Anthropometric Data For a
Shopping Mall
Group 1:
Anish
Ann
Aswin
Ashna
Sandeep
Sumit
Canteen
Size of
table:0.75mx0.75m
Size of chair:
0.45mx0.45m
Clearance for
services: 0.60m
Total area used:
5.55m-6.45mx3.75m-
4.2m
Size of table:
0.75mx0.75m
Size of chair:
0.45mx0.45m
Clearances for
services: 0.75m end
to end
Total area used:
4.95m-5.4mx3.45m-
3.6m
Size of table: 0.9m dia
Size of chair:
0.45x0.45m
Clearances for
services: 0.85m from
edge to edge of the
table
Total area used:
3.45m-5.05mx2.7m-
3.75m
Seating and Clearances (calculated for 24 people)
Co-op Store
The maximum height of the shelves
should be 1.86m and the lowest shelf
should be at a height of 0.42m
The minimum width of the shop
should be 4m
The length of the shop may vary
according to demand. The length
should be on the lower side as self
service is not recommended in
colleges. 5m is the estimated length of
the shop
Hair Dressing Saloon
The hair dressing saloon with two chair units will measure up to 5.5m x 3.6m
The tailoring shop should
have a handwork area which
consists of tables for sewing
and finishing boards
Additionally a pressing table is
required
Hanging racks are also
essential
DIMENSIONS:
Sewing table: 0.9mx1.8m
Finishing boards:1.2mx 1.8m
Pressing table: 0.6mx1.4m
Estimated size for the entire
tailoring shop is around 3.2mx
3.5m
Tailoring Centre
The medical store should be a minimum of
4m x 4m
This space should accommodate both the
hot and cold storage spaces
The shelves of the medical store should be
0.50m wide and 0.30m high
The cash counter should be 1.1m high,
0.45m wide and 0.6m long
Medical Shop
Multi-purpose hall
The Dimensions for the multi-purpose hall for seating 80 people is 8.5m x 4.75m
HeToilets
The size of the toilet should be 1.8m x
1.9m. This includes the water closet and
the urinal.
 Parking requirement: 1/100sq.m of carpet area
25% of above parking to be provided additionally for 2
wheeler parking.
 Each of street parking space provided for parking motor
cars should be not less than 15sq.m area (5.5 m x 2.7m)
and for scooters and cycles the area of each parking space
provided shall be not less than 3sq.m and 1.5sq.m
respectively
 KMBR prescribes 1 parking unit per 100sq.m of carpet
area, i.e. for 12540sq.m carpet area, 125 parking units are
required as far as the old block is considered. But the new
block carpet area is 7970sq.m so an additional parking
space for 80 more cars…
Parking
Parking - Dimensions
AHU room - 16.5 18
Air conditioning plant room 35 136 137.5
Electric room
(2 transformers) 54 54
Electrical substation 35 154 154
Generator room
(2 generators) 42 70 105
Ups room - 45 45
AREAS for HVAC and ELECTRICAL SERVICES
MIMS
(sq.m)
optimum
area (sq.m)
I.S.CODES
(sq.m)
HVAC
Function:
• provide clean, comfortable and controlled environment to
minimize risk of transmission of airborne pathogens
• controls air quality and air movement. restriction of air
movement through and between departments.
• provides different types of temperature and humidity to
various areas
• ensures operation of equipments by providing an
appropriate environmental temperature, humidity and
absence of dust.
Components of an HVAC
• OUTSIDE AIR INLET OR INTAKE FILTERS
• HUMIDITY MODIFICATION MECHANISM
• HEATING AND COOLING EQUIPMENT
• FANS
• DUCTWORK
• AIR EXHAUST
• DIFFUSERS OR GRILLS FOR PROPER
DISTRIBUTION OF AIR
• CONTROLS AND SWITCHES
• ELECTRICITY SUPPLY SYSTEM WITH GEN SET
BACKUP
• Prevention through proper design and construction
• Provisions for
– Smoke/fire detection
– Restriction of spread
– Extinguishment systems
• Evacuation of buildings: Horizontal and vertical evacuation to be
