Cut and Fill Mining
A case study of Lagma Manganese Mine (MOIL)
AMRITESH
717MN1023
NIT ROURKELA
CONTENTS
 Introduction
 Method of Working
 Cycle of Activity
 Stope preparation
 Sequence of extraction
 Backfilling
 Application
 Disadvantages
 Case Study
2
INTRODUCTION
 It is used in winning high grade and high-value minerals, like gold and copper.
 It is expensive but is highly selective with low ore loss and dilution.
 It can be applied to thick and extra thick ore bodies.
 It has a broad range of application due to its flexibility, good recovery rate and
the possibility of mining under weak rock conditions.
 This method has been used in MOIL, HCL and also in Hutti Gold Mines Limited
(HGML).
3
METHOD OF WORKING
4
Reference: Williams Ted J. and Brady Tom M., Underhand Cut and Fill Mining as Practiced in Three Deep Hard Rock Mines in the
United States, Spokane Research Laboratory, NIOSH, p. 2
METHOD OF WORKING
 The ore is excavated by drilling and blasting in horizontal slices starting from the
bottom of a stope and advancing upwards (overhand) or from the top of the stope
advancing downwards (underhand).
 Each slice has a thickness not more that 3 m.
 The broken ore is loaded and removed from the stope for ore pass and then to a
lower haulage level.
 The resulting empty space created after removal of ore is then backfilled.
 Ramps or declines are excavated to connect the surface to the underground ore body.
 Drifts are excavated to access the ore; chute raises are excavated to provide the easy
removal of ore from the mine.
5
CYCLE OF ACTIVITY
6
Reference: https://minewiki.engineering.queensu.ca/mediawiki/index.php/Cut_and_fill
CYCLE OF ACTIVITY
 Drilling and Blasting of a horizontal slice of ore, of 3 to 4 meters thickness,
removal of the roof of the stope.
 Loading and transportation of ore, mechanically removed from the stope for
orepass, and then to a lower horizon of transportation.
 Removal of loose fragments by the detonation and support or reinforcement
ceiling.
 Backfilling the floor of the stope with a layer of composite material varied and
equal in thickness with the ore ceiling.
7
STOPE PREPARATION
8
Reference: Deshmukh D.J (2014), Elements of Mining Technology Vol. II, Denett Publications, Nagpur, p. 251
STOPE PREPARATION
 Haulage drift along the ore body at the lower main level.
 Undercut of the stope, usually 5-10 m above the haulage drift.
 Short raises for manways and ore passes from haulage drift to undercut.
 Raise from undercut to the level above for transport of filling material and for
ventilation.
 Provision of sufficient water and filling material and arrangement for their storage
and transport.
 Adequate pumping capacity underground to pump out water overflowing from
the filled stope.
9
SEQUENCE OF EXTRACTION
 Overhand cut and fill: In this method the ore lies above the working area and
the floor is of backfill. It involves a work area of cemented backfill while mining
ore from the roof.
 Underhand cut and fill: In this method the ore lies beneath the working area and
the roof is of cemented backfill. Ore overlies the working area and the machines
work on backfill.
10
SEQUENCE OF EXTRACTION (OVERHAND)
11
Reference: Hustrulid W. and Bullock R., Underground Mining Methods: engineering fundamentals and
international case studies, SME, 2001.
SEQUENCE OF EXTRACTION
(UNDERHAND)
12
Reference: Jain Saurabh (2011), Mining Methods, https://www.slideshare.net/, p.42
BACKFILLING
 The function of backfilling is to support rock walls and pillars.
 It provides a working surface for continuing mining.
 It provides opportunity for more selective mining and better recovery of ore and
pillars.
 It prevents subsidence and provides better control over ventilation flow through the
mine working.
 The stope is filled up to within 2-3 m of the back before the next slice is mined.
 Ore production from the stope needs to be stopped while filling is in progress.
 The filling material is mixed with water and is transported into the mine and
distributed through pipelines.
13
TYPES OF FILLERS
 Hydraulic backfill: Deslimed mill tailing slurries, with densities raised to 70% by
weight. The coarser fractions are placed underground as hydraulic backfill and the
slimes are rejected to the surface dam.
 Paste backfill: Total mill tailings filtered or thickened to around 80% by weight to
which cement and water is then added to achieve the required rheological and
strength characteristics. Any rejects to the dam are at the full tailing sizing range.
