INTRODUCTION
The CN Tower in downtown Toronto is
a concrete communications/observation
tower and an iconic symbol of Canada. The
tower was built by Canadian National in
response to the need for uninterrupted
communications broadcasting over the
skyline of buildings constructed during
Toronto’s 1960s boom.
In 1995 it was ranked as one of the
Seven Wonders of the Modern
World by the American Society of
Civil Engineers.
GENERAL INFORMATION
• LOCATION : 301 Front Street West
Toronto, Ontario
• CONSTRUCTION PERIOD : 1973 – 1976
• COST : $63,000,000
• ARCHITECTS : John Andrews, Webb Zerafa, Menkes
Housden
• TYPE : Observation , telecommunications,
attraction , Restaurant
• FLOOR COUNT : 147
QUICK FACTS
• CN TOWER IS TORONTO’S TALLEST LANDMARK
• IT IS A MAJOR TOURIST DESTINATION
QUICK FACTS
• THE GLASS FLOOR EXPERIENCE YOU DARE TO WALK ON
FLOOR
QUICK FACTS
• THE CN TOWER HEIGHT IS 553.33 METERS
• THERE ARE 360 RESTAURANTS IN CN TOWER
QUICK FACTS
• It has two water tanks of more than 56,000 liters each that
recharge automatically.
• It is estimated that the CN Tower weighs 134,193 tonnes
HISTORY
• IN THE '60s MOST THE LOW HEIGHT BUILDINGS WERE CHANGED TO
SKY SCAPERS
• THIS CAUSED SERIOUS COMMUNICATION PROBLEMS
• THE CONSTRUCTION OF CN TOWER HELPED SOLVING THESE
PROBLEMS WITH ITS MICROWAVE RECEPTORS AND ANTENNAS.
• THE PEOPLE OF TORONTO AREA NOW ENJOY
ONE OF THE CLEAREST RECEPTION IN
NORTH AMERICA
LOCATION
The CN Tower is located at 301 Front Street West in the heart of
the Entertainment District, on the north shore of Lake Ontario,
Toronto, Canada.
The Tower is easily accessible from Union Station and the streets
and major roads.
CONCEPT
• In the beginning was planned with the aim of placing an
antenna high enough to permit the transmission and
reception of signals without any interference, especially due
to the tall buildings of Toronto.
• Before completion, the architects added to it a revolving
restaurant and observation deck
CONSTRUCTION
• Concrete is a material that has been used for centuries
and some of the world’s most famous ancient structures,
such as the Pantheon (built 118-128 AD) and the
Coliseum in Rome (70 AD), were made from concrete.
• Known for its strength, versatility, affordability and ability
to withstand natural disasters, such as earthquakes, it is
readily used in the construction of a number of dramatic
structures worldwide including statues, bridges, dams,
buildings and tunnels.
BUILT USING A CLIMBING CONCRETE FRAMEWORK
UNIQUE ELEMENTS
• GLASS FLOOR (64mm THICK)
• LIFT ( 6 GLASS ELEVATORS )
UNIQUE ELEMENTS
• ANTENNA
( The transmitting antenna measures 102 meters and consists
of 44 pieces of steel with 8 tons the heaviest )
CONSTRUCTION MATERIALS
• CONCRETE : 40.532 CUBIC METERS
• POST TENSIONING STEEL : 129 MILES
• STEEL REINFORCEMENT : 5080 TONS
• STRUCTURAL STEEL : 600 TONS
DESIGN AND CONSTRUCTION
• The construction of the tower was an ambitious project that
involved 1,537 workers, employed 24-hours a day for 40
months.
• 56,000 tonnes of earth and shale was removed from the site
for foundation
• The base foundation incorporated 7,000 m3 of concrete, 450
tonnes of rebar and 36 tonnes of steel cable.
• Poured a thick concrete and steel foundation 6.71 m (22 ft)
deep
• The y-shaped foundation contained 7,046 cubic metres (9,200
cubic yards) of concrete, 453.5 metric tonnes (500 tons) of
reinforcing steel and 36.28 metric tonnes (40 tons) of thick,
tensioning cables.
Building the tower inch-by-inch
• The next mission was to build the Tower’s 335m concrete
shaft a hexagonal core with three curved support arms.
• Concrete was poured into a massive mold or “*slipform".
*SLIP FORM
A mould in which a concrete structure of uniform cross section
is cast by filling the mould with liquid concrete and then
continuously moving and refilling it at a sufficiently slow rate for
the emerging part to have partially set.
• As the concrete hardened, the slipform, supported by a ring of
climbing jacks powered by hydraulic pressure, moved
upwards, gradually decreasing in size to produce the Tower's
gracefully tapered contour.