planned
Preventive measures
• Non combustible material to be used in load bearing elements, stair ways
and corridors
• Proper plug and sockets to be provided for heating appliances
• Electrical wiring laid in separate duct and sealed at every alternate floor with
non combustible materials.
• Good house keeping and proper waste disposal
• Proper storage conditions, and segregation of combustible and explosive
materials like gases, chemicals and x ray films
Fundamental philosophies of fire safety
FIRE DETECTORS
CONTROL PANELS PLACED IN
SECURITY OFFICE WHICH NOTIFY
SECURITY PERSONELSL
Panel to detect activation
of sprinkler system
monitored zone wise
Panel to detect activation
of smoke alarms
monitored zone wise
Restriction of spread
• Unit concept of construction
• Min fire resistance offered by structural frame: 2 hrs
• Compartmentalization of building:
smoke stop doors of minimum half an hour fire resistance to be interposed between
galleries, lobbies and between wards. Single swing type opening in the direction of
escape
• AC ducts provided with dampers/stoppers. Dampers installed in inlet duct at ac plant
room and fire separation walls provided wherever ducts enter the vertical shafts.
• At least two areas of refuge to be provided in each horizontal plane.
• Fire and smoke should not go up and down the level of origin. Vulnerable spots: stair
ways, lifts, chutes, shafts etc. RCC floors resistance:2 hrs
• Life risk areas( wards, OT etc) should be segregated from high hazard service areas
(boiler room, laundry, gas supply etc)
Exits:
– min 2 on each floor with area more than 500sq.m.
– Corridor: 2.4m wide, well lit with signage, clear of obstructions
– Door exits lead directly to outside, interior stairway, exterior stairs, horizontal
exits, ramps, or exit passage ways.
– door: min 2m high and 2m wide, open able from both sides.
• For buildings more than 24m height, refuge area of 15sq.m or .3sqm per person to
accommodate occupants of 2 consecutive floors, whichever is higher should be
provided.
• Wet riser systems of pipes 150
mm dia located within lobby,
approach staircase or within
staircase where there is no
lobby.
– One riser for floor area
1000sq.m
– Riser passes from ground
floor to top floor and each
floor should be bound with
one landing valve and two
oulets for connecting to
hose reels
– Capacity of Under tank for
wet riser:
• 50,000 for hospitals of
3 levels
• 1 lakh L for hospitals
with height 15m- 24m
• 1.5 lakh L for hospitals
with height 24m- 30m
Fire fighting equipments
• Fire extinguishers at strategic points
• Automatic sprinkler extinguisher systems
• Fire detection systems where equipment may get damaged by water
• Separate water supply
Safe fire exits
• Wards: travel distance from the
farthest point in the ward room to
the exit door should be 30m or
less. Where this cannot be ensures
2 or more doors should be
provided
• Corridors and escape routes to be provided with recessed lights in the wall
.5m above the floor with power supply from a separate emergency source.
• At least one enclosed staircase from each fire protected zone to the ground
floor outside the building.
• Children’s ward, maternity ward, ICU’s, fracture treatment wards, where every
patient needs assistance could be located on ground floor or first floor so
efforts to save them in an emergency is less.
• Since vertical transportation is relatively more difficult arrangements should be
made so that patients can be transferred from one section to another section
of the same floor separated by a fire protection zone.
Data

