1. CURRICULUM VITAE
Name: MOHAMED ZAKARIA MAHMOUD
Nationality: Egyptian.
Date of Birth: 3-2-1973.
Marital Status: Married.
Languages: Arabic, English.
Mobile No.: +971558251268, +971503485168
E-Mail: m_zakariam@yahoo.com
PROFESSIONAL SYNOPSIS
Over 17 Years of experience in Facilities Management, Design Management, and
construction Management Participating in mega projects with Multinational workforces; with
exposure in Design, Construction, Maintenance, contracts, Tender Estimation, projects
planning, Strategic Planning and Operation defining continuous improvement plan.
Deep practical engineering knowledge and a proven track record for timely project delivery,
project management, and cost control in addition to the customer satisfaction.
Able to work effectively in a team environment, Bring knowledge and creativity to the
position as well as have the discipline to drive results and follow established fundamental
processes.
Wealth of experience gained from working as following:
Positions Held
• Head of Engineering Department (Facilities management, Construction, Tender
Estimation and Fit out) – Since January 2013 till now.
• Facilities Manager. – 2 Years
• MEP Manager – 3 Years
• Sr. Mechanical Engineer. – 1.5 Years
• Mechanical Engineer. – 7.5 Years
ESSENTIAL CHARACTERISTICS:
• Leading/Managing multidisciplinary / multicultural teams
• Thorough understanding of all Engineering disciplines.
• Liaising with client, consultant, contractor and authorities.
• Ability to work independently as well as managing a team.
• Organized and detail oriented.
• Analytical thinker with the ability to grasp new concepts quickly.
• Capable of working in a dynamic, fast-paced environment.
• Capable of managing a variety of complex project tasks simultaneously.
• Highly adaptable and professional.
• Strong interpersonal skills.
• Have the experience of cost effective operations and maintenance life cycle
programs, additional to efficient planning, programming, budgeting and execution
systems.
• Have the experience of working as Projects management, Consultant, and contractor.
Employer Summary
• Currently Working as Head of Engineering Department since 2 years in Marina
Facilities Management LLC – Abu Dhabi
• Facilities Manager for 2 years in Marina Facilities Management LLC – Abu Dhabi
1/7
2. • Working as MEP Manager in International Project Management Company
(IPM) – Dubai over 3 years.
• Working as a Sr. Mechanical Engineer in Consolidated Contractors Company,
CCC- Dubai for 1.5 Years.
• Worked as a Mechanical Engineer in Dar Al-handasah consultants (Shair &
Partners)-Dubai for 2.5 Years.
• Worked as a Mechanical Engineer in Arab Specialist for Electromechanical
Projects (ASPEC) - Egypt for 4 Years.
• Worked as a Mechanical Engineer in Sanitaire Contractors & Engineers - Egypt
for 1 Year.
Carrier Highlights
MARINA FACILITIES MANAGEMENT IS THE CONTRACTING ARM OF NIC - NATIONAL
INVESTMENT CORPORATION (ABU DHABI, UAE)
HEAD OF ENGINEERING DEPARTMENT / FACILITIES MANAGER, 2010 TO PRESENT.
• Managing all levels of respon
• Handling all tender estimations and new proposals.
• Exposure to Soft Services.
• Managing all the Estimation and tendering procedures.
• Managing and supervising overall technical and contractual progress of the handled
projects; time and cost wise. sibility including profitability, sales, and business
development. Establish long and short range goals and objectives for business
development, growth, revenue, sales and individual employee achievements.
• Managing all kind of Technical and operation procedure pertaining the Hard
Servicing, Fit out and Construction Fields.
• Monitoring and assessing the various design and construction stage
• Reviewing and approving work plans, in order to achieve the most optimum
technical/commercial project approaches.
Projects Names:
• Various fit out and construction and fit out works with the concept of design and built
for Clinics, Offices, and Villas.
• Managing all tenders process technically and Financially for all facilities
management and fit out departments.
• Electromechanical systems and Structure elements rectifications (upgrade of all
BMS, AC, Fire alarm, Lifts, flooring Epoxy paint, structure repair, Ski dooms, water
proof …etc. (Marina Mall)
• Abu Dhabi Marina Mall project (Facilities Management)
• Marina Office Park Villas. (Facilities Management)
• Marina Royal Villas. (Facilities Management)
• Al Jazeera Club (Abu Dhabi – Al Shwamekh – Al Fujaira).(Maintenance)
• ICT (9 Towers, 170 Villas)(Maintenance)
2/7
3. • ADCP buildings
• ADNP buildings
PRIVATE WORKS - APRIL 2010 – AUGUST 2010. (EGYPT)
Preparing all the Mechanical concept design of two hospitals in Egypt (HVAC, Fire
Fighting, Plumbing, Drainage, and Medical gases) for the account of consortium of
contractors, the tender was Design, built and operation of two hospitals in Alexandria
– Egypt.