• In order to maintain consistency, all concrete used in the
Tower had to come from the same source
• Workers mixed every ounce of the concrete on site,
continuously testing and re-testing it and then reinforcing it
with a unique system of **post-tensioning.
**Post Tensioning
is a technique for reinforcing concrete. Post-
tensioning tendons, which are prestressing steel
cables inside plastic ducts or sleeves, are
positioned in the forms before the concrete is
placed
Building a seven-storeybuildingat 1,100feet
• After the completion of the shaft they started constructing the
Skypod (a seven-storey building that would eventually house
two observation decks, 36O Revolving Restaurant, Horizons,
the GLASS FLOOR and various technical areas )
• This construction in the sky involved
lifting 318 metric tons of steel and
wood brackets up the sides of the
Tower using 45 hydraulic jacks and
miles of steel cable.
Construction of the
seven storey building
• Creating the two-storey Space Deck, the World's Highest
Public Observation Gallery, involved Cantilevering a concrete
platform around the top edge of the Tower.
• A glass wall was suspended from the overhang of its roof,
banking inwards at the bottom and completely enclosing the
upper storey.
• The next mission was the placing of the Antenna at the top
• This was done with the help of an helicopter Olga
• CN Tower engineers attached two optical plumbs specially
designed to keep tall buildings straight to permanent mounts
on the tower and suspended a 113.4 km steel cylinder from an
aviation cable in the Tower's core.
The construction of CN TOWER
Was completed in the year
1976
PHASES OF CONSTRUCTION
CONSTRUCTING THE BASE , JULY 1973
BRACKETS BEING RAISED ,
AUGUST 1974
MAIN POD CONSTRUCTION , APRIL 1975
HELICOPTER LIFTING PART OF
THE ANTENNA ,
APRIL 1975
NEARING COMPLETION ,
DECEMBER 1975
TWO MONTHS AFTER OPENING ,
AUGUST 1976
FACTS AT A GLANCE
• The CN Tower was built by the Canadian National Railway.
• Opened to the public on June 26, 1976
• Official opening on October 1, 1976
• Original cost: $63 million
• Adjusted cost (1997 dollars): $250 million
• Total construction time: 40 months
• Number of construction workers: 1,537
• Total weight of the Tower: 117,910 metric tonnes (130,000
tons)
• Volume of concrete: 40,523.8 cubic metres (53,000 cubic
yards)
FACTS AT A GLANCE
• Reinforcing steel: 4,535 metric tonnes (5,000 tons)
• Structural steel: 544.2 metric tonnes (600 tons)
• Number of elevators: 6 (including 2 which officially opened
March 20, 1997)
• Speed of elevators: 6 metres/second (20 feet/second)
• Slow speed of elevators (in high winds): 1.5 metres/second (5
feet/second)
• Attendance: about 1.8 million per year
• Total staff (off season): approximately 400
• Total staff (peak season): approximately 550
FACTS AT A GLANCE
• Maximum sway in 190 km/h winds with 320 km/h gusts (120
mph winds with 200 mph gusts):
• Antenna: 6 ft., 8 in. from centre Sky Pod: 3 ft., 4 in. from
centre Tower Sphere: 1 ft., 7 in. from centre
• Windows: Double-pane armourplated
• Thickness of windows: Outer pane - 9.5 mm (3/8 inch), inner
pane - 6.4 mm (1/4 inch)
• Capacity of 360, The Restaurant at the Tower: 400 people
• Time it takes to revolve once: 72 minutes
• Capacity of Horizons Café: 500 people
• Broadcast Facilities: UHF, VHF Television; FM Radio; Microwave
Transmissions; Fixed Mobile Systems
FACTS AT A GLANCE
• Broadcast Facilities: UHF, VHF Television; FM Radio; Microwave
Transmissions; Fixed Mobile Systems
• Companies that broadcast from the Tower:
• CBC Channel 5 & 25, CFMT 47, CFTO 9, City 57, Global/CIII 41,
TV Ontario 19, LOOK Communications (Digital), CHFI/Rogers,
CFNY FM, CHIN FM, CHUM FM, CILQ FM, CJEZ FM, CJRT FM,
CKFM FM, Bell Canada, Cantel, Motorola, TTC
• Thickness of The Glass Floor: 2 1/2 ". Layers, from the top
down:
• 3/16" scuff plate (replaced annually) Two 1/2" layers of clear
tempered glass, laminated together A one inch layer of air (for
insulation) Two 1/4" layers of clear tempered glass, laminated
together Size of each panel: 42" by 50" Load tests are performed
annually on each panel to ensure safety
THANKYOU

