How we can support your
research
David Law
Head of Research Support Group
Research Support
Group
Research Support Group
 Who we are
 What we do to help you
 How you can help us to help you
Who are we?
Research
Facilitators
Finance Office
Research and
Innovation Services
Contracts
Research Support
Group
5 teams
27 staff
Research
Support Office
Research
Finance
Strategic
Partnerships,
Specialist Support
(EU FP7),
Commercial
Development
7 Officers
3 Assistants
Research
Support Partner
Colleges
Governance and
Ethics
2 teams
7 staff
College / school
administration
Research
Facilitators
Finance Office
Research and
Innovation Services
Contracts
Research Support
Group
5 teams
27 staff
Research
Support Office
Research
Finance
Strategic
Partnerships,
Specialist Support
(EU FP7),
Commercial
Development
7 Officers
3 Assistants
Research
Support Partner
College / school
administration
Colleges
Governance and
Ethics
2 teams
7 staff
Costings, pre
and post award
administration
Separate EU team
(6 staff)
2 MDS teams
(11 staff)
Project cost
updates ,
purchase orders,
expenses,
payments etc
Research Finance
What we do
Project costings (fEC and other) 5,500 per year
RCUK and other major funder applications 750
New project accounts opened 1,350
Approval of research project staff appointments 4,250
Claims and invoicing 1,750
Account monitoring and administration 2,500 live accounts
Account closure and Final Expenditure Statements 1,000
Research Finance
Post
award
How the RF teams are structured
CLOSEApplication
Open
account
Approve
staff
FES, final
invoicing,
account
closure
Amendments
Account
administration
Collate
approvals
and open
Check,
submit
and record
Monitoring,
claims,
invoicing
AWARD
Costing
Approval
of staff at
the start of
a project
Approval of staff
changes, project
extensions, and
new funding
PROJECT
START
POST-AWARDPRE-AWARD
How the RF teams are structured
CLOSEApplication
Open
account
Approve
staff
FES, final
invoicing,
account
closure
Amendments
Account
administration
Collate
approvals
and open
Check,
submit
and record
Monitoring,
claims,
invoicing
AWARD
Costing
Approval
of staff at
the start of
a project
Approval of staff
changes, project
extensions, and
new funding
New Account Team
PROJECT
START
Everything financial that you need to START your research project;
urgent deadlines, avoiding costly delays
POST-AWARDPRE-AWARD
How the RF teams are structured
CLOSEApplication
Open
account
Approve
staff
FES, final
invoicing,
account
closure
Amendments
Account
administration
Collate
approvals
and open
Check,
submit
and record
Monitoring,
claims,
invoicing
Account Administration Team
AWARD
Helping you to maximise the income from your
research project
Costing
Approval
of staff at
the start of
a project
Approval of staff
changes, project
extensions, and
new funding
New Account Team
PROJECT
START
Everything financial that you need to START your research project;
urgent deadlines, avoiding costly delays
POST-AWARDPRE-AWARD
How can you help us?
 Supporting evidence required by funders
– Expense details and receipts
– EU and other timesheets
– Research deliverables as condition of invoicing
 Lead time
– Final expenditure statements
– Extensions
Research Finance: post award
Research
Facilitators
Finance Office
Research and
Innovation Services
Contracts
Research Support
Group
5 teams
27 staff
Research
Support Office
Research
Finance
Strategic
Partnerships,
Specialist Support
(EU FP7),
Commercial
Development
7 Officers
3 Assistants
Research
Support Partner
Colleges
Governance and
Ethics
2 teams
7 staff
Prepare, review,
negotiate and
authorise
research
contracts
Research Contracts
College / school
administration
What the contracts team does
 Negotiate 1,400 research contracts per year
– Financial and non-financial (eg Confidentiality
Agreements, Material Transfer Agreements)
– Mostly post-award
 Protect the University and its researchers
– eg your right to publish, intellectual property rights,
limiting our liabilities, safeguarding our charitable
status
– eg. financial terms (VAT, conditional milestones and
penalties)
How can you help us?
