SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
BACHELOR OF SCIENCE (HONS) ARCHITECTURE
TAYLOR’S UNIVERSITY COLLEGE
BUILDING TECHNOLOGY 1 (BLD 60703)
ASSIGNMENT 1: INDUSTRIALISED BUILDING
SYSTEM
TUTOR: AR.EDWIN
CHONG YIT JIA 0331684
KELVIN SHIM KAH VUN 0331371
PAUL WONG SZE LING 0331208
ZOE LOW LI MIEN 0319444
PHAN GUANG LEI 0331858
1
TABLE OF CONTENTS
2
1.INTRODUCTION ……………………………………..……....3
1.2 Strengths of the IBS System………………………………...4
1.3 Weaknesses of the IBS System…………………………….8
1.CASE STUDY…………………………………………………….11
2.1 Task & Methodology………………………………………….14
1.PRECAST CONCRETE FRAMING…………………………….15
3.1 Skeletal Frame System………………………………………16
3.2 Types of Precast Components……………………………....17
3.3 Precast beams………………………………………………...19
3.4 Precast Columns……………………………………………....20
3.5 Precast Slabs…………………………………………………..21
3.6 Precast Staircase……………………………………………....22
1.Joints………………………………………………………………...23
4.1 Column to Column……………………………………………..24
4.2 Beam to Column………………………………………………..25
4.3 Column to Base……………………………………………..….27
1.Blockwork System……………………………………………..…..29
2.Steel truss System…………………………………………..……..30
3.Sequence of Construction.…………..……………………..……..31
4.Construction Drawings……………………………………..……...36
5. Schedule of IBS Components…………………………………....42
6. Construction Process……………………………………………..51
7. Model Making Process…………………………………………...54
8.IBS Score…………………………………………………………..58
1.INTRODUCTION
The five most commonly used IBS Systems in
Malaysia are:
1.Precast concrete framing, panel and box systems;
2.Steel framework systems;
3.Prefabricated timber framing systems;
4.Steel framing systems; and
5.Blockwork systems
In our project’s case, we used the Precast Concrete
Framing System to construct our building.
IBS system is a construction method which components
are manufactured in a controlled, factory environment at
site or off - site. In Malaysia’s case, the term “IBS” is used
to describe this construction method, whereas in other
countries it is also known as Pre-fabricated/Pre-fab
Construction, Modern Method of Construction (MMC) and
Off-site Construction. These manufactured components
are transported, positioned and assembled in site.
3
4
1.2 STRENGTHS OF THE IBS SYSTEM
a) Providing a cleaner & safer
construction site
IBS construction sites are proven to be tidier and neatly
organised compared to the wet and dirty traditional
construction sites. The usage of IBS components can reduce
wet work at construction sites. It also reduces the site’s
wastage such as timber formworks and props on temporary
works. These common conventional constructions. are reduced
greatly as the construction of the project put greater
emphasises on IBS components. Prompting construction sites
to become neater, reducing involved risks related to health and
well-being of the site other than promoting a safer working
environment.
b) Cost reduction
IBS construction methods are cheaper than traditional
construction methods. Reducing the employment of workers
needed to construction labour in terms of wages. Due to the
usage of prefabricated materials, IBS also can reduce the
usage of scaffoldings and other temporary supports compared
to in-situ systems. This system is considered to be one of the
cheapest options when the overall cost incurred for the
construction of a building project is considered. Bringing the
phenomenon of this construction method, where it has been
made beneficial for the constructions of small shops, offices
and simple house designs. Proving this system is to be useful
when a project is constructing repetitive designs.
5
c) Reduced Labour
The construction sector in Malaysia is very dependent on foreign
labour from neighbouring countries such as Indonesia,
Bangladesh and Vietnam. With the implementation of the IBS
system, this dependency can be reduced for the benefit of the
local economy. By doing so, the IBS system is able to reduce the
number of workers such as concreter, carpenters, bar benders,
plasterer and many more. When the IBS components are
produced at factories using complex machineries, it minimises the
requirement of labour needed to construct the project. Replacing
the task with a group of IBS component installers which consisted
of at least 5 individuals in each project. Leading to saving
expenses in terms of labour costs.
d) High and controlled quality of end
products
The IBS system offers improvements on the quality, productivity and
efficiency of the project due to the prefabrication of components.
