Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION PARTIALLY INDUSTRIALIZED ELEMENTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY Picture:  Jon Lopez Allende
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION ,[object Object],[object Object],[object Object],[object Object],[object Object],HISTORY 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION -Prefabricated elements and in situ built elements combination -They use elements comprobated in contralated way. -Instead of using finished elements,they use those who need to finish them in the building works. DEFINITION OF PARTIALLY INDUSTRIALIZED ELEMENTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures:  Partially industrialized construction, Rosa Alvarez, Maite Otaño CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION - Depending on the weigth :  -Light Prefabricated elements: less than 30 kg. little  elements,they can be put by one or two workers   -Midely light prefabricated elements: less than 500kg,  they can be put by a simple system,pulley,lever -Heavy prefabricated elements: more than 500kg  elements. They had to be put in building works by heavy  machinary and big cranes. - Depending on the form :  -Bloks: They are prefabricated elements for walls  construction. Those elements are self-preservation and  they doesn`t need any help of other elements. Concrete  bloks,bricks..  -Panels:Sheets with an important relacionship between  surface and thickness. Retaining walls,sheets on  facades,“pladur” sheets,… -Linear elements:Trasversal section of rigid elements.In  conection with the ground CLASIFICATION OF PARTIALLY INDUSTRIALIZED ELEMENTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION + Easy manufacture + Simply conecction + Fast assembly + Less surpluss + Better quality of elements. + No attack from climatology conditions. + More resistance elements + Dry construction priority ADVANTAGES AND DISADVANTAGES OF PARTIALLY INDUSTRIALIZED ELEMENTS  - Elements for a specific building work - Many different elements  -Obligatory Spetialization to assembly works. - Less flexibility - Need to redesing 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  Partially industrialized construction, Rosa Alvarez, Maite Otaño CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION Construction: Gordillo Study // Client: Luis Gordillo eta PilarLinares // Architects: Iñaki Ábalos , Juan Herreros, Ángel Jaramillo // Colaborators: Renata Sentkievicz, Mª Auxiliadora Gálvez // Structures: Juan Gómez // Works director: Ábalos&Herreros // Administration executor: Ángel Jamarillo // Landscape: Fernando Valero // Technical Architect José Torres // Prizes:  1997 COAM Architect Prize – 1997 Prize of Autonomous Community of Madrid - 2002 COAM 2000 Prize - 1997 finalist of the Architecture Prize Iberfad GORDILLO STUDY 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5.5. WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  2G magazine, Abalos & Herreros. G.Gili editorial CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY DESCRIPTION 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5. 5.WINDOWS  MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Croquis magazine, número 118, Abalos&Herreros, cero9, no.mad ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY SITUATION, CULTURAL SCENE AND CLIMATE 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5. 5.WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  2G magazine, Abalos & Herreros. G.Gili editorial ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY CLIMATE AND ENVIRONMENT CONSEQUENCES ,[object Object],[object Object],[object Object],[object Object],Picture: Croquis magazine, Abalos&Herreros, cero9, no.mad 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5.5. WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY TECHNICAL AND ESTHETIC REQUIREMENT ,[object Object],[object Object],[object Object],[object Object],[object Object],Picture: Croquis magazine, 118 nmb. Abalos&Herreros, cero9, no.mad 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5.5. WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY STRUCTURAL SISTEMS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5.5. WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz ,[object Object],[object Object],[object Object],[object Object],[object Object],CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY STRUCTURAL SISTEMS:  VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES Picture: Croquis magazine,, 118 nmb Abalos&Herreros, cero9, no.mad 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5. 5.WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz ,[object Object],[object Object],[object Object],[object Object],CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY STRUCTURAL SISTEMS:  HORIZONTAL ELEMENTS THE BELT OF STEEL Picture: Croquis magazine, 118 nmb.. Abalos&Herreros, cero9, no.mad 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2.   HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5. 