This document provides an introduction to Object Oriented Analysis and Design (OOAD) and the Unified Process (UP). It discusses key OOAD concepts like objects, classes, inheritance, polymorphism, and encapsulation. It then describes the Unified Process, an iterative software development approach that involves inception, elaboration, construction, and transition phases. Each phase includes requirements analysis, design, implementation, and testing activities. The document also discusses the Unified Modeling Language (UML) and diagrams used in OOAD like use case diagrams, class diagrams, and sequence diagrams.
Chapter 3 Classes and Objects 3
2.1 The Nature of Objects 4
2.2 Relationships among Object 7
2.3 The Nature of Classes 10
2.4 Relationships among Classes 11
2.5 Interplay of Classes and Objects 14
2.6 Identifying Classes and Objects 15
2.7 Importance of Proper Classification 18
2.8 Key abstractions and Mechanism 19
Chapter 2 The Object Model
2.1 The Evolution of the Object Model
2.2 Foundations of the Object Model
2.3 Elements of the Object Model
2.4 Applying the Object Model
Chapter 3 Classes and Objects 3
2.1 The Nature of Objects 4
2.2 Relationships among Object 7
2.3 The Nature of Classes 10
2.4 Relationships among Classes 11
2.5 Interplay of Classes and Objects 14
2.6 Identifying Classes and Objects 15
2.7 Importance of Proper Classification 18
2.8 Key abstractions and Mechanism 19
Chapter 2 The Object Model
2.1 The Evolution of the Object Model
2.2 Foundations of the Object Model
2.3 Elements of the Object Model
2.4 Applying the Object Model
OOAD Part A Question with answer and Part B & C questions.
References :
1) Previous University Questions.
2) Applying UML and Patterns: An Introduction to Object-Oriented Analysis and Design and Iterative Development by Craig Larman.
3) Google search engine for text and images.
IT2255 Web Essentials - Unit II Web Designingpkaviya
HTML - Form Elements - Input types and Media elements - HTML 5 - CSS3 - Selectors, Box Model, Backgrounds and Borders, Text Effects, Animations, Multiple Column Layout, User Interface.
IT2255 Web Essentials - Unit I Website Basicspkaviya
Internet Overview – Fundamental computer network concepts – Web Protocols – URL – Domain Name – Web Browsers and Web Servers – Working principle of a Website – Creating a Website – Client-side and server-side scripting.
BT2252 - ETBT - UNIT 3 - Enzyme Immobilization.pdfpkaviya
Enzymes are catalysts that perform all vital biological reactions within an organism’s body. Their distinguishing characteristic is that they endure the reaction unchanged.
Therefore, they can be utilised repeatedly. However, soluble enzymes are limited by their separation from the product and substrate.
The majority of Enzymes in a living organism are either connected to the cell membrane or encapsulated within the cells.
This result led to the hypothesis that pure separated enzymes may work better when immobilised on a solid substrate.
The phrase immobilised enzyme refers to “catalytically active enzymes that are physically limited or localised in a specific region of space and can be used again and continuously.”
The benefit of immobilisation is that it promotes work-up product isolation. Listed below are some potential advantages and disadvantages of immobility.
Soluble Enzyme + Substrate———– Product (single time usage of enzyme)
Immobilized Enzyme + Substrate———Product (Repeated usage of enzyme)
A number of essential considerations must be made when immobilising an enzyme.
The enzyme’s biological activity should be maintained.
The enzyme ought to be more stable than its soluble equivalent.
The price of immobilisation shouldn’t be excessively high.
