UJJAIN FOODS PVT. LTD.
PRESENTATION ON
UJJAIN FOODS PVT. LTD.
PRESENTATION ON
WORK PLACE IMPROVEMENT
TARGET FOR PROJECT
Workplace Improvements
Project Details
STATUS AT DSR
STAGE
PHASES-II
Workplace Improvement
TARGET ACHIEVED
A. 5S Implementation
Score Audit Score 16%
Audit Score 30%
(Cumulative)
Audit Score 36%
(Cumulative)
B. Number / Hours of employee
60~201 85
B. Number / Hours of employee
training No training Plan
60~201
Man Hours Training
Topic wise
85
Man Hours Training
Topic wise
C. Visual Management
15%
% Completion of list
made for visual
control
= 30% (Cumulative)
% Completion of list
made for visual control
= 40% (Cumulative)
ACTIVITIES FOR PROJECT
Workplace Improvements
Awareness Training Provided
Team Defined & Display of 5S Zone Managers
5S Red Tag Area & Liquidation Plan Created
1S/2S/3S Massive Derive Started in whole Unit
5S Audits started & 5S RADAR charts Displayed at each zone
Identification & Location marking Done for Zones, Areas, ItemsIdentification & Location marking Done for Zones, Areas, Items
& Equipments
Single Point Photography (BEFORE & AFTER FORMATS)
Yellow Gangways Marking Done
At A Glance & Kaizen Boards Installed
Various Display Boards Made & Some are in Process
Incident Recording System Started
PPEs implemented
Near Miss Identified & Rectified
Awareness Training Provided to All
Employees- TRAINING RECORDS
On-Site Training
has been
provided to allprovided to all
employees on
the 5S, Safety &
Visual
Management on
Regular Basis
(Man-hours- 85)
Sample Record
Format
Distribution of 5S Pocket Cards
5S Red Tag Area & Liquidation Plan
Created
To Remove unnecessary items from work place & to Establish method to
make area free of unnecessary items we created the 5S Red Tag Area and
liquidation for storing the unwanted material
1S/2S/3S Massive Derive Started
in whole Unit
Work inWork in
ProgressProgress
We started the massive derive on 1S/2S/3S in the whole unit and
eliminated the unwanted material of Approx. Rs. 40,000/-
5S Audits started & 5S RADAR
charts Displayed at each zone
On the basis of the 5S audits, RADAR charts updated
5S Scores
2
3
2 2
2
2.5
3
3.5
1 1
0 0
1 1
0
0.5
1
1.5
1S- Sorting 2S- Set in Order 3S- Shine 4S- Standardize 5S- Sustain
Intial Score @ DSR Stage Current Score @ Phase-2
Implementations as per
Visual Audit Check-Sheet
Achieved
40%, Target 30%
Identification & Location marking for
Zones, Areas, Items & Equipments
We have listed down the all the list of the Items, zone etc. for display and
currently displayed on papers printouts
Creation of Model Area-
Extruder
With Epoxy Flooring Paint and Yellow marking of Gangways we have created a 5S
model Area
Single Point Photography
(BEFORE & AFTER FORMATS)
On Next Pages
Company Name: Ujjain Foods Pvt. Ltd Deptt.: All Result: 5S improved
Month:
Aug-17
Subject: 5S Date of Implementation 10.08.2018
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Temporary arrangement for storage of the
caps on the shop floor
Now:
Wooden box with identification for
arrangement/ storage of caps in working area
fixed
Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved system for the Cap Storage
2. Easy Accesibilty
Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Stores Result: 5S improved
Month:
Aug-17
Subject: 5S Date of Implementation 17.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Improper Layout & Storage of the FG (Puff)
and no identification
Now:
Layout improved with probability of easy
retrieval and identification need to be done Cost Saving/ Year (Rupees)
BENEFITS:-
1. Easy accessibility of Material
2. No Material Mixing
Suggested By A. Mishra
Approved By
Changes in Layout of Dum-
Dum FG Store
Before Variety-
1,2,3,4 & 5 mixed Up Storage
After Variety-
1
Variety-
2
Variety-
3
Variety-
4
Variety-
5
We have re-designed the Layout the FG Store of DUM-DUM Store, according to
the variety. After each variety gap has been maintained. Currently it is in under
trial, we will fix the location by yellow marking in the next stage
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Fryer Result: Safety improved
Month:
July-17
Subject: 5S & Safety Date of Implementation 17.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S) √
