Case Study of
Burj KhalifaBy,
Vaibhav, Jebin,Ashish,
Nirmal ,Krishna
Conception
• Dubai being well known for its Oil Reserves and
profits that they have gained so far, making them
one of the richest country in the world, came up
with a plan of changing their oil based economy
to service and tourism based economy.
• What better than constructing the tallest building
in the world, to set an eg. of international
cooperation, symbolic beacon of progress and
dynamic prosperity of middle east, a tangible
proof of Dubai’s growing role in changing world.
Enough of Oil,
lets go with
Tourism
CLIENT EMMAR Properties
CONSTRUCTION
MANAGER
TURNER INTERNATIONAL
GENERAL
CONTRACTOR
Samsung Joint
Venture (consisting of Samsung, Korea base contractor;
Besix, Belgium base contractor; and Arabtec, (Dubai base
Contractor) together known as SBAJV
ARCHITECT and
DESIGNER
Adrian Smith (Chicago) from the architecture firm
Skidmore, Owings& Merrill.
SUB-
CONTRACTORS
More than 100 at a time on Site.
Highlights of Construction
Management
• Achieving 3 days cycle for structural work:
The tower consists of more than 160 floors & to be completed within a
very tight schedule Hence, the following key construction technologies
were incorporated to achieve the 3-day cycle set for the concrete works:
• Auto Climbing formwork system (ACS).
• Rebar pre-fabrication.
• High performance concrete suitable for providing high strength, high
durability requirement, high modulus, and pumping.
• Advanced concrete pumping technology (BSA-14000 SHP-D).
• Simple drop head formwork system that can be dismantled and assembled
quickly with minimum labor requirement.
• Column/Wall proceeding method, part of ACS formwork system.
• Optimum Transportation:
They developed an optimum transportation
systems with large capacity high speed
equipments to carry raw material and pre-
fabricated components.
• Management of Labour:
They managed to get sufficient cheap labour
from South-Asian countries like INDIA, PAKISTAN,
BANGLADESH, SRILANKA etc.
• Managed to keep the pace of the work even in
adverse conditions.
• Management of SBAJV.
Efficent management of three different firms from three
different corners of the world, giving them specified job over
limited period of time.
• Effective Use of Softwares:
Softwares such as PRIMAVERA and MICROSOFT
PROJECT(MSP) were efficiently used in design and to assist
project managers in developing plans, assigning resources to
tasks, tracking progress, managing budgets and analyzing
workloads .
Causes for OverRun
• Dubai Bubble Burst (2008, borrowed 10b$)
• Change in Design of Apartments and Luxury
finishes.
• Increase in height of structure. (808 m to 828m)
• Armani Hotel.
• Conflicts between Labourers and Management
over wages and increasing death toll.
• Change in Labour Law that occurred during the
construction.
Figures
• 1.5- billion USD. Total cost after escalation
• 828- height of building in metre (tallest ever).
• 160-number of storeys.
• 95- Distance(km) from where Spire is visible.
• 504- rise in metre of main service lift (highest)
• 64- speed of lift in Km/hr.
• 1.25- deflection(m) of Spire’s central position.
THANK YOU ALL !!!

More Related Content

What's hot

Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
Joji Mathew
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
Bimenpreet Kaur
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
SaloniHosmani
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
Rajat Nainwal
 
Presentation on burj khalifa
Presentation on burj khalifaPresentation on burj khalifa
Presentation on burj khalifa
ashu Kusha
 
Burj khalifa Dubai
Burj khalifa DubaiBurj khalifa Dubai
Burj khalifa Dubai
abhaykumar619
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Safa Aboelssaad
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
Ar. M. Senthil [ senthilmani ]
 
Cayan tower,dubai
Cayan tower,dubaiCayan tower,dubai
Cayan tower,dubai
Ar.Muhammad Riyas
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
Shreelekha Kulkarni
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
Daniela Villa
 
Burj khalifa
Burj khalifa Burj khalifa
Burj khalifa
shiv404
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Puspendu Ray
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Ar. M. Senthil [ senthilmani ]
 
Burj Khalifa
Burj KhalifaBurj Khalifa
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
Self employed
 
Aldar headquarters building
Aldar headquarters buildingAldar headquarters building
Aldar headquarters building
Rajat Nainwal
 
Report of cayan tower
Report of cayan towerReport of cayan tower
Report of cayan tower
sagar arora
 