More Related Content

What's hot

Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studiesSoumitra Smart
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.Chiranjita Jibhkate
 
Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN Devesh Anand Jha
 
Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )MOHIT PANCHAL
 
steel roof truss
steel roof trusssteel roof truss
steel roof trussRohit Dutta
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and SteelRithika Ravishankar
 
Planning and locating service cores.
Planning and locating service cores.Planning and locating service cores.
Planning and locating service cores.Danish Ryan
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREShivangi Saini
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case studySimi Sayed
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyShivangi Shankar
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshikusha Ahmed
 
Case study on gohar mahal,bhopal
Case study on gohar mahal,bhopalCase study on gohar mahal,bhopal
Case study on gohar mahal,bhopalShivaniAnand15
 

What's hot (20)

Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN
 
Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )
 
steel roof truss
steel roof trusssteel roof truss
steel roof truss
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Planning and locating service cores.
Planning and locating service cores.Planning and locating service cores.
Planning and locating service cores.
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
 
Charles correa
Charles correaCharles correa
Charles correa
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
KOHINOOR SQUARE.pdf
KOHINOOR SQUARE.pdfKOHINOOR SQUARE.pdf
KOHINOOR SQUARE.pdf
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshi
 
Petronas towers
Petronas towersPetronas towers
Petronas towers
 
Case study on gohar mahal,bhopal
Case study on gohar mahal,bhopalCase study on gohar mahal,bhopal
Case study on gohar mahal,bhopal
 
CONSTRUCTION OF DOMES
CONSTRUCTION OF DOMESCONSTRUCTION OF DOMES
CONSTRUCTION OF DOMES
 

Viewers also liked

Classification of buildings
Classification of buildingsClassification of buildings
Classification of buildingsMounika swathi
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed studyMelbin Biju
 
Bundled Tube Structure
Bundled Tube StructureBundled Tube Structure
Bundled Tube StructureErsa Sitompul
 
Design and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generationDesign and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generationAakash Bagchi
 
Willis tower presentation
Willis tower presentationWillis tower presentation
Willis tower presentationnerdrealms
 
002 ADG I: Building Components and Materials
002 ADG I: Building Components and Materials002 ADG I: Building Components and Materials
002 ADG I: Building Components and Materialsindiracad
 
Eiffel tower: An Architectural Presentation
Eiffel tower: An Architectural PresentationEiffel tower: An Architectural Presentation
Eiffel tower: An Architectural Presentationbaburajiv2007
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication towerRohithasangaraju
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)mbrsalman
 

Viewers also liked (20)

CN Tower
CN TowerCN Tower
CN Tower
 
Toronto
TorontoToronto
Toronto
 
Classification of buildings
Classification of buildingsClassification of buildings
Classification of buildings
 
Cn tower-tripathi
Cn tower-tripathiCn tower-tripathi
Cn tower-tripathi
 
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
 
Ximo and ferran
Ximo and ferranXimo and ferran
Ximo and ferran
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed study
 