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Air gun lying on the floor causing chances of
accidents and damage to the gun
Now:
A small hook welded with the table so that it
can be hanged after use Cost Saving/ Year (Rupees)
BENEFITS:-
1. No Chances of accidents
2. No Damage to the Gun
Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Fryer Result: Safety improved
Month:
Aug-17
Subject: 5S & Safety Date of Implementation 17.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S) √
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Pipes lying in the corner, Causing Place
Making dirty &
Now:
Pipe hanged on the wall
Cost Saving/ Year (Rupees)
BENEFITS:-
1. Cleaner Place
2. No Damage to the Pipe
3. No Chances of the accidents
Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Printer Result: 5S improved
Month:
Aug-17
Subject: Safety Date of Implementation 20.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Material Mixing & No Identifications
Now:
No Material Mixing & Identifications done
Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved 1S/ 2S Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Open Gallery Result: 5S improved
Month:
Aug-17
Subject: 5S Date of Implementation 22.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
2 Ladders stored along side wall in the gallery,
Occupying More Place
Now:
Ladders hanged on the walls with the help of
hooks Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved 5S
2. Occupying Less Space
Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Masala Result: 5S improved
Month:
Aug-17
Subject: 5S Date of Implementation 25.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Challi (Jaali ) & other material lying under the
table
Now:
Proper place defined for challi (Jaali)
Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved 1S/ 2S/ 3S Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Masala Result: 5S improved
Month:
Aug-17
Subject: 5S Date of Implementation 25.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Improper Material Storage
Now:
Proper Material Storage with details of
identification, Numbering & Location Marking
Done
Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved 1S/ 2S/ 3S Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Tool Room Result: 5S improved
Month:
Aug-17
Subject: 5S Date of Implementation 28.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Tools stored in bad condition & Mixed Up
Now:
Tool Shadow Boards Implemented
Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved 1S/ 2S/ 3S Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Extruder Result: 5S improved
Month:
Aug-17
Subject: 5S & Quality Date of Implementation 28.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Gaps in the Floor, due to which material falls
in the lower floor (Ground Floor)
Now:
Gaps filled with welding of the plates with the
floor Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved 5S & Quality Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Store Result: 5S & Safety improved
Month:
Aug-17
Subject: 5S & Safety Date of Implementation 30.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S) √
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
No Location/ Stand for Sewing Machine &
Weighing Machines
Now:
Location/ Stand for Sewing Machine &
Weighing Machines Defined Cost Saving/ Year (Rupees)
BENEFITS:-
1. Improved Safety & 5S Suggested By A. Mishra
Approved By
VISUAL BOARDS
β€’ 5S VISUAL DISPLAY BOARDS DISPLAYED AT SHOP FLOOR
At 2 Places
PRODUCTION MONITORING BOARDS
IMPLEMENTED
At all Departments
YELLOW GANGWAYS MARKING
Yellow Marking Done:
180 Meters
YELLOW GANGWAYS MARKING
Yellow Marking Done:
180 Meters
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Result: 5S Improved
Month:
July-17
Subject: 5S Date of Implementation 19.07.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S)
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
No designated path for material movement
Now:
Designated path for material movement
Cost Saving/ Year (Rupees)
BENEFITS:-
1. Smooth flow of material, as it there was no designated path earlier. So saving material
movement time.
