Material Requirement
Planning (MRP1)
What is MRP?
 Computerized Inventory Control
 Production Planning System
 Management Information System
 Manufacturing Control System
What is MRP? (cont)
 This is the most comprehensive approach to
manufacturing inventory and other dependents
which demand an efficient inventory management
system.
What is MRP do ?
 The MRP system determines item-by-item, what is to
be processed and when, as well as what is to be
manufactured when.
 This is based on order priorities and available
capacities.
When to use MRP
 Job Shop Production
 Complex Products
 Assemble-to-Order Environments
 Discrete and Dependent Demand Items
What can MRP do?
 Reduce Inventory Levels
 Reduce Component Shortages
 Improve Shipping Performance
 Improve Customer Service
 Improve Productivity
 Simplified and Accurate Scheduling
 Reduce Purchasing Cost
 Improve Production Schedules
 Reduce Manufacturing Cost
 Reduce Lead Times
 Less Scrap and Rework
 Higher Production Quality
What can MRP do?(contd)
 Improve Communication
 Improve Plant Efficiency
 Reduce Freight Cost
 Reduction in Excess Inventory
 Reduce Overtime
 Improve Supply Schedules
 Improve Calculation of Material Requirements
 Improve Competitive Position
Three Basic Steps of MRP
 Identifying Requirements
 Running MRP – Creating the Suggestions
 Firming the Suggestions
Step 1: Identifying the Requirements
 Quantity on Hand
 Quantity on Open Purchase Order
 Quantity in/or Planned for Manufacturing
 Quantity Committed to Existing Orders
 Quantity Forecasted
Step 1: Important Information
MRP is…..
 Company Sensitive
 Location Sensitive
 Date Sensitive
Step 2: Running MRP – Creating the
Suggestions
 Critical Items
 Expedite Items
 Delay Items
Step 3: Firming the Suggestions
 Manufacturing Orders
 Purchasing Orders
 Various Reports
Overview of the MRP System
Product
Structure
File
Master
Production
Schedule
Inventory
Master File
Material
Requirements
Planning
Manufacturin
g Orders
Purchase
Orders
Various
Reports
MRP Inputs
 Product Structure File
 Master Production Schedule
 Inventory Master File
Product Structure File
 Bill of Materials:
 It is a materials list that provides information
useful to reconstruct the manufacturing
process. It is the master product definition
that contains “as designed” information.
Bill-of-Material
Product Structure Tree
Bicycle(1)
P/N 1000
Handle Bars (1)
P/N 1001
Frame Assembly
(1) P/N 1002
Wheels (2)
P/N 1003
Frame (1)
P/N 1004
Master Production Schedule
 Schedule of Finished Products
 Represents Production, not Demand
 Combination of Customer Orders and Demand
Forecasts
 What Needs to be Produced
Inventory Master File
 On-Hand Quantities
 On-Order Quantities
 Lot Sizes
 Safety Stock
 Lead Time
 Past-Usage Figures
MRP Process
Item:
Low-Level Code:
Lot Size:
Lead Time
PD 1 2 3 4 5
Gross
requirement
Scheduled
receipts
Projected on
hand
Net
requirements
Planned order
receipts
Planned order
releases
Terms Defined
 Item – name or number for the item being scheduled
 Low-Level Code – the lowest level of the item on the product
structure file
 Lot Size – order multiples of quantity
 Lead Time – the time from when an order is placed to when it is
received
 PD – Past Due Time Bucket, orders behind schedule
Terms Defined
 Gross Requirements – demand for an item by time period
 Scheduled Receipts – material already ordered
 Projected on Hand – expected ending inventory
 Net Requirements – number of items to be provided and when
 Planned Order Receipts – net requirements adjusted for lot size
 Planned Order Releases – planned order receipts offset for lead
times
Example of the MRP Process
Item:
PD 1 2 3 4 5
Gross
requirement 10 15 25 25 30
Scheduled
receipts 25
Projected
on hand 20
Net
requirement
s
Planned
order
receipts
Planned
order
releases
Example of the MRP Process
Item
PD 1 2 3 4 5
Gross
requiremen
t
10 15 25 25 30
Scheduled
receipts 25
Projected
on hand 20 10 20 20 20 15
Net
requiremen
ts
5 5 10
Planned
order
receipts
25 25 25
Planned
order
releases
25 25 25 30 25
Aggregate
Production Plan
Marketing
Customer
Demand
Engineering
Design
Completion
Management
Return on
Investment
Capital
Human
Resources
Manpower
Planning
Procurement
Supplier
Performance
Finance
Cash Flow
Production
Capacity
Inventory
Inputs to the Production Plan
Production Plan
Execute Material
Plans
Master Production
Schedule
Material
Requirements
Plan
Capacity
Requirements
Plan
Execute Capacity
Plans
Realistic??
No
Yes
The Planning
Process
MRP Outputs
Manufacturing Orders
Purchasing Orders
Various Reports
Hubbell Lighting Case
Before MRP Implementation
Less than 75% of orders completed on time
After MRP Implementation
97% of orders completed on time
2% of orders completed with 1 to 2 days
after due date
Summary of
MRP
MRP is a…..
Computerized Inventory Control
Production Planning System
that…..
Schedules Component Items as Needed
which will…..
Track Inventory and…..
Help you in many other aspects of business