Bundled Tube Structure
Bundled Tube StructureBundled Tube Structure
Bundled Tube Structure
 
Design and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generationDesign and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generation
 
Willis tower presentation
Willis tower presentationWillis tower presentation
Willis tower presentation
 
Various elements of building
Various elements of buildingVarious elements of building
Various elements of building
 
002 ADG I: Building Components and Materials
002 ADG I: Building Components and Materials002 ADG I: Building Components and Materials
002 ADG I: Building Components and Materials
 
Types of structures
Types of structuresTypes of structures
Types of structures
 
Type of building structures
Type of building structuresType of building structures
Type of building structures
 
Eiffel tower: An Architectural Presentation
Eiffel tower: An Architectural PresentationEiffel tower: An Architectural Presentation
Eiffel tower: An Architectural Presentation
 
PPT OF TRUSSES
PPT OF TRUSSESPPT OF TRUSSES
PPT OF TRUSSES
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication tower
 
Components of a building
Components of a buildingComponents of a building
Components of a building
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
 

Similar to Cn tower.. a detailed study

Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatravaParth Bansal
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towersaman shukla
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid ArchitectsDhanveersinh Chavda
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysisMohammad Ali
 
History(3)
History(3)History(3)
History(3)sugeladi
 
Petronas tower - Malaysia (Theory of Structures)
Petronas tower - Malaysia  (Theory of Structures)Petronas tower - Malaysia  (Theory of Structures)
Petronas tower - Malaysia (Theory of Structures)RADHIKASARDA8
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
HIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxHIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxgoreshsaini2
 

Similar to Cn tower.. a detailed study (20)

Petronas tower
Petronas towerPetronas tower
Petronas tower
 
Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towers
 
Turning torso
Turning torsoTurning torso
Turning torso
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid Architects
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysis
 
Project Taipei 101
Project Taipei 101Project Taipei 101
Project Taipei 101
 
History(3)
History(3)History(3)
History(3)
 
Norman foster
Norman foster Norman foster
Norman foster
 
Norman foster
Norman foster Norman foster
Norman foster
 
Ar. Norman Foster.pptx
Ar. Norman Foster.pptxAr. Norman Foster.pptx
Ar. Norman Foster.pptx
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Petronas tower - Malaysia (Theory of Structures)
Petronas tower - Malaysia  (Theory of Structures)Petronas tower - Malaysia  (Theory of Structures)
Petronas tower - Malaysia (Theory of Structures)
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
 
the millau viaduct
the millau viaductthe millau viaduct
the millau viaduct
 
HIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxHIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptx
 
petronas twin tower
petronas twin towerpetronas twin tower
petronas twin tower
 
Anupreksha Jain
Anupreksha JainAnupreksha Jain
Anupreksha Jain
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 