Suggested By A. Mishra
Approved By
Work instructions Made& Displayed,
Started Making the Work Instructions for the Sections, where work Instructions not
displayed and in Next Step will convert all Work Instructions in Permanent Boards
Work Instruction
for MASALA
PPEs Implemented
Masks
We have
implemented
the PPEs
(Personal
Protective
Caps
Aprons
Protective
Equipments)
like:
1. Caps
2. Masks
3. Aprons
4. Gloves
As per the
requirement of
each section
MSDS Made & Displayed
We have made & Displayed the Material Safety Data Sheet (MSDS) for the
Chemical and gases
Near Miss Rectification
On Next Pages
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Extruder Result: Safety improved
Month:
July-17
Subject: Safety Date of Implementation 22.07.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S) √
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Pulley Covers Missing , Can Cause Major
accidents
Now:
Pulley Covers fabricated and installed
Cost Saving/ Year (Rupees)
BENEFITS:-
1. No Chances of accidents Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Guard Room Result: Safety improved
Month:
Aug-17
Subject: Safety Date of Implementation 10.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S) √
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Loose & Open Wiring
Now:
Loose Wiring rectified
Cost Saving/ Year (Rupees)
BENEFITS:-
1. No Chances of Short Circuit Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Main Gate Result: Safety improved
Month:
Aug-17
Subject: Safety Date of Implementation 10.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S) √
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S √
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S √
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
Empty & Expired Fire Extinguishers Lying
below the stairs
Now:
Empty & Expired Fire Extinguishers removed
& Refilled Cost Saving/ Year (Rupees)
BENEFITS:-
1. Can be used at the time of mis-happening Suggested By A. Mishra
Approved By
Company Name: Ujjain Foods Pvt. Ltd Deptt.: Stores Result: Safety improved
Month:
July-17
Subject: Safety Date of Implementation 30.08.2017
Before Improvement
(Photo or Explanation Drawing)
After Improvement
(Photo or Explanation Drawing)
Category
Tick (√)
Applicable
1. Productivity Improvement
(P)
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
2. Quality Improvement (Q)
3. Cost Reduction (C)
4. Improved Delivery (D)
5. Improved Safety (S) √
6. Improved Morale (M)
7. Improved Environment (E)
8. Energy Saving
9. 5S
ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH
9. 5S
10. Space Saving
11. Other
12. Manpower, Man-hours
Saving
13. Horizontal Deployments
Earlier:
An Anlge coming out from the floor, Causing
chances of the accidents
Now:
Angle need cut down
Cost Saving/ Year (Rupees)
BENEFITS:-
1. No Chances of accidents Suggested By A. Mishra
Approved By
AshutoshAshutosh MishraMishraAshutoshAshutosh MishraMishra
(Lean Consultant)(Lean Consultant)
88820317128882031712

More Related Content

Similar to Work place improvement [read only]

Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...
Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...
Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...ADD VALUE CONSULTING Inc
Β 
Ceat qip report template
Ceat qip report templateCeat qip report template
Ceat qip report templatepriyadarshanams
Β 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortGoLeanSixSigma.com
Β 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppthari534691
Β 
Ppap training presentation
Ppap   training presentationPpap   training presentation
Ppap training presentationJitesh Gaurav
Β 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
Β 
Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018
Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018
Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018April Bright
Β 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_PayrollBalaguru SP
Β 
QCC - QIC Presentation, Mission Possible Team
QCC - QIC Presentation, Mission Possible TeamQCC - QIC Presentation, Mission Possible Team
QCC - QIC Presentation, Mission Possible TeamArief M Ridwan
Β 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
Β 
Six-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxSix-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxWFD02BLR13Outlet
Β 
Resume Aich 120815
Resume Aich 120815Resume Aich 120815
Resume Aich 120815Sibabrata Aich
Β 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMike Poland, CMRP
Β 
IRJET- Study and Implementation of β€˜5 S’ System in Manufacturing Industry
IRJET-  	  Study and Implementation of β€˜5 S’ System in Manufacturing IndustryIRJET-  	  Study and Implementation of β€˜5 S’ System in Manufacturing Industry
IRJET- Study and Implementation of β€˜5 S’ System in Manufacturing IndustryIRJET Journal
Β 
Manufacturing systems WithAdrianβ„’
Manufacturing systems WithAdrianβ„’Manufacturing systems WithAdrianβ„’
Manufacturing systems WithAdrianβ„’Adrian Beale
Β 

Similar to Work place improvement [read only] (20)

Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...
Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...
Improved Reliability by 5S, Flow, Standardization Case Study of Diagnostic La...