More Related Content

What's hot

Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
Onal Kothari
 
Museum literature study
Museum literature studyMuseum literature study
Museum literature study
DeepikaAgarwal42
 
literature review in museum and art gallery design
literature review in museum and art gallery designliterature review in museum and art gallery design
literature review in museum and art gallery design
ritikchaudhary15
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
Abhishek Tiwari
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
jagrutib22
 
Literature Study of Hotels
Literature Study of HotelsLiterature Study of Hotels
Literature Study of Hotels
Sunayana Miglani
 
case study ART GALLERY
case study ART GALLERY case study ART GALLERY
case study ART GALLERY
Nitin Johari
 
JAWAHAR KALA KENDRA JAIPUR case study
JAWAHAR KALA KENDRA JAIPUR case studyJAWAHAR KALA KENDRA JAIPUR case study
JAWAHAR KALA KENDRA JAIPUR case study
Nihan Guetta
 
Shri ram center of performing arts,delhi
Shri ram center of performing arts,delhiShri ram center of performing arts,delhi
Shri ram center of performing arts,delhi
chandar prakash suthar
 
BRICK school of architecture, case study
BRICK school of architecture, case studyBRICK school of architecture, case study
BRICK school of architecture, case study
NavyaTessSabu
 
Shirish beri
Shirish beriShirish beri
Shirish beri
Shivani Nandgowle
 
Kala Academy - Charles Correa
Kala Academy - Charles CorreaKala Academy - Charles Correa
Kala Academy - Charles Correa
Ajith M M
 
Site analysis
Site analysisSite analysis
Site analysis
AnthonyNikhil
 
IUCAA
IUCAAIUCAA
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
Amir Azhar
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
NafeeZullah
 
university campus design
university campus design university campus design
university campus design
iqraabishah
 
LAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESLAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIES
Sumaiya Musliim
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
Milan Jain
 

What's hot (20)

Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
 
Museum literature study
Museum literature studyMuseum literature study
Museum literature study
 
literature review in museum and art gallery design
literature review in museum and art gallery designliterature review in museum and art gallery design
literature review in museum and art gallery design
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Literature Study of Hotels
Literature Study of HotelsLiterature Study of Hotels
Literature Study of Hotels
 
case study ART GALLERY
case study ART GALLERY case study ART GALLERY
case study ART GALLERY
 
JAWAHAR KALA KENDRA JAIPUR case study
JAWAHAR KALA KENDRA JAIPUR case studyJAWAHAR KALA KENDRA JAIPUR case study
JAWAHAR KALA KENDRA JAIPUR case study
 
Shri ram center of performing arts,delhi
Shri ram center of performing arts,delhiShri ram center of performing arts,delhi
Shri ram center of performing arts,delhi
 
BRICK school of architecture, case study
BRICK school of architecture, case studyBRICK school of architecture, case study
BRICK school of architecture, case study
 
Shirish beri
Shirish beriShirish beri
Shirish beri
 
Kala Academy - Charles Correa
Kala Academy - Charles CorreaKala Academy - Charles Correa
Kala Academy - Charles Correa
 
Site analysis
Site analysisSite analysis
Site analysis
 
IUCAA
IUCAAIUCAA
IUCAA
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
 
university campus design
university campus design university campus design
university campus design
 
LAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESLAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIES
 
literature study library
literature study libraryliterature study library
literature study library
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
 

Similar to Data

Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital
manjul gambhir
 
(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)
Bee Key Verma
 
Multicomplex and Commercial Complex
Multicomplex  and Commercial ComplexMulticomplex  and Commercial Complex
Multicomplex and Commercial Complex
Remisha Maharjan
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finale
Tee Joanne
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
Lee Chun Yee
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitals
Komal Gupta
 
Godown management
Godown managementGodown management
DATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdfDATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdf
SALONIKAAHUJA1
 
Handbook to build_an_hospital_crf
Handbook to build_an_hospital_crfHandbook to build_an_hospital_crf
Handbook to build_an_hospital_crf
subh111
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
XinYee Khoo
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016
Anil Kumar R
 
Fire safety
Fire safety Fire safety
Fire safety
Annapurna Sakhardande
 
Ot mang
Ot mangOt mang
Ot mang
BHANU DIXIT
 
Ot infection control rkch
Ot infection control rkchOt infection control rkch
Ot infection control rkchsabahjak
 
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
bccomfort
 
LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTS and maintenance in SLAUGHTER HOUSES
LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTSand maintenance  in SLAUGHTER HOUSES  LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTSand maintenance  in SLAUGHTER HOUSES
LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTS and maintenance in SLAUGHTER HOUSES
Hariharan R
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditorium
Nilanjana Pal
 
Case study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworCase study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshwor
Eeelsa shrestha
 
BS2 Fire protection 2
BS2 Fire protection 2BS2 Fire protection 2
BS2 Fire protection 2
Est
 

Similar to Data (20)

Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital
 
(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)
 
Multicomplex and Commercial Complex
Multicomplex  and Commercial ComplexMulticomplex  and Commercial Complex
Multicomplex and Commercial Complex
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finale
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitals
 