More Related Content

What's hot

Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Akash Maurya
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationDelwin Arikatt
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationPankaj Kumar
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production scheduleyashbhhardwaj260
 
Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Pankil Shah
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP) Konok Mondal
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
Presentation aggregate planning
Presentation aggregate planningPresentation aggregate planning
Presentation aggregate planningLauraRLR
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps omfatuma ahmed
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planningsenthil.G
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)Dipesh Pandey
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 

What's hot (20)

Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Operations MRP
Operations MRPOperations MRP
Operations MRP
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production schedule
 
Ch17 Mrp
Ch17  MrpCh17  Mrp
Ch17 Mrp
 
Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Master Production Scheduling (MPS)
Master Production Scheduling (MPS)
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
MRP-II
MRP-IIMRP-II
MRP-II
 
Presentation aggregate planning
Presentation aggregate planningPresentation aggregate planning
Presentation aggregate planning
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Mrp
MrpMrp
Mrp
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 

Similar to Material requirement planning (mrp1)

Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & ManufacturingPantit Sirapobthada
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)vins049
 
QAD solution (ENG)
QAD solution (ENG)QAD solution (ENG)
QAD solution (ENG)Phu Ton
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookellamuralikrishnanookella
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdfJOHN PAUL ROBERTO
 
My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS international university (S...
My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS  international university (S...My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS  international university (S...
My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS international university (S...ravindra sharma
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxIrelynJasmin
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic conceptsgokulfea
 

Similar to Material requirement planning (mrp1) (20)

3. mrp1 pgp1
3. mrp1 pgp13. mrp1 pgp1
3. mrp1 pgp1
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
MRP and Planning Overview
MRP and Planning OverviewMRP and Planning Overview
MRP and Planning Overview
 
IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & Manufacturing
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
MRP
MRPMRP
MRP
 
Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
QAD solution (ENG)
QAD solution (ENG)QAD solution (ENG)
QAD solution (ENG)
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 
module 2 OM.pptx
module 2 OM.pptxmodule 2 OM.pptx
module 2 OM.pptx
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
 
Erp viva
Erp  vivaErp  viva
Erp viva
 
Appendix c
Appendix cAppendix c
Appendix c
 
My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS international university (S...
My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS  international university (S...My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS  international university (S...
My SAP PPT BY ravindra nath sharma MBA SYNBIOSIS international university (S...
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptx
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic concepts
 

Recently uploaded

Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 

Recently uploaded (17)

Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 

Material requirement planning (mrp1)

