Capacity Management Administración de la producción MC. Ma. del Pilar C. León F.
Capacity Management “ Capacity is t he capability of a worker, machine, work center, plan or organization to produce output per period of time ”  APICS dictionary. Rate of for doing work, not of quantity of work done.
Capacity Managament Capacity required:  Capacity of a system or resource need to produce a desired output in a given time period Capacity required:  Load. Amount of released and planned work assigned to a facility for a particular time period.
Capacity Management Capacity Management: Determining the capacity need to achieve the priority plans as well as providing, monitoring and controlling that capacity so the priority plan can be met. “ the function of establishing, measuring, monitoring, and adjusting limits or levels of capacity in order to execute all manufacturing schedules ” APICS Dictionary
Capacity Management Capacity planning : is the process of determining the resources required to meet the priority plan and the methods needed to make that capacity available Capacity Control: The process of monitoring production output, comparing ir with capacity plans, and taking corrective action when needed.
Capacity Management Load Capacity Available Output
Capacity Planning Calculating the capacity needed to achieve the priority plan and finding ways of making the capacity available. Priority plans are usually stated in unit of product or some standard unit of output.  Capacity can sometimes be stated in the same units.
Capacity Planning Determine that capacity available at each work center in each time period Determine the load at each work center in each time period Translate the priority plan into the hours or work required at each work center in each time period Sum up the capacities required Resolve differences between available capacity and required capacity
Planning levels Resource planning  involves long rate capacity resource requirement and is directly linked to production planning. Rough-cut capacity planning :  Takes capacity planning to the next level of detail, check the feasibility of the MPS, provide warnings of any bottlenecks, ensure utilization of work centers and advise vendors of capacity requirement
Planning levels Capacity requirements planning is directly linked to the material requirements plan. It is concerned with individual orders at individual work centers and calculates work center loads and labor requirements for each time period at each work center.
Planning levels PRODUCTION PLAN MATERIAL REQUIREMENTS PLAN PRODUCTION ACTIVITY CONTROL CAPACITY CONTROL CAPACITY REQUIREMENTS PLAN ROUGH-CUT CAPACITY PLAN RESOURCE PLAN MASTER PRODUCTION SCHEDULE Long Range Short Range Short Range Medium Range Plan Implement / Control
Capacity requirements planning  (CRP) Process of determining in detail the amount of labor and machine resources needed to achieve the required products. Planned orders forms the MRP and open shop orders (scheduled receipts) are converted into demand for time in each work center in each time period.
Inputs Open order file: It is a released order for a quantity of a part  to be manufactured and completed on a specific date. Is a record of all the active shop orders. Planned order releases: Assessing the total capacity required in future time periods determined by the computer's MRP
Inputs Routing file: Specified on a route sheet or, in a computer-based system in a route file: Operations to be performed Sequence of operations Work center to be used Possible alternate work centers Tooling needed at each operation Standard times: setup times and run times per piece
Inputs Work center file : It is a released order for a quantity of a part to be manufactured and completed on a specific date (schedule receipt on MRP). Planned order releases : Based upon the gross requirement for a particular part.  Assessing the total capacity required in future time periods.
Inputs Routing file : Routing is specified on a route sheet or, in a computer-based system in a route file Operations to be performed Sequence of operations Work centers to be used Possible alternate work centers Tooling needed at each operation Standard times: setup times and run times per piece.
Inputs Work center file: Composed of a number of machines or workers capable of doing the same work.  It contains information on the capacity and move, wait, and queue times associated with the center.
Inputs Move time: move material from one workstation to another Wait time: Time a job is at work center after completion and before being moved Queue time is the time a ob waits at a work center before being handled. Lead time: Is the sum of queue, setup, run,  Wait and move times .
Shop  calendar Is the number of working days available . fecha Día de trabajo Días de no trabajo 36   .  .  35   .  .  34   .  .  146 33   .  .  145 32   .  .  144 31   .  .  143 30   .  .  142 31 29  .  .  28  .  .  27  .  .  141 26  .  .  140 25  ……....  .  .  139 24  ……..  138 23  …….….  137 30 22  .  .  21  .  .  20  .  .  136 19  .  .  135 18  ……....  .  .  134 17  ……..  133 16  …….….  132 29 15  .  ……….  14  .  … ……...  13  .  ….. ….  131 12  .  …..  .   130 11  . …..  129 10  ……   ...  128 9  .  …..  127 28 8  .  7  .  …..  6  .  …..  126 5  .  …..  125 4  .  …..  3  .  …..  124 2  .  …..  123 27 July Sun Sat Fri Thurs Wend Tues Mon Week Month 2 123
Capacity Available Is  the capacity of a system or resource to produce a quantity of output in a given time period. It is affected by the following: Product specifications Production mix Plant and equipment Work effort
Measuring Capacity Units of output: Use a unit common to all products Standard time: Time required to make the product using a given method of manufacture.