 Rock backfill: Waste rock from the surface or underground and crushed to a
typical top size of around 40 mm. This can be placed with cemented hydraulic
backfill slurry or cement water slurry.
14
TYPES OF FILLERS
15
Paste Fill Rock Fill Hydraulic Fill
APPLICATIONS
 Ore zones are irregular in shape and orientation.
 Ore is of high grade and dilution control is critical.
 The waste rock is weak.
 Ore zones are large, but their rock quality is weak.
 Localized underground stability is required.
 Surface disturbance must be minimized.
 The value of the ore makes recovery of economically viable support pillars.
16
DISADVANTAGES
 As it is a cyclic method, production of ore is intermittent unless a few stopes are worked
simultaneously.
 When ore production operations are suspended in one stope for filling the other stope
should be able to supply ore.
 Suitable filling material may not be available in all cases.
 It is a very expensive mining method, so is applied to ores of very high value only.
 It requires intensive manual labour and skills.
 There are risks of instability of the rock mass is the backfill is not properly sized or applied.
17
CASE STUDY: LAGMA MANGANESE MINE,
BALAGHAT (MOIL)
 Lagma mine is located in Baihar Tahsil of
Balaghat District, Madhya Pradesh.
 It is 33.5 km from Balaghat town.
 The proposed Manganese mine (48.974
hectares) will be developed as Mechanized
Mine by Underground – Horizontal cut
and fill stoping with post filling by sand
method.
 The production capacity will be 0.120
MTPA.
18
EXPLORATION
19
Reference: ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma
Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 12,13
UNDERGROUND LAYOUT
 Size of the stope block: 80 metres
 Level interval: 30 m (vertical)
 Winzes/ raise: 2.5m x 2.5m
 Cable bolting: 1.5 m x 1.5 m of sufficient length with min 2 m inside the hang
wall contact zone
 Roof bolt: Roof bolt of 1.5 m length will be put at the centre of 4 cable bolts
20
DRILLING AND BLASTING
 Drilling in the drivage for haulage road,
cross cut and ore drive will be done by
pneumatically operated jack hammer of
33 mm diameters of the length of 1.5 m.
 Generally, wedge cut and parallel cut will
be carried out at Lagma Mine due to soft
strata of country rock.
21
Reference: ABC Techno Labs India Private Limited, Project Feasibility Report for
Lagma Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 16
STOPING PARAMETERS
S.N
O
Stoping parameters
1 Number of working stopes At a time 4-6
2 Size of the panel 80 m
3 Level interval 30 m vertical (55 to 60 m in dip
direction)
4 Thickness of crown Pillar 7.5 m
5 Thickness of Sill pillar No sill pillar
6 Thickness of Rib pillar 5 m
7 Size and interval of Stopes pillar No stope pillar
8 Size/shape of manway Steel manway of 1.5 m dia. circular
9 Size/shape of ore pass Steel chute of 1.2 m dia. circular
10 Method of stowing/ back filling Backfilling of sand hydraulically from
surface to stope by HDPE pipes
11 Method of drainage of stowed water Poke holes in concrete walls of cross
cuts at lower levels. Stowed water will
go to drains and drains it will go to
sump. From sumps it will be circulated
to surface.
22
Reference: ABC Techno Labs India Private Limited, Project
Feasibility Report for Lagma Manganese Mine, M/S MOIL
LIMITED, Nagpur, p. 16
PRODUCTION
23
Reference: ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma
Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 16
LITERATURE REFERENCE
 Deshmukh D.J (2014), Elements of Mining Technology Vol. II, Denett Publications, Nagpur, p. 249-252
 Chacharkar Y.P. (1994), A study of Metalliferous Mining Methods, Lovely Prakashan, Dhanbad, p.192
 Harraz Hassan Z. (2014), Cut and Fill Stoping, Tanta University, p. 4-5,8, 11-12, 16, 24, 26-27, 29
 ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma Manganese Mine, M/S MOIL
LIMITED, Nagpur, p. 3-5, 13, 15-17, 19
 http://www.miningfunda.com/2016/10/cut-and-fill-stoping.html
 Bharti Sujeet (2014), Cut and fill stopes design and their stability analysis: a case study of a u/g metalliferous
mine, I.I.T. Kharagpur, p. 4
 Fernberg Hans (2007), Mining Methods in Underground Mining, Atlas Copco Rock Drills AB, SE-701 91 Orebro,
Sweden, p. 35, 43
 Williams Ted J. and Brady Tom M., Underhand Cut and Fill Mining as Practiced in Three Deep Hard Rock Mines in
the United States, Spokane Research Laboratory, NIOSH, p. 2
 https://www.newtrax.com/cut-and-fill-mining-method-101/
24

