A complete lowdown on Estimate To Complete (ETC). This presentation defines and explains project forecasting using ETC. It describes different scenarios and their associated formulas. It uses an example project to calculate ETC in different scenarios.
A comprehensive beginner's guide on Earned Value Management (EVM) to understand the basics & fundamentals. It includes definitions, example, pictures, and explanation in easy language.
This presentation takes you through the essential steps of cost planning through pictures. It describes how cost planning starts from scope planning and time planning. It then goes on to describe the steps involved in estimating activity costs and determining budget.
4D bim construction scheduling on the 1885 St. James pl. projectDat Lien
Part of the Associated General Contractors (AGC Houston) Tech Expo in Houston, TX in 2016, this presentation highlights the tools and processes used for complex construction planning, scheduling and visualization to minimize risk and ensure timely project delivery.
5 Steps Of Project Scheduling Process For Absolute BeginnersPraveen Malik, PMP
This presentation explains the 5 basic steps and associated techniques of project scheduling process. It is meant for beginners and intermediate level professionals.
A comprehensive beginner's guide on Earned Value Management (EVM) to understand the basics & fundamentals. It includes definitions, example, pictures, and explanation in easy language.
This presentation takes you through the essential steps of cost planning through pictures. It describes how cost planning starts from scope planning and time planning. It then goes on to describe the steps involved in estimating activity costs and determining budget.
4D bim construction scheduling on the 1885 St. James pl. projectDat Lien
Part of the Associated General Contractors (AGC Houston) Tech Expo in Houston, TX in 2016, this presentation highlights the tools and processes used for complex construction planning, scheduling and visualization to minimize risk and ensure timely project delivery.
5 Steps Of Project Scheduling Process For Absolute BeginnersPraveen Malik, PMP
This presentation explains the 5 basic steps and associated techniques of project scheduling process. It is meant for beginners and intermediate level professionals.
Here’s something from the APM PMC SIG that you may find useful in your day-to-day business in Project Control Earned Value and Agile. Now there's a potent combination. This Gold Card summarises the terms and Three Letter Abbreviations used by EV and Agile. It also shows how similar EV and Agile really are.
Even better, it shows how to translate between the two. A project control Babel Fish (for those of you who remember the book...) The real trick is to try and make a mousemat out of it (the PDF that is...not the Hitchhiker's Guide). Remember, this product may help you in your quest to demand rigidly defined areas of doubt and uncertainty.
Using The Earned Value Method To Calculate Project Delays In Terms Of TimeAhmed Elsayed
Using The Earned Value Method To Calculate Project Delays In Terms Of Time A simplified approach derived from “Practice Standard for Earned Value Management” ISBN: 1-930699-42-5 Published by: Project Management Institute, Inc.
In order to schedule the growing number of activities on-site more efficiently, BAM Infra has chosen to use ORTEC Cloud Services. The optimization of BAM Infra operations resulted in an immediate cost reduction and a higher level of service for the consumer.
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...Kuldeep Kumar
No Need Thankx! Very Helpful in Software Mange Tools, Software Project Management, I cover all things of MS Project, like History, Purpose Critical Path. Scheduling & Competitors.
ASSIGNMENT III
B Tech 8th Semester
Submit it on or before 20th April 2020
01. Construct a network for each of the activities and their precedence relationships are given below:
Building TaxBrain: Numba-enabled Financial Computing on the Webtalumbau
My slides on building TaxBrain, a webapp based on 'taxcalc', a Python package that uses Numba to do microeconomic tax simulation. The work was sponsored by the Open Source Policy Center. You can find them online at www.ospc.org.
In defining a project accounting system for an organisation, the needs of both project management and the finance function have to be met. However their needs differ. By combining project and programme management techniques with financial and management accounting methods, a more holistic approach to capturing metrics is possible. Analysis of this will enable focused effort to improve project efficiency and effectiveness.
Here’s something from the APM PMC SIG that you may find useful in your day-to-day business in Project Control Earned Value and Agile. Now there's a potent combination. This Gold Card summarises the terms and Three Letter Abbreviations used by EV and Agile. It also shows how similar EV and Agile really are.
Even better, it shows how to translate between the two. A project control Babel Fish (for those of you who remember the book...) The real trick is to try and make a mousemat out of it (the PDF that is...not the Hitchhiker's Guide). Remember, this product may help you in your quest to demand rigidly defined areas of doubt and uncertainty.