 Accurate and detailed information
– Contract request form needed
– The sooner we start, the sooner we are likely to finish
 Lead time
– Negotiating a contract can take several months - we
can only go as quickly as the other party does
 Please don’t sign contracts yourself
Research Contracts
Research
Facilitators
Finance Office
Research and
Innovation Services
Contracts
Research Support
Group
5 teams
27 staff
Research
Support Office
Research
Finance
Strategic
Partnerships,
Specialist Support
(EU FP7),
Commercial
Development
7 Officers
3 Assistants
Research
Support Partner
Colleges
Governance and
Ethics
2 teams
7 staff
Management of
sponsorship,
clinical trial
insurance and
ethical review
Quality Management
Team
Research Governance and Ethics
College / school
administration
What the Governance and Ethics team do
 Co-ordinate all ethical review processes*
– 1,500 Self Assessment Forms
– 400 internal ethical review committee referrals
– 250 external ethical review applications (NRES)
 Act as the sponsor representative
– Approve sponsorship
– Co-ordinate clinical trial insurance
– Monitor compliance with regulatory requirements
(collation of evidence NOT on-site auditing)
* Except animal research approvals – dealt with by BERSC
How can you help us?
 Please do the Self Assessment Form early
– You won’t be able to spend your money without it
– It acts as your sponsorship application
 Please make sure the sponsor’s
representative can comply with our regulatory
requirements
– The MHRA need us to have annual progress
reports, DSURs, SUSARs, ethical approval
applications and amendments
Research Governance and Ethics
Research Support Group
 We’re here to give you the best support
service we possibly can
– Maximising your income
– Protecting your interests
– Obtaining the necessary regulatory approvals
 Please help us to help you
 If we get it wrong, tell us and we’ll put it right
Where to find us
 We’re based in Aston Webb B Block
 Contact details, forms, guidance etc are on the
Intranet (under ‘Finance/Accounting’)
www.birmingham.ac.uk/researchsupportgroup
 Please contact us whenever you need to
Any questions?
Academic Perspective
Kate Fletcher, Primary Care Clinical Sciences
Start of the Study
 Contracts
 Sponsorship
 Finance
 HR
 Regulatory Approvals
Ongoing/Study Closedown
 Finance
 Ongoing Monitoring/Reporting
 Closedown Reports
Pitfalls and hints
 Remember it is your project!
 Ask lots of questions
 Follow up
 Plan budgets and monitor regularly
 Staff contracts
What is good project
management?
Sarah Knaggs
So you’ve been awarded a grant…
Grants
 Vary in size and complexity - from small projects for a student or
Research Fellow to large scale multidisciplinary and multi-
organisation activities
 Are awarded to perform a project / a programme of research,
within a fixed budget and duration
 Often involve balancing innovation with delivery
 Are awarded to the institution via a member of staff
 Come with regulations and constraints
 May be taken away again if the institution does not comply
 Are seen as a measure of your success
 Often don’t have dedicated project managers!
Do I need project management?
