About Company
 NAME OF THE ORGANIZATION: C.P.FOUNDRY WORKS
 PLANT ADDRESS: P.O.UPPALWADI INDUSTRIALESTATE , KAMPTEE
ROAD, NEAR PILI NADI, NAGPUR.
 E-MAILADDRESS: foundry_ngp@bsnl.in & foundry_ngp@yahoo.com
 CONTACT PERSON: MAQSOOD ALAM
 YEAR OF ESTABLISHMENT: 1942
 Major customers :
1. Mahindra & Mahindra Ltd.
2. Johnson Lifts
MAHINDRA &
MAHINDRA
JOHNSON LIFTS
Company Products
CI ROLLING MILL COUPLINGS CI ROLLING MILL STAND CI GRATE STEEL ROLLING MILL PARTS
CI SANITARY GRATE CI METRIC WEIGHT CI MANHOLE COVER CI TILES
CI FLYWHEEL
Main Processes
o MELTING
o MOULD MAKING
o CORE MAKING
o POURING
o FOUNDRY SAND SYSTEM
o CLEANING AND FINISHING
5 S Zone Wise Layout
ZONE 1 OFFICE
ZONE 2
PRODUCTION AND
PATTERN
ZONE 3 MELTING
ZONE 4 LAB
ZONE 5
STORE AND
OUTSIDE AREA
ZONE 6 INDUCTION
ZONE 7 DISPATCH
Kaizen
 From the Japanese words “kai-” which means “change”
and “-zen” which means “good.”
 Kaizen is defined as a continuous effort by each and
every employee (from the CEO to field staff) to ensure
improvement of all processes and systems of a particular
organization.
 Kaizen process aims at continuous improvement of
processes not only in manufacturing sector but all other
departments as well.
5S
 5S represents Japanese words that describe the steps of a
workplace organization process.
 Seiri - (Sort)
 Seiton - (Straighten, Set)
 Seiso - (Shine, Sweep)
 Seiketsu - (Standardize)
 Shitsuke - (Sustain)
 The five S methodology helps a workplace remove items that
are no longer needed (sort).
 Organize the items to optimize efficiency and flow
(straighten).
 Clean the area in order to more easily identify problems
(shine)
 Implement color coding and labels to stay consistent with
other areas (standardize) and
 Develop behaviors that keep the workplace organized over the
long term (sustain).
 It can also referred as 7S adding Safety and Spirit to it.
5S
Red Tag Summary
Zone No.
Zone
Name
1st 2nd
3rd
4th
Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign
5/7/2018 22/10/2018
Red tag
Found
Red Tag
Clear
Pending
Red Tag
Red tag
Found
Red Tag
Clear
Pending
Red Tag
Red tag
Found
Red Tag
Clear
Pending
Red Tag
Total Red
tag Found
Total Red
Tag Clear
Total
Pending
Red Tag
1 OFFICE 3 2 1
2
PRODUCTIO
N
14 8 6 3 3
3 MELTING 2 0 2 2 2
4 LAB 1 1 0
5
STORE AND
GREEN
AREA
8 0 8
6
INDUCTION
PLANT
2 2 0
7
DELIVERY/D
ISPATCH
0
8
9
Total 30 13 17 5 0 5
Red Tag Summary
0
2
4
6
8
10
12
14
16 Total RED TAG Captured – 35
Total Red Tag Cleared – 13
% Clearance – 37.14
Worst Point Photograph Zone No.2
Improvement: - SPACE UTILIZED
Shop: PATTERN ROOM Item: PATTERN
23.02.2018 11.11.2018
Before:- UNEVEN PATTERNS PLACED After:- ARRANGE PATTERN
Worst Point Photograph Zone No.6
Improvement: - AREA SPECIFIED
Shop: INDUCTION FURNACE Item: AREA NAME BOARD DISPLAYED
03.11.2019 03.11.2019
Before:- AREA NOT SPECIFIED After:-AREA SPECIFIED
Worst Point Photograph Zone No.5
Improvement: - MATERIAL STACKING
Shop: OUTSIDE AREA Item: FOOTSTEP , SURFACE BOXES
16/06/19 24/07/19
Before:- CASTINGS NOT ARRANGE
PROPERLY
After:- PAINTING AND STACKING OF
CASTINGS
Worst Point Photograph Zone No.6
Improvement: - CLEAN AREA
Shop: INDUCTION FURNACE Item: RACKS
31/01/2019 21/07/2019