Using The Earned Value Method To Calculate Project Delays In Terms Of TimeAhmed Elsayed
Using The Earned Value Method To Calculate Project Delays In Terms Of Time A simplified approach derived from “Practice Standard for Earned Value Management” ISBN: 1-930699-42-5 Published by: Project Management Institute, Inc.
In order to schedule the growing number of activities on-site more efficiently, BAM Infra has chosen to use ORTEC Cloud Services. The optimization of BAM Infra operations resulted in an immediate cost reduction and a higher level of service for the consumer.
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...Kuldeep Kumar
No Need Thankx! Very Helpful in Software Mange Tools, Software Project Management, I cover all things of MS Project, like History, Purpose Critical Path. Scheduling & Competitors.
ASSIGNMENT III
B Tech 8th Semester
Submit it on or before 20th April 2020
01. Construct a network for each of the activities and their precedence relationships are given below:
Building TaxBrain: Numba-enabled Financial Computing on the Webtalumbau
My slides on building TaxBrain, a webapp based on 'taxcalc', a Python package that uses Numba to do microeconomic tax simulation. The work was sponsored by the Open Source Policy Center. You can find them online at www.ospc.org.
In defining a project accounting system for an organisation, the needs of both project management and the finance function have to be met. However their needs differ. By combining project and programme management techniques with financial and management accounting methods, a more holistic approach to capturing metrics is possible. Analysis of this will enable focused effort to improve project efficiency and effectiveness.
Presentation by Nico De Greef as delivered during the event "How successful teams are built on top
of Atlassian and Tempo" on the 29th of September, 2015
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the NumbersPMI-Montréal
The purpose of Earned Value Management (EVM) is to integrate a common rigour of project performance management. Execution is everything with EVM. It requires nothing less than a complete commitment by senior management to fully ingrain a business wide culture of EVM. Do it right, and you will reap invaluable data from and for your project teams. Do it wrong, and it will send you into an abyss of disarray. Proper execution does not guarantee perfect program performance. Rather, it will give you invaluable insight into your schedule and budget. Being ahead of schedule and under budget may have the same negative impacts as the opposite unless you can effectively manage to answer the most daunting question of all: Why? Please join me as we Go Beyond the Numbers of EVM. We will briefly review the basic foundations of EVM (SPI, CPI, etc.) before we seek to not only understand what the data is telling us, but more importantly, how can we use it to our benefit.
BIOGRAPHY
Jonathan Shriqui has over a decade of financial management experience acquired from General Electric & Lockheed Martin on large scale programs. His Earned Value Management (EVM) acumen was refined when he joined Lockheed Martin, in 2007, as part of the successful capture team for the frigate modernization program (HCM/FELEX CSI) for the Canadian Navy. In 2012, he transitioned to the Navy’s arctic patrol program (AOPS) where the EVM reporting requirement demanded a weekly delivery cycle. Since 2015, as part of the BMT Clarity management consultancy, he provides insights and recommendations to the Department of National Defense for the AOPS and Canadian Surface Combatant (CSC) programs. Jonathan has earned his PMP and Six Sigma Black Belt credentials and is currently working towards completing his Canadian Risk Management (CRM) designation.
Capital Power has implemented Unifier as our Project Control's tool for $500,000 to $2 billion construction projects. What is different about our implementation is that we use Unifier to collect quantity of work (e.g. km of roads) and the hours of labour involved. This information is very important in understanding productivity on a project and in estimating future projects. We are using Unifier on our first project, Genesee 4/5 a gas turbine plant with a construction budget of $1.5 billion. We also leverage the power of Oracle integration across EBS, P6 and Unifier to eliminate rekeying and avoidance of potential errors. Direct input by contractors of progress information also saves time.
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
Introduction
Overview of Key Performance Indicators ( KPI )
What Is The Earned Value Management ?
Why Project Managers Use EVM ?
Earned Value Management Terms and Formulas
Planned value (PV)
Earned value (EV)
Actual cost (AC)
Variance
Schedule Variance ( SV )
Cost Variance ( CV )
Performance Index
Schedule Performance Index (SPI)
Cost Performance Index (CPI)
Example ( Case Study )
Project Forecasting
Budget at Completion (BAC)
Estimate at Completion (EAC)
Estimate to Complete (ETC).