 Project management is the discipline of organizing
and managing resources (e.g. people) in such a way
that the project is completed within defined scope,
quality, time and cost constraints
 All research projects need careful management (wrt
resources, timelines, budgets, reporting, deliverables,
etc.) to ensure the integrity and quality of the
research, recording/storage of data and timely
delivery of outputs within the project budget
What project management isn’t
 A box ticking exercise
 About just managing a big plan
 A recipe for 100% success
 Rigid – it evolves and need to adapt style and
method according to the groups you are working with
Typical tasks or stages in projects
 Initiation – involves contracts team, Research
Finance, research governance/ethics, HR…
– define critical success factors/risks, project structure,
constraints, recruitment, legal agreements, setup budgets
 Planning – divide work into manageable
chunks/tasks that have defined timelines
 Executing – delivery by project team
 Controlling – monitoring and taking corrective action
where required
 Closing – lessons learnt, data archiving, final
reports, account closure
During the project lifetime…
• Financial management
– Purchasing
– Completing claims
– Monitoring expenditure, profiling spend and forecasting
• Communication
– Within and beyond the University
• Project reporting
– Delivery of required reports: progress reports and
expenditure statements
Compliance issues…
Ensure familiarity with:
 Funder T&Cs and policies: expenditure, reporting,
outputs, data, staffing
 Regulatory requirements affecting project: research
governance and ethics (MHRA, HTA, REC),
Health & Safety, Data Protection Act,
Copyright Law, UKBA
 University and local
College policies/CoP
Specific
award terms
University /
College
policies
Funder policies
Statutory Laws /
Government regulations
Elements of good project
management
 Be prepared
 Be organised
 Manage the resources – people, budget, etc
 Conduct your research ethically
 Provide leadership
 Create a supportive and enabling environment -
foster a productive research culture
 Establish effective communications
 Record, store and archive data/materials
Planning for success
 Identify the main tasks that will need to be performed, then split
the main tasks into their respective subtasks
 Consider how much time each task takes
 Determine which tasks run simultaneously
 Assess the consequences if a task takes more time to complete
 Determine what resources (people, space, equipment, etc.) are
required to undertake the tasks
 Allow for some slippage in your timelines and have contingency
plans (mitigate risk)
 Add in ‘checkpoints’ to evaluate progress in the project
 Consider data management up-front
 Ensure familiarity with funder T&C, UoB policies & regulatory
requirements affecting the project and who to seek help from
Defining roles… at proposal stage
Many research projects are a team effort, so at proposal
stage:
• Determine how much involvement the PI/Co-Is can really
give or have promised to give
• Are the tasks suitable for a project manager or
administration support?
• Are the tasks required across the full duration of the
project?
• Define how decisions will be made and by who
• Define stakeholders to determine the characteristics of a
project ‘lead’
• Ask ‘Am I happy to empower someone to facilitate the
project process?’
Where do I draw the boundary lines?
• Act as a figurehead for the project
• Define reporting structures
• Support recruitment process
• Ensure meetings/reviews/steering committees happen
• Ensure meetings documented and communicated
• Ensure budgets setup and managed
• Ensure contracts negotiated in a timely manner
• Ensure communication across project
• Project identity – website, template documents, logo, sample talks, PR
• Plan activity across parts of all of project in detail
• Manage the staff
• Monitor performance of partners and staff
• Reporting on progress to stakeholders
• Managing risk and dependencies
• Manage external communication for the project
• Manage requirements/needs/input to research
• Manage decision making processes for milestones
How much do you really
want to do ?
Should I employ someone
part-time/full-time?
Can I utilise an existing
member of staff with project
management experience?
Typical split on larger projects with a
project manager
Scientific lead
• Drive and direct the science
• Supervise/motivate staff and
students
• Drive future scientific direction
• Report scientifically
Operational lead
• Ensure projects are delivered
• Advise, support where
required
• Facilitate
• Ensure whole project
supported and conflicts
resolved
Administrative and
financial support
• Provide essential support
for the project, including
finance, travel, workshop
organisation
Role of the ‘Project Manager’ is to..
 Ensure deliver on proposed project
to budget and within time
 Manage and mitigate project risk
 Ensure communication to project
teams, and stakeholders as well as
the public where required
 Make decisions with the support of
a management team
 Address conflicts, fight fires,
manage relationships
So to help make your projects a
success…
 Consider how your project will be managed and who
will be involved in this
 Spend the time considering the initiation tasks early
to ensure that the project gets off to a flying start
 Take care to adhere to funder T&Cs, regulatory
requirements and UoB policies/CoPs
 Keep an eye on deadlines and deliverables
 Motivate the team – or will be like swimming in
treacle!
In Summary
 Grant/project management processes need to be
considered for every project
 Roles and responsibilities need to be established
early!