Levels of Capacity Machine or individual worker Work center Plant, witch can be considered as a group of different work centers
Determining Capacity Available Demonstrated (measured) capacity is figured from historical data. Rated capacity: Product of available time, utilization and efficiency. Available time: Number of hours a work center can be used. A  work center has three machines an is operated for 8 hours a day 5 days a week.  What is the available time?  Available time = 3x8x5 = 120 hours per week.
Utilization Available time is the maximum hours we can expect from the work center. A work center is available 120 hours but actually produce good for 100 hours. What is the utilization of the work center?
Efficiency The workers might be working at a faster or slower pace than the standard working pace. A work center produces 120 unit in a shift.  The standard for that item is 100 units a shift. What is efficiency of the work center?
Rated capacity Rated capacity is calculated by taking into account the work center utilization and efficiency. A work center consists of four machines and is operated 8 hours per day for 5 days a week.  Historically, the utilization has been 85% and the efficiency 110%.  What is the rated capacity ?
Demonstrated Capacity One way to find out the capacity of a work center is to examine the previous production records and to use that information as the available capacity of the work center. Over the previous four weeks, a work canter produced 120, 130, 150 and 140 standard hours of work. What is the demonstrated capacity of a the work center?
Capacity Required (Load) Capacity requirements are generated by the priority planning systems and involve translating priorities, given in units of product or some common unit, into hours or work required at each work center in each time period. Determining the capacity required is a two-step process. First, determine the time needed for each order at each work center, then, sum up the capacity required for individual orders to obtain the load.
Capacity required  (Load) The time needed for each order is the sum of the setup time and the run time. A work center is to process 150 units of gear shaft SG 123 on work order 333.  The setup time is 1.5 hours, and the run time is 0.2 hours per piece.  What is the standard time needed to run the order? How much actually time will be need to run the order if the work center has an efficiency of 120% and a utilization of 80%?
Work Center Load report The work center load shows future capacity requirements based on released and planned orders for each time period of the plan. 8 15 20 10 (25) (12) (Over)/Under capacity 700 140 140 140 140 140 Rated Capacity 692 125 120 130 165 152 Total Load 510.5 100 90 100 120 100.5 Planned Load 181.5 25 30 30 45 51.5 Released Load Total 24 23 22 21 20 Week
Capacity required  (Load) Load:  Sum of the required times for all the planned and actual orders to be run on the work center in a specified period.  The steps in calculating load are as follows:
Scheduling Orders “ A time table for planned occurrences”  APICS dictionary Back scheduling: The usual process is to start with the due data and, using the lead times, to work back to find the star date for each operation.  This process is called Back scheduling. We need to know The quantity and due date Sequence of operations and work centers needed Setup and run times for each operation.
Making the  Plan Compare the load to available capacity to see if there are imbalances and if so, to find possible solutions. Two ways of balancing capacity available and load: alter the load or change the capacity available
Making plan Schedule overtime or under time Adjust the level of the workforce by hiring or laying off workers Shift workforce from under load to overloaded work centers. Use alternate routings to shift some load to another work center Subcontract work when more capacity is needed or bring in previously subcontracted work to increase required capacity.
Summary Capacity management occurs at all levels of the planning process. It is directly related to the priority plan, need the level of detail and time spans will be similar to the related priority plan. CP is concerned with translating the priority plan into the hours of capacity required in manufacturing to make the items in the priority plan and with methods of making that capacity available.
Summary Material requirements planning and capacity requirements planning should form part of a closed-loop system witch not only includes planning and control functions but also provide feedback so planning can always be current .

Capacity Management

  • 1.
    Capacity Management Administraciónde la producción MC. Ma. del Pilar C. León F.
  • 2.
    Capacity Management “Capacity is t he capability of a worker, machine, work center, plan or organization to produce output per period of time ” APICS dictionary. Rate of for doing work, not of quantity of work done.