Variance at Completion (VAC)
To Complete Performance Index (TCPI)
Construction of 6 CPCL Oil storage tankers - A critical Project Management pe...Shanmukha S. Potti
The project - Construction of 6 Euro IV CPCL Oil storage tankers is critically analyzed from a project management perspective.
Systems approach, Work Breakdown Structure, PERT, Costing, Project C&M, Biz (CMS) are discussed in detail.
How To Use Scheduling Lead And Lag With 4 Types Of RelationshipsPraveen Malik, PMP
This presentation provides an in-depth analysis of scheduling lead and lag. It has definitions, examples and various diagrammatic representations. It also shows how these can be used with 4 types of scheduling relationships - FS, FF, SS, SF
How To Do Planning Using 4 Types of Project Dependencies?Praveen Malik, PMP
This ppt provides definition, examples, and difference between project dependencies, assumptions, constraints, and risks. It also provides definitions & examples of 4 types of project dependencies and how they can be used for scheduling - mandatory, discretionary, external, and internal.
4 Project Estimation Techniques That Can Make You Super SuccessfulPraveen Malik, PMP
This presentation provides an overview of different project estimation techniques - expert judgement, analogous estimation, parametric estimation, 3-point estimation, and also reserve analysis. It can be used by PMP certification aspirants.
This presentation provides a good description of project scope, product scope, scope statement, WBS and WBS dictionary. It will also tell you about the benefits of WBS. You will also learn about the 2 ways to represent a WBS. Lastly, you can use it to prepare for the PMP exam.
How Project Network Diagram's Can Help You Become A Better Project ManagerPraveen Malik, PMP
This presentation provides a good description of Project Network Diagrams. It explains: Precedence Diagramming Method, Logical Relationships, Lead & Lag, Float and Critical Path Method. It will help you in preparing for PMP Exam.
Normal Labour/ Stages of Labour/ Mechanism of LabourWasim Ak
Normal labor is also termed spontaneous labor, defined as the natural physiological process through which the fetus, placenta, and membranes are expelled from the uterus through the birth canal at term (37 to 42 weeks
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Dr. Vinod Kumar Kanvaria
Exploiting Artificial Intelligence for Empowering Researchers and Faculty,
International FDP on Fundamentals of Research in Social Sciences
at Integral University, Lucknow, 06.06.2024
By Dr. Vinod Kumar Kanvaria
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
A workshop hosted by the South African Journal of Science aimed at postgraduate students and early career researchers with little or no experience in writing and publishing journal articles.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
Francesca Gottschalk - How can education support child empowerment.pptxEduSkills OECD
Francesca Gottschalk from the OECD’s Centre for Educational Research and Innovation presents at the Ask an Expert Webinar: How can education support child empowerment?
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
2. AGENDA
• Definition & Explanation
• Calculating ETC
• Example Project
• ETC Formulas
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 2
3. AGENDA
• Definition & Explanation
• Calculating ETC
• Example Project
• ETC Formulas
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 3
4. ESTIMATE TO COMPLETE (ETC)
Estimate to Complete or ETC is the expected
cost to finish all the remaining project work.
How much money is needed to complete the
remaining project work?
4DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
5. PROJECT STATUS
• On Control Date, some work has been completed while some is
remaining.
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 5
COMPLETED REMAINING
TOTAL PROJECT SCOPE/WORK
6. CALCULATING ETC
• Problem Statement – To Calculate Expected Cost of Remaining Work
(ETC)
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 6
EARNED VALUE
MONETARY VALUE
OF
REMAINING WORK
ORIGINAL PROJECT BUDGET (BAC)
ACTUAL COST/EXPENDITURE ETC
FORECASTED PROJECT BUDGET
?
7. AGENDA
• Definition & Explanation
• Calculating ETC
• Example Project
• ETC Formulas
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 7
8. CALCULATING ETC
Is ETC Equivalent to Monetary Value of Remaining Work?
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 8
9. CALCULATING ETC
Is ETC Equivalent to Monetary Value of Remaining Work?
• No
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 9
10. CALCULATING ETC
Is ETC Equivalent to Monetary Value of Remaining Work?
• No
• The ETC depends on the Project Team’s efficiency of utilizing the
money
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 10
11. CALCULATING ETC
Is ETC Equivalent to Monetary Value of Remaining Work?
