Manufacturing > Communication > Transportation and Power > Construction > Industrial Design
MAIN PAGE

LEARNING
OUTCOMES

STRUCTURE
CONSTRUCTIONPREPARATION
INTRODUCTION
SITE
EARTHWORK

SUPERSTURCTURE
CONSTRUCTION

FOUNDATION
CONSTRUCTION

STRUCTURE COVERING

Click here to
continue
LEARNING OUTCOMES :

Students should be able to:
 List the procedures to construct structure
 List earthwork activities.
 Describe earthwork processes.
 Explain the purpose of using foundation.
 List the types of foundation.
 Describe the types of foundation.
 Plan a flowchart on the process of construction
structure.
 List superstructure construction and method
available.
 List structure covering methods.
 Describe structure covering methods
INTRODUCTION
Structure construction works
are performed by the contractor
and supervised by the project
manager. In structure construction
stage, various type of work are
involved and facilitated by various
construction machineries.
SITE PREPARATION
•

ACQUIRING PERMIT AND PERMISSION

Application for acquiring permission to
construct building is normally dependent
on local regulation enforced by the local
authority. Application for acquiring
permission should be enclosed with the
drawing, specification, site plan, primary
stakeholders and land ownership letter
of the project.
SITE PREPARATION
•CONSTRUCTION SITE CLEARING
a) Cutting and uprooting tree
that obstructing construction
work
Trees on the construction
site which obstruct
construction works need to
be chopped or uprooted to
the dumping area

b) Demolishing old
structures
Structures that are not
required at the
construction site should
be demolished
Cutting and uprooting tree that obstructing construction work
Demolishing old
structures
SITE PREPARATION
•DETERMINING STRUCTURE LOCATION
Pickets and stakes were used in
setting out process to determined
structure or building location.
Accuracy in setting out process helps
to determine the location, shape and
size of building according to the
drawing of the building plan. There
are two methods to determine
structure location;
• Site line method
• Center line method
SITE LINE METHOD
A

A
d

c

e
f

4

a

3

g

b
B

A

a’

b’
SITE LINE METHOD
Steps :
1. Construct AB line as a site line. Border line can
be used as site line too. Site line should be
drawn clearly because it is used as a reference
line when other sign are missing.
2. Measure and mark point a’ and point b’ on the
site line according to building size.
3. Point a and b should be a building line parallel
with the site line.
4. Mark point d where ad line is perpendicular to
line ab. To get a perpendicular angle, pythagoras
4
method is used.
3
CENTRE LINE METHOD
B

d

c

y

e

z

g

A

b
CENTRE LINE METHOD
STEPS:
1. Construct line AB as a centre line. Generally, it is located in
the middle of a building. This centre line should be drawn
clearly because it is used as reference line.
2. Measure and mark point a and point b by taking into account
the distance from line AB. Line AB is perpendicular to line
ab. The method used to accquire perpendicular angle is
similar to the site line method.
3. Measure and mark point c and point d by considering the
distance from line AB. Line cd is perpendicular to line AB.
4. Measure and mark point e on line bc
5. Measure and mark point g on line ab
6. Measure and mark point f on line AB
7. For testing the accuracy of setting out work, measure the
distance of ac and bd. If ac=bd, therefore all angles in abcd
is accurate.
SITE PREPARATION

•CONSTRUCTION SITE ARRANGEMENT
After the location of the construction structure has
been marked, temporary building and facilities has
Construction site should have temporary access road to
to be identified.
ease workers movement and transport construction
Access Road
material

Site Office

Used as a place to manage the operation of all
construction works. Normally near to the main entrance

Accomodation

Needs to be constructed for workers

Utilities(electric,

It is essential in construction area. Eg; electricity is the
source of energy used to operate machines and
construction equipment.

water telephone)

Safety

Safety of workers, construction materials and equipment
is very important. Stores should be built in order to keep
materials and equipment
SITE PREPARATION

An example of structure
arrangement and temporary
facilities on construction site
EARTHWORK
ACTIVITY
Earth loosing

Cutting

Earth filling

Earthwork
activities
DESCRIPTION
Before any excavation activities, soils which
consist of sedimentation rock layer should be
loosen. Bulldozer is used to execute soil. If there
are huge rocks that cant be moved, explosive
substance will be used.
For higher or elevated area it should be
excavated to the required formation level. Soil is
also excavated in constructing system drainage
and building site foundation
Filling is necessary for areas lower than the
construction level required. Filled soil should be
compacted
EARTHWORK
ACTIVITY
Earth
consolidating