Before:- Unwanted & wanted material kept in
mixed condition
After:-Unwanted material disposed off &
wanted material kept properly. Spaced saved
10.61sq.m.
Sort & Set Activity done in Store
• Analysis of current situation
• Getting list of materials from Production Lines
• SDQ From Buyers (Concerned Person From Company)
• Physical verification of material (with store to production
line)
• Temporary location with coloured chalk or removable
stickers
• Labelling of Every Required items with Proper location
Old Store Photographs
New Store Photographs
New Rack Arrangement Sorting of Tools
CONTINUOUS
IMPROVEMENTS
Kaizen 1
Company: C.P. FOUNDRY
WORKS
Dept : LAB Result : FIRE EXTINGUSHER Month : 5 MAR 2019
Subject : SPACE UTILIZATION Process : SAFETY
Before Improvement
( Photo or Explanation drawing)
After Improvement
( Photo or Explanation drawing)
1. Manpower, Man hour
Saving
2. Physical Distribution
(Transporting distance)
3. Space Saving
4. Commanisation,
Unification
5. Weight Reduction
6. Energy Saving
7. Yield
8. Quality Improvement
9. 5s Yes
10. Cost Reduction.
11. Safety Yes
12. Horizontal Application
13. Productivity improved
Earlier : NO FIRE EXTINGUSHER Now : SPACE IS UTILIZED FOR FIRE
EXTINGUSHER
Cost Saving per year
Date of Implementation 26
TH
JULY 2018
Benefits :
 SPACE UTILIZED.
 SAFETY IMPROVED.
Suggested by MR. TAHIR
SIR
Approved by MR. TAHIR SIR
Kaizen 2
Company: C.P. FOUNDRY
WORKS
Dept : OFFICE Result : WORKPLACE 5S & SAFETY IMPROVED Month : 23
RD
FEB 2018
Subject : PROPER ARRANGEMENT OF WIRES ,
CABLES & COMPUTER EQUIPMENTS
Process : SYSTEMATIC ARRANGEMENTS OF WIRES ,
CABLES & COMPUTER EQUIPMENTS
Before Improvement
( Photo or Explanation drawing)
After Improvement
( Photo or Explanation drawing)
1. Manpower, Man hour
Saving
2. Physical Distribution
(Transporting distance)
3. Space Saving
4. Commanisation,
Unification
5. Weight Reduction
6. Energy Saving
7. Yield
8. Quality Improvement
9. 5s Yes
10. Cost Reduction.
11. Safety Yes
12. Horizontal Application
13. Productivity improved
Earlier : WIRES , CABLES & COMPUTER
EQUIPMENTS ARE TANGLLED &
UNSAFE FOR USE
Now : WIRES , CABLES & COMPUTER
EQUIPMENTS ARE ARRANGED
SYSTEMATICALLY
Cost Saving per year
Date of Implementation 26
TH
JULY 2018
Benefits :
 SAFETY IMPROVED.
 HOUSEKEEPING & 5S IMPROVED.
Suggested by MR. JOSHI SIR
Approved by MR. TAHER SIR
Kaizen 3
Company: C.P. FOUNDRY
WORKS
Dept : moulding
area
Result : 5S IMPROVED Month : 24 FEB 2019
Subject : SPACE SAVED Process : DISPOSED OF UNWANTED MATERIAL
Before Improvement
( Photo or Explanation drawing)
After Improvement
( Photo or Explanation drawing)
1. Manpower, Man hour
Saving
2. Physical Distribution
(Transporting distance)
3. Space Saving YES
4. Commanisation,
Unification
5. Weight Reduction
6. Energy Saving
7. Yield
8. Quality Improvement
9. 5s Yes
10. Cost Reduction.
11. Safety
12. Horizontal Application
13. Productivity improved
Earlier : MOLDING BOXES AND WOODEN
MATERIAL LYING ON AREA
Now : DISPOSED OFF MATERIAL AND CLAEA
N AREA
5.54 SQ.M. SPACE SAVED
Cost Saving per year
Date of Implementation 24
TH
FEB 2019
Benefits :
 SPACE SAVED. (5.54 SQ.M.)
 HOUSEKEEPING IMPROVED.
Suggested by MR.
MAQSOOD SIR
Approved by MR. TAHER SIR
Thank You