Zaha Mohamad hadid
Zaha Mohamad hadid Zaha Mohamad hadid
Zaha Mohamad hadid
Remisha Maharjan
 
Burj khalifa presentation ppt
Burj khalifa presentation pptBurj khalifa presentation ppt
Burj khalifa presentation ppt
Princess Dollz
 

What's hot (20)

Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Presentation on burj khalifa
Presentation on burj khalifaPresentation on burj khalifa
Presentation on burj khalifa
 
Burj khalifa Dubai
Burj khalifa DubaiBurj khalifa Dubai
Burj khalifa Dubai
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Cayan tower,dubai
Cayan tower,dubaiCayan tower,dubai
Cayan tower,dubai
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj khalifa
Burj khalifa Burj khalifa
Burj khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
Aldar headquarters building
Aldar headquarters buildingAldar headquarters building
Aldar headquarters building
 
Report of cayan tower
Report of cayan towerReport of cayan tower
Report of cayan tower
 
Zaha Mohamad hadid
Zaha Mohamad hadid Zaha Mohamad hadid
Zaha Mohamad hadid
 
Burj khalifa presentation ppt
Burj khalifa presentation pptBurj khalifa presentation ppt
Burj khalifa presentation ppt
 

Viewers also liked

Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.
Rohit Arora
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
MD DANIYAL
 
Victorian manchester
Victorian manchesterVictorian manchester
Victorian manchester
mcrarchives
 
Case study risk management
Case study risk managementCase study risk management
Case study risk management
abpeters82
 
Salehi- burj khalifa
Salehi- burj khalifaSalehi- burj khalifa
Salehi- burj khalifa
Mohammad Salehi
 
Burj Khalifa - Case Study
Burj Khalifa - Case Study Burj Khalifa - Case Study
Burj Khalifa - Case Study
rachelkcole
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Hari Krishna Velpula
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Dinesh Rishi Bhoga
 
Designing Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsDesigning Better Applications, Websites and Intranets
Designing Better Applications, Websites and Intranets
nForm User Experience
 
nForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm better intranets | PCL construction case study
nForm better intranets | PCL construction case study
nForm User Experience
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Constructionturbi
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CVDavid Smith
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.
Silvapen
 

Viewers also liked (18)

Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
burjjjj new
burjjjj newburjjjj new
burjjjj new
 
Making of Burj khalifa
Making of Burj khalifaMaking of Burj khalifa
Making of Burj khalifa
 
Victorian manchester
Victorian manchesterVictorian manchester
Victorian manchester
 
Case study risk management
Case study risk managementCase study risk management
Case study risk management
 
Salehi- burj khalifa
Salehi- burj khalifaSalehi- burj khalifa
Salehi- burj khalifa
 
Burj Khalifa - Case Study
Burj Khalifa - Case Study Burj Khalifa - Case Study
Burj Khalifa - Case Study
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Designing Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsDesigning Better Applications, Websites and Intranets
Designing Better Applications, Websites and Intranets
 
nForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm better intranets | PCL construction case study
nForm better intranets | PCL construction case study
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Construction
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CV
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.
 

Similar to Construction Management Case Study on Burj Khalifa

My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDFKarim Ashry
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanagermathavan2008
 
Shaping the Skyline by Building Tall – Creating distinctive landmark developm...
Shaping the Skyline by Building Tall – Creating distinctive landmark developm...Shaping the Skyline by Building Tall – Creating distinctive landmark developm...
Shaping the Skyline by Building Tall – Creating distinctive landmark developm...
Galala University
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
NAVNEET KUMAR JHA
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
NAVNEET KUMAR JHA
 
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadFiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
CCT International
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016Faraz Yasin
 
modern techniques for construction project management.pptx
modern techniques for construction project management.pptxmodern techniques for construction project management.pptx
modern techniques for construction project management.pptx
AmitShelake1
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)Suresh Singh
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
Manjeera Group
 
Xebec case study, express towers, sep 2012
Xebec case study, express towers, sep 2012Xebec case study, express towers, sep 2012
Xebec case study, express towers, sep 2012
Deepak Gahlowt
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkataengineeringwatch
 

Similar to Construction Management Case Study on Burj Khalifa (20)