More Related Content

What's hot

Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast mines
Anurag Jha
 

What's hot (20)

Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and Development
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in mining
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
Applicability of hydraulic mining
Applicability of hydraulic miningApplicability of hydraulic mining
Applicability of hydraulic mining
 
Underground mine
Underground mineUnderground mine
Underground mine
 
Rock blasting for mining
Rock blasting  for miningRock blasting  for mining
Rock blasting for mining
 
Room and Pillar Mining Method
Room and Pillar Mining MethodRoom and Pillar Mining Method
Room and Pillar Mining Method
 
Shrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat StopingShrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat Stoping
 
ore dilution and ore recovery
ore dilution and ore recoveryore dilution and ore recovery
ore dilution and ore recovery
 
Longwall machinery
Longwall  machineryLongwall  machinery
Longwall machinery
 
Support Systems In Cut And Fill Method Of Stoping
Support Systems In Cut And Fill Method Of StopingSupport Systems In Cut And Fill Method Of Stoping
Support Systems In Cut And Fill Method Of Stoping
 
Topic 7-mining methods-part iii -surface mining- placer mining
Topic 7-mining methods-part iii -surface mining- placer miningTopic 7-mining methods-part iii -surface mining- placer mining
Topic 7-mining methods-part iii -surface mining- placer mining
 
Underground mining system
Underground mining systemUnderground mining system
Underground mining system
 
Underground mining
Underground miningUnderground mining
Underground mining
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal mines
 
Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blasting
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast mines
 
Square set stoping
Square set stopingSquare set stoping
Square set stoping
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 

Similar to Cut and Fill mining

13surface mining
13surface mining13surface mining
13surface mining
Arun Kumar
 
3rd International Symposium6
3rd International Symposium63rd International Symposium6
3rd International Symposium6
Walter Nemasasi
 
03 azamat the experience of industrial processing of an uranium deposit of ak...
03 azamat the experience of industrial processing of an uranium deposit of ak...03 azamat the experience of industrial processing of an uranium deposit of ak...
03 azamat the experience of industrial processing of an uranium deposit of ak...
Monatom Mgl
 

Similar to Cut and Fill mining (20)

Underground mining methods + swot analysis of maddhapara granite
Underground mining methods + swot analysis of maddhapara graniteUnderground mining methods + swot analysis of maddhapara granite
Underground mining methods + swot analysis of maddhapara granite
 
Open pit mining
Open pit miningOpen pit mining
Open pit mining
 
13surface mining
13surface mining13surface mining
13surface mining
 
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G TaylorThe Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
 
A study into the feasibility of application of longwall top coal caving (ltc...
A study into the feasibility of application of longwall  top coal caving (ltc...A study into the feasibility of application of longwall  top coal caving (ltc...
A study into the feasibility of application of longwall top coal caving (ltc...
 
Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
 
3rd International Symposium6
3rd International Symposium63rd International Symposium6
3rd International Symposium6
 
03 azamat the experience of industrial processing of an uranium deposit of ak...
03 azamat the experience of industrial processing of an uranium deposit of ak...03 azamat the experience of industrial processing of an uranium deposit of ak...
03 azamat the experience of industrial processing of an uranium deposit of ak...
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptx
 
perfomance and evaluation of limestone mine in gujrat
perfomance and evaluation of limestone mine in gujratperfomance and evaluation of limestone mine in gujrat
perfomance and evaluation of limestone mine in gujrat
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
SOIL EXPLORATION
SOIL EXPLORATIONSOIL EXPLORATION
SOIL EXPLORATION
 
Mining terminology
Mining terminologyMining terminology
Mining terminology
 
report for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machinereport for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machine
 
MINERIA
MINERIAMINERIA
MINERIA
 
Tipong report
Tipong report Tipong report
Tipong report
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Coal mining methods Seminar Presentation
Coal mining methods Seminar Presentation Coal mining methods Seminar Presentation
Coal mining methods Seminar Presentation
 
Advance Construction equipment's reports
Advance Construction equipment's reports Advance Construction equipment's reports
Advance Construction equipment's reports
 

Recently uploaded

Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Introduction to Casting Processes in Manufacturing
Introduction to Casting Processes in ManufacturingIntroduction to Casting Processes in Manufacturing
Introduction to Casting Processes in Manufacturing
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdf
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 

