KOHINOOR SQUARE
BLOCK ZONING AND
FLOOR PLANS
BLOCK
ZONING
3
BLOCKING
For a high-end shopping mall the first five floors
of the main building are used and the remaining
47 floors are commercial offices and a hotel of
five stars.
BLOCK SEGREGATION INTRODUCTION
The main building is crowned on the top 5
floors by a 5-star hotel
Separate office spaces are provided in every office from the 6th to the 14th floors, and toilets are
provided on all floors. The Central Core at 24 m is surrounded by offices and refuge areas
The architects have thus designed Kohinoor Square, leaving office spaces pillarless , inorder to create
a luxurious aura of space
The first 13 floors of the residential building
is occupied as a parking spaces for both the
buildings and the remaining 19 floors are
residences.
4
FLOOR
PLAN
The floor pattern “stitches” the atrium and tower lobby
together, while geo-metric shapes and diagonal lines direct
you towards destination points. The darker floor color
palette along with the subtle changes in hue, provide a rich
contrast with the wooden wall .
5
FLOOR
PLAN
-
RETAIL
The first five floors of the main building is used for a
high-end shopping mall – RETAIL
6
FLOOR
PLAN
-
RETAIL
7
FLOOR
PLAN
-
RETAIL
The first five floors of the main building is used for a
high-end shopping mall – RETAIL
8
FLOOR
PLAN
-
RETAIL
9
FLOOR
PLAN
-
RETAIL
10
FLOOR
PLAN
-
RETAIL
The first five floors of the main building is used for a
high-end shopping mall – RETAIL
11
COLUMN
GRID
COLUMN GRID :
The Average Centre to Centre Distance
between columns is 9.5m
❑ The Column is 1.8m x 1.8m
❑ Concrete Shear Wall + Frame
Structure
❑ This assembly of columns and beams
forms a rigid frame that amounts to a
dense and strong structural wall along
the exterior of the building.
❑ The structure comprises a concrete
core and post-tensioned concrete slab
and spandrel beams
The tube system concept is based on
the idea that a building can be
designed to resist lateral loads
12
FLOOR
PLAN
-
OFFICE
42 floors of Office Space
13
FLOOR
PLAN
-
OFFICE
42 floors of Office Space
14
FLOOR
PLAN
-
OFFICE
11TH FLOOR
15
REFUGE
Refuge area is a separate space in high-rise buildings,
where residents can take shelter in case of fire or
other emergencies.
16
FLOOR
PLAN
-
OFFICE
11TH TO 24TH TYPICAL FLOOR PLAN
DCR RULE
In case of High-Rise Building more
than 30 m then first refuge floor
shall be provided at 24 m or first
habitable floor whichever is higher.
Thereafter at every seventh
habitable floor.
At 11th floor the first refuge floor is
provided
Area – 4938.1 ft2
17
FLOOR
PLAN
-
OFFICE
25TH FLOOR
18
FLOOR
PLAN
-
OFFICE
26TH – 39TH
FLOOR
19
CIRCULATION
&
CORE
The Central Core is
surrounded by the office
spaces and refuge areas at
24 meter of height
There are segregated
office space from 2nd to
24th floor with toilets to
each office and a common
toilet s also provided on
all these floors.
There are segregated
office space from 6th to 14
floor with toilets
to each office and
common toilets also
provided on all these floor.
20
CIRCULATION
&
CORE
WHY SPECIFIC LIFTS FOR SPECIFIC FLOORS ?
Specific Lifts are allocated to specific floors in
order to reduce time
The Commercial Tower has 47 elevators for
different floors with separate elevator banks ,
minimizing the time required to wait.
This system is called the Compass Navigation
System, which divides circulation between
different lifts, ensuring no longer than 29 seconds
of waiting time.
21
CORE
&
CIRCULATION
NO. OF LOBBY : 4
3 Lobbies with 6 lifts in each
1 lobby with 4 lifts
Lobby with 4 lifts serving 6th to 14th
floor for office facilities
There is a Lift Bank on the 25th Floor
22
CENTRAL
CORE
One Lobby with 6
elevator serving 6th
to 25th floor offices
2 Lobbies with 6 elevators which
serve 25th to 52th floors on the top
floors of building
Specific toilets are used between the
lifts where the lift lobby isn’t provided
& 2 lifts from this pack of 6 are
assessable to lower floors as well
In the Centre, there are 2 staircases
that travel across the building
In the Centre there are 2 lifts ( service elevator ) that travel across the building
23
SERVICE
-
OFFICE
24
SERVICES
-
OFFICE
FLOOR
PLAN
-
RESIDENTIAL
13 stories of parking in below floors.
132 residential units . 8 units on each floor.
At top few floors 4 units on each floor.
6 on 17th floor which is refuge floor
FLOOR
PLAN
-
RESIDENTIAL
3 lifts and 1 service lift
2 Stairs are also placed in the core
FLOOR
PLAN
-
RESIDENTIAL
SERVICES
SERVICES