Cn tower.. a detailed study

  • 1. GROUP 5 • ARUN GEORGE • ATHULYA JOHN PAULS • CARIS SUSAN • MELBIN BIJU • SHAHZAD AHMED
  • 2. CN TOWER THE TALLEST BUILDING IN THE WORLD FROM 1976 TO 2007
  • 3. INTRODUCTION The CN Tower in downtown Toronto is a concrete communications/observation tower and an iconic symbol of Canada. The tower was built by Canadian National in response to the need for uninterrupted communications broadcasting over the skyline of buildings constructed during Toronto’s 1960s boom.
  • 4. In 1995 it was ranked as one of the Seven Wonders of the Modern World by the American Society of Civil Engineers.
  • 5. GENERAL INFORMATION • LOCATION : 301 Front Street West Toronto, Ontario • CONSTRUCTION PERIOD : 1973 – 1976 • COST : $63,000,000 • ARCHITECTS : John Andrews, Webb Zerafa, Menkes Housden • TYPE : Observation , telecommunications, attraction , Restaurant • FLOOR COUNT : 147
  • 6. QUICK FACTS • CN TOWER IS TORONTO’S TALLEST LANDMARK • IT IS A MAJOR TOURIST DESTINATION
  • 7. QUICK FACTS • THE GLASS FLOOR EXPERIENCE YOU DARE TO WALK ON FLOOR
  • 8. QUICK FACTS • THE CN TOWER HEIGHT IS 553.33 METERS • THERE ARE 360 RESTAURANTS IN CN TOWER
  • 9. QUICK FACTS • It has two water tanks of more than 56,000 liters each that recharge automatically. • It is estimated that the CN Tower weighs 134,193 tonnes
  • 10. HISTORY • IN THE '60s MOST THE LOW HEIGHT BUILDINGS WERE CHANGED TO SKY SCAPERS • THIS CAUSED SERIOUS COMMUNICATION PROBLEMS • THE CONSTRUCTION OF CN TOWER HELPED SOLVING THESE PROBLEMS WITH ITS MICROWAVE RECEPTORS AND ANTENNAS. • THE PEOPLE OF TORONTO AREA NOW ENJOY ONE OF THE CLEAREST RECEPTION IN NORTH AMERICA
  • 11. LOCATION The CN Tower is located at 301 Front Street West in the heart of the Entertainment District, on the north shore of Lake Ontario, Toronto, Canada. The Tower is easily accessible from Union Station and the streets and major roads.
  • 12. CONCEPT • In the beginning was planned with the aim of placing an antenna high enough to permit the transmission and reception of signals without any interference, especially due to the tall buildings of Toronto. • Before completion, the architects added to it a revolving restaurant and observation deck
  • 13. CONSTRUCTION • Concrete is a material that has been used for centuries and some of the world’s most famous ancient structures, such as the Pantheon (built 118-128 AD) and the Coliseum in Rome (70 AD), were made from concrete. • Known for its strength, versatility, affordability and ability to withstand natural disasters, such as earthquakes, it is readily used in the construction of a number of dramatic structures worldwide including statues, bridges, dams, buildings and tunnels.
  • 14. BUILT USING A CLIMBING CONCRETE FRAMEWORK
  • 15. UNIQUE ELEMENTS • GLASS FLOOR (64mm THICK) • LIFT ( 6 GLASS ELEVATORS )
  • 16. UNIQUE ELEMENTS • ANTENNA ( The transmitting antenna measures 102 meters and consists of 44 pieces of steel with 8 tons the heaviest )
  • 17. CONSTRUCTION MATERIALS • CONCRETE : 40.532 CUBIC METERS • POST TENSIONING STEEL : 129 MILES • STEEL REINFORCEMENT : 5080 TONS • STRUCTURAL STEEL : 600 TONS
  • 18. DESIGN AND CONSTRUCTION • The construction of the tower was an ambitious project that involved 1,537 workers, employed 24-hours a day for 40 months. • 56,000 tonnes of earth and shale was removed from the site for foundation • The base foundation incorporated 7,000 m3 of concrete, 450 tonnes of rebar and 36 tonnes of steel cable.
  • 19. • Poured a thick concrete and steel foundation 6.71 m (22 ft) deep • The y-shaped foundation contained 7,046 cubic metres (9,200 cubic yards) of concrete, 453.5 metric tonnes (500 tons) of reinforcing steel and 36.28 metric tonnes (40 tons) of thick, tensioning cables.
  • 20. Building the tower inch-by-inch • The next mission was to build the Tower’s 335m concrete shaft a hexagonal core with three curved support arms. • Concrete was poured into a massive mold or “*slipform".
  • 21. *SLIP FORM A mould in which a concrete structure of uniform cross section is cast by filling the mould with liquid concrete and then continuously moving and refilling it at a sufficiently slow rate for the emerging part to have partially set.