• No
• The ETC depends on the Project Team’s efficiency of utilizing the
money
• If Efficiency = 1, ETC will be equal to Monetary Value
If Efficiency < 1, ETC will be more than Monetary Value
If Efficiency > 1, ETC will be less than Monetary Value
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 11
Reference –
Basics of Earned Value Analysis
Earned Value Management System Explained in Easy
12. CALCULATING ETC
12DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
Reference –
Estimate to Complete
ETC = (monetary value of remaining work)/(future projected cost
efficiency)
13. CALCULATING ETC
Monetary value of remaining work = monetary value of total work –
monetary value of completed work
Monetary value of remaining work = BAC – EV
13DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
Reference –
Estimate to Complete
ETC = (monetary value of remaining work)/(future projected cost
efficiency)
14. CALCULATING ETC
Monetary value of remaining work = monetary value of total work –
monetary value of completed work
Monetary value of remaining work = BAC – EV
In EVM, Cost Efficiency is represented as Cost Performance Index (CPI)
Let us represent the future projected cost efficiency as CPIp
14DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
Reference –
Estimate to Complete
ETC = (monetary value of remaining work)/(future projected cost
efficiency)
16. AGENDA
• Definition & Explanation
• Calculating ETC
• Example Project
• ETC Formulas
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 16
17. PROJECT PLAN – EXAMPLE
PROJECT
Refer to the example in the previous presentation
(https://www.slideshare.net/pmalik2/101-a-beginners-guide-to-earned-
value-management)
17DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
Project Scope Build 80 Tables
Project Time Estimate (Duration) 5 Days
Cost Estimate Per Table $1000
Project Cost (Budget) $1000*80 = $80000
18. PROJECT STATUS – EXAMPLE
PROJECT
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 18
Work Completed 35 out of 80 tables
Actual Expenditure $36000 for building 35 tables
Remaining Project Work 45 tables
ETC ?
19. AGENDA
• Definition & Explanation
• Calculating ETC
• Example Project
• ETC Formulas
DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018 19
20. SCENARIO I
• The project team believes that the project’s past performance will
continue to effect the future performance.
• The project would continue to expend money at the current rate.
• The remaining work would be completed at project’s current cost
efficiency.
• Replacing CPIp with CPI, Generic ETC equation becomes
ETC = (BAC – EV) / CPI
20DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
21. SCENARIO I - CALCULATION
• ETC = ($80000-$35000)/($35000/$36000)
= $46286
• It simply means that the project team will require $46286 to build
the remaining 45 tables.
21DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
22. SCENARIO II
• The project team believes that the project’s past performance will
not effect the future performance.
• The irregularities of the past would not be repeated in future.
• The remaining work would be completed at project’s 100% cost
efficiency (as per the original estimates).
• Replacing CPIp with 100%, Generic ETC equation becomes
ETC = (BAC – EV)
22DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
23. SCENARIO II - CALCULATION
• ETC = ($80000-$35000)
= $45000
• It simply means that the project team will require $45000 to build
remaining 45 tables.
23DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
24. SCENARIO III
• The project team believes that the project’s past performance will
not effect the future performance.
• The team also believes that project would expend money neither at
current rate nor at 100%.
• The remaining work would be completed at new cost efficiency -
CPIp.
• Generic ETC equation becomes formula for the current Scenario
ETC = (BAC – EV) / CPIp
24DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
25. SCENARIO III - CALCULATION
• Let us assume that the project team determines that future cost
efficiency would be 120% (or 1.2).
• ETC = (80000 – 35000)/1.2
= $37500
• It simply means that the project team will require $37500 to build 45
remaining tables.
25DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
26. SCENARIO IV
• After analysing the project’s past performance, The project team
believes that the original estimates were not good.
• The cost of remaining work should be re-estimated i.e. ETC should
be determined afresh.
• A fresh ETC can by found by estimating the cost of remaining
(unfinished) work from the Work Breakdown Structure (WBS).
• The project team can re-estimate the cost of remaining work
components (work packages and activities) and then total then total
them Upwards in the WBS to determine a fresh ETC.
• There is no ETC formula for this scenario.
26DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018
27. YOUR OPINION IS
IMPORTANT TO US
For Any Questions Or
Suggestions Contact Us @
https://www.pmbypm.com/c
ontact-praveen-malik/
27DESIGNED AND DEVELOPED BY HTTPS://WWW.PMBYPM.COM | COPYRIGHT 2018