Godown management
Godown managementGodown management
Godown management
 
DATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdfDATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdf
 
Handbook to build_an_hospital_crf
Handbook to build_an_hospital_crfHandbook to build_an_hospital_crf
Handbook to build_an_hospital_crf
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016
 
Fire safety
Fire safety Fire safety
Fire safety
 
Ot mang
Ot mangOt mang
Ot mang
 
Eurocar_en
Eurocar_enEurocar_en
Eurocar_en
 
Ot infection control rkch
Ot infection control rkchOt infection control rkch
Ot infection control rkch
 
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
 
LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTS and maintenance in SLAUGHTER HOUSES
LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTSand maintenance  in SLAUGHTER HOUSES  LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTSand maintenance  in SLAUGHTER HOUSES
LAYOUT,DESIGN ,OPERATIONS ,EQUIPMENTS and maintenance in SLAUGHTER HOUSES
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditorium
 
Case study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworCase study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshwor
 
BS2 Fire protection 2
BS2 Fire protection 2BS2 Fire protection 2
BS2 Fire protection 2
 

Recently uploaded

CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
Excellence Foundation for South Sudan
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 

Recently uploaded (20)

CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 

Data

  • 1. Anthropometric Data For a Shopping Mall Group 1: Anish Ann Aswin Ashna Sandeep Sumit
  • 2.
  • 3.
  • 4.
  • 5. Canteen Size of table:0.75mx0.75m Size of chair: 0.45mx0.45m Clearance for services: 0.60m Total area used: 5.55m-6.45mx3.75m- 4.2m Size of table: 0.75mx0.75m Size of chair: 0.45mx0.45m Clearances for services: 0.75m end to end Total area used: 4.95m-5.4mx3.45m- 3.6m Size of table: 0.9m dia Size of chair: 0.45x0.45m Clearances for services: 0.85m from edge to edge of the table Total area used: 3.45m-5.05mx2.7m- 3.75m Seating and Clearances (calculated for 24 people)
  • 6. Co-op Store The maximum height of the shelves should be 1.86m and the lowest shelf should be at a height of 0.42m The minimum width of the shop should be 4m The length of the shop may vary according to demand. The length should be on the lower side as self service is not recommended in colleges. 5m is the estimated length of the shop
  • 7. Hair Dressing Saloon The hair dressing saloon with two chair units will measure up to 5.5m x 3.6m
  • 8. The tailoring shop should have a handwork area which consists of tables for sewing and finishing boards Additionally a pressing table is required Hanging racks are also essential DIMENSIONS: Sewing table: 0.9mx1.8m Finishing boards:1.2mx 1.8m Pressing table: 0.6mx1.4m Estimated size for the entire tailoring shop is around 3.2mx 3.5m Tailoring Centre
  • 9. The medical store should be a minimum of 4m x 4m This space should accommodate both the hot and cold storage spaces The shelves of the medical store should be 0.50m wide and 0.30m high The cash counter should be 1.1m high, 0.45m wide and 0.6m long Medical Shop
  • 10. Multi-purpose hall The Dimensions for the multi-purpose hall for seating 80 people is 8.5m x 4.75m
  • 11. HeToilets The size of the toilet should be 1.8m x 1.9m. This includes the water closet and the urinal.
  • 12.  Parking requirement: 1/100sq.m of carpet area 25% of above parking to be provided additionally for 2 wheeler parking.  Each of street parking space provided for parking motor cars should be not less than 15sq.m area (5.5 m x 2.7m) and for scooters and cycles the area of each parking space provided shall be not less than 3sq.m and 1.5sq.m respectively  KMBR prescribes 1 parking unit per 100sq.m of carpet area, i.e. for 12540sq.m carpet area, 125 parking units are required as far as the old block is considered. But the new block carpet area is 7970sq.m so an additional parking space for 80 more cars… Parking
  • 14. AHU room - 16.5 18 Air conditioning plant room 35 136 137.5 Electric room (2 transformers) 54 54 Electrical substation 35 154 154 Generator room (2 generators) 42 70 105 Ups room - 45 45 AREAS for HVAC and ELECTRICAL SERVICES MIMS (sq.m) optimum area (sq.m) I.S.CODES (sq.m)