Earthwork
activities
DESCRIPTION

There are types of soil which is soft and easy to
settle such as peat soil. This type of soil should be
excavated and changed with high compacted soil.
Filled area should be compacted with appropriate
roller machines for earth consolidating
Earth dumping Excessive soil from construction area should be
moved to other places. Scrapers and lorries are
used to moved soil.
Clearing
Clearing soil work is executed after all filling works
such as foot foundation and site building have
been completed.
Excess soils should be cleared and dumped to
other location.
Example Of Cut And Fill Work

Cutting soil from high ground will be used to fill
low ground level
FOUNDATION CONSTRUCTION
A building foundation is the lowest level of the
building and known as substructure. Its function
to sustain the entire building load and transfer it
to the lower layer of ground. There are various
types and shapes of foundation which are used in
building construction. Selection criteria of
foundation types are dependent on;
•Type of soil
•Building load
•Design
•Cost
•technology
FOUNDATION CONSTRUCTION
There are four types of foundation

i. Pad foundation

ii. Strip foundation

iii. Slab/ Raft foundation

iv. Pile foundation
FOUNDATION CONSTRUCTION
Pad foundation
•Used to support small and light load.

(Eg; house or

single storey building)

•Appropriate type of soil is the hard soil which
has high bearing capacity
•Constructed in rectangular shape beneath each
stump which support loads
•The thickness and area is dependent upon
imposed loads and its bearing capacity
•The depth is normally up to one meter below
ground level.
•Common proportion of concrete mix used is 1:2:4
•Reinforcement steel bars are used to increase
FOUNDATION CONSTRUCTION
Strip foundation
•Used to support small and light loads
•Width and thickness depend upon the imposed building load
and its bearing capacity
•There are two types of Strip foundation;

i. Wide strip foundation

ii. Deep strip foundation
FOUNDATION CONSTRUCTION
Slab/ Raft foundation
•Suitable for building which is constructed on soils that have
low bearing capacity. (eg; soft soil, high shrinkage soil,
formerly filled swamp soil)
•Its purpose is to prevent from uneven settlement which may
cause cracking to building
•Constructed from reinforced concrete according to surface
area of building floor or until it covers the sidewalk area
•The thickness is normally between 200mm to 300mm.
•The bottom part imposed to walls and columns load is made
thicker
FOUNDATION CONSTRUCTION
Pile foundation
•Suitable or a big and high rise building also used in building
bridges.
•Depth of pile depends on the imposed load
•It can prevent deep excavation, which reduces the cost of
excavation and concrete pouring
•Normally used with other foundation type.
•There are two types of techniques which is;
i. Friction method
ii. End-bearing method
Chapter 10  structure construction

More Related Content

What's hot

workability test of concrete
workability test of concreteworkability test of concrete
workability test of concrete
Karan Patel
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
neharajpl
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
KHUSHBU SHAH
 
Valuation
ValuationValuation
Valuation
gayu pandian
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
guasiya
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18
SANJEEV Wazir
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
GAURAV. H .TANDON
 
Levelling
LevellingLevelling
Levelling
Arissa Loh
 
Topic 3 mass haul diagram
Topic 3   mass haul diagramTopic 3   mass haul diagram
Topic 3 mass haul diagram
kmasz kamal
 
rate analysis
rate analysisrate analysis
rate analysis
Ganesh Tatikonda
 
Foundations
FoundationsFoundations
Foundations
Aglaia Connect
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge construction
Madujith Sagara
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
Noorhazlinda Rahman
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
Vilas Nikam
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Aabid Ansar
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
KHUSHBU SHAH
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
gayu pandian
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
Riezat Zainal
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionDon W. Lewis
 
Chapter 4 earth work and quantities new
Chapter 4 earth work and quantities newChapter 4 earth work and quantities new
Chapter 4 earth work and quantities new
BashaFayissa1
 

What's hot (20)

workability test of concrete
workability test of concreteworkability test of concrete
workability test of concrete
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Valuation
ValuationValuation
Valuation
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Levelling
LevellingLevelling
Levelling
 
Topic 3 mass haul diagram
Topic 3   mass haul diagramTopic 3   mass haul diagram
Topic 3 mass haul diagram
 
rate analysis
rate analysisrate analysis
rate analysis
 
Foundations
FoundationsFoundations
Foundations
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge construction
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
 