The scope of work was to arrange a full concept and schematic drawings additional to
all specifications, Both hospitals have operation rooms, Intensive cares rooms,
Morgue, pharmacy, Radiology units, X-ray units, treatment rooms,…etc.
Projects Names:
• SMOUHA MATERNITY UNIVERSITY HOSPITAL (200 Beds, 38000 m2 built up
area)
• MOWASAT MATERNITY UNIVERSITY HOSPITAL (230 Beds, 33400 m2 built
up area)
INTERNATIONAL PROJECT MANAGEMENT (IPM) – DUBAI . FROM MAY 2007- APRIL
2010.
MEP MANAGER
• Managing and supervising overall technical and contractual progress of the handled
projects; time and cost wise.
• Monitoring and assessing the various design and construction stage outputs achieved
by the relevant consultants/contractors, with regards to its overall integrity and
comprehensiveness.
• Reviewing and approving work plans proposed by various consultants/contractors, in
order to achieve the most optimum technical/commercial project approaches.
• Studying and endorsing deliverables of the different project stages contractually,
technically and commercially.
• Handling technical and commercial evaluation process of the various offers from
consultants/contractors in response to newly issued projects; starting from endorsing
the proposal request and ending by the final overall recommendation.
• Leading the value Engineering process in both design and construction stages.
• Managing the variations process with the consultant and contractors.
Projects Handled
HHHR Tower, Sheikh Zayed Road, Dubai
Mixed Use Tower of 317 meters high Total G + Mezz + 70 Floors. Built up Area is
124,800 sqm approx. inclusive of 460 Furnished Apartments, 4,158 sqm of Offices
and 1,600 sqm of Showrooms. The project is served by 2 Car Parking Buildings
offering up to 953 Car Parking Spaces.
Baynounah Media Studio and Offices Fit Out, Business Hub, Abu Dhabi
3/7
4. 5 TV Studios Complex located at the fringes of Abu Dhabi housing a top end Audio
and Visual facilities for one of the upcoming TV Channels. Total Built up Area is
7,813 sqm comprising of Studios, Offices and different Specialized Services.
Burj RAFAL, Riyadh , KSA
Mixed Use Tower consists of: 2B + G + 5 Podium + 14 Kimbiniski Hotel Floors + 5
Service Apartments + 15 Offices Floors + 18 Apartments Floors + 4 Mechanical
floors, All Superstructure levels is 62 levels.
One Zabeel Kempinski Project, Dubai
Mixed Use Tower of: 5B + G + Mezz + 36 Floors. Total Built Up Area is 340,000
sqm approx. inclusive of 370 Key Hotel, 422 Residential Units and 113 Serviced
Apartments, 830,000 sqm offices space and 420,000 sqm retail area. The project is
served by conventional car parking of 1100 spaces and an automated car parking of
1500 spaces.
Conrad Hotel and Offices, Sheikh Zayed Road, Dubai
Mixed Use Tower of: 3B + G + 2 Mezz + 6 Hotel Public Areas + 23 Grade A Offices
+ 19 Hotel Guestrooms Floors. Total Built Up Area is 148,975 sqm and 35,715 sqm
of Automated Car Parking Structure, inclusive of 559 key hotel and 42,014 sqm of
hotel Public Areas in addition to 39,693 sqm of offices.
Marina Arcade, Dubai Marina, Dubai
Residential Building of 2B + G + 64 Floors attached to a luxurious Retail Area. Total
Built Up Area is 137,464sqm inclusive of 360 Luxurious Residential Apartments
served by Fitness Centre and other Leisure Facilities.
Dubai Lifestyle City, Dubai Land, Dubai
Mixed Use Low Rise Development of International Standard Sports Academy, Five
Star Luxury Marriott Hotel and Spa, 4 Star Marriott Sports Hotel, Retail Centre,
Marriott Executive Apartments, Members Sports Club, Luxurious Condominiums
and 68 Luxury Residential Villas. The Development is served by various facilities
like Garden Centre/ Arboretum, Mosque, Golf Driving Range, Putting Greens with a
total capacity of up to 1,805 Car Parking Spaces.
Emirates Industrial Bank (EIB) – Dubai.
Emirates Industrial Bank headquarter is located in Port saeed area, Overlooking Al
Gharhood Main Road, The project consists of 3 Basements and 12 modern stories of
offices to be used by the Bank..
Bahrain Business park Project- Manamah – Bahrain
Bahrain Business Park project is located in the heart of Al Seef area in Manama. The
project consists of 2 identical towers of offices and apartments. Bath towers each
comprise of basements, Ground and 24 floors.
CONSOLIDATED CONTRACTORS COMPANY, CCC-DUBAI (FROM NOV. 2005 –
APRIL.2007)
SR. MECHANICAL ENGINEER.
• Dubai Mall Project- Dubai
Project Value: 5 billions AED, Electromech. Value: 1.4 Billion Dhms
• The world’s largest mall Located in the prestigious sheikh zayed
District.
• 5.9 Million sq ft Gross floor area.