The relationship between humans and enzymes has evolved over time. Even during historical times, where there was no concept of enzymes, ancient Egypt people produced beer and wine by enzymatic fermentation. After several thousand years, enzymatic studies have significantly progressed. Enzymes are proteins that accelerate many biochemical and chemical reactions. They are natural catalysts and are ubiquitous, in plants, animals, and microorganisms, where they catalyze processes that are vital to living organisms. The growing knowledge and technique improvement about protein extraction and purification lead to the production of many enzymes at an analytical grade purity for research and biotechnological applications. Enzymes are intimately involved in a wide variety of traditional food processes, such as cheese making, beer brewing, and wine industry. Recent advances in biotechnology, particularly in protein engineering, have provided the basis for the efficient development of enzymes with improved properties. This has led to establishment of novel, tailor-made enzymes for completely new applications, where enzymes were not previously used. The technology of immobilized enzymes is still going through a phase of evolution and maturation. Evolution is reflected in the ever-broadening range of applications of immobilized enzymes. Maturation is mirrored in the development of the theory of how immobilized enzymes function and how the technique of immobilization is related to their primary structure through the formation and configuration of their three dimensional structure. There still remains much room for the development of useful processes and materials based on this hard-won understanding.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
1. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 1
CS8592 – Object Oriented Analysis and Design
UNIT I – Unified Process and Use Case Diagrams
Introduction to OOAD with OO Basics – Unified Process – UML diagrams – Use Case –Case
study – the Next Gen POS system, Inception – Use case Modelling – Relating Use cases –
include, extend and generalization – When to use Use-cases
1.1 INTRODUCTION TO OOAD WITH OO BASICS
OOAD is a software development approach that models a system as a group of objects.
Each object represents some real world entity that has its own attributes and
operations.
Object Oriented Analysis: Focuses on the analysis of functional requirements of the
system. Emphasis on finding and describing the objects or concepts in the problem
domain.
Object Oriented Design: Emphasis on defining software objects and how they
collaborate to fulfill the requirements. It takes analysis model as an input and produces
implementation specifications.
1.1.1 Artifact (Diagram)
It entitles identifying a rich set of conceptual classes.
It is the heart of OO analysis.
Example: Play a Dice Game (A player picks up and rolls the dice. If the dice face value total
seven, they win; otherwise, they lose.)
a) Define Use Cases
Use cases are not an object-oriented artifact, they are simply written stories.
A popular tool in requirements analysis and are an important part of the Unified Process.
2. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 2
b) Define a Domain Model
Object-oriented analysis is concerned with creating a description of the domain from
the perspective of classification by objects.
A decomposition of the domain involves an identification of the concepts, attributes,
and associations.
c) Define Interaction Diagrams
Object-oriented design is concerned with defining software objects and their
collaborations.
A common notation to illustrate collaborations is the interaction diagram.
It shows the flow of messages between software objects, and thus the invocation of
methods.
3. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 3
d) Define Design Class Diagrams
It is useful to create a static view of the class definitions with a design class diagram.
It illustrates the attributes and methods of the classes.
1.1.2. Unified Modelling Language (UML)
A language for specifying, visualizing, constructing, and documenting the artifacts of
software systems, as well as for business modeling and other non-software systems.
UML is composed of 9 graphical diagrams:
1. Class Diagram: Describes the structure of a system by showing the system's classes,
their attributes, and the relationships among the classes.
2. Use-Case Diagram: Describes the functionality provided by a system in terms of
actors, their goals represented as use cases, and any dependencies among those use cases.
3. Behavior Diagram
a. Interaction Diagram
i. Sequence Diagram: Shows how objects communicate with each other
in terms of a sequence of messages.
ii. Communication diagram: How the interactions between objects or
parts in terms of sequenced messages.
b. State Chart Diagram: Describes the states and state transitions of the system.
c. Activity Diagram: Describes the business and operational step-by-step
workflows of components in a system. An activity diagram shows the overall
flow of control.
4. Implementation Diagram
a. Component Diagram: Describes how a software system is split up into
components and shows the dependencies among these components.
4. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 4
b. Deployment Diagram: Describes the hardware used in system implementations
and the execution environments and artifacts deployed on the hardware.
Three ways to Apply UML
1. Sketch: Informal and incomplete diagrams created to explore difficult parts of the
problem or solution. (Eg: Agile Model)
2. Blueprint: Detailed designed diagrams (Reverse & Forward Engineering)
3. Programming Language: Complete executable specification of a software system.
Executable code will be automatically generated.