 Non compliance may result in withdrawn funding and
damaged reputation
 Seek help if you are not sure… speak to your School
Research Facilitator and/or College Strategic Project
Manager
Any Questions?

Your Research Project - Effective Post Award Management

  • 1.
    How we cansupport your research David Law Head of Research Support Group Research Support Group
  • 2.
    Research Support Group Who we are  What we do to help you  How you can help us to help you
  • 3.
    Who are we? Research Facilitators FinanceOffice Research and Innovation Services Contracts Research Support Group 5 teams 27 staff Research Support Office Research Finance Strategic Partnerships, Specialist Support (EU FP7), Commercial Development 7 Officers 3 Assistants Research Support Partner Colleges Governance and Ethics 2 teams 7 staff College / school administration
  • 4.
    Research Facilitators Finance Office Research and InnovationServices Contracts Research Support Group 5 teams 27 staff Research Support Office Research Finance Strategic Partnerships, Specialist Support (EU FP7), Commercial Development 7 Officers 3 Assistants Research Support Partner College / school administration Colleges Governance and Ethics 2 teams 7 staff Costings, pre and post award administration Separate EU team (6 staff) 2 MDS teams (11 staff) Project cost updates , purchase orders, expenses, payments etc Research Finance
  • 5.
    What we do Projectcostings (fEC and other) 5,500 per year RCUK and other major funder applications 750 New project accounts opened 1,350 Approval of research project staff appointments 4,250 Claims and invoicing 1,750 Account monitoring and administration 2,500 live accounts Account closure and Final Expenditure Statements 1,000 Research Finance Post award
  • 6.
    How the RFteams are structured CLOSEApplication Open account Approve staff FES, final invoicing, account closure Amendments Account administration Collate approvals and open Check, submit and record Monitoring, claims, invoicing AWARD Costing Approval of staff at the start of a project Approval of staff changes, project extensions, and new funding PROJECT START POST-AWARDPRE-AWARD
  • 7.
    How the RFteams are structured CLOSEApplication Open account Approve staff FES, final invoicing, account closure Amendments Account administration Collate approvals and open Check, submit and record Monitoring, claims, invoicing AWARD Costing Approval of staff at the start of a project Approval of staff changes, project extensions, and new funding New Account Team PROJECT START Everything financial that you need to START your research project; urgent deadlines, avoiding costly delays POST-AWARDPRE-AWARD
  • 8.
    How the RFteams are structured CLOSEApplication Open account Approve staff FES, final invoicing, account closure Amendments Account administration Collate approvals and open Check, submit and record Monitoring, claims, invoicing Account Administration Team AWARD Helping you to maximise the income from your research project Costing Approval of staff at the start of a project Approval of staff changes, project extensions, and new funding New Account Team PROJECT START Everything financial that you need to START your research project; urgent deadlines, avoiding costly delays POST-AWARDPRE-AWARD
  • 9.
    How can youhelp us?  Supporting evidence required by funders – Expense details and receipts – EU and other timesheets – Research deliverables as condition of invoicing  Lead time – Final expenditure statements – Extensions Research Finance: post award
  • 10.
    Research Facilitators Finance Office Research and InnovationServices Contracts Research Support Group 5 teams 27 staff Research Support Office Research Finance Strategic Partnerships, Specialist Support (EU FP7), Commercial Development 7 Officers 3 Assistants Research Support Partner Colleges Governance and Ethics 2 teams 7 staff Prepare, review, negotiate and authorise research contracts Research Contracts College / school administration
  • 11.
    What the contractsteam does  Negotiate 1,400 research contracts per year – Financial and non-financial (eg Confidentiality Agreements, Material Transfer Agreements) – Mostly post-award  Protect the University and its researchers – eg your right to publish, intellectual property rights, limiting our liabilities, safeguarding our charitable status – eg. financial terms (VAT, conditional milestones and penalties)
  • 12.