5.WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz ,[object Object],[object Object],[object Object],CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY STRUCTURAL SISTEMS:  VERTICAL VEGETAL ELEMENT THE VEGETAL FRONT - It goes a net from outside to inside - An element called  Feltemper  supports the plants and water Picture: Croquis magazine, 118 nmb. Abalos&Herreros, cero9, no.mad 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5.5. WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz ,[object Object],[object Object],[object Object],[object Object],[object Object],CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO STUDY STRUCTURAL SISTEMS:  HORIZONTAL VEGETAL ELEMENT THE ROOF ,[object Object],[object Object],[object Object],[object Object],[object Object],1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF   5..5. 5.WINDOWS  6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Croquis magazine, 118 nmb. Abalos&Herreros, cero9, no.mad CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION GORDILLO ESTUDIOA STRUCTURAL SISTEMS: WINDOWS ,[object Object],[object Object],[object Object],[object Object],1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1.   DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS   5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3.  VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5. 5.WINDOWS   6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Croquis magazine, 118 nmb. Abalos&Herreros, cero9, no.mad CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
MEDIATHEQUE IN SENDAI    Building: Mediatheque Sendai// Client: Sendaiko hiria // Architects: Toyo Ito, Tatsuo Kuwahara, Takeo Higashi, Mkoto Yokomizo, Toyohiko Kobayashi, Shinichi Takeutsi, Takuhiro Seu, Hironori Matsubara, Reo Yokota // Collaborators: Kazuyo Sejima  // Structure: Mutsuro Sasaki, Masahiro Ikeda, Shuji Tada, Akira Suzuki // Lightning: Lightning Planners Associates //  Acoustic: Nagata Acoustics // Work: Kumagai Takenaka Ando Hashimoto JV Picture:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
DESCRIPTION - Objetives +To give live to the place +Direct relation with the outside. -Multifunctional +Library +A comunication center that fulfills the needs of the  digital era +Culture and art propellant - Free standing space with free circulation -Space without an specific function -Lighting importance -Direct relation with nature around_doing reference to the trees of the city -Transparency_ open the building to outside 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
SITE AND HIS RELATION - Aoba-ku, Sendai Hiria, Miyagi, Japan (1997/2000)   -Sendai City  +To 300 km from Tokio +Big population +Great development in Industry and new technology -Site area 40000m ² -Japanish culture influence +Relation with nature in the structure and facade +Not obtacles between inside and outside +Same spaces for diferent functions +Light and dinamic furniture -The orientation determinates the facades shape -Mild climate (12,1Cº average)_cold winter -Strong wind site  1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
BUILDING FUNCTIONS - Legal states +To achieve the acceptation of the structure +Obey the earthquakes regulation +Internal partition against fire and his regulation  by    protecting the columns -Enviroment requirements +The use of new technology to reduce the   bisual shock +Recyclable materials like steel and glass +Pasibe mechanism to save energy -Economic limits_cheaper than estimation 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
BUILDING FUNCTIONS -Technologycal and appearance requirements +Free standing, without partition_Elevator and ducts through  the tube structure +No columns_ Tube made structure +Tubular structure with organic shape_   new industrialized systems +Big distance between tube frames_platform system +Façade composition is the result of esthetic and functionaly   requirements 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
-3 Construction system used +Tube frame columns +Platform slaps +Façade cladding -Building system_Based in Le Corbusier´s Domino system STRUCTURAL SYSTEMS 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
- Structural function -13 tube frames_Diferent diameters up and down_organic shape -All tube parts are different -Stairs, lifts and instalation duct through the tube frame -Dificult build up_Tube parts cutted by computers in a factory_take it to the building work_weld in the building work -Diferent assembled -Thickness of parts +40mm-diameter thinnest +240mm-diameter thickest -Tube structure modeled by  Kawasaki Heavy Industries Company   (www.khi.co.jp) BUILDING SYSTEM _TUBE FRAME COLUMNS 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
BUILDING SYSTEMS _  PLATFORM SLAPS -Slaps_ width 80 cm (including plumbing) -Made in the factory and assambled in building work -Metallic sheet+ steel beam (net) -Net for the metallic beams +slaps  + roof +Assembled UPE- profiles -Sheets  +Metallics +Similar to those used in shipyards +Oven and under the net +Accurate cutting_Triangle form around the tube frame Picture:  Anaiz Aulestiarte Bustinduy 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