  • 22. • As the concrete hardened, the slipform, supported by a ring of climbing jacks powered by hydraulic pressure, moved upwards, gradually decreasing in size to produce the Tower's gracefully tapered contour. • In order to maintain consistency, all concrete used in the Tower had to come from the same source • Workers mixed every ounce of the concrete on site, continuously testing and re-testing it and then reinforcing it with a unique system of **post-tensioning.
  • 23. **Post Tensioning is a technique for reinforcing concrete. Post- tensioning tendons, which are prestressing steel cables inside plastic ducts or sleeves, are positioned in the forms before the concrete is placed
  • 24.
  • 25. Building a seven-storeybuildingat 1,100feet • After the completion of the shaft they started constructing the Skypod (a seven-storey building that would eventually house two observation decks, 36O Revolving Restaurant, Horizons, the GLASS FLOOR and various technical areas ) • This construction in the sky involved lifting 318 metric tons of steel and wood brackets up the sides of the Tower using 45 hydraulic jacks and miles of steel cable.
  • 26. Construction of the seven storey building
  • 27. • Creating the two-storey Space Deck, the World's Highest Public Observation Gallery, involved Cantilevering a concrete platform around the top edge of the Tower. • A glass wall was suspended from the overhang of its roof, banking inwards at the bottom and completely enclosing the upper storey.
  • 28. • The next mission was the placing of the Antenna at the top • This was done with the help of an helicopter Olga
  • 29. • CN Tower engineers attached two optical plumbs specially designed to keep tall buildings straight to permanent mounts on the tower and suspended a 113.4 km steel cylinder from an aviation cable in the Tower's core.
  • 30. The construction of CN TOWER Was completed in the year 1976
  • 31. PHASES OF CONSTRUCTION CONSTRUCTING THE BASE , JULY 1973
  • 32. BRACKETS BEING RAISED , AUGUST 1974
  • 33. MAIN POD CONSTRUCTION , APRIL 1975
  • 34. HELICOPTER LIFTING PART OF THE ANTENNA , APRIL 1975
  • 36. TWO MONTHS AFTER OPENING , AUGUST 1976
  • 37. FACTS AT A GLANCE • The CN Tower was built by the Canadian National Railway. • Opened to the public on June 26, 1976 • Official opening on October 1, 1976 • Original cost: $63 million • Adjusted cost (1997 dollars): $250 million • Total construction time: 40 months • Number of construction workers: 1,537 • Total weight of the Tower: 117,910 metric tonnes (130,000 tons) • Volume of concrete: 40,523.8 cubic metres (53,000 cubic yards)
  • 38. FACTS AT A GLANCE • Reinforcing steel: 4,535 metric tonnes (5,000 tons) • Structural steel: 544.2 metric tonnes (600 tons) • Number of elevators: 6 (including 2 which officially opened March 20, 1997) • Speed of elevators: 6 metres/second (20 feet/second) • Slow speed of elevators (in high winds): 1.5 metres/second (5 feet/second) • Attendance: about 1.8 million per year • Total staff (off season): approximately 400 • Total staff (peak season): approximately 550
  • 39. FACTS AT A GLANCE • Maximum sway in 190 km/h winds with 320 km/h gusts (120 mph winds with 200 mph gusts): • Antenna: 6 ft., 8 in. from centre Sky Pod: 3 ft., 4 in. from centre Tower Sphere: 1 ft., 7 in. from centre • Windows: Double-pane armourplated • Thickness of windows: Outer pane - 9.5 mm (3/8 inch), inner pane - 6.4 mm (1/4 inch) • Capacity of 360, The Restaurant at the Tower: 400 people • Time it takes to revolve once: 72 minutes • Capacity of Horizons Café: 500 people • Broadcast Facilities: UHF, VHF Television; FM Radio; Microwave Transmissions; Fixed Mobile Systems
  • 40. FACTS AT A GLANCE • Broadcast Facilities: UHF, VHF Television; FM Radio; Microwave Transmissions; Fixed Mobile Systems • Companies that broadcast from the Tower: • CBC Channel 5 & 25, CFMT 47, CFTO 9, City 57, Global/CIII 41, TV Ontario 19, LOOK Communications (Digital), CHFI/Rogers, CFNY FM, CHIN FM, CHUM FM, CILQ FM, CJEZ FM, CJRT FM, CKFM FM, Bell Canada, Cantel, Motorola, TTC • Thickness of The Glass Floor: 2 1/2 ". Layers, from the top down: • 3/16" scuff plate (replaced annually) Two 1/2" layers of clear tempered glass, laminated together A one inch layer of air (for insulation) Two 1/4" layers of clear tempered glass, laminated together Size of each panel: 42" by 50" Load tests are performed annually on each panel to ensure safety