Cut and Fill mining

  • 1. Cut and Fill Mining A case study of Lagma Manganese Mine (MOIL) AMRITESH 717MN1023 NIT ROURKELA
  • 2. CONTENTS  Introduction  Method of Working  Cycle of Activity  Stope preparation  Sequence of extraction  Backfilling  Application  Disadvantages  Case Study 2
  • 3. INTRODUCTION  It is used in winning high grade and high-value minerals, like gold and copper.  It is expensive but is highly selective with low ore loss and dilution.  It can be applied to thick and extra thick ore bodies.  It has a broad range of application due to its flexibility, good recovery rate and the possibility of mining under weak rock conditions.  This method has been used in MOIL, HCL and also in Hutti Gold Mines Limited (HGML). 3
  • 4. METHOD OF WORKING 4 Reference: Williams Ted J. and Brady Tom M., Underhand Cut and Fill Mining as Practiced in Three Deep Hard Rock Mines in the United States, Spokane Research Laboratory, NIOSH, p. 2
  • 5. METHOD OF WORKING  The ore is excavated by drilling and blasting in horizontal slices starting from the bottom of a stope and advancing upwards (overhand) or from the top of the stope advancing downwards (underhand).  Each slice has a thickness not more that 3 m.  The broken ore is loaded and removed from the stope for ore pass and then to a lower haulage level.  The resulting empty space created after removal of ore is then backfilled.  Ramps or declines are excavated to connect the surface to the underground ore body.  Drifts are excavated to access the ore; chute raises are excavated to provide the easy removal of ore from the mine. 5
  • 6. CYCLE OF ACTIVITY 6 Reference: https://minewiki.engineering.queensu.ca/mediawiki/index.php/Cut_and_fill
  • 7. CYCLE OF ACTIVITY  Drilling and Blasting of a horizontal slice of ore, of 3 to 4 meters thickness, removal of the roof of the stope.  Loading and transportation of ore, mechanically removed from the stope for orepass, and then to a lower horizon of transportation.  Removal of loose fragments by the detonation and support or reinforcement ceiling.  Backfilling the floor of the stope with a layer of composite material varied and equal in thickness with the ore ceiling. 7
  • 8. STOPE PREPARATION 8 Reference: Deshmukh D.J (2014), Elements of Mining Technology Vol. II, Denett Publications, Nagpur, p. 251
  • 9. STOPE PREPARATION  Haulage drift along the ore body at the lower main level.  Undercut of the stope, usually 5-10 m above the haulage drift.  Short raises for manways and ore passes from haulage drift to undercut.  Raise from undercut to the level above for transport of filling material and for ventilation.  Provision of sufficient water and filling material and arrangement for their storage and transport.  Adequate pumping capacity underground to pump out water overflowing from the filled stope. 9
  • 10. SEQUENCE OF EXTRACTION  Overhand cut and fill: In this method the ore lies above the working area and the floor is of backfill. It involves a work area of cemented backfill while mining ore from the roof.  Underhand cut and fill: In this method the ore lies beneath the working area and the roof is of cemented backfill. Ore overlies the working area and the machines work on backfill. 10
  • 11. SEQUENCE OF EXTRACTION (OVERHAND) 11 Reference: Hustrulid W. and Bullock R., Underground Mining Methods: engineering fundamentals and international case studies, SME, 2001.
  • 12. SEQUENCE OF EXTRACTION (UNDERHAND) 12 Reference: Jain Saurabh (2011), Mining Methods, https://www.slideshare.net/, p.42
  • 13. BACKFILLING  The function of backfilling is to support rock walls and pillars.  It provides a working surface for continuing mining.  It provides opportunity for more selective mining and better recovery of ore and pillars.  It prevents subsidence and provides better control over ventilation flow through the mine working.  The stope is filled up to within 2-3 m of the back before the next slice is mined.  Ore production from the stope needs to be stopped while filling is in progress.  The filling material is mixed with water and is transported into the mine and distributed through pipelines. 13