Chapter 4 earth work and quantities new
Chapter 4 earth work and quantities newChapter 4 earth work and quantities new
Chapter 4 earth work and quantities new
 

Similar to Chapter 10 structure construction

muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
EmHetchMaidabino
 
site report
site reportsite report
site report
dhirazain
 
Site report
Site reportSite report
Site report
HuiYik
 
Summer training project by surendra
Summer training project by surendraSummer training project by surendra
Summer training project by surendra
Surendra Sah
 
Construction site
Construction siteConstruction site
Construction site
Timun Loh
 
Summer training report
Summer training reportSummer training report
Summer training report
aki8872233
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 
Ez
EzEz
Introduction to machine maintinance and installation
Introduction to machine maintinance and installationIntroduction to machine maintinance and installation
Introduction to machine maintinance and installation
technovic
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering institute
SrikanthReddy345872
 
Site visit report
Site visit reportSite visit report
Site visit report
Wen Crystal
 
Internship PPT 2022.pptx
Internship PPT 2022.pptxInternship PPT 2022.pptx
Internship PPT 2022.pptx
HarshKumarEname
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdf
Ranadita
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
Bolin Loong
 
CONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKSCONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKS
JhunelIvanGoyena
 

Similar to Chapter 10 structure construction (20)

muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
 
site report
site reportsite report
site report
 
Site report
Site reportSite report
Site report
 
Summer training project by surendra
Summer training project by surendraSummer training project by surendra
Summer training project by surendra
 
Construction site
Construction siteConstruction site
Construction site
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Final Report
Final Report Final Report
Final Report
 
Ez
EzEz
Ez
 
Introduction to machine maintinance and installation
Introduction to machine maintinance and installationIntroduction to machine maintinance and installation
Introduction to machine maintinance and installation
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering institute
 
Shib
ShibShib
Shib
 
Site report 1
Site report 1Site report 1
Site report 1
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Internship PPT 2022.pptx
Internship PPT 2022.pptxInternship PPT 2022.pptx
Internship PPT 2022.pptx
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdf
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
CONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKSCONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKS
 

Recently uploaded

Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 

Recently uploaded (20)

Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 

Chapter 10 structure construction

  • 2. ENGINEERING TECHNOLOGY Manufacturing > Communication > Transportation and Power > Construction > Industrial Design MAIN PAGE LEARNING OUTCOMES STRUCTURE CONSTRUCTIONPREPARATION INTRODUCTION SITE EARTHWORK SUPERSTURCTURE CONSTRUCTION FOUNDATION CONSTRUCTION STRUCTURE COVERING Click here to continue
  • 3. LEARNING OUTCOMES : Students should be able to:  List the procedures to construct structure  List earthwork activities.  Describe earthwork processes.  Explain the purpose of using foundation.  List the types of foundation.  Describe the types of foundation.  Plan a flowchart on the process of construction structure.  List superstructure construction and method available.  List structure covering methods.  Describe structure covering methods
  • 4. INTRODUCTION Structure construction works are performed by the contractor and supervised by the project manager. In structure construction stage, various type of work are involved and facilitated by various construction machineries.
  • 5. SITE PREPARATION • ACQUIRING PERMIT AND PERMISSION Application for acquiring permission to construct building is normally dependent on local regulation enforced by the local authority. Application for acquiring permission should be enclosed with the drawing, specification, site plan, primary stakeholders and land ownership letter of the project.
  • 6. SITE PREPARATION •CONSTRUCTION SITE CLEARING a) Cutting and uprooting tree that obstructing construction work Trees on the construction site which obstruct construction works need to be chopped or uprooted to the dumping area b) Demolishing old structures Structures that are not required at the construction site should be demolished
  • 7. Cutting and uprooting tree that obstructing construction work
  • 9. SITE PREPARATION •DETERMINING STRUCTURE LOCATION Pickets and stakes were used in setting out process to determined structure or building location. Accuracy in setting out process helps to determine the location, shape and size of building according to the drawing of the building plan. There are two methods to determine structure location; • Site line method • Center line method
  • 11. SITE LINE METHOD Steps : 1. Construct AB line as a site line. Border line can be used as site line too. Site line should be drawn clearly because it is used as a reference line when other sign are missing. 2. Measure and mark point a’ and point b’ on the site line according to building size. 3. Point a and b should be a building line parallel with the site line. 4. Mark point d where ad line is perpendicular to line ab. To get a perpendicular angle, pythagoras 4 method is used. 3
  • 13. CENTRE LINE METHOD STEPS: 1. Construct line AB as a centre line. Generally, it is located in the middle of a building. This centre line should be drawn clearly because it is used as reference line. 2. Measure and mark point a and point b by taking into account the distance from line AB. Line AB is perpendicular to line ab. The method used to accquire perpendicular angle is similar to the site line method. 3. Measure and mark point c and point d by considering the distance from line AB. Line cd is perpendicular to line AB. 4. Measure and mark point e on line bc 5. Measure and mark point g on line ab 6. Measure and mark point f on line AB 7. For testing the accuracy of setting out work, measure the distance of ac and bd. If ac=bd, therefore all angles in abcd is accurate.
  • 14. SITE PREPARATION •CONSTRUCTION SITE ARRANGEMENT After the location of the construction structure has been marked, temporary building and facilities has Construction site should have temporary access road to to be identified. ease workers movement and transport construction Access Road material Site Office Used as a place to manage the operation of all construction works. Normally near to the main entrance Accomodation Needs to be constructed for workers Utilities(electric, It is essential in construction area. Eg; electricity is the source of energy used to operate machines and construction equipment. water telephone) Safety Safety of workers, construction materials and equipment is very important. Stores should be built in order to keep materials and equipment
  • 15. SITE PREPARATION An example of structure arrangement and temporary facilities on construction site
  • 16. EARTHWORK ACTIVITY Earth loosing Cutting Earth filling Earthwork activities DESCRIPTION Before any excavation activities, soils which consist of sedimentation rock layer should be loosen. Bulldozer is used to execute soil. If there are huge rocks that cant be moved, explosive substance will be used. For higher or elevated area it should be excavated to the required formation level. Soil is also excavated in constructing system drainage and building site foundation Filling is necessary for areas lower than the construction level required. Filled soil should be compacted
  • 17. EARTHWORK ACTIVITY Earth consolidating Earthwork activities DESCRIPTION There are types of soil which is soft and easy to settle such as peat soil. This type of soil should be excavated and changed with high compacted soil. Filled area should be compacted with appropriate roller machines for earth consolidating Earth dumping Excessive soil from construction area should be moved to other places. Scrapers and lorries are used to moved soil. Clearing Clearing soil work is executed after all filling works such as foot foundation and site building have been completed. Excess soils should be cleared and dumped to other location.
  • 18. Example Of Cut And Fill Work Cutting soil from high ground will be used to fill low ground level
  • 19. FOUNDATION CONSTRUCTION A building foundation is the lowest level of the building and known as substructure. Its function to sustain the entire building load and transfer it to the lower layer of ground. There are various types and shapes of foundation which are used in building construction. Selection criteria of foundation types are dependent on; •Type of soil •Building load •Design •Cost •technology
  • 20. FOUNDATION CONSTRUCTION There are four types of foundation i. Pad foundation ii. Strip foundation iii. Slab/ Raft foundation iv. Pile foundation
  • 21. FOUNDATION CONSTRUCTION Pad foundation •Used to support small and light load. (Eg; house or single storey building) •Appropriate type of soil is the hard soil which has high bearing capacity •Constructed in rectangular shape beneath each stump which support loads •The thickness and area is dependent upon imposed loads and its bearing capacity •The depth is normally up to one meter below ground level. •Common proportion of concrete mix used is 1:2:4 •Reinforcement steel bars are used to increase
  • 22. FOUNDATION CONSTRUCTION Strip foundation •Used to support small and light loads •Width and thickness depend upon the imposed building load and its bearing capacity •There are two types of Strip foundation; i. Wide strip foundation ii. Deep strip foundation
  • 23. FOUNDATION CONSTRUCTION Slab/ Raft foundation •Suitable for building which is constructed on soils that have low bearing capacity. (eg; soft soil, high shrinkage soil, formerly filled swamp soil) •Its purpose is to prevent from uneven settlement which may cause cracking to building •Constructed from reinforced concrete according to surface area of building floor or until it covers the sidewalk area •The thickness is normally between 200mm to 300mm. •The bottom part imposed to walls and columns load is made thicker
  • 24. FOUNDATION CONSTRUCTION Pile foundation •Suitable or a big and high rise building also used in building bridges. •Depth of pile depends on the imposed load •It can prevent deep excavation, which reduces the cost of excavation and concrete pouring •Normally used with other foundation type. •There are two types of techniques which is; i. Friction method ii. End-bearing method