Reducing the poor workmanship and lack of quality control.
Providing high quality surface finishes as the joint sections are the
only parts to be grouted, eliminating the requirement of plastering.
The construction is completed in shaded and protective
environments which emphasises on critical elements such as
material curing processes for e.g. Temperature control would be
able to evade crack problems on the concrete structures.
6
f) Faster completion time
The IBS system reduces the project’s time period of
construction, which helps to reduce monetary losses. This is
due to the construction of prefabricated components, which
are concurrently constructing. Enabling it to proceed when the
foundations of the construction sites are under surveyed or
when the prefab components are involved in the earthwork.
The installations of IBS components will occur on the sites
only after this process. This phenomenon helps to reduce the
risks of project delays and unnecessary expenditures. The
production of IBS elements are not affected by weather
conditions. Instead, the use of large panel structures would be
able to accelerate structural-related tasks such as painting,
electrical wiring and plumbing.
g) Not affected by adverse weather
conditions
The datelines of the IBS projects will not be affected due to the
faster rates of completion. This prevents the construction
operations from being affected as the fabrications of the IBS
components are conducted at factories under controlled
environments.
7
1.3 WEAKNESSES OF IBS SYSTEM
8
a) High capital costs
The weakness of the the IBS system are the high Initial capital
costs within this project. This is due to taking account of all the
costs of the construction works in the factories. Such as the
casting of beds and the acquisition of supported machineries
which leads to high expenses. Besides this, in some case, the IBS
system can also require a large demand of export labour.
Therefore, resulting the project to face extra costs required to train
the unskilled or semi-skilled labour.
b) Problem of joints between components
Malaysia has an equatorial climate which experiences heavy
rainfall. This climatical aspect issues the problem of leakages
which the building has to face when it is constructed using IBS
applications. When this leakage occurs, other complications may
have to follow, leading the project to have issues of dampness,
corrosion and many more issues.
9
c)Sophisticated plants and skilled operators
In the IBS system, extensive usage of sophisticated plants and
machineries are involved which are needed to be maintained by
skilled operators. If any damages to the plants or on the machines
occur, it will result a significant impact upon the production of IBS
components.
d) Site accessibility
Site facility and accessibility is one of the most important factors in
the implementation of the IBS. The IBS system requires adequate
access to transport all the components of the plants up to the
construction sites. It is possible for complications to arise at the
construction sites. One example is the delay of the installation of
the components due to transportation woes, which results in
construction delay. Prompting the installation task to perform at a
later date.
10
e) Rigid Sizing
The main disadvantage of using the IBS System is that the
components are prefabricated in Fixed modular sizes. In term of
coordination, when there are mistakes involving sizing or
components occur, it leads to a wastage of costs and
prefabrication.
2. CASE STUDY
Seri Jati Apartment, Setia Alam
A 10 storey, 6 blocks apartment consisting of 948 Units.
Seri Jati uses the Precast System for IBS. Known for its high
IBS score due to their application of a reusable system formwork
onto the Precast Structural Frames along with in-situ concrete
floor.
Precast Components such as:
- Precast Loadbearing & non-loadbearing walls
- Staircases & Landing Slabs
- Lift Core Walls
- Bathroom Slabs
- Air-Con Ledges
11
12
IBS Score Advantages:
1.Project has high degree of repetitions for both horizontal
and vertical plain.
2.Architectural and Structural designs with precast
intention to capitalise on precast advantages.
3.High economy of scale with >900 units apartment with a
single unit layout.
4.Construction logistic is fully considered at planning stage
E.g. wall layout, work sequencing,crane’s capacity and
movement.
IBS Score Disadvantages:
1.Brickwork/plastering in stand alone amenities building, box-
out for M&E services/risers and kitchen/yardwalls.