  • 14. TYPES OF FILLERS  Hydraulic backfill: Deslimed mill tailing slurries, with densities raised to 70% by weight. The coarser fractions are placed underground as hydraulic backfill and the slimes are rejected to the surface dam.  Paste backfill: Total mill tailings filtered or thickened to around 80% by weight to which cement and water is then added to achieve the required rheological and strength characteristics. Any rejects to the dam are at the full tailing sizing range.  Rock backfill: Waste rock from the surface or underground and crushed to a typical top size of around 40 mm. This can be placed with cemented hydraulic backfill slurry or cement water slurry. 14
  • 15. TYPES OF FILLERS 15 Paste Fill Rock Fill Hydraulic Fill
  • 16. APPLICATIONS  Ore zones are irregular in shape and orientation.  Ore is of high grade and dilution control is critical.  The waste rock is weak.  Ore zones are large, but their rock quality is weak.  Localized underground stability is required.  Surface disturbance must be minimized.  The value of the ore makes recovery of economically viable support pillars. 16
  • 17. DISADVANTAGES  As it is a cyclic method, production of ore is intermittent unless a few stopes are worked simultaneously.  When ore production operations are suspended in one stope for filling the other stope should be able to supply ore.  Suitable filling material may not be available in all cases.  It is a very expensive mining method, so is applied to ores of very high value only.  It requires intensive manual labour and skills.  There are risks of instability of the rock mass is the backfill is not properly sized or applied. 17
  • 18. CASE STUDY: LAGMA MANGANESE MINE, BALAGHAT (MOIL)  Lagma mine is located in Baihar Tahsil of Balaghat District, Madhya Pradesh.  It is 33.5 km from Balaghat town.  The proposed Manganese mine (48.974 hectares) will be developed as Mechanized Mine by Underground – Horizontal cut and fill stoping with post filling by sand method.  The production capacity will be 0.120 MTPA. 18
  • 19. EXPLORATION 19 Reference: ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 12,13
  • 20. UNDERGROUND LAYOUT  Size of the stope block: 80 metres  Level interval: 30 m (vertical)  Winzes/ raise: 2.5m x 2.5m  Cable bolting: 1.5 m x 1.5 m of sufficient length with min 2 m inside the hang wall contact zone  Roof bolt: Roof bolt of 1.5 m length will be put at the centre of 4 cable bolts 20
  • 21. DRILLING AND BLASTING  Drilling in the drivage for haulage road, cross cut and ore drive will be done by pneumatically operated jack hammer of 33 mm diameters of the length of 1.5 m.  Generally, wedge cut and parallel cut will be carried out at Lagma Mine due to soft strata of country rock. 21 Reference: ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 16
  • 22. STOPING PARAMETERS S.N O Stoping parameters 1 Number of working stopes At a time 4-6 2 Size of the panel 80 m 3 Level interval 30 m vertical (55 to 60 m in dip direction) 4 Thickness of crown Pillar 7.5 m 5 Thickness of Sill pillar No sill pillar 6 Thickness of Rib pillar 5 m 7 Size and interval of Stopes pillar No stope pillar 8 Size/shape of manway Steel manway of 1.5 m dia. circular 9 Size/shape of ore pass Steel chute of 1.2 m dia. circular 10 Method of stowing/ back filling Backfilling of sand hydraulically from surface to stope by HDPE pipes 11 Method of drainage of stowed water Poke holes in concrete walls of cross cuts at lower levels. Stowed water will go to drains and drains it will go to sump. From sumps it will be circulated to surface. 22 Reference: ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 16
  • 23. PRODUCTION 23 Reference: ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 16
  • 24. LITERATURE REFERENCE  Deshmukh D.J (2014), Elements of Mining Technology Vol. II, Denett Publications, Nagpur, p. 249-252  Chacharkar Y.P. (1994), A study of Metalliferous Mining Methods, Lovely Prakashan, Dhanbad, p.192  Harraz Hassan Z. (2014), Cut and Fill Stoping, Tanta University, p. 4-5,8, 11-12, 16, 24, 26-27, 29  ABC Techno Labs India Private Limited, Project Feasibility Report for Lagma Manganese Mine, M/S MOIL LIMITED, Nagpur, p. 3-5, 13, 15-17, 19  http://www.miningfunda.com/2016/10/cut-and-fill-stoping.html  Bharti Sujeet (2014), Cut and fill stopes design and their stability analysis: a case study of a u/g metalliferous mine, I.I.T. Kharagpur, p. 4  Fernberg Hans (2007), Mining Methods in Underground Mining, Atlas Copco Rock Drills AB, SE-701 91 Orebro, Sweden, p. 35, 43  Williams Ted J. and Brady Tom M., Underhand Cut and Fill Mining as Practiced in Three Deep Hard Rock Mines in the United States, Spokane Research Laboratory, NIOSH, p. 2  https://www.newtrax.com/cut-and-fill-mining-method-101/ 24