BUILDING SYSTEMS _ FAÇADE - 3 kind of facades depend on orientation -Western_in front of a house_emergency stairs -Northern and Eastern +Looking toward the street +Diferent cladding in each flats  +Translucent glasses +Policarbonate Aluminium -Diferent height flats -Berticaly fitted parts -Southern facade is the main important 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
BUILDING SYSTEMS _ SOUTHERN FAÇADE -Two glass sheets    +The inner fitted between slaps   +The outher curtain wall -Amoung the two glasses there is an air chamber 60cm -Glass_policarbonate -Aluminium woodwork - Horizontal pieces, made of the same materials -Curtain Wall_fitted by steel tents -In summer the up and down windows are opened to achieve the air flow. -In winter the heat is storage between the two glass skins. 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1.   DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS   6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS   6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE   7. VELODROME AND SWIMMING POOL IN BERLIN Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures:  Toyo Ito_Sendai Mediatheque – Actar  editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION VELODROME AND SWIMMING POOL, BERLIN Building: Velodrome and swimming pool// Client:  City of Berlin, represented by OSB  Sportstättenbauten GmbH  // Architects: Dominique Perrault// Partners: Rolf Reichert-RPM, Schmidt, Schicketanz & Partner// Structures:  Ove Arup & Partners  // Landscape:  Landschaft Planen & Bauen  // Award: Deutscher Architekturpreis, 2 nd  prize, 1999 Picture: Patxi Etxeandia Pereiro 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION DESCRIPTION OF VELODROME AND SWIMMING POOL  ,[object Object],[object Object],[object Object],[object Object],[object Object],Picture: Ander Rodriguez Picture: Ander Rodriguez 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION LOCATION, ORIENTATION AND AROUND OF VELODROME AND SWIMMING POOL ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Picture:Tectonic magazine, number 6 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CLIMATE AND IT´S INFLUENCE ON THE BUILDING ,[object Object],[object Object],[object Object],[object Object],Picture: Ander Rodriguez 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],VELODROME AND SWIMMING POOL STRUCTURAL SYSTEM: BURIED BASE AND OUTER CYLINDER 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER  CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:  Aitzol Bizkarguenaga CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
10.GAIA  ERAIKIN INDUSTRIALAK ETA EKIPAMENDUAK. ALTZAIRUZKO EGITURA INDUSTRIALIZATUA. HORMIGOI ARMATUZKO  ETA AURRETENTSATUZKO EGITURA INDUSTRIALIZATUAK.EGURREZKO EGITURA INDUSTRIALIZATUAK. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION - Vertical uprights: +80x60x4 mm tubes  +Mat. galvanized steel,  +Fixed superiorly to guides for a correct restatement +Supported inferiorly with an angle and as an anchor pin retention -Vertical guides +Mat. lacquered aluminum  +Located between the sandwich panels, the 3 mm thick lacquered galvanized sheet and core insulation, + work also as scabs +Above them overlaps the metal grid of stainless steel lining, anchored by fixing discs VELODROME AND SWIMMING POOL STRUCTURAL SYSTEM: FRONT 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Imagen:  Aitzol Bizkarguenaga CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION VELODROME AND POOL STRUCTURE: THE COVER  - Deck type cover -Composition: corrugated sheet, flat sheet, vapour barrier, thermal insulation and waterproofing -  The 110x8 mm plates and 60x60x6 mm angles of galvanized steel, where is fixed the steel mesh, weighs just enough to be supported on the deck and works as a ballast to the waterproofing, which does not require any added mechanical fixing 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Imagen:  Aitzol Bizkarguenaga CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION -The skylight structure is made by  galvanized steel -Formed by a hollow tube grid of 80x60x3 mm located at the bottom that is screwed to the profiles of the trusses -The sides are folded sheets with holes on top for ventilation -Above the sheets are placed other U shaped sheets that works  as gutter and as practicable glazing -The skylight is closed inferiorly with laminated, 4 +4 camera, tempered glass and laminated ,4 +4, safety glass -Motorized louvers allows the control of outdoor lighting   VELODROME AND POOL STRUCTURE: SKYLIGHTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4.  BURIED BASE AND OUTER CYLINDER   7.5. FRONT 7.6. COVER 7.7.  SKYLIGHT Authors:  Nerea Atutxa,  Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:Tectonic magazine, number 6 CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY
UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III  5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN   UNIVERSITY OF THE BASQUE COUNTRY AUTHORS [2008-2009] Andoni Esteban  Ander Cia Jon Cano Ainhize Egiraun Anaiz Aulestiarte AUTHORS [2009-2010] Nerea Atutxa Aitzol Bizkarguenaga Jon Borrajo Ander Enziondo Ibai Esteibarlanda Patxi Etxeandia Marta Fernandez Jon Lopez Aroa Ruiz Copyrights of these images belong to their  authors * . Any other content on this work is licensed under  Creative Commons by-sa 3.0.