  • 3.
    Capacity Managament Capacityrequired: Capacity of a system or resource need to produce a desired output in a given time period Capacity required: Load. Amount of released and planned work assigned to a facility for a particular time period.
  • 4.
    Capacity Management CapacityManagement: Determining the capacity need to achieve the priority plans as well as providing, monitoring and controlling that capacity so the priority plan can be met. “ the function of establishing, measuring, monitoring, and adjusting limits or levels of capacity in order to execute all manufacturing schedules ” APICS Dictionary
  • 5.
    Capacity Management Capacityplanning : is the process of determining the resources required to meet the priority plan and the methods needed to make that capacity available Capacity Control: The process of monitoring production output, comparing ir with capacity plans, and taking corrective action when needed.
  • 6.
    Capacity Management LoadCapacity Available Output
  • 7.
    Capacity Planning Calculatingthe capacity needed to achieve the priority plan and finding ways of making the capacity available. Priority plans are usually stated in unit of product or some standard unit of output. Capacity can sometimes be stated in the same units.
  • 8.
    Capacity Planning Determinethat capacity available at each work center in each time period Determine the load at each work center in each time period Translate the priority plan into the hours or work required at each work center in each time period Sum up the capacities required Resolve differences between available capacity and required capacity
  • 9.
    Planning levels Resourceplanning involves long rate capacity resource requirement and is directly linked to production planning. Rough-cut capacity planning : Takes capacity planning to the next level of detail, check the feasibility of the MPS, provide warnings of any bottlenecks, ensure utilization of work centers and advise vendors of capacity requirement
  • 10.
    Planning levels Capacityrequirements planning is directly linked to the material requirements plan. It is concerned with individual orders at individual work centers and calculates work center loads and labor requirements for each time period at each work center.
  • 11.
    Planning levels PRODUCTIONPLAN MATERIAL REQUIREMENTS PLAN PRODUCTION ACTIVITY CONTROL CAPACITY CONTROL CAPACITY REQUIREMENTS PLAN ROUGH-CUT CAPACITY PLAN RESOURCE PLAN MASTER PRODUCTION SCHEDULE Long Range Short Range Short Range Medium Range Plan Implement / Control
  • 12.
    Capacity requirements planning (CRP) Process of determining in detail the amount of labor and machine resources needed to achieve the required products. Planned orders forms the MRP and open shop orders (scheduled receipts) are converted into demand for time in each work center in each time period.
  • 13.
    Inputs Open orderfile: It is a released order for a quantity of a part to be manufactured and completed on a specific date. Is a record of all the active shop orders. Planned order releases: Assessing the total capacity required in future time periods determined by the computer's MRP
  • 14.
    Inputs Routing file:Specified on a route sheet or, in a computer-based system in a route file: Operations to be performed Sequence of operations Work center to be used Possible alternate work centers Tooling needed at each operation Standard times: setup times and run times per piece
  • 15.
    Inputs Work centerfile : It is a released order for a quantity of a part to be manufactured and completed on a specific date (schedule receipt on MRP). Planned order releases : Based upon the gross requirement for a particular part. Assessing the total capacity required in future time periods.
  • 16.
    Inputs Routing file: Routing is specified on a route sheet or, in a computer-based system in a route file Operations to be performed Sequence of operations Work centers to be used Possible alternate work centers Tooling needed at each operation Standard times: setup times and run times per piece.
  • 17.
    Inputs Work centerfile: Composed of a number of machines or workers capable of doing the same work. It contains information on the capacity and move, wait, and queue times associated with the center.
  • 18.
    Inputs Move time:move material from one workstation to another Wait time: Time a job is at work center after completion and before being moved Queue time is the time a ob waits at a work center before being handled. Lead time: Is the sum of queue, setup, run, Wait and move times .
  • 19.
    Shop calendarIs the number of working days available . fecha Día de trabajo Días de no trabajo 36 . . 35 . . 34 . . 146 33 . . 145 32 . . 144 31 . . 143 30 . . 142 31 29 . . 28 . . 27 . . 141 26 . . 140 25 …….... . . 139 24 …….. 138 23 …….…. 137 30 22 . . 21 . . 20 . . 136 19 . . 135 18 …….... . . 134 17 …….. 133 16 …….…. 132 29 15 . ………. 14 . … ……... 13 . ….. …. 131 12 . ….. . 130 11 . ….. 129 10 …… ... 128 9 . ….. 127 28 8 . 7 . ….. 6 . ….. 126 5 . ….. 125 4 . ….. 3 . ….. 124 2 . ….. 123 27 July Sun Sat Fri Thurs Wend Tues Mon Week Month 2 123
  • 20.
