2. INTRODUCTION
• The Petronas twin tower were
designed by American architect
Cesar Peli
• Petronas twin tower are twin sky
scraper in Kuala Lumpur Malaysia
• They are the tallest twin building
in the world
3. CASE STUDY
• Height of the tower : 452m
(1482.6 ft)
• Number of floors : 88
(occupiable)
• Height of pinnacle : 241 ft
• Typical floor to floor height : 13
ft 2 inches
• Finished ceiling height : 8 ft 8
inches
4. CONCET
• The tower describes ancients
motifs of Muslim art, conformity
to the Malaysia Muslim heritage
combined with innovative
technology.
• Therefore the looks were
impressing by characteristics of
Muslim design like respective
geometries
5. SOIL AND
FOUNDATION
• Irregular bedrock at a lower
place. Perimeter diaphragm walls
2’6” thick
• 2 raft foundation. 15’ thick
containing 13000 humor of
concrete.
• 300,000 metric load of each
tower cover concrete slab or mat
anchored to soil , not bed rock
• The tower rest on RCC
foundation mat poured over
piles.
6. INTERIOR
• Designs and patterns of the
doorway halls vestibules
replicate traditional handicrafts
and weaving.
• Wall panels and screens
impressing by hardwood carving
from the east coast of terra firma
Malaya.
• Also the floor designs square
measures supported byzantine
patterns of pandan weaving and
palm wall matting.
7. EXTERIOR
• Each tower is about back 5 times
in its ascent to keep up the
vertical axis and tapering of the
look.
• The walls of the top floors are
slanting inward to taper and
meet the pinnacle.
8. THE CENTRE
CORE
• Its central core in every tower
accommodates – lifts, exit, stairs,
mechanical services.
• Extremely bolstered thick corner
walls resist wind.
• The outer walls thickness 750 to
350 millimeter.
• Also inner walls constant 350
mm.
9. PINNACLE OF THE
TOWERS
• Every tower topped by 73m
tapering top.
• Accommodates building
maintenance machine, aviation
lighting and lightning protection.
• Concrete construction
impractical.
• Steel used through out.
10. SKYBRIDGE AT
PETRONAS
TOWER
• The bridge is 170m higher than
the bottom and 58.4m long
deliberation 750 tons.
• Two hinge arch springing from
supports a try of parallel two
span continuous bridge grinders
at level 41.
• The two hinge arch supporting
the bridge has motion pins at the
top of every leg or spring
purpose and at the highest of the
arch supporting the bridge.
11. ACTIVITIES IN
PETRONAS
TOWERS
• TOWER 1 : Petronas head
quarters offices
• TOWER 2 : Mostly private
tenants, local and international
private tenants, mall holdings,
some vacant areas for rent
petroleum research center, 4
story basement parking etc.