More Related Content

Viewers also liked

Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructionsengineeringwatch
 
IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machineTeow Beng Hur
 
Construction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingConstruction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingDragon Sourcing
 
Construction Management Case Study on Burj Khalifa
Construction Management Case Study on  Burj KhalifaConstruction Management Case Study on  Burj Khalifa
Construction Management Case Study on Burj KhalifaVaibhav Shrivastava
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREShivangi Saini
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storeyBroad Homes Intl.
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibsUTHM
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of constructionJoji Mathew
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Actionable Customer Development
Actionable Customer DevelopmentActionable Customer Development
Actionable Customer DevelopmentAndreas Klinger
 
Casting and its types
Casting and its typesCasting and its types
Casting and its typesWaqas Ahmed
 

Viewers also liked (13)

Indonesia - adaptation in South East Asia
Indonesia - adaptation in South East AsiaIndonesia - adaptation in South East Asia
Indonesia - adaptation in South East Asia
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machine
 
Construction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingConstruction Company Case Study by Dragonsourcing
Construction Company Case Study by Dragonsourcing
 
Construction Management Case Study on Burj Khalifa
Construction Management Case Study on  Burj KhalifaConstruction Management Case Study on  Burj Khalifa
Construction Management Case Study on Burj Khalifa
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storey
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Actionable Customer Development
Actionable Customer DevelopmentActionable Customer Development
Actionable Customer Development
 
Casting and its types
Casting and its typesCasting and its types
Casting and its types
 

Similar to Partially Industrialized Construction

10 Taldea Ingeleraz
10 Taldea Ingeleraz10 Taldea Ingeleraz
10 Taldea Ingelerazeraik3
 
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdfBIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdfRachitaDalpati
 
Sustainability (Comenius 2010-2012)
Sustainability (Comenius 2010-2012)Sustainability (Comenius 2010-2012)
Sustainability (Comenius 2010-2012)Sara Cabello Ochoa
 
Repair and Maintance of Building Cracks
Repair and Maintance of Building CracksRepair and Maintance of Building Cracks
Repair and Maintance of Building Cracksijtsrd
 
Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...
Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...
Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...IRJET Journal
 
04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdf04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdfwebtierra
 
Portfolio Chiara Trento
Portfolio Chiara TrentoPortfolio Chiara Trento
Portfolio Chiara TrentoChiara Trento
 
Renato_Portfolio_en
Renato_Portfolio_enRenato_Portfolio_en
Renato_Portfolio_enRenato Loddo
 
Edilizia sostenibile dom_100521
Edilizia sostenibile dom_100521Edilizia sostenibile dom_100521
Edilizia sostenibile dom_100521morosini1952
 
Case study of international architecture college
Case study of international architecture collegeCase study of international architecture college
Case study of international architecture collegeNilanjana Pal
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)RAINBOW by ECS-3.COM
 
Development of Aluminum in Architecture
Development of Aluminum in ArchitectureDevelopment of Aluminum in Architecture
Development of Aluminum in ArchitectureIJERA Editor
 
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bisrael hurtado cola
 
IRJET- Reuse of Plastics in Soil Bricks Substituting Traditional Bricks
IRJET- Reuse of Plastics in Soil Bricks Substituting Traditional BricksIRJET- Reuse of Plastics in Soil Bricks Substituting Traditional Bricks
IRJET- Reuse of Plastics in Soil Bricks Substituting Traditional BricksIRJET Journal
 
04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De Rivas04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De RivasRedit
 