My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
 
Emad Hamdy Resume
Emad Hamdy ResumeEmad Hamdy Resume
Emad Hamdy Resume
 
CV MZ
CV MZCV MZ
CV MZ
 
Mohamed Hegab CV111
Mohamed Hegab CV111Mohamed Hegab CV111
Mohamed Hegab CV111
 
Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
C.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCMC.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCM
 
Shaping the Skyline by Building Tall – Creating distinctive landmark developm...
Shaping the Skyline by Building Tall – Creating distinctive landmark developm...Shaping the Skyline by Building Tall – Creating distinctive landmark developm...
Shaping the Skyline by Building Tall – Creating distinctive landmark developm...
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadFiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
 
OMRAN CV
OMRAN CVOMRAN CV
OMRAN CV
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
modern techniques for construction project management.pptx
modern techniques for construction project management.pptxmodern techniques for construction project management.pptx
modern techniques for construction project management.pptx
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 
k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
 
Xebec case study, express towers, sep 2012
Xebec case study, express towers, sep 2012Xebec case study, express towers, sep 2012
Xebec case study, express towers, sep 2012
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkata
 

Recently uploaded

The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
Wasim Ak
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
gb193092
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
ArianaBusciglio
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
Mohammed Sikander
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 

Recently uploaded (20)

The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 

Construction Management Case Study on Burj Khalifa

  • 1. Case Study of Burj KhalifaBy, Vaibhav, Jebin,Ashish, Nirmal ,Krishna
  • 2. Conception • Dubai being well known for its Oil Reserves and profits that they have gained so far, making them one of the richest country in the world, came up with a plan of changing their oil based economy to service and tourism based economy. • What better than constructing the tallest building in the world, to set an eg. of international cooperation, symbolic beacon of progress and dynamic prosperity of middle east, a tangible proof of Dubai’s growing role in changing world.
  • 3. Enough of Oil, lets go with Tourism
  • 4. CLIENT EMMAR Properties CONSTRUCTION MANAGER TURNER INTERNATIONAL GENERAL CONTRACTOR Samsung Joint Venture (consisting of Samsung, Korea base contractor; Besix, Belgium base contractor; and Arabtec, (Dubai base Contractor) together known as SBAJV ARCHITECT and DESIGNER Adrian Smith (Chicago) from the architecture firm Skidmore, Owings& Merrill. SUB- CONTRACTORS More than 100 at a time on Site.
  • 5.
  • 6.
  • 7. Highlights of Construction Management • Achieving 3 days cycle for structural work: The tower consists of more than 160 floors & to be completed within a very tight schedule Hence, the following key construction technologies were incorporated to achieve the 3-day cycle set for the concrete works: • Auto Climbing formwork system (ACS). • Rebar pre-fabrication. • High performance concrete suitable for providing high strength, high durability requirement, high modulus, and pumping. • Advanced concrete pumping technology (BSA-14000 SHP-D). • Simple drop head formwork system that can be dismantled and assembled quickly with minimum labor requirement. • Column/Wall proceeding method, part of ACS formwork system.
  • 8. • Optimum Transportation: They developed an optimum transportation systems with large capacity high speed equipments to carry raw material and pre- fabricated components. • Management of Labour: They managed to get sufficient cheap labour from South-Asian countries like INDIA, PAKISTAN, BANGLADESH, SRILANKA etc. • Managed to keep the pace of the work even in adverse conditions.
  • 9. • Management of SBAJV. Efficent management of three different firms from three different corners of the world, giving them specified job over limited period of time. • Effective Use of Softwares: Softwares such as PRIMAVERA and MICROSOFT PROJECT(MSP) were efficiently used in design and to assist project managers in developing plans, assigning resources to tasks, tracking progress, managing budgets and analyzing workloads .
  • 10. Causes for OverRun • Dubai Bubble Burst (2008, borrowed 10b$) • Change in Design of Apartments and Luxury finishes. • Increase in height of structure. (808 m to 828m) • Armani Hotel. • Conflicts between Labourers and Management over wages and increasing death toll. • Change in Labour Law that occurred during the construction.
  • 11. Figures • 1.5- billion USD. Total cost after escalation • 828- height of building in metre (tallest ever). • 160-number of storeys. • 95- Distance(km) from where Spire is visible. • 504- rise in metre of main service lift (highest) • 64- speed of lift in Km/hr. • 1.25- deflection(m) of Spire’s central position.
  • 12.
  • 13.