  • 2. What is MRP?  Computerized Inventory Control  Production Planning System  Management Information System  Manufacturing Control System
  • 3. What is MRP? (cont)  This is the most comprehensive approach to manufacturing inventory and other dependents which demand an efficient inventory management system.
  • 4. What is MRP do ?  The MRP system determines item-by-item, what is to be processed and when, as well as what is to be manufactured when.  This is based on order priorities and available capacities.
  • 5. When to use MRP  Job Shop Production  Complex Products  Assemble-to-Order Environments  Discrete and Dependent Demand Items
  • 6. What can MRP do?  Reduce Inventory Levels  Reduce Component Shortages  Improve Shipping Performance  Improve Customer Service  Improve Productivity  Simplified and Accurate Scheduling  Reduce Purchasing Cost  Improve Production Schedules  Reduce Manufacturing Cost  Reduce Lead Times  Less Scrap and Rework  Higher Production Quality
  • 7. What can MRP do?(contd)  Improve Communication  Improve Plant Efficiency  Reduce Freight Cost  Reduction in Excess Inventory  Reduce Overtime  Improve Supply Schedules  Improve Calculation of Material Requirements  Improve Competitive Position
  • 8. Three Basic Steps of MRP  Identifying Requirements  Running MRP – Creating the Suggestions  Firming the Suggestions
  • 9. Step 1: Identifying the Requirements  Quantity on Hand  Quantity on Open Purchase Order  Quantity in/or Planned for Manufacturing  Quantity Committed to Existing Orders  Quantity Forecasted
  • 10. Step 1: Important Information MRP is…..  Company Sensitive  Location Sensitive  Date Sensitive
  • 11. Step 2: Running MRP – Creating the Suggestions  Critical Items  Expedite Items  Delay Items
  • 12. Step 3: Firming the Suggestions  Manufacturing Orders  Purchasing Orders  Various Reports
  • 13. Overview of the MRP System Product Structure File Master Production Schedule Inventory Master File Material Requirements Planning Manufacturin g Orders Purchase Orders Various Reports
  • 14. MRP Inputs  Product Structure File  Master Production Schedule  Inventory Master File
  • 15. Product Structure File  Bill of Materials:  It is a materials list that provides information useful to reconstruct the manufacturing process. It is the master product definition that contains “as designed” information.
  • 16. Bill-of-Material Product Structure Tree Bicycle(1) P/N 1000 Handle Bars (1) P/N 1001 Frame Assembly (1) P/N 1002 Wheels (2) P/N 1003 Frame (1) P/N 1004
  • 17. Master Production Schedule  Schedule of Finished Products  Represents Production, not Demand  Combination of Customer Orders and Demand Forecasts  What Needs to be Produced
  • 18. Inventory Master File  On-Hand Quantities  On-Order Quantities  Lot Sizes  Safety Stock  Lead Time  Past-Usage Figures
  • 19. MRP Process Item: Low-Level Code: Lot Size: Lead Time PD 1 2 3 4 5 Gross requirement Scheduled receipts Projected on hand Net requirements Planned order receipts Planned order releases
  • 20. Terms Defined  Item – name or number for the item being scheduled  Low-Level Code – the lowest level of the item on the product structure file  Lot Size – order multiples of quantity  Lead Time – the time from when an order is placed to when it is received  PD – Past Due Time Bucket, orders behind schedule
  • 21. Terms Defined  Gross Requirements – demand for an item by time period  Scheduled Receipts – material already ordered  Projected on Hand – expected ending inventory  Net Requirements – number of items to be provided and when  Planned Order Receipts – net requirements adjusted for lot size  Planned Order Releases – planned order receipts offset for lead times
  • 22. Example of the MRP Process Item: PD 1 2 3 4 5 Gross requirement 10 15 25 25 30 Scheduled receipts 25 Projected on hand 20 Net requirement s Planned order receipts Planned order releases
  • 23. Example of the MRP Process Item PD 1 2 3 4 5 Gross requiremen t 10 15 25 25 30 Scheduled receipts 25 Projected on hand 20 10 20 20 20 15 Net requiremen ts 5 5 10 Planned order receipts 25 25 25 Planned order releases 25 25 25 30 25
  • 25. Production Plan Execute Material Plans Master Production Schedule Material Requirements Plan Capacity Requirements Plan Execute Capacity Plans Realistic?? No Yes The Planning Process
  • 27. Hubbell Lighting Case Before MRP Implementation Less than 75% of orders completed on time After MRP Implementation 97% of orders completed on time 2% of orders completed with 1 to 2 days after due date
  • 28. Summary of MRP MRP is a….. Computerized Inventory Control Production Planning System that….. Schedules Component Items as Needed which will….. Track Inventory and….. Help you in many other aspects of business