More Related Content

What's hot

Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case study
Inu shakya
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
ChetanMehta39
 
The Role of Environmental Impact in Building Material’s Selection
The Role of Environmental Impact in Building Material’s SelectionThe Role of Environmental Impact in Building Material’s Selection
The Role of Environmental Impact in Building Material’s Selection
Hafedh Yahya
 
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
krishnaheda
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
Zakir Husain
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
Anand Subramaniam
 
Office 5S implementation workshop
Office 5S implementation workshopOffice 5S implementation workshop
Office 5S implementation workshop
Improvement Skills Consulting Ltd.
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
sudarshan jadwal
 
Mistake proofing for web
Mistake proofing for webMistake proofing for web
Mistake proofing for webvedzen1234
 
How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...
Iskcon Ahmedabad
 
5S Facilitator Guide
5S  Facilitator Guide5S  Facilitator Guide
5S Facilitator GuideRhonda Kovera
 
5-S Technique
5-S Technique5-S Technique
5-S Technique
Engr. Abdun Noor
 
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
Raymond O'Reilly
 
OEE
OEEOEE
01 shop floor best practices
01 shop floor best practices01 shop floor best practices
01 shop floor best practices
Dr. Chandan Vichoray
 
5S Implementation - Case Study
5S Implementation - Case Study5S Implementation - Case Study
5S Implementation - Case Study
Abhishek Raj
 

What's hot (20)

Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case study
 
5s ppt
5s ppt5s ppt
5s ppt
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
The Role of Environmental Impact in Building Material’s Selection
The Role of Environmental Impact in Building Material’s SelectionThe Role of Environmental Impact in Building Material’s Selection
The Role of Environmental Impact in Building Material’s Selection
 
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Office 5S implementation workshop
Office 5S implementation workshopOffice 5S implementation workshop
Office 5S implementation workshop
 
Proposal of green building in
Proposal of green building inProposal of green building in
Proposal of green building in
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Mistake proofing for web
Mistake proofing for webMistake proofing for web
Mistake proofing for web
 
How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...
 
5S Facilitator Guide
5S  Facilitator Guide5S  Facilitator Guide
5S Facilitator Guide
 
5-S Technique
5-S Technique5-S Technique
5-S Technique
 
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
 
OEE
OEEOEE
OEE
 
01 shop floor best practices
01 shop floor best practices01 shop floor best practices
01 shop floor best practices
 
5S Implementation - Case Study
5S Implementation - Case Study5S Implementation - Case Study
5S Implementation - Case Study
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 

Similar to Case study _cp foundry

Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
haganone
 
Problem solving thru qc circle (1)
Problem solving thru qc circle (1)Problem solving thru qc circle (1)
Problem solving thru qc circle (1)
Jitesh Gaurav
 
Sanmukh cv (2017)
Sanmukh cv (2017)Sanmukh cv (2017)
Sanmukh cv (2017)
Sanmukh Singh
 
Fixture design for heat treatment of nail gun
Fixture design for heat treatment of nail gunFixture design for heat treatment of nail gun
Fixture design for heat treatment of nail gun
Kushal Shah
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
Raheem Arif
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
Ishmam Ahmed
 