  • 15. HVAC Function: • provide clean, comfortable and controlled environment to minimize risk of transmission of airborne pathogens • controls air quality and air movement. restriction of air movement through and between departments. • provides different types of temperature and humidity to various areas • ensures operation of equipments by providing an appropriate environmental temperature, humidity and absence of dust.
  • 16. Components of an HVAC • OUTSIDE AIR INLET OR INTAKE FILTERS • HUMIDITY MODIFICATION MECHANISM • HEATING AND COOLING EQUIPMENT • FANS • DUCTWORK • AIR EXHAUST • DIFFUSERS OR GRILLS FOR PROPER DISTRIBUTION OF AIR • CONTROLS AND SWITCHES • ELECTRICITY SUPPLY SYSTEM WITH GEN SET BACKUP
  • 17.
  • 18. • Prevention through proper design and construction • Provisions for – Smoke/fire detection – Restriction of spread – Extinguishment systems • Evacuation of buildings: Horizontal and vertical evacuation to be planned Preventive measures • Non combustible material to be used in load bearing elements, stair ways and corridors • Proper plug and sockets to be provided for heating appliances • Electrical wiring laid in separate duct and sealed at every alternate floor with non combustible materials. • Good house keeping and proper waste disposal • Proper storage conditions, and segregation of combustible and explosive materials like gases, chemicals and x ray films Fundamental philosophies of fire safety
  • 19. FIRE DETECTORS CONTROL PANELS PLACED IN SECURITY OFFICE WHICH NOTIFY SECURITY PERSONELSL Panel to detect activation of sprinkler system monitored zone wise Panel to detect activation of smoke alarms monitored zone wise
  • 20. Restriction of spread • Unit concept of construction • Min fire resistance offered by structural frame: 2 hrs • Compartmentalization of building: smoke stop doors of minimum half an hour fire resistance to be interposed between galleries, lobbies and between wards. Single swing type opening in the direction of escape • AC ducts provided with dampers/stoppers. Dampers installed in inlet duct at ac plant room and fire separation walls provided wherever ducts enter the vertical shafts. • At least two areas of refuge to be provided in each horizontal plane. • Fire and smoke should not go up and down the level of origin. Vulnerable spots: stair ways, lifts, chutes, shafts etc. RCC floors resistance:2 hrs • Life risk areas( wards, OT etc) should be segregated from high hazard service areas (boiler room, laundry, gas supply etc) Exits: – min 2 on each floor with area more than 500sq.m. – Corridor: 2.4m wide, well lit with signage, clear of obstructions – Door exits lead directly to outside, interior stairway, exterior stairs, horizontal exits, ramps, or exit passage ways. – door: min 2m high and 2m wide, open able from both sides. • For buildings more than 24m height, refuge area of 15sq.m or .3sqm per person to accommodate occupants of 2 consecutive floors, whichever is higher should be provided.
  • 21. • Wet riser systems of pipes 150 mm dia located within lobby, approach staircase or within staircase where there is no lobby. – One riser for floor area 1000sq.m – Riser passes from ground floor to top floor and each floor should be bound with one landing valve and two oulets for connecting to hose reels – Capacity of Under tank for wet riser: • 50,000 for hospitals of 3 levels • 1 lakh L for hospitals with height 15m- 24m • 1.5 lakh L for hospitals with height 24m- 30m
  • 22. Fire fighting equipments • Fire extinguishers at strategic points • Automatic sprinkler extinguisher systems • Fire detection systems where equipment may get damaged by water • Separate water supply Safe fire exits • Wards: travel distance from the farthest point in the ward room to the exit door should be 30m or less. Where this cannot be ensures 2 or more doors should be provided
  • 23. • Corridors and escape routes to be provided with recessed lights in the wall .5m above the floor with power supply from a separate emergency source. • At least one enclosed staircase from each fire protected zone to the ground floor outside the building. • Children’s ward, maternity ward, ICU’s, fracture treatment wards, where every patient needs assistance could be located on ground floor or first floor so efforts to save them in an emergency is less. • Since vertical transportation is relatively more difficult arrangements should be made so that patients can be transferred from one section to another section of the same floor separated by a fire protection zone.