Β 
Ceat qip report template
Ceat qip report templateCeat qip report template
Ceat qip report template
Β 
CV Gith A
CV Gith ACV Gith A
CV Gith A
Β 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
Β 
Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_
Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_
Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_
Β 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt
Β 
Ppap training presentation
Ppap   training presentationPpap   training presentation
Ppap training presentation
Β 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
Β 
Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018
Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018
Additive Manufacturing - Design Considerations Rapid Fire - OMTEC 2018
Β 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_Payroll
Β 
QCC - QIC Presentation, Mission Possible Team
QCC - QIC Presentation, Mission Possible TeamQCC - QIC Presentation, Mission Possible Team
QCC - QIC Presentation, Mission Possible Team
Β 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
Β 
kka 110316
kka 110316kka 110316
kka 110316
Β 
Six-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxSix-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptx
Β 
LeanSixSigmaProjectPresentation
LeanSixSigmaProjectPresentationLeanSixSigmaProjectPresentation
LeanSixSigmaProjectPresentation
Β 
Resume Aich 120815
Resume Aich 120815Resume Aich 120815
Resume Aich 120815
Β 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
Β 
IRJET- Study and Implementation of β€˜5 S’ System in Manufacturing Industry
IRJET-  	  Study and Implementation of β€˜5 S’ System in Manufacturing IndustryIRJET-  	  Study and Implementation of β€˜5 S’ System in Manufacturing Industry
IRJET- Study and Implementation of β€˜5 S’ System in Manufacturing Industry
Β 
Manufacturing systems WithAdrianβ„’
Manufacturing systems WithAdrianβ„’Manufacturing systems WithAdrianβ„’
Manufacturing systems WithAdrianβ„’
Β 
Planning Presentation1
Planning Presentation1Planning Presentation1
Planning Presentation1
Β 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
Β 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
Β 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
Β 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
Β 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
Β 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
Β 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
Β 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
Β 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
Β 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
Β 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
Β 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
Β 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
Β 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
Β 
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
Β 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
Β 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
Β 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Β 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Β 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
Β 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
Β 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
Β 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
Β 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
Β 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Β 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
Β 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Β 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
Β 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
Β 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Β 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
Β 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
Β 
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
Β 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Β 
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCRβ˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Β 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Β 

Work place improvement [read only]

  • 2. PRESENTATION ON UJJAIN FOODS PVT. LTD. PRESENTATION ON WORK PLACE IMPROVEMENT
  • 3. TARGET FOR PROJECT Workplace Improvements Project Details STATUS AT DSR STAGE PHASES-II Workplace Improvement TARGET ACHIEVED A. 5S Implementation Score Audit Score 16% Audit Score 30% (Cumulative) Audit Score 36% (Cumulative) B. Number / Hours of employee 60~201 85 B. Number / Hours of employee training No training Plan 60~201 Man Hours Training Topic wise 85 Man Hours Training Topic wise C. Visual Management 15% % Completion of list made for visual control = 30% (Cumulative) % Completion of list made for visual control = 40% (Cumulative)
  • 4. ACTIVITIES FOR PROJECT Workplace Improvements Awareness Training Provided Team Defined & Display of 5S Zone Managers 5S Red Tag Area & Liquidation Plan Created 1S/2S/3S Massive Derive Started in whole Unit 5S Audits started & 5S RADAR charts Displayed at each zone Identification & Location marking Done for Zones, Areas, ItemsIdentification & Location marking Done for Zones, Areas, Items & Equipments Single Point Photography (BEFORE & AFTER FORMATS) Yellow Gangways Marking Done At A Glance & Kaizen Boards Installed Various Display Boards Made & Some are in Process Incident Recording System Started PPEs implemented Near Miss Identified & Rectified