Ceat qip report template
Ceat qip report templateCeat qip report template
Ceat qip report template
priyadarshanams
 
SCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptxSCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptx
molla17
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BECATHERINE NGUYEN
 
Work place improvement [read only]
Work place improvement [read only]Work place improvement [read only]
Work place improvement [read only]
ASHUTOSH MISHRA
 
project report - COMPLETE
project report - COMPLETEproject report - COMPLETE
project report - COMPLETEAmit Verma
 
IRJET- Design and Development of Gear Shift Boot Die
IRJET- Design and Development of Gear Shift Boot DieIRJET- Design and Development of Gear Shift Boot Die
IRJET- Design and Development of Gear Shift Boot Die
IRJET Journal
 
Human Performance AI Enhanced
Human Performance AI EnhancedHuman Performance AI Enhanced
Human Performance AI Enhanced
COMOSS Electronic Co., Ltd.
 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt
hari534691
 
MBA project
MBA projectMBA project
5 s 07.09.2015
5 s 07.09.20155 s 07.09.2015
5 s 07.09.2015
Leela Krishna Prasad
 
Danvil Dela Cruz CV
Danvil Dela Cruz CVDanvil Dela Cruz CV
Danvil Dela Cruz CVDanvil Cruz
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET Journal
 

Similar to Case study _cp foundry (20)

Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
 
Problem solving thru qc circle (1)
Problem solving thru qc circle (1)Problem solving thru qc circle (1)
Problem solving thru qc circle (1)
 
Sanmukh cv (2017)
Sanmukh cv (2017)Sanmukh cv (2017)
Sanmukh cv (2017)
 
Fixture design for heat treatment of nail gun
Fixture design for heat treatment of nail gunFixture design for heat treatment of nail gun
Fixture design for heat treatment of nail gun
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
 
Ceat qip report template
Ceat qip report templateCeat qip report template
Ceat qip report template
 
SCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptxSCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptx
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BE
 
Work place improvement [read only]
Work place improvement [read only]Work place improvement [read only]
Work place improvement [read only]
 
project report - COMPLETE
project report - COMPLETEproject report - COMPLETE
project report - COMPLETE
 
IRJET- Design and Development of Gear Shift Boot Die
IRJET- Design and Development of Gear Shift Boot DieIRJET- Design and Development of Gear Shift Boot Die
IRJET- Design and Development of Gear Shift Boot Die
 
Human Performance AI Enhanced
Human Performance AI EnhancedHuman Performance AI Enhanced
Human Performance AI Enhanced
 
Amit_Barjibhe - cv
Amit_Barjibhe - cvAmit_Barjibhe - cv
Amit_Barjibhe - cv
 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt
 
MBA project
MBA projectMBA project
MBA project
 
5 s 07.09.2015
5 s 07.09.20155 s 07.09.2015
5 s 07.09.2015
 
Danvil Dela Cruz CV
Danvil Dela Cruz CVDanvil Dela Cruz CV
Danvil Dela Cruz CV
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
 

Recently uploaded

CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 

Recently uploaded (20)

CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 

Case study _cp foundry

  • 1. SHRI RAMDEOBABA COLLEGE OF ENGINEERING AND MANAGEMENT Department of Industrial Engineering Case Study C.P.FOUNDRY WORKS Presented by Ajinkya Sawarkar & Deepak Pandey IInd Semester Mtech 2019-20 Submitted to Dr. V.S. Deshpande
  • 2. About Company  NAME OF THE ORGANIZATION: C.P.FOUNDRY WORKS  PLANT ADDRESS: P.O.UPPALWADI INDUSTRIALESTATE , KAMPTEE ROAD, NEAR PILI NADI, NAGPUR.  E-MAILADDRESS: foundry_ngp@bsnl.in & foundry_ngp@yahoo.com  CONTACT PERSON: MAQSOOD ALAM  YEAR OF ESTABLISHMENT: 1942  Major customers : 1. Mahindra & Mahindra Ltd. 2. Johnson Lifts MAHINDRA & MAHINDRA JOHNSON LIFTS
  • 3. Company Products CI ROLLING MILL COUPLINGS CI ROLLING MILL STAND CI GRATE STEEL ROLLING MILL PARTS CI SANITARY GRATE CI METRIC WEIGHT CI MANHOLE COVER CI TILES CI FLYWHEEL
  • 4. Main Processes o MELTING o MOULD MAKING o CORE MAKING o POURING o FOUNDRY SAND SYSTEM o CLEANING AND FINISHING
  • 5. 5 S Zone Wise Layout ZONE 1 OFFICE ZONE 2 PRODUCTION AND PATTERN ZONE 3 MELTING ZONE 4 LAB ZONE 5 STORE AND OUTSIDE AREA ZONE 6 INDUCTION ZONE 7 DISPATCH
  • 6. Kaizen  From the Japanese words “kai-” which means “change” and “-zen” which means “good.”  Kaizen is defined as a continuous effort by each and every employee (from the CEO to field staff) to ensure improvement of all processes and systems of a particular organization.  Kaizen process aims at continuous improvement of processes not only in manufacturing sector but all other departments as well.
  • 7. 5S  5S represents Japanese words that describe the steps of a workplace organization process.  Seiri - (Sort)  Seiton - (Straighten, Set)  Seiso - (Shine, Sweep)  Seiketsu - (Standardize)  Shitsuke - (Sustain)
  • 8.  The five S methodology helps a workplace remove items that are no longer needed (sort).  Organize the items to optimize efficiency and flow (straighten).  Clean the area in order to more easily identify problems (shine)  Implement color coding and labels to stay consistent with other areas (standardize) and  Develop behaviors that keep the workplace organized over the long term (sustain).  It can also referred as 7S adding Safety and Spirit to it. 5S
  • 9. Red Tag Summary Zone No. Zone Name 1st 2nd 3rd 4th Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign Red Tagging Campaign 5/7/2018 22/10/2018 Red tag Found Red Tag Clear Pending Red Tag Red tag Found Red Tag Clear Pending Red Tag Red tag Found Red Tag Clear Pending Red Tag Total Red tag Found Total Red Tag Clear Total Pending Red Tag 1 OFFICE 3 2 1 2 PRODUCTIO N 14 8 6 3 3 3 MELTING 2 0 2 2 2 4 LAB 1 1 0 5 STORE AND GREEN AREA 8 0 8 6 INDUCTION PLANT 2 2 0 7 DELIVERY/D ISPATCH 0 8 9 Total 30 13 17 5 0 5
  • 10. Red Tag Summary 0 2 4 6 8 10 12 14 16 Total RED TAG Captured – 35 Total Red Tag Cleared – 13 % Clearance – 37.14
  • 11. Worst Point Photograph Zone No.2 Improvement: - SPACE UTILIZED Shop: PATTERN ROOM Item: PATTERN 23.02.2018 11.11.2018 Before:- UNEVEN PATTERNS PLACED After:- ARRANGE PATTERN
  • 12. Worst Point Photograph Zone No.6 Improvement: - AREA SPECIFIED Shop: INDUCTION FURNACE Item: AREA NAME BOARD DISPLAYED 03.11.2019 03.11.2019 Before:- AREA NOT SPECIFIED After:-AREA SPECIFIED
  • 13. Worst Point Photograph Zone No.5 Improvement: - MATERIAL STACKING Shop: OUTSIDE AREA Item: FOOTSTEP , SURFACE BOXES 16/06/19 24/07/19 Before:- CASTINGS NOT ARRANGE PROPERLY After:- PAINTING AND STACKING OF CASTINGS
