #42 Research paper: Often you’ll start writing as you would a research paper – but this is more of a sales pitch than a research paper. Yes, the research should be sound and, yes, you need to give contextual information in order to justify the project. But bear in mind that you need to explain what this project is about and what will be achieved, rather than focusing on the current state of the art.Get to the point sooner rather than later. Don’t leave it until paragraph 3 of page 2 before you explain what your research project will do. It’s understandable that you may need to set out some context to frame your research, but tell the reader briefly up front what you’re going to do and why it’s important. Then you can come back later to flesh out the details.Justify: You must always justify the need for your research, the resources you are requesting, the methodological and theoretical approaches you take. There will always be a reviewer who thinks their approach is better, so you need to cover yourself by setting out the reasons why your approach is the best fit for your project.Methodology: Sometimes an application will be well justified in terms of the need and importance of the research, but will fall down on methodology. I’ve seen this happen in both physical sciences and arts/humanities applications. Don’t assume the reviewer knows exactly what you’re going to do. Explain it to them. Tell them how.Language: There’s a balance to strike between being too technical and not technical enough. There will be subject experts on the review panel so you need to show that you know your stuff in detail, but you also need to make the point of the research clear to a non-expert (at least in the lay summary, but also in the body of the Case for Support).Spelling/grammar: Just spell check it and get it peer reviewed to sense check. Leave time if you can to come back to it with a fresh pair of eyes.Inconsistencies: As you construct your application you may change your plans slightly, particularly when it comes to the budget – this is why I mentioned it’s important to sort this out early on. Ensure you cross-check the whole thing before submission to make sure, for example, your research questions match what you wrote in the summary.Promising too much: or too little for the money… Check what has been funded previously. Most funders make this information easily available, and you can usually see overall budget figures. Think about your resources: do you need a full-time RA for the length of the project? Do you need that extra iPad? Also, ask someone with experience of running a research project whether or not your project looks feasible within a given time frame (think about publisher deadlines, etc.)Funder priorities: Don’t just read the call information thoroughly, also check the funder’s latest strategic/delivery plans. You should link your work to their priorities to increase your chances of success.Tell a story: This is probably the hardest one to define, but it relates to the overarching narrative (or lack of one) in the bid. This covers all of the key elements: what, how, who and why. One way to do this is to use signposting, i.e. flagging up something at an earlier point which you will discuss in detail in a later section, for example impact.
  • #43 Challenge them to tell you 10 reasons why they wouldn’t fund itTry to get a subject expert and a lay reviewerRemember, this is partly why we’re here – talk to RBS and your RFDMs!
  • #44 You can’t be told how to do this, you need to have a go!
  • #46 Please contact Laura McMahon to book onto one of these asap.Remember as preparation you need to complete the outline application form and send to me at least three working days before your session.