Three Perspectives to Apply UML
1. Conceptual Perspective: Describing things in a situation of the real world or domain
of interest.
2. Specification (software) Perspective: Describe software abstractions or
components with specifications and interfaces, but no commitment to a particular
implementation. (Eg: Not specifically a class in C# or Java).
3. Implementation (software) Perspective: Describe software implementations in a
particular technology (Eg: Java).
Basic Concepts of Object Orientation
Objects: A real world entity. Attributes or properties describe object‘s state (data)
and methods define its behavior.
Classes: To define the attributes and methods (the state and behavior) of its
instances.
5. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 5
Inheritance: A relationship between classes where one class is the parent class of
another (derived) class. To inherits all of the properties and methods (procedures)
defined in its super class. (Super class & Sub class)
Polymorphism: The same operation may behave differently on different classes.
Abstraction: Hiding unwanted details while showing most essential information.
Encapsulation: Binding the code and data into a single unit. Hiding is a principle of
hiding internal data and procedures of an object. Protects the data from corruption.
Example:
class Student {
int rollno;
String name;
void get_rollno();
void get_name();
}
Structured Programming Vs. Object Oriented Programming
Structured Programming Object Oriented Programming
Focuses on process Focuses on data
Top-down approach Bottom-up approach
Less reusability More reusability
1.2 UNIFIED PROCESS (UP)
A software development process describes an approach to building, deploying, and
maintaining software.
Unified Process is a popular iterative software development process for building
object-oriented systems.
6. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 6
1.2.1 UP for three reasons
1. The UP is an iterative process.
2. UP provides a structure for how to do and thus how to explain OOA/D.
3. The UP is flexible, and can be applied in a lightweight and agile approach.
1.2.2 Iterative, Evolutionary and Agile Development
Development is organized into a series of iterations (Mini-project).
The outcome of each iteration is tested, integrated, and executable partial system.
Each iteration includes its own requirements analysis, design, implementation, and
testing activities.
The system grows incrementally over time, iteration by iteration.
Iterations are time-boxed or fixed in length.
This approach is also known as iterative and incremental development.
1.2.3 Agile Modeling
Best architecture. Requirements emerge from teams.
It emphasizes UML as sketch to satisfy the customer through early and continuous
delivery of valuable software. Example: DSDM, SCRUM
7. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 7
1.2.4 Benefits of Iterative Development
Less project failure, better productivity, and lower defect rates.
Early rather than late mitigation of high risks (technical, requirements, objectives,
usability, and so forth).
Early visible progress.
Early feedback, user engagement, and adaptation, leading to a refined system that
more closely meets the real needs of the stakeholders
Managed complexity; the team is not overwhelmed by "analysis paralysis" or very
long and complex steps
The learning within iteration can be methodically used to improve the development
process itself, iteration by iteration.
1.2.5 Best Practices in UP
Tackle high-risk in early iterations
Continuously engage users of evaluation, feedback and requirements.
Continuously verify quality, test early, often and realistically.
Develop software iteratively
Manage requirements
Use component based architecture
Control changes to architecture
1.2.6 The UP Phases
A UP project organizes the work and iterations across four major phases:
1. Inception: Approximate vision, business case, scope, vague estimates.
2. Elaboration: Refined vision, iterative implementation of the core architecture,
resolution of high risks, identification of most requirements and scope, more
realistic estimates.
3. Construction: Iterative implementation of the remaining lower risk and easier
elements, and preparation for deployment.
4. Transition: Beta tests, deployment.
Increment: The difference (delta) between the releases of two subsequent phases
Δ = V2 – V1
8. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 8
1.2.7 The UP Disciplines
Disciplines: A set of activities (and related artifacts) in one subject area, such as the activities
within requirements analysis.
An artifact is the general term for any work product: code, Web graphics, database schema,
text documents, diagrams, models, and so on.
There are several disciplines in the UP:
Business Modeling: The Domain Model artifact, to visualize noteworthy concepts in the
application domain.