    How can youhelp us?  Accurate and detailed information – Contract request form needed – The sooner we start, the sooner we are likely to finish  Lead time – Negotiating a contract can take several months - we can only go as quickly as the other party does  Please don’t sign contracts yourself Research Contracts
  • 13.
    Research Facilitators Finance Office Research and InnovationServices Contracts Research Support Group 5 teams 27 staff Research Support Office Research Finance Strategic Partnerships, Specialist Support (EU FP7), Commercial Development 7 Officers 3 Assistants Research Support Partner Colleges Governance and Ethics 2 teams 7 staff Management of sponsorship, clinical trial insurance and ethical review Quality Management Team Research Governance and Ethics College / school administration
  • 14.
    What the Governanceand Ethics team do  Co-ordinate all ethical review processes* – 1,500 Self Assessment Forms – 400 internal ethical review committee referrals – 250 external ethical review applications (NRES)  Act as the sponsor representative – Approve sponsorship – Co-ordinate clinical trial insurance – Monitor compliance with regulatory requirements (collation of evidence NOT on-site auditing) * Except animal research approvals – dealt with by BERSC
  • 15.
    How can youhelp us?  Please do the Self Assessment Form early – You won’t be able to spend your money without it – It acts as your sponsorship application  Please make sure the sponsor’s representative can comply with our regulatory requirements – The MHRA need us to have annual progress reports, DSURs, SUSARs, ethical approval applications and amendments Research Governance and Ethics
  • 16.
    Research Support Group We’re here to give you the best support service we possibly can – Maximising your income – Protecting your interests – Obtaining the necessary regulatory approvals  Please help us to help you  If we get it wrong, tell us and we’ll put it right
  • 17.
    Where to findus  We’re based in Aston Webb B Block  Contact details, forms, guidance etc are on the Intranet (under ‘Finance/Accounting’) www.birmingham.ac.uk/researchsupportgroup  Please contact us whenever you need to Any questions?
  • 18.
    Academic Perspective Kate Fletcher,Primary Care Clinical Sciences
  • 19.
    Start of theStudy  Contracts  Sponsorship  Finance  HR  Regulatory Approvals
  • 20.
    Ongoing/Study Closedown  Finance Ongoing Monitoring/Reporting  Closedown Reports
  • 21.
    Pitfalls and hints Remember it is your project!  Ask lots of questions  Follow up  Plan budgets and monitor regularly  Staff contracts
  • 22.
    What is goodproject management? Sarah Knaggs
  • 23.
    So you’ve beenawarded a grant… Grants  Vary in size and complexity - from small projects for a student or Research Fellow to large scale multidisciplinary and multi- organisation activities  Are awarded to perform a project / a programme of research, within a fixed budget and duration  Often involve balancing innovation with delivery  Are awarded to the institution via a member of staff  Come with regulations and constraints  May be taken away again if the institution does not comply  Are seen as a measure of your success  Often don’t have dedicated project managers!
  • 24.
    Do I needproject management?  Project management is the discipline of organizing and managing resources (e.g. people) in such a way that the project is completed within defined scope, quality, time and cost constraints  All research projects need careful management (wrt resources, timelines, budgets, reporting, deliverables, etc.) to ensure the integrity and quality of the research, recording/storage of data and timely delivery of outputs within the project budget
  • 25.
    What project managementisn’t  A box ticking exercise  About just managing a big plan  A recipe for 100% success  Rigid – it evolves and need to adapt style and method according to the groups you are working with
  • 27.
    Typical tasks orstages in projects  Initiation – involves contracts team, Research Finance, research governance/ethics, HR… – define critical success factors/risks, project structure, constraints, recruitment, legal agreements, setup budgets  Planning – divide work into manageable chunks/tasks that have defined timelines  Executing – delivery by project team  Controlling – monitoring and taking corrective action where required  Closing – lessons learnt, data archiving, final reports, account closure
  • 28.
    During the projectlifetime… • Financial management – Purchasing – Completing claims – Monitoring expenditure, profiling spend and forecasting • Communication – Within and beyond the University • Project reporting – Delivery of required reports: progress reports and expenditure statements
  • 29.