    Capacity Available Is the capacity of a system or resource to produce a quantity of output in a given time period. It is affected by the following: Product specifications Production mix Plant and equipment Work effort
  • 21.
    Measuring Capacity Unitsof output: Use a unit common to all products Standard time: Time required to make the product using a given method of manufacture.
  • 22.
    Levels of CapacityMachine or individual worker Work center Plant, witch can be considered as a group of different work centers
  • 23.
    Determining Capacity AvailableDemonstrated (measured) capacity is figured from historical data. Rated capacity: Product of available time, utilization and efficiency. Available time: Number of hours a work center can be used. A work center has three machines an is operated for 8 hours a day 5 days a week. What is the available time? Available time = 3x8x5 = 120 hours per week.
  • 24.
    Utilization Available timeis the maximum hours we can expect from the work center. A work center is available 120 hours but actually produce good for 100 hours. What is the utilization of the work center?
  • 25.
    Efficiency The workersmight be working at a faster or slower pace than the standard working pace. A work center produces 120 unit in a shift. The standard for that item is 100 units a shift. What is efficiency of the work center?
  • 26.
    Rated capacity Ratedcapacity is calculated by taking into account the work center utilization and efficiency. A work center consists of four machines and is operated 8 hours per day for 5 days a week. Historically, the utilization has been 85% and the efficiency 110%. What is the rated capacity ?
  • 27.
    Demonstrated Capacity Oneway to find out the capacity of a work center is to examine the previous production records and to use that information as the available capacity of the work center. Over the previous four weeks, a work canter produced 120, 130, 150 and 140 standard hours of work. What is the demonstrated capacity of a the work center?
  • 28.
    Capacity Required (Load)Capacity requirements are generated by the priority planning systems and involve translating priorities, given in units of product or some common unit, into hours or work required at each work center in each time period. Determining the capacity required is a two-step process. First, determine the time needed for each order at each work center, then, sum up the capacity required for individual orders to obtain the load.
  • 29.
    Capacity required (Load) The time needed for each order is the sum of the setup time and the run time. A work center is to process 150 units of gear shaft SG 123 on work order 333. The setup time is 1.5 hours, and the run time is 0.2 hours per piece. What is the standard time needed to run the order? How much actually time will be need to run the order if the work center has an efficiency of 120% and a utilization of 80%?
  • 30.
    Work Center Loadreport The work center load shows future capacity requirements based on released and planned orders for each time period of the plan. 8 15 20 10 (25) (12) (Over)/Under capacity 700 140 140 140 140 140 Rated Capacity 692 125 120 130 165 152 Total Load 510.5 100 90 100 120 100.5 Planned Load 181.5 25 30 30 45 51.5 Released Load Total 24 23 22 21 20 Week
  • 31.
    Capacity required (Load) Load: Sum of the required times for all the planned and actual orders to be run on the work center in a specified period. The steps in calculating load are as follows:
  • 32.
    Scheduling Orders “A time table for planned occurrences” APICS dictionary Back scheduling: The usual process is to start with the due data and, using the lead times, to work back to find the star date for each operation. This process is called Back scheduling. We need to know The quantity and due date Sequence of operations and work centers needed Setup and run times for each operation.
  • 33.
    Making the Plan Compare the load to available capacity to see if there are imbalances and if so, to find possible solutions. Two ways of balancing capacity available and load: alter the load or change the capacity available
  • 34.
    Making plan Scheduleovertime or under time Adjust the level of the workforce by hiring or laying off workers Shift workforce from under load to overloaded work centers. Use alternate routings to shift some load to another work center Subcontract work when more capacity is needed or bring in previously subcontracted work to increase required capacity.
  • 35.
    Summary Capacity managementoccurs at all levels of the planning process. It is directly related to the priority plan, need the level of detail and time spans will be similar to the related priority plan. CP is concerned with translating the priority plan into the hours of capacity required in manufacturing to make the items in the priority plan and with methods of making that capacity available.
  • 36.
    Summary Material requirementsplanning and capacity requirements planning should form part of a closed-loop system witch not only includes planning and control functions but also provide feedback so planning can always be current .