Requirements: The Use-Case Model and Supplementary Specification artifacts to
capture functional and non-functional requirements.
Design: The Design Model artifact, to design the software objects.
9. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 9
1.2.8 The Relationship between Disciplines and Phases
1.2.9 Development Case
The choice of practices and UP artifacts for a project may be written up in a short
document.
Discipline Practice
Artifact
Iterations
Inception
I1
Elaboration
E1… En
Construction
C1… Cn
Transition
T1… Tn
Business
Modelling
Agile Modelling
Req. workshop
Domain
Model s
Requirements
Req. workshop
Vision box exercise
Dot voting
Use-Case
Model s r
Vision s r
Supplementary
Specification s r
Glossary s r
Design
Agile Modelling
Test-driven dev.
Design Model s r
SW
Architecture
Document
s
Data Model s r
Implementation
Test-driven dev.
Pair programming
Continuous integration
Coding standards
…
Project
Management
Agile PM
Daily SCRUM
Meeting
…
…
Sample Development Case: s – Start; r – Refine
10. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 10
1.3 INCEPTION
It is the initial step to establish a common vision and basic scope for the project.
It will include analysis of use cases, critical non-functional requirements, creation of
business case and preparation of development environment.
It may include the first requirements workshop, planning for the first iteration, and then
quickly moving forward to elaboration.
The purpose is not to define all the requirements, or generate a believable estimate or
project plan.
Envision the product scope, vision and business case.
Duration: One or few weeks
1.3.1 What is Inception?
Most projects require a short initial step in which the following kinds of questions are explored:
What is the vision and business case for this project?
Feasible?
Buy and/or build?
Rough estimate of cost: Is it $10K-100K or in the millions?
Should we proceed or stop?
1.3.2 Inception Artifacts
Artifact Comment
Vision and Business Case
Describes the high-level goals and constraints, the business case, and
provides an executive summary.
Use-Case Model Describes the functional requirements.
Supplementary Specification Describes other requirements, mostly non-functional.
Glossary Key domain terminology, and data dictionary.
Risk List & Risk Management
Plan
Describes the risks (business, technical, resource, and schedule) and ideas
for their mitigation or response.
Prototypes and proof-of-
concepts
To clarify the vision, and validate technical ideas.
Iteration Plan Describes what to do in the first elaboration iteration.
Phase Plan & Software
Development Plan
Low-precision guess for elaboration phase duration and effort. Tools,
people, education, and other resources.
Development Case
A description of the customized UP steps and artifacts for this project. In the
UP, one always customizes it for the project.
11. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 11
1.3.3 When you didn’t understand inception?
No Business Case or Vision artifact.
The names of most of the use cases and actors were not identified
An attempt to define most of the requirements.
Takes more than "a few" weeks long for most projects.
Estimates or plans are expected to be reliable.
None of the use cases were written in detail.
1.3.4 How much UML during Inception?
UML use case diagrams are drawn and not much diagram is warranted,
UML diagrams will occur in the elaboration phase,
Only 10% of requirements are expressed in text forms.
1.3.5 Evolutionary Requirements
Requirements: capabilities and conditions to which the system must confirm.
A primary challenge of requirement analysis is to find, communicate and remember
(write down) what is really needed.
Requirements keep on changing throughout the system development.
The systematic approach to find, document, organize and track the changing
requirements of a system has to be followed.
Waterfall Requirements Evolutionary Requirements
The approach of full requirement
definition followed by a long gap to
the next phase.
Spending significant time and effort
in analysis phase is inappropriate.
Frequent stake-holders participation,
evolution and feedback on
requirements take place to gather the
requirements.
Types of Requirements: (According to FURPS+)
o Functional: features, capabilities, security.
o Usability: human factors, help, documentation.
o Reliability: frequency of failure, recoverability, predictability.
o Performance: response times, throughput, accuracy, availability, resource usage.
o Supportability: adaptability, maintainability, internationalization, configurability
12. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 12
The "+" in FURPS+ indicates ancillary and sub-factors, such as:
o Implementation: resource limitations, languages and tools, hardware.
o Interface: constraints imposed by interfacing with external systems.
o Operations: system management in its operational setting.
o Packaging
o Legal: licensing
Requirement Artifacts
Artifacts Comment
Use-Case Model Describes the functional requirements.