    Compliance issues… Ensure familiaritywith:  Funder T&Cs and policies: expenditure, reporting, outputs, data, staffing  Regulatory requirements affecting project: research governance and ethics (MHRA, HTA, REC), Health & Safety, Data Protection Act, Copyright Law, UKBA  University and local College policies/CoP Specific award terms University / College policies Funder policies Statutory Laws / Government regulations
  • 30.
    Elements of goodproject management  Be prepared  Be organised  Manage the resources – people, budget, etc  Conduct your research ethically  Provide leadership  Create a supportive and enabling environment - foster a productive research culture  Establish effective communications  Record, store and archive data/materials
  • 32.
    Planning for success Identify the main tasks that will need to be performed, then split the main tasks into their respective subtasks  Consider how much time each task takes  Determine which tasks run simultaneously  Assess the consequences if a task takes more time to complete  Determine what resources (people, space, equipment, etc.) are required to undertake the tasks  Allow for some slippage in your timelines and have contingency plans (mitigate risk)  Add in ‘checkpoints’ to evaluate progress in the project  Consider data management up-front  Ensure familiarity with funder T&C, UoB policies & regulatory requirements affecting the project and who to seek help from
  • 33.
    Defining roles… atproposal stage Many research projects are a team effort, so at proposal stage: • Determine how much involvement the PI/Co-Is can really give or have promised to give • Are the tasks suitable for a project manager or administration support? • Are the tasks required across the full duration of the project? • Define how decisions will be made and by who • Define stakeholders to determine the characteristics of a project ‘lead’ • Ask ‘Am I happy to empower someone to facilitate the project process?’
  • 34.
    Where do Idraw the boundary lines? • Act as a figurehead for the project • Define reporting structures • Support recruitment process • Ensure meetings/reviews/steering committees happen • Ensure meetings documented and communicated • Ensure budgets setup and managed • Ensure contracts negotiated in a timely manner • Ensure communication across project • Project identity – website, template documents, logo, sample talks, PR • Plan activity across parts of all of project in detail • Manage the staff • Monitor performance of partners and staff • Reporting on progress to stakeholders • Managing risk and dependencies • Manage external communication for the project • Manage requirements/needs/input to research • Manage decision making processes for milestones How much do you really want to do ? Should I employ someone part-time/full-time? Can I utilise an existing member of staff with project management experience?
  • 35.
    Typical split onlarger projects with a project manager Scientific lead • Drive and direct the science • Supervise/motivate staff and students • Drive future scientific direction • Report scientifically Operational lead • Ensure projects are delivered • Advise, support where required • Facilitate • Ensure whole project supported and conflicts resolved Administrative and financial support • Provide essential support for the project, including finance, travel, workshop organisation
  • 36.
    Role of the‘Project Manager’ is to..  Ensure deliver on proposed project to budget and within time  Manage and mitigate project risk  Ensure communication to project teams, and stakeholders as well as the public where required  Make decisions with the support of a management team  Address conflicts, fight fires, manage relationships
  • 37.
    So to helpmake your projects a success…  Consider how your project will be managed and who will be involved in this  Spend the time considering the initiation tasks early to ensure that the project gets off to a flying start  Take care to adhere to funder T&Cs, regulatory requirements and UoB policies/CoPs  Keep an eye on deadlines and deliverables  Motivate the team – or will be like swimming in treacle!
  • 38.
    In Summary  Grant/projectmanagement processes need to be considered for every project  Roles and responsibilities need to be established early!  Non compliance may result in withdrawn funding and damaged reputation  Seek help if you are not sure… speak to your School Research Facilitator and/or College Strategic Project Manager
  • 39.