More Related Content

What's hot

Brigade Gateway Enclave Bangalore
Brigade Gateway Enclave BangaloreBrigade Gateway Enclave Bangalore
Brigade Gateway Enclave BangaloreCommonFloor.com
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case studySimi Sayed
 
High rise building case study
High rise building case study High rise building case study
High rise building case study VISHAKA BOTHRA
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa Sonali Shah
 
case study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhicase study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhiSumit Jha
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbaiRAAJESH SHETH
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City CentreRashmi Gautam
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research DocumentNicholas Socrates
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building ConstructionAsz My
 
Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016MOHAMMED RABIN
 
Forum mall banglore case study
Forum mall banglore case studyForum mall banglore case study
Forum mall banglore case studyVISHAKA BOTHRA
 
Services in high rise
Services in high riseServices in high rise
Services in high riseAstha Agarwal
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic BuildingsDania Abdel-aziz
 

What's hot (20)

Brigade Gateway Enclave Bangalore
Brigade Gateway Enclave BangaloreBrigade Gateway Enclave Bangalore
Brigade Gateway Enclave Bangalore
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
Select city mall
Select city mallSelect city mall
Select city mall
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa
 
case study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhicase study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhi
 
Case study on group housing - Architectural design
Case study on group housing - Architectural designCase study on group housing - Architectural design
Case study on group housing - Architectural design
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbai
 
Desktop study
Desktop studyDesktop study
Desktop study
 
The interlace singapore
The interlace singaporeThe interlace singapore
The interlace singapore
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City Centre
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
 
Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016
 
Forum mall banglore case study
Forum mall banglore case studyForum mall banglore case study
Forum mall banglore case study
 
Services in high rise
Services in high riseServices in high rise
Services in high rise
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
 
Iiit delhi case study
Iiit delhi   case studyIiit delhi   case study
Iiit delhi case study
 

Similar to KOHINOOR SQUARE.pdf

F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsAr. Md Shahroz Alam
 
Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Mayur Waghulde
 
The Quad Business Towers - Brochure
The Quad Business Towers - BrochureThe Quad Business Towers - Brochure
The Quad Business Towers - BrochureGordonCachia
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Arafat Akash
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive researchdenverdieza
 
COMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptxCOMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptxAmreetaPoudel1
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high riseAnamikaAntora
 
theinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptxtheinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptxAlSalahiDiaa
 
Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...
Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...
Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...Aliva Kar
 
report on high riseee
report on high riseeereport on high riseee
report on high riseeeAditya Sanyal
 
Kuala Lumpur Convention Centre
Kuala Lumpur Convention CentreKuala Lumpur Convention Centre
Kuala Lumpur Convention CentreBarsha
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxRaiyyanKhalak
 

Similar to KOHINOOR SQUARE.pdf (20)

F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
 
432 park avenue
432 park avenue432 park avenue
432 park avenue
 
Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Inter Active Corp Building, New york.
Inter Active Corp Building, New york.
 
The Quad Business Towers - Brochure
The Quad Business Towers - BrochureThe Quad Business Towers - Brochure
The Quad Business Towers - Brochure
 
Jin Mao Tower
Jin Mao TowerJin Mao Tower
Jin Mao Tower
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
COMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptxCOMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptx
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high rise
 
galaxy soho
galaxy sohogalaxy soho
galaxy soho
 
Podium
PodiumPodium
Podium
 
theinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptxtheinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptx
 
Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...
Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...
Phoenix Mills Art Guild House Kurla West Mumbai Commercial Office Space Retai...
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
report on high riseee
report on high riseeereport on high riseee
report on high riseee
 
Kuala Lumpur Convention Centre
Kuala Lumpur Convention CentreKuala Lumpur Convention Centre
Kuala Lumpur Convention Centre
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
 