Supplementary Specifications Describes other requirements, mostly non-functional.
Glossary Key domain terminology, and data dictionary.
Vision
Describes the high-level goals and constraints, the
business case, and provides an executive summary.
Business Rules
Domain Rules. Describe requirements or polices that
transcend one software project
1.4 USE CASE MODELLING
Use cases are text stories, used to discover and record requirements.
Use cases: Actor using a system to meet goals.
Sequence of actions
Different tasks that user can perform while interacting with the system.
1.4.1 Definition: Actors, Scenarios, and Use Cases
An actor is something with behavior, such as a person, computer system, or
organization; for example, a cashier.
A scenario is a specific sequence of actions and interactions between actors and the
system; it is also called a use case instance.
A use case is a collection of related success and failure scenarios that describe an
actor using a system to support a goal.
1.4.2 Use Cases & Use-Case Model
Use cases are text documents, not diagrams,
Use-case modeling is primarily an act of writing text, not drawing diagrams.
The Use-Case Model shows the names of use cases and actors, and their
relationships.
13. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 13
1.4.3 Why Use Cases?
Make domain experts or requirement donors to write use cases.
Emphasize the user goals and perspective
Question "Who is using the system, what are their typical scenarios of use, and what
are their goals?"
1.4.4 Three Kinds of Actors
An actor is anything with behavior, including the system under discussion (SuD)
itself when it calls upon the services of other systems.
Actors are roles played not only by people, but by organizations, software, and
machines.
There are three kinds of external actors in relation to the SuD:
o Primary actor: User goals fulfilled through using services of the SuD. Example:
the cashier.
– Why identify? To find user goals, which drive the use cases.
o Supporting actor: Provides a service (for example, information) to the SuD.
Example: Automated payment authorization service. Often a computer system,
but could be an organization or person.
– Why identify? To clarify external interfaces and protocols.
o Offstage actor: An interest in the behavior of the use case, but is not primary or
supporting. Example: A government tax agency.
– Why identify? To ensure that all necessary interests are identified and
satisfied. Offstage actor interests are sometimes subtle or easy to miss
unless these actors are explicitly named.
1.4.5 Three Common Use Case Formats
Brief: Terse one-paragraph summary, usually of the main success scenario. It was
created during early requirements analysis, to get a quick sense of subject and scope.
May take only a few minutes to create.
Casual: Informal paragraph format. Multiple paragraphs that cover various scenarios.
It was created during early requirements analysis, to get a quick sense of subject and
scope. May take only a few minutes to create.
14. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 14
Fully Dressed: All steps and variations are written in detail, and there are supporting
sections, such as preconditions and success guarantees. It was created , after many use
cases have been identified and written in a brief format, then during the first
requirements workshop a few of the architecturally significant and high-value use
cases are written in detail.
Use Case Section Comment
Use Case Name Start with a verb.
Scope The system under design.
Level "user-goal" or "subfunction"
Primary Actor Calls on the system to deliver its services.
Stakeholders and Interests Who cares about this use case, and what do they want?
Preconditions What must be true on start, and worth telling the reader?
Success Guarantee What must be true on successful completion, and worth telling
the reader?
Main Success Scenario A typical, unconditional happy path scenario of success.
Extensions Alternate scenarios of success or failure.
Special Requirements Related non-functional requirements.
Technology and Data Variations
List
Varying I/O methods and data formats.
Frequency of Occurrence Influences investigation, testing, and timing of
implementation.
Miscellaneous Such as open issues.
1.4.6 Use Case: Process Sale: Fully Dressed Format Example
Scope: NextGen POS application
Level: User Goal
Primary Actor: Cashier
Stakeholders and Interests:
- Cashier: Wants accurate, fast entry, and no payment errors, as cash drawer shortages are
deducted from his/her salary.