Editor's Notes

  • #25 Project management is a set of principles, practices, and techniques applied to lead project teams and control project schedule, cost, and performance risks to result in delighted customers or stakeholders
  • #28 Initiation:Define risks and how you will mitigate these risks. Every project has a risk or 2 … failure to recruit, PI moves, problem not solvableRecruitment – allow 3-4 months minimum per post if new recruitFinances – check project setupContracts – ensure progressing/progressed. Engage early and consider IP issues from day 1 Work out communication methodsPlanning:Don’t need to have complex gantt chartsIt helps to break the programme of work into chunks that have defined time-limes and involve single or small number of individualsDon’t need MS project - excel or text documents OKTasks can include working a paper for a conference - the deadline is a milestone!Plans are a good tool to communicate:dependencies and challengeswhere the work of an individual fits into the bigger pictureExecution:Cannot deliver alone, requires a cohesive teamAsk the project team how ‘we’ can solve a problem – it really helps to develop trust if you ask them for adviceDrive delivery not with a stick but with a carrot... give team members a chance to shine through, empower them to take ownership with ‘public’ proof of progressDrive from the front, believe in the team abilitiesControlling:Manage a risk list and share this with othersDon’t be afraid to say ‘I am concerned’Periodic reviews: set time and plan 12 months ahead! Holding f-2-f meetings helps to identify people issues Minute meetings clearly with actionsTraffic light system… shows that you are concerned (or not) with achieving deadlinesClosing:Lessons learned – useful for all contributorsWhat happens to the output? Consider what you will do with website, reports, documents, minutes and whether others could benefit from itUse the blueprint to document things you cannot achieve – often results in new proposalsConsider at least 6 months ahead how to produce final reports... Or funds may be lost ... And that is everyone’s problem
  • #30 MHRA;Human Tissue Act;Animals (Scientific Procedures) Act 1986;NHS RECs;Data Protection Act - internal UoB training available to all staff and students;Concordat to Support Research Integrity (2012) and Research Councils’ Code of Conduct and Policy on the Governance of Good Research Conduct (2009) – incorporated in UoBCoP on research and disseminated to all research staff and students upon commencement of appointment;Concordat to Support the Career Development of Researchers (2008);Health & Safety;Copyright Law;Funder requirements, which may relate to:Specific grant T&Cs;Reporting requirements (during and post-grant) incl. ROS, ResaerchFish etc. Expenditure/use of funds – support provided by Research Finance;Research data management and open data – support provided by Research Facilitators. UoB policy under development, further training to be provided;Open access publication – training sessions provided. Detailed guidance available on intranet;Acknowledgement of funding in publications/dissemination activities;Recruitment of staff/research students – guidance issued to recruitment managers/administrators.UKBA – Training and guidance provided by HR/ISAS on recruitment of staff/visiting researchers etc. Intranet pages available and contacts points for further advice/guidance.
  • #31 Involves team of people – researchers & admin staff (finance officer, research governance, IT, etc)Important to consider how project will be managed at proposal stageBe prepared for all eventualities and have contingency plansBe prepared for project set-up: contracts review/negotiation, research ethics/governance, account set-up, recruitmentBe organised: wrt time, check deadlines/deliverables regularly, ensure clarity wrt roles & responsibilitiesReview expenditure regularlyEnsure familiarity with funder T&C, UoB policies & regulatory requirements affecting the project and who to seek help from
  • #36 The PI has primary responsibility for achieving the technical success of the project, while also complying with the financial and administrative policies and regulations associated with the award. Although administrative staff will assist with the management of project funds, ultimate responsibility for the management of the sponsored research award rests with the PI. The fundamental responsibilities of the PI during the post-award phase of a sponsored research award include:Execution of the project as outlined in the funded proposal; Reporting project progress to the sponsor as outlined in the terms of award; Maintaining an accurate record of project-related expenses; Complying with all University policies and procedures related to project management, personnel practices and research integrity; Complying with all applicable sponsor rules, regulations and/or terms and conditions of the award.
  • #38 Motivate the team and provide leadershipIncrease their level of responsibility as they increase in confidence and experienceGive regular critical feedback and praise where praise is dueKeep them informed of overall project progress