  • 5. Awareness Training Provided to All Employees- TRAINING RECORDS On-Site Training has been provided to allprovided to all employees on the 5S, Safety & Visual Management on Regular Basis (Man-hours- 85) Sample Record Format
  • 6. Distribution of 5S Pocket Cards
  • 7. 5S Red Tag Area & Liquidation Plan Created To Remove unnecessary items from work place & to Establish method to make area free of unnecessary items we created the 5S Red Tag Area and liquidation for storing the unwanted material
  • 8. 1S/2S/3S Massive Derive Started in whole Unit Work inWork in ProgressProgress We started the massive derive on 1S/2S/3S in the whole unit and eliminated the unwanted material of Approx. Rs. 40,000/-
  • 9. 5S Audits started & 5S RADAR charts Displayed at each zone On the basis of the 5S audits, RADAR charts updated
  • 10. 5S Scores 2 3 2 2 2 2.5 3 3.5 1 1 0 0 1 1 0 0.5 1 1.5 1S- Sorting 2S- Set in Order 3S- Shine 4S- Standardize 5S- Sustain Intial Score @ DSR Stage Current Score @ Phase-2
  • 11. Implementations as per Visual Audit Check-Sheet Achieved 40%, Target 30%
  • 12. Identification & Location marking for Zones, Areas, Items & Equipments We have listed down the all the list of the Items, zone etc. for display and currently displayed on papers printouts
  • 13. Creation of Model Area- Extruder With Epoxy Flooring Paint and Yellow marking of Gangways we have created a 5S model Area
  • 14. Single Point Photography (BEFORE & AFTER FORMATS) On Next Pages
  • 15. Company Name: Ujjain Foods Pvt. Ltd Deptt.: All Result: 5S improved Month: Aug-17 Subject: 5S Date of Implementation 10.08.2018 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Temporary arrangement for storage of the caps on the shop floor Now: Wooden box with identification for arrangement/ storage of caps in working area fixed Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved system for the Cap Storage 2. Easy Accesibilty Suggested By A. Mishra Approved By
  • 16. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Stores Result: 5S improved Month: Aug-17 Subject: 5S Date of Implementation 17.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Improper Layout & Storage of the FG (Puff) and no identification Now: Layout improved with probability of easy retrieval and identification need to be done Cost Saving/ Year (Rupees) BENEFITS:- 1. Easy accessibility of Material 2. No Material Mixing Suggested By A. Mishra Approved By
  • 17. Changes in Layout of Dum- Dum FG Store Before Variety- 1,2,3,4 & 5 mixed Up Storage After Variety- 1 Variety- 2 Variety- 3 Variety- 4 Variety- 5 We have re-designed the Layout the FG Store of DUM-DUM Store, according to the variety. After each variety gap has been maintained. Currently it is in under trial, we will fix the location by yellow marking in the next stage
  • 18. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Fryer Result: Safety improved Month: July-17 Subject: 5S & Safety Date of Implementation 17.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) √ 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Air gun lying on the floor causing chances of accidents and damage to the gun Now: A small hook welded with the table so that it can be hanged after use Cost Saving/ Year (Rupees) BENEFITS:- 1. No Chances of accidents 2. No Damage to the Gun Suggested By A. Mishra Approved By
  • 19. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Fryer Result: Safety improved Month: Aug-17 Subject: 5S & Safety Date of Implementation 17.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) √ 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Pipes lying in the corner, Causing Place Making dirty & Now: Pipe hanged on the wall Cost Saving/ Year (Rupees) BENEFITS:- 1. Cleaner Place 2. No Damage to the Pipe 3. No Chances of the accidents Suggested By A. Mishra Approved By
  • 20. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Printer Result: 5S improved Month: Aug-17 Subject: Safety Date of Implementation 20.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Material Mixing & No Identifications Now: No Material Mixing & Identifications done Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved 1S/ 2S Suggested By A. Mishra Approved By
  • 21. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Open Gallery Result: 5S improved Month: Aug-17 Subject: 5S Date of Implementation 22.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: 2 Ladders stored along side wall in the gallery, Occupying More Place Now: Ladders hanged on the walls with the help of hooks Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved 5S 2. Occupying Less Space Suggested By A. Mishra Approved By
  • 22. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Masala Result: 5S improved Month: Aug-17 Subject: 5S Date of Implementation 25.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Challi (Jaali ) & other material lying under the table Now: Proper place defined for challi (Jaali) Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved 1S/ 2S/ 3S Suggested By A. Mishra Approved By