- Salesperson: Wants sales commissions updated.
- Customer: Wants purchase and fast service with minimal effort. Wants easily visible display
of entered items and prices. Wants proof of purchase to support returns.
15. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 15
- Company: Wants to accurately record transactions and satisfy customer interests. Wants to
ensure that Payment Authorization Service payment receivables are recorded. Wants some
fault tolerance to allow sales capture even if server components (e.g., remote credit
validation) are unavailable. Wants automatic and fast update of accounting and inventory.
- Manager: Wants to be able to quickly perform override operations, and easily debug Cashier
problems.
- Government Tax Agencies: Want to collect tax from every sale. May be multiple agencies,
such as national, state, and county.
- Payment Authorization Service: Wants to receive digital authorization requests in the
correct format and protocol. Wants to accurately account for their payables to the store.
Preconditions: Cashier is identified and authenticated.
Success Guarantee (or Postconditions): Sale is saved. Tax is correctly calculated. Accounting and
Inventory are updated. Commissions recorded. Receipt is generated. Payment authorization approvals are
recorded.
Main Success Scenario (or Basic Flow):
1. Customer arrives at POS checkout with goods and/or services to purchase.
2. Cashier starts a new sale.
3. Cashier enters item identifier.
4. System records sale line item and presents item description, price, and running total. Price
calculated from a set of price rules.
Cashier repeats steps 3-4 until indicates done.
5. System presents total with taxes calculated.
6. Cashier tells Customer the total, and asks for payment.
7. Customer pays and System handles payment.
8. System logs completed sale and sends sale and payment information to the external Accounting
system (for accounting and commissions) and Inventory system (to update inventory).
9. System presents receipt.
10. Customer leaves with receipt and goods (if any).
Extensions (or Alternative Flows):
*a. At any time, Manager requests an override operation:
1. System enters Manager-authorized mode.
2. Manager or Cashier performs one Manager-mode operation. e.g., cash balance change,
resume a suspended sale on another register, void a sale, etc.
3. System reverts to Cashier-authorized mode.
*b. At any time, System fails:
To support recovery and correct accounting, ensure all transaction sensitive state and events can be
recovered from any step of the scenario.
1. Cashier restarts System, logs in, and requests recovery of prior state.
2. System reconstructs prior state.
2a. System detects anomalies preventing recovery:
1. System signals error to the Cashier, records the error, and enters a clean
state.
2. Cashier starts a new sale.
16. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 16
1a. Customer or Manager indicates to resume a suspended sale.
1. Cashier performs resume operation, and enters the ID to retrieve the sale.
2. System displays the state of the resumed sale, with subtotal.
2a. Sale not found.
1. System signals error to the Cashier.
2. Cashier probably starts new sale and re-enters all items.
3. Cashier continues with sale (probably entering more items or handling payment).
2-4a. Customer tells Cashier they have a tax-exempt status (e.g., seniors, native peoples)
1. Cashier verifies, and then enters tax-exempt status code.
2. System records status (which it will use during tax calculations)
Special Requirements:
- Touch screen UI on a large flat panel monitor. Text must be visible from 1 meter.
- Credit authorization response within 30 seconds 90% of the time.
- Somehow, we want robust recovery when access to remote services such the inventory
system is failing.
- Language internationalization on the text displayed.
- Pluggable business rules to be insertable at steps 3 and 7.
- …
Technology and Data Variations List:
*a. Manager override entered by swiping an override card through a card reader, or entering an
authorization code via the keyboard.
3a. Item identifier entered by bar code laser scanner (if bar code is present) or keyboard.
3b. Item identifier may be any UPC, EAN, JAN, or SKU coding scheme.
…
Frequency of Occurrence: Could be nearly continuous.
Open Issues:
- What are the tax law variations?
- Explore the remote service recovery issue.
- What customization is needed for different businesses?
- Must a cashier take their cash drawer when they log out?
- Can the customer directly use the card reader, or does the cashier have to do it?