Usman Farooq (Punjab Tianjin University of Technology)
Usman Farooq (Punjab Tianjin University of Technology)Usman Farooq (Punjab Tianjin University of Technology)
Usman Farooq (Punjab Tianjin University of Technology)
 

Recently uploaded

How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 

Recently uploaded (20)

Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 

KOHINOOR SQUARE.pdf

  • 3. 3 BLOCKING For a high-end shopping mall the first five floors of the main building are used and the remaining 47 floors are commercial offices and a hotel of five stars. BLOCK SEGREGATION INTRODUCTION The main building is crowned on the top 5 floors by a 5-star hotel Separate office spaces are provided in every office from the 6th to the 14th floors, and toilets are provided on all floors. The Central Core at 24 m is surrounded by offices and refuge areas The architects have thus designed Kohinoor Square, leaving office spaces pillarless , inorder to create a luxurious aura of space The first 13 floors of the residential building is occupied as a parking spaces for both the buildings and the remaining 19 floors are residences.
  • 4. 4 FLOOR PLAN The floor pattern “stitches” the atrium and tower lobby together, while geo-metric shapes and diagonal lines direct you towards destination points. The darker floor color palette along with the subtle changes in hue, provide a rich contrast with the wooden wall .
  • 5. 5 FLOOR PLAN - RETAIL The first five floors of the main building is used for a high-end shopping mall – RETAIL
  • 7. 7 FLOOR PLAN - RETAIL The first five floors of the main building is used for a high-end shopping mall – RETAIL
  • 10. 10 FLOOR PLAN - RETAIL The first five floors of the main building is used for a high-end shopping mall – RETAIL
  • 11. 11 COLUMN GRID COLUMN GRID : The Average Centre to Centre Distance between columns is 9.5m ❑ The Column is 1.8m x 1.8m ❑ Concrete Shear Wall + Frame Structure ❑ This assembly of columns and beams forms a rigid frame that amounts to a dense and strong structural wall along the exterior of the building. ❑ The structure comprises a concrete core and post-tensioned concrete slab and spandrel beams The tube system concept is based on the idea that a building can be designed to resist lateral loads
  • 15. 15 REFUGE Refuge area is a separate space in high-rise buildings, where residents can take shelter in case of fire or other emergencies.
  • 16. 16 FLOOR PLAN - OFFICE 11TH TO 24TH TYPICAL FLOOR PLAN DCR RULE In case of High-Rise Building more than 30 m then first refuge floor shall be provided at 24 m or first habitable floor whichever is higher. Thereafter at every seventh habitable floor. At 11th floor the first refuge floor is provided Area – 4938.1 ft2
  • 19. 19 CIRCULATION & CORE The Central Core is surrounded by the office spaces and refuge areas at 24 meter of height There are segregated office space from 2nd to 24th floor with toilets to each office and a common toilet s also provided on all these floors. There are segregated office space from 6th to 14 floor with toilets to each office and common toilets also provided on all these floor.
  • 20. 20 CIRCULATION & CORE WHY SPECIFIC LIFTS FOR SPECIFIC FLOORS ? Specific Lifts are allocated to specific floors in order to reduce time The Commercial Tower has 47 elevators for different floors with separate elevator banks , minimizing the time required to wait. This system is called the Compass Navigation System, which divides circulation between different lifts, ensuring no longer than 29 seconds of waiting time.
  • 21. 21 CORE & CIRCULATION NO. OF LOBBY : 4 3 Lobbies with 6 lifts in each 1 lobby with 4 lifts Lobby with 4 lifts serving 6th to 14th floor for office facilities There is a Lift Bank on the 25th Floor
  • 22. 22 CENTRAL CORE One Lobby with 6 elevator serving 6th to 25th floor offices 2 Lobbies with 6 elevators which serve 25th to 52th floors on the top floors of building Specific toilets are used between the lifts where the lift lobby isn’t provided & 2 lifts from this pack of 6 are assessable to lower floors as well In the Centre, there are 2 staircases that travel across the building In the Centre there are 2 lifts ( service elevator ) that travel across the building
  • 25. FLOOR PLAN - RESIDENTIAL 13 stories of parking in below floors. 132 residential units . 8 units on each floor. At top few floors 4 units on each floor. 6 on 17th floor which is refuge floor
  • 26. FLOOR PLAN - RESIDENTIAL 3 lifts and 1 service lift 2 Stairs are also placed in the core