  • 14. Worst Point Photograph Zone No.6 Improvement: - CLEAN AREA Shop: INDUCTION FURNACE Item: RACKS 31/01/2019 21/07/2019 Before:- Unwanted & wanted material kept in mixed condition After:-Unwanted material disposed off & wanted material kept properly. Spaced saved 10.61sq.m.
  • 15. Sort & Set Activity done in Store • Analysis of current situation • Getting list of materials from Production Lines • SDQ From Buyers (Concerned Person From Company) • Physical verification of material (with store to production line) • Temporary location with coloured chalk or removable stickers • Labelling of Every Required items with Proper location
  • 17. New Store Photographs New Rack Arrangement Sorting of Tools
  • 19. Kaizen 1 Company: C.P. FOUNDRY WORKS Dept : LAB Result : FIRE EXTINGUSHER Month : 5 MAR 2019 Subject : SPACE UTILIZATION Process : SAFETY Before Improvement ( Photo or Explanation drawing) After Improvement ( Photo or Explanation drawing) 1. Manpower, Man hour Saving 2. Physical Distribution (Transporting distance) 3. Space Saving 4. Commanisation, Unification 5. Weight Reduction 6. Energy Saving 7. Yield 8. Quality Improvement 9. 5s Yes 10. Cost Reduction. 11. Safety Yes 12. Horizontal Application 13. Productivity improved Earlier : NO FIRE EXTINGUSHER Now : SPACE IS UTILIZED FOR FIRE EXTINGUSHER Cost Saving per year Date of Implementation 26 TH JULY 2018 Benefits :  SPACE UTILIZED.  SAFETY IMPROVED. Suggested by MR. TAHIR SIR Approved by MR. TAHIR SIR
  • 20. Kaizen 2 Company: C.P. FOUNDRY WORKS Dept : OFFICE Result : WORKPLACE 5S & SAFETY IMPROVED Month : 23 RD FEB 2018 Subject : PROPER ARRANGEMENT OF WIRES , CABLES & COMPUTER EQUIPMENTS Process : SYSTEMATIC ARRANGEMENTS OF WIRES , CABLES & COMPUTER EQUIPMENTS Before Improvement ( Photo or Explanation drawing) After Improvement ( Photo or Explanation drawing) 1. Manpower, Man hour Saving 2. Physical Distribution (Transporting distance) 3. Space Saving 4. Commanisation, Unification 5. Weight Reduction 6. Energy Saving 7. Yield 8. Quality Improvement 9. 5s Yes 10. Cost Reduction. 11. Safety Yes 12. Horizontal Application 13. Productivity improved Earlier : WIRES , CABLES & COMPUTER EQUIPMENTS ARE TANGLLED & UNSAFE FOR USE Now : WIRES , CABLES & COMPUTER EQUIPMENTS ARE ARRANGED SYSTEMATICALLY Cost Saving per year Date of Implementation 26 TH JULY 2018 Benefits :  SAFETY IMPROVED.  HOUSEKEEPING & 5S IMPROVED. Suggested by MR. JOSHI SIR Approved by MR. TAHER SIR
  • 21. Kaizen 3 Company: C.P. FOUNDRY WORKS Dept : moulding area Result : 5S IMPROVED Month : 24 FEB 2019 Subject : SPACE SAVED Process : DISPOSED OF UNWANTED MATERIAL Before Improvement ( Photo or Explanation drawing) After Improvement ( Photo or Explanation drawing) 1. Manpower, Man hour Saving 2. Physical Distribution (Transporting distance) 3. Space Saving YES 4. Commanisation, Unification 5. Weight Reduction 6. Energy Saving 7. Yield 8. Quality Improvement 9. 5s Yes 10. Cost Reduction. 11. Safety 12. Horizontal Application 13. Productivity improved Earlier : MOLDING BOXES AND WOODEN MATERIAL LYING ON AREA Now : DISPOSED OFF MATERIAL AND CLAEA N AREA 5.54 SQ.M. SPACE SAVED Cost Saving per year Date of Implementation 24 TH FEB 2019 Benefits :  SPACE SAVED. (5.54 SQ.M.)  HOUSEKEEPING IMPROVED. Suggested by MR. MAQSOOD SIR Approved by MR. TAHER SIR