4/7
5. • 3.7 Million sq ft Leasable area (1300 Shops).
• 14000 car parking spaces.
• The biggest indoor aquarium in the Middle East.
- Company Title: Main Contractor.
- Job Responsibilities:
Responsible for a large section of the Dubai mall, supervising the
Engineering, the Co-ordination and the installation with both subcontractors
and consultants of the following activities:
- HVAC, Plumbing, Fire fighting and water supply system at the
mall areas.
- Chilled water, fire fighting, and water supply pump rooms.
- Air Handling Units Rooms.
DAR AL-HANDASAH CONSULTANT (SHAIR AND PARTNERS) –DUBAI (FROM JUNE.
2003 – OCT.2005)
MECHANICAL ENGINEER.
• Burjuman Centre Expansion project – Dubai
Project Value: 1400 Million AED.
The Project consists of:
• 4 Basements (Car Park)
• Ground Level (Car Park + 2 Shops)
• Retail 1 (56 Shops)
• Retail 2 (53 Shops)
• Retail 3 (40 Shops)
• Retail 4&4M
• High Rising luxurious Building #1 (25 Multi Story)
• High Rising luxurious Building #2 (22 Multi Story)
• Office Tower (26 Floors)
• Service Building.
- Company Title: Project Manager and site supervision.
- Job Responsibilities:
The responsibilities were to Participate in the review and comment the submitted
shop drawings and technical materials compared with the design drawings and
specifications, supervise and commented on all mechanical installations and testing
& commissioning of the following activities:
- HVAC, Plumbing, Firefighting and Drainage systems.
ARAB SPECIALIST FOR ELECTROMECHANICAL PROJECTS CO.(ASPEC)-EGYPT
(FROM JULY. 1999 – JUNE.2003)
MECHANICAL ENGINEER.
- Company Title: ElectroMech. Contractor
- Job Responsibilities:
The responsibilities during the duration of joining ASPEC were to do the
tender study, Value Engineering if required, Estimation, Redesign, Producing
shop drawings and co-ordination work with all other trades, preparing
material submittals, and following up the installation of HVAC, Plumbing,
and Fire fighting Relevant to the following projects:
5/7
6. • Four Season Hotel, Cairo at Nile plaza-Egypt
Project Value 500 Million US. $ , Electromech Value 160 Million US$
The Project Consist Of:
• 600 Guest Room
• 50 One Bedroom
• 25 Two Bedroom
• 20 Four Season Suit
• 20 Business Suit
• 20 Royal Suit
• Large Suit
• Full utilities retail
• Different Types of Restaurants.
• Indoor swimming pool.
• Maadi Nile Mall-Egypt
Project Value: 10 Million us$
The Project Consist Of: 75 shops as a tenant area additional to a food
court area.
• Al-rehab shopping center-Egypt
Project Value: 40 Million us$
The Project Consist Of: 150 shops as a tenant area additional to a food
court area and parking spaces
- Studding tenders and producing the value engineering for the following
projects:
• San Stefano complex- Egypt.
• Air Force Medical Center.
• Telecommunication Building Plan (B1, B7, B15 …Etc.).
• Agriculture Credit & Development Bank.
• Sheraton Dream Land.
• Psychiatric health resort (Dr: Ahmed Okasha).
• National Museum of Egyptian Civilization.
• Renaissance hotel (Alexandria).
• Multiple Use Complex Hotel 6th of October City.
SANITAIRE CONTRACTORS & ENGINEERS -EGYPT (FROM FEB. 1998 – JUNE 1999)
MECHANICAL ENGINEER.
- Company Title: ElectroMech. Contractor
- Job Responsibilities:
The responsibilities were to prepare shop drawings and execute the
mechanical activities relevant to the following project:
• Cairo Le Meridian - Egypt
It was a renovation work which needs more coordination that the hotel
was renovated during operational mode.
My responsibilities were to Preparing shop drawings of the tower
(HVAC & fire fighting). Then Participated in the Installation of HVAC
work by replacing an existing work and keeping the entire hotel in
operational mode by installing a bypass at the risers in the floors which
dismantled and installing the new activities.
6/7
7. EDUCATION
B.Sc. in Mech. Power Engineering, 1997, Cairo University Faculty of Engineering-Egypt.
TRAINING
Feb. 2001 - ASHRAE Continuing Education Series.
Attended a course presented through the American Society for Heating, Refrigeration and
Air-Conditioning Engineers (Cairo Chapter) discussing the Fundamentals of Heating
Ventilation and air conditioning System
MEMBERSHIP
Member of the Egyptian Engineers Syndicate.
Having a valid Emirate and Egyptian driving licenses.
COMPUTER SKILLS
Excellent knowledge of AutoCAD software.
Familiar with most of the software related to Mechanical design tools and electronic
equipment selection catalogues.
A very good knowledge of most of the software run under “Windows”, especially those
related to engineering application, such as; (Excel, Power Point, Word, M.S. Project …
etc.).
7/7