04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De Rivas04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De RivasElena Cortés Ventura
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation parkİrfan Meriç
 
Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro...
 Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro... Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro...
Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro...JIT KUMAR GUPTA
 

Similar to Partially Industrialized Construction (20)

10 Taldea Ingeleraz
10 Taldea Ingeleraz10 Taldea Ingeleraz
10 Taldea Ingeleraz
 
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdfBIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
 
Sustainability (Comenius 2010-2012)
Sustainability (Comenius 2010-2012)Sustainability (Comenius 2010-2012)
Sustainability (Comenius 2010-2012)
 
Repair and Maintance of Building Cracks
Repair and Maintance of Building CracksRepair and Maintance of Building Cracks
Repair and Maintance of Building Cracks
 
Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...
Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...
Replacement Of Acoustic Insulation Material With Engineered Mycelium Composit...
 
04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdf04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdf
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Portfolio Chiara Trento
Portfolio Chiara TrentoPortfolio Chiara Trento
Portfolio Chiara Trento
 
Renato_Portfolio_en
Renato_Portfolio_enRenato_Portfolio_en
Renato_Portfolio_en
 
Edilizia sostenibile dom_100521
Edilizia sostenibile dom_100521Edilizia sostenibile dom_100521
Edilizia sostenibile dom_100521
 
Case study of international architecture college
Case study of international architecture collegeCase study of international architecture college
Case study of international architecture college
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)
 
Development of Aluminum in Architecture
Development of Aluminum in ArchitectureDevelopment of Aluminum in Architecture
Development of Aluminum in Architecture
 
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-b
 
A3 report
A3 reportA3 report
A3 report
 
IRJET- Reuse of Plastics in Soil Bricks Substituting Traditional Bricks
IRJET- Reuse of Plastics in Soil Bricks Substituting Traditional BricksIRJET- Reuse of Plastics in Soil Bricks Substituting Traditional Bricks
IRJET- Reuse of Plastics in Soil Bricks Substituting Traditional Bricks
 
04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De Rivas04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De Rivas
 
04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De Rivas04_CI4_LIFECLAYGLASS_Raquel De Rivas
04_CI4_LIFECLAYGLASS_Raquel De Rivas
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation park
 
Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro...
 Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro... Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro...
Role and Importance of Pre-fabrication in Promoting Sustainable Built Enviro...
 

More from turbi

Ekoskola Aroa Marta Nerea Ibai Ander Jon Patxi
Ekoskola Aroa Marta Nerea Ibai Ander Jon PatxiEkoskola Aroa Marta Nerea Ibai Ander Jon Patxi
Ekoskola Aroa Marta Nerea Ibai Ander Jon Patxiturbi
 
Partzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako ErainkuntzaPartzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako Erainkuntzaturbi
 
Construccion Parcielmente Industrializada
Construccion Parcielmente IndustrializadaConstruccion Parcielmente Industrializada
Construccion Parcielmente Industrializadaturbi
 
Construccion Parcielmente Industrializada
Construccion Parcielmente IndustrializadaConstruccion Parcielmente Industrializada
Construccion Parcielmente Industrializadaturbi
 
Partzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako ErainkuntzaPartzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako Erainkuntzaturbi
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Constructionturbi
 

More from turbi (6)

Ekoskola Aroa Marta Nerea Ibai Ander Jon Patxi
Ekoskola Aroa Marta Nerea Ibai Ander Jon PatxiEkoskola Aroa Marta Nerea Ibai Ander Jon Patxi
Ekoskola Aroa Marta Nerea Ibai Ander Jon Patxi
 
Partzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako ErainkuntzaPartzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako Erainkuntza
 
Construccion Parcielmente Industrializada
Construccion Parcielmente IndustrializadaConstruccion Parcielmente Industrializada
Construccion Parcielmente Industrializada
 
Construccion Parcielmente Industrializada
Construccion Parcielmente IndustrializadaConstruccion Parcielmente Industrializada
Construccion Parcielmente Industrializada
 
Partzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako ErainkuntzaPartzialki Industrializatutako Erainkuntza
Partzialki Industrializatutako Erainkuntza
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Construction
 

Recently uploaded

Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxruthvilladarez
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 

Recently uploaded (20)

Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 

Partially Industrialized Construction

  • 1. Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION PARTIALLY INDUSTRIALIZED ELEMENTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY Picture: Jon Lopez Allende
  • 2.
  • 3. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION -Prefabricated elements and in situ built elements combination -They use elements comprobated in contralated way. -Instead of using finished elements,they use those who need to finish them in the building works. DEFINITION OF PARTIALLY INDUSTRIALIZED ELEMENTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures: Partially industrialized construction, Rosa Alvarez, Maite Otaño CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 4. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION - Depending on the weigth : -Light Prefabricated elements: less than 30 kg. little elements,they can be put by one or two workers -Midely light prefabricated elements: less than 500kg, they can be put by a simple system,pulley,lever -Heavy prefabricated elements: more than 500kg elements. They had to be put in building works by heavy machinary and big cranes. - Depending on the form : -Bloks: They are prefabricated elements for walls construction. Those elements are self-preservation and they doesn`t need any help of other elements. Concrete bloks,bricks.. -Panels:Sheets with an important relacionship between surface and thickness. Retaining walls,sheets on facades,“pladur” sheets,… -Linear elements:Trasversal section of rigid elements.In conection with the ground CLASIFICATION OF PARTIALLY INDUSTRIALIZED ELEMENTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 5. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION + Easy manufacture + Simply conecction + Fast assembly + Less surpluss + Better quality of elements. + No attack from climatology conditions. + More resistance elements + Dry construction priority ADVANTAGES AND DISADVANTAGES OF PARTIALLY INDUSTRIALIZED ELEMENTS - Elements for a specific building work - Many different elements -Obligatory Spetialization to assembly works. - Less flexibility - Need to redesing 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Partially industrialized construction, Rosa Alvarez, Maite Otaño CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 6. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION Construction: Gordillo Study // Client: Luis Gordillo eta PilarLinares // Architects: Iñaki Ábalos , Juan Herreros, Ángel Jaramillo // Colaborators: Renata Sentkievicz, Mª Auxiliadora Gálvez // Structures: Juan Gómez // Works director: Ábalos&Herreros // Administration executor: Ángel Jamarillo // Landscape: Fernando Valero // Technical Architect José Torres // Prizes: 1997 COAM Architect Prize – 1997 Prize of Autonomous Community of Madrid - 2002 COAM 2000 Prize - 1997 finalist of the Architecture Prize Iberfad GORDILLO STUDY 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO STUDY 5.1. DESCRIPTION 5.2. SITUATION, CULTURAL SCENE AND CLIMATE 5..3. CLIMATE AND ENVIRONMENT CONSEQUENCES 5.4. TECHNICAL AND ESTHETIC REQUIREMENT 5..5. STRUCTURAL SISTEMS 5..5.1. VERTICAL ELEMENTS THE LOADBEARING WALLS AND FAÇADES 5..5.2. HORIZONTAL ELEMENTS THE BELT OF STEEL 5. 5.3. VERTICAL VEGETAL ELEMENT ,THE VEGETAL FAÇADE 5. 5.4. HORIZONTAL VEGETAL ELEMENT ,THE ROOF 5 5..5.5. WINDOWS 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: 2G magazine, Abalos & Herreros. G.Gili editorial CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. MEDIATHEQUE IN SENDAI Building: Mediatheque Sendai// Client: Sendaiko hiria // Architects: Toyo Ito, Tatsuo Kuwahara, Takeo Higashi, Mkoto Yokomizo, Toyohiko Kobayashi, Shinichi Takeutsi, Takuhiro Seu, Hironori Matsubara, Reo Yokota // Collaborators: Kazuyo Sejima // Structure: Mutsuro Sasaki, Masahiro Ikeda, Shuji Tada, Akira Suzuki // Lightning: Lightning Planners Associates // Acoustic: Nagata Acoustics // Work: Kumagai Takenaka Ando Hashimoto JV Picture: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 18. DESCRIPTION - Objetives +To give live to the place +Direct relation with the outside. -Multifunctional +Library +A comunication center