  • 23. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Masala Result: 5S improved Month: Aug-17 Subject: 5S Date of Implementation 25.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Improper Material Storage Now: Proper Material Storage with details of identification, Numbering & Location Marking Done Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved 1S/ 2S/ 3S Suggested By A. Mishra Approved By
  • 24. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Tool Room Result: 5S improved Month: Aug-17 Subject: 5S Date of Implementation 28.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Tools stored in bad condition & Mixed Up Now: Tool Shadow Boards Implemented Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved 1S/ 2S/ 3S Suggested By A. Mishra Approved By
  • 25. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Extruder Result: 5S improved Month: Aug-17 Subject: 5S & Quality Date of Implementation 28.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Gaps in the Floor, due to which material falls in the lower floor (Ground Floor) Now: Gaps filled with welding of the plates with the floor Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved 5S & Quality Suggested By A. Mishra Approved By
  • 26. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Store Result: 5S & Safety improved Month: Aug-17 Subject: 5S & Safety Date of Implementation 30.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) √ 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: No Location/ Stand for Sewing Machine & Weighing Machines Now: Location/ Stand for Sewing Machine & Weighing Machines Defined Cost Saving/ Year (Rupees) BENEFITS:- 1. Improved Safety & 5S Suggested By A. Mishra Approved By
  • 27. VISUAL BOARDS β€’ 5S VISUAL DISPLAY BOARDS DISPLAYED AT SHOP FLOOR At 2 Places
  • 29. YELLOW GANGWAYS MARKING Yellow Marking Done: 180 Meters
  • 30. YELLOW GANGWAYS MARKING Yellow Marking Done: 180 Meters
  • 31. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Result: 5S Improved Month: July-17 Subject: 5S Date of Implementation 19.07.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: No designated path for material movement Now: Designated path for material movement Cost Saving/ Year (Rupees) BENEFITS:- 1. Smooth flow of material, as it there was no designated path earlier. So saving material movement time. Suggested By A. Mishra Approved By
  • 32. Work instructions Made& Displayed, Started Making the Work Instructions for the Sections, where work Instructions not displayed and in Next Step will convert all Work Instructions in Permanent Boards Work Instruction for MASALA
  • 33. PPEs Implemented Masks We have implemented the PPEs (Personal Protective Caps Aprons Protective Equipments) like: 1. Caps 2. Masks 3. Aprons 4. Gloves As per the requirement of each section
  • 34. MSDS Made & Displayed We have made & Displayed the Material Safety Data Sheet (MSDS) for the Chemical and gases
  • 36. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Extruder Result: Safety improved Month: July-17 Subject: Safety Date of Implementation 22.07.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) √ 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Pulley Covers Missing , Can Cause Major accidents Now: Pulley Covers fabricated and installed Cost Saving/ Year (Rupees) BENEFITS:- 1. No Chances of accidents Suggested By A. Mishra Approved By
  • 37. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Guard Room Result: Safety improved Month: Aug-17 Subject: Safety Date of Implementation 10.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) √ 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Loose & Open Wiring Now: Loose Wiring rectified Cost Saving/ Year (Rupees) BENEFITS:- 1. No Chances of Short Circuit Suggested By A. Mishra Approved By
  • 38. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Main Gate Result: Safety improved Month: Aug-17 Subject: Safety Date of Implementation 10.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) √ 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S √ ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S √ 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: Empty & Expired Fire Extinguishers Lying below the stairs Now: Empty & Expired Fire Extinguishers removed & Refilled Cost Saving/ Year (Rupees) BENEFITS:- 1. Can be used at the time of mis-happening Suggested By A. Mishra Approved By
  • 39. Company Name: Ujjain Foods Pvt. Ltd Deptt.: Stores Result: Safety improved Month: July-17 Subject: Safety Date of Implementation 30.08.2017 Before Improvement (Photo or Explanation Drawing) After Improvement (Photo or Explanation Drawing) Category Tick (√) Applicable 1. Productivity Improvement (P) ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 2. Quality Improvement (Q) 3. Cost Reduction (C) 4. Improved Delivery (D) 5. Improved Safety (S) √ 6. Improved Morale (M) 7. Improved Environment (E) 8. Energy Saving 9. 5S ADD BEFORE PIC/ DRAWING/ SKETCH ADD AFTER PIC/ DRAWING/ SKETCH 9. 5S 10. Space Saving 11. Other 12. Manpower, Man-hours Saving 13. Horizontal Deployments Earlier: An Anlge coming out from the floor, Causing chances of the accidents Now: Angle need cut down Cost Saving/ Year (Rupees) BENEFITS:- 1. No Chances of accidents Suggested By A. Mishra Approved By