1.4.7 Guidelines
1. Write in an Essential UI-Free Style
a. Essential Style Writing: Write use cases in an essential style; keep the user
interface out and focus on actor intent
b. Concrete Style: User interface decisions are embedded in the use case text.
The text may even show window screen shots, discuss window navigation,
GUI widget manipulation and so forth.
17. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 17
2. Write Terse Use Cases: Delete "noise" words. Even small changes add up, such as
"System authenticates…" rather than "The System authenticates…"
3. Write Black-Box Use Cases: Black-box use cases are the most common and
recommended kind; they do not describe the internal workings of the system, its
components, or design.
4. Take an Actor and Actor-Goal Perspective: A set of use-case instances, where
each instance is a sequence of actions a system performs that yields an observable
result of value to a particular actor.
5. To Find Use Cases
a. Choose the System Boundary
b. Find Primary Actors and Goals
c. Identify the goals for each primary actor
d. Define use cases that satisfy user goals
6. Tests To Find Useful Use Cases
a. The Boss Test: To check for achieving results of measurable value. It may be
a use case at some low goal level, but not the desirable level of focus for
requirements analysis.
b. The EBP (Elementary Business Process) Test: Focus on use case that
reflects the business process. A task performed by one person in one place at
one time, in response to a business event, which adds measurable business
value and leaves the data in a consistent state, e.g., Approve Credit or Price
Order
c. The Size Test: Use case is a single action or a sequence of actions, all type of
actions is selected.
1.5 The Next Gen POS system
It is a next generation Point of Sale System, a computerized application used to record
sales and handle payments.
It is used in retail stores.
It includes hardware components such as computer, barcode scanner, printer and software
to run a system.
18. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 18
Use Case Diagram
It is the model for system functionality and environment.
It captures the goals of each user and their responsibilities.
1.7 RELATING USE CASES
The Use Case Model describes the proposed functionality of the new system.
A Use Case represents a discrete unit of interaction between a user (human or
machine) and the system.
A Use Case may 'include' another Use Case's functionality or 'extend' another Use Case
with its own behavior.
The formal specification of a Use Case includes:
o Requirements: formal functional requirements that a Use Case must provide to
the end user.
o Constraints: formal rules and limitations that a Use Case operates under, and
includes pre- post- and invariant conditions.
o Scenarios: formal descriptions of the flow of events that occurs during a Use
Case instance.
19. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 19
1.7.1 Types of Use Cases
Concrete Use Case: Initiated by an actor and performs the entire behavior desired by
the actor. These are the elementary business process use cases. Example: Process
Sale.
Abstract Use Case: Never instantiated by itself. It is a sub-function use case that is
part of another use case. Example: Handle Credit Payment.
Base Use Case: It includes another use case or it is extended or specialized by
another use case. Example: Process Sale includes Handle Credit Payment
Addition Use Case: The use case that is an inclusion, extension, or specialization is
called an addition use case. Example: Handle Credit Payment added with
Process Sale
Addition use cases are usually abstract. Base use cases are usually concrete.
1.7.2 Kinds of Relationships
An organization mechanism to improve communication and comprehension of the
use cases, reduce duplication of text, and improve management of the use case
documents.
1. The include Relationship: It is common to have some partial behavior that is
common across several use cases. The include relationship could be used:
a. To simplify large use case by splitting it into several use cases
b. To extract common parts of the behaviors of two or more use cases.
Example: Base use case is incomplete without derived use case.
include Customer Authentication use case Deposit Funds and Withdraw Cash use cases
2. The extend Relationship: The idea is to create an extending or addition use case,
and within it, describe where and under what condition it extends the behavior of
some base use case.
20. CS8592 Object Oriented Analysis and Design Unit I
III IT Prepared by Kaviya.P, AP/IT Page 20
Example: Base use case is completed with / without derived use case.
3. The Generalization Use Case: The activity of identifying commonality among
concepts and defining superclass (general concept) and subclass (specialized
concept) relationships. Child use case inherits properties and behavior of the parent
use case and may override the behavior of the parent. Base use case could be
abstract.
Example (Include, Extends, Generalization):