that fulfills the needs of the digital era +Culture and art propellant - Free standing space with free circulation -Space without an specific function -Lighting importance -Direct relation with nature around_doing reference to the trees of the city -Transparency_ open the building to outside 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 19. SITE AND HIS RELATION - Aoba-ku, Sendai Hiria, Miyagi, Japan (1997/2000) -Sendai City +To 300 km from Tokio +Big population +Great development in Industry and new technology -Site area 40000m ² -Japanish culture influence +Relation with nature in the structure and facade +Not obtacles between inside and outside +Same spaces for diferent functions +Light and dinamic furniture -The orientation determinates the facades shape -Mild climate (12,1Cº average)_cold winter -Strong wind site 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 20. BUILDING FUNCTIONS - Legal states +To achieve the acceptation of the structure +Obey the earthquakes regulation +Internal partition against fire and his regulation by protecting the columns -Enviroment requirements +The use of new technology to reduce the bisual shock +Recyclable materials like steel and glass +Pasibe mechanism to save energy -Economic limits_cheaper than estimation 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 21. BUILDING FUNCTIONS -Technologycal and appearance requirements +Free standing, without partition_Elevator and ducts through the tube structure +No columns_ Tube made structure +Tubular structure with organic shape_ new industrialized systems +Big distance between tube frames_platform system +Façade composition is the result of esthetic and functionaly requirements 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 22. -3 Construction system used +Tube frame columns +Platform slaps +Façade cladding -Building system_Based in Le Corbusier´s Domino system STRUCTURAL SYSTEMS 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 23. - Structural function -13 tube frames_Diferent diameters up and down_organic shape -All tube parts are different -Stairs, lifts and instalation duct through the tube frame -Dificult build up_Tube parts cutted by computers in a factory_take it to the building work_weld in the building work -Diferent assembled -Thickness of parts +40mm-diameter thinnest +240mm-diameter thickest -Tube structure modeled by Kawasaki Heavy Industries Company (www.khi.co.jp) BUILDING SYSTEM _TUBE FRAME COLUMNS 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 24. BUILDING SYSTEMS _ PLATFORM SLAPS -Slaps_ width 80 cm (including plumbing) -Made in the factory and assambled in building work -Metallic sheet+ steel beam (net) -Net for the metallic beams +slaps + roof +Assembled UPE- profiles -Sheets +Metallics +Similar to those used in shipyards +Oven and under the net +Accurate cutting_Triangle form around the tube frame Picture: Anaiz Aulestiarte Bustinduy 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 25. BUILDING SYSTEMS _ FAÇADE - 3 kind of facades depend on orientation -Western_in front of a house_emergency stairs -Northern and Eastern +Looking toward the street +Diferent cladding in each flats +Translucent glasses +Policarbonate Aluminium -Diferent height flats -Berticaly fitted parts -Southern facade is the main important 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 26. BUILDING SYSTEMS _ SOUTHERN FAÇADE -Two glass sheets +The inner fitted between slaps +The outher curtain wall -Amoung the two glasses there is an air chamber 60cm -Glass_policarbonate -Aluminium woodwork - Horizontal pieces, made of the same materials -Curtain Wall_fitted by steel tents -In summer the up and down windows are opened to achieve the air flow. -In winter the heat is storage between the two glass skins. 1. HISTORY 2. DEFINIZINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAJES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 6.1. DESCRIPTION 6.2. SITUATION, CULTURAL SCENE AND CLIMATE 6.3. FUNCTIONS 6.4. STRUCTURAL SISTEMS 6.4.1. TUBE FRAME COLUMNS 6.4.2. P PLATAFORM SLAPS 6.4.3. FAÇADE 6.4.5. SOUTHERN FAÇADE 7. VELODROME AND SWIMMING POOL IN BERLIN Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Pictures: Toyo Ito_Sendai Mediatheque – Actar editorial– ISBN 84-95951-03-7 UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 27. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION VELODROME AND SWIMMING POOL, BERLIN Building: Velodrome and swimming pool// Client: City of Berlin, represented by OSB Sportstättenbauten GmbH // Architects: Dominique Perrault// Partners: Rolf Reichert-RPM, Schmidt, Schicketanz & Partner// Structures: Ove Arup & Partners // Landscape: Landschaft Planen & Bauen // Award: Deutscher Architekturpreis, 2 nd prize, 1999 Picture: Patxi Etxeandia Pereiro 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4. BURIED BASE AND OUTER CYLINDER 7.5. FRONT 7.6. COVER 7.7. SKYLIGHT Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 28.
  • 29.
  • 30.
  • 31.
  • 32. 10.GAIA ERAIKIN INDUSTRIALAK ETA EKIPAMENDUAK. ALTZAIRUZKO EGITURA INDUSTRIALIZATUA. HORMIGOI ARMATUZKO ETA AURRETENTSATUZKO EGITURA INDUSTRIALIZATUAK.EGURREZKO EGITURA INDUSTRIALIZATUAK. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION - Vertical uprights: +80x60x4 mm tubes +Mat. galvanized steel, +Fixed superiorly to guides for a correct restatement +Supported inferiorly with an angle and as an anchor pin retention -Vertical guides +Mat. lacquered aluminum +Located between the sandwich panels, the 3 mm thick lacquered galvanized sheet and core insulation, + work also as scabs +Above them overlaps the metal grid of stainless steel lining, anchored by fixing discs VELODROME AND SWIMMING POOL STRUCTURAL SYSTEM: FRONT 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4. BURIED BASE AND OUTER CYLINDER 7.5. FRONT 7.6. COVER 7.7. SKYLIGHT Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Imagen: Aitzol Bizkarguenaga CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 33. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION VELODROME AND POOL STRUCTURE: THE COVER - Deck type cover -Composition: corrugated sheet, flat sheet, vapour barrier, thermal insulation and waterproofing - The 110x8 mm plates and 60x60x6 mm angles of galvanized steel, where is fixed the steel mesh, weighs just enough to be supported on the deck and works as a ballast to the waterproofing, which does not require any added mechanical fixing 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4. BURIED BASE AND OUTER CYLINDER 7.5. FRONT 7.6. COVER 7.7. SKYLIGHT Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Imagen: Aitzol Bizkarguenaga CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 34. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION -The skylight structure is made by galvanized steel -Formed by a hollow tube grid of 80x60x3 mm located at the bottom that is screwed to the profiles of the trusses -The sides are folded sheets with holes on top for ventilation -Above the sheets are placed other U shaped sheets that works as gutter and as practicable glazing -The skylight is closed inferiorly with laminated, 4 +4 camera, tempered glass and laminated ,4 +4, safety glass -Motorized louvers allows the control of outdoor lighting   VELODROME AND POOL STRUCTURE: SKYLIGHTS 1. HISTORY 2. DEFINITION 3. CLASIFICATION 4. ADVANTAGES AND DISADVANTAGES 5. GORDILLO ESTUDY 6. MEDIATHEQUE IN SENDAI 7. VELODROME AND SWIMMING POOL IN BERLIN 7.1. 1. DESCRIPTION 7.2. SITUATION, CULTURAL SCENE AND CLIMATE 7.3. CLIMATE AND ENVIRONMENT CONSEQUENCES 7.4. BURIED BASE AND OUTER CYLINDER 7.5. FRONT 7.6. COVER 7.7. SKYLIGHT Authors: Nerea Atutxa, Aitzol Bizkarguenaga, Jon Borrajo, Ander Enziondo, Ibai Esteibarlanda, Marta Fernandez, Patxi Etxeandia, Jon Lopez, Aroa Ruiz Picture:Tectonic magazine, number 6 CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY
  • 35. UNIT 8: PARTIALLY INDUSTRIALIZED CONSTRUCTION CONSTRUCTION III 5 th LEVEL 2.009-2.010 YEAR SCHOOL OF ARCHITECTURE OF SAN SEBASTIAN UNIVERSITY OF THE BASQUE COUNTRY AUTHORS [2008-2009] Andoni Esteban Ander Cia Jon Cano Ainhize Egiraun Anaiz Aulestiarte AUTHORS [2009-2010] Nerea Atutxa Aitzol Bizkarguenaga Jon Borrajo Ander Enziondo Ibai Esteibarlanda Patxi Etxeandia Marta Fernandez Jon Lopez Aroa Ruiz Copyrights of these images belong to their authors * . Any other content on this work is licensed under Creative Commons by-sa 3.0.