2.Non-compliance in Modular Coordination for structural
elements and architectural design input.
13
2.1) TASK AND METHODOLOGY
THE APPLICATION OF IBS SYSTEM:
i) Design an apartment unit which do not exceed more than
100 meter square.
ii) The apartment consist of a living hall, a dining area, three
bedrooms and two toilets.
iii) The design should apply mainly Ibs system components
and construction method such as precast wall, blockwork
hollow core slab, precast staircase, toilet pod, prefabricated
timber roof truss, etc , appropriate sizes.
COMPONENTS APPLICATION:
Our apartment consist of these three main systems:
i) Precast concrete framing
- Precast beams
- Precast columns
- Precast slabs
- Precast staircase
ii) Blockwork system
iii) steel truss system
14
The precast concrete framing system consists of precast slab, beam and column components which are fabricated
and manufactured off-site. This systematic fabrication process is carried out to produce similar components
repeatedly. The components are casted in reusable mould which is then cured under controlled environment,
transported to site and placed at the required position.
The components of precast concrete framing and its technical details are compiled and presented as a catalogue.
The contalogue contains basic information of precast concrete components such as section properties, capacities
and detailing. We are required to use the catalogue as our design guidelines to apply proper sizes of precast
concrete components
3) PRECAST CONCRETE FRAMING
15
The skeletal frame system is a structural
system, which consists of precast
concrete beams, columns and slabs as
shown in the figure. Non-load bearing
walls also can be incorporated in the
frame.
3.1) SKELETAL FRAME SYSTEM
16
17
3.2) TYPES OF PRECAST BUILDING COMPONENTS
18
The selection of beams are not determined by the
function and utilities of a building. However a flat
and wide rectangular precast concrete beam is
commonly used to support a long span hollow core
slab because it provides enough bearing seating for
the slab. While inverted T-beams and edge beams
are used for internal and external beams
respectively to increase the ceiling height. For a
floor layout, a secondary beam is used to transfer
building load to primary beam which is connected to
columns.
3.3 PRECAST BEAMS
`19
Building Structural Components.
(A) Rectangular Beam
(B) Inverted T Beam
(C) Edge Beam.
C
.B.
A.
Square precast columns with corbels structures are
very common in this construction system. Corbels are
used to provide support or bearing the beam ends so
that beams can be released from crane immediately
after placing. Precast concrete columns can be
fabricated up to four storey high. However, for easy
handling and transporting, one-storey and two-storey
high columns are more preferred.
3.4 PRECAST COLUMN
20
Square precast columns with
corbels
A)single storey B) two storey
s
Square precast column with
corbels connected to precast
beam
Two storey precast column Four storey precast column
3.5 PRECAST SLABS
Precast hollow core slab or precast half slabs are
types of flooring system which are used depending on
suitability of floor structure. Precast hollow core slabs
are normally used for long span structure such as
office buildings to provide spacious areas. While
precast half slabs are used for short span structures
ranging from two to five meters which are suitable for
residential dwellings. Since precast slabs are
manufactured individually, each slab is joined to each
other to form a diaphragm and is strengthened with
cast in-situ structural concrete topping of thickness
ranges between 50mm to 75mm.
21
Precast Hollow Slab With Con crete Topping Supported By Precast
Beam
Precast Hollow Core Slab for Long Span Structure
Precast Half Slab
supported by precast
beams with structural
concrete topping
3.6 PRECAST STAIRCASE
Most of the concrete stair arrangements are possible to
produce as precast concrete components which can be:
- Individual steps units
- Complete flight with number of steps required
Advantages of precast concrete units:
- Better quality control of the finished product
- Saving of space on site as formwork storage space and
fabrication space is not required
- Stairway enclosing shaft can be utilized for hoisting or
lifting of materials and equipments during the major
construction period.
- Can usually be positioned and fixed by semiskilled labor
- Along with the extensive experiments in formwork
tehcniques, the coloring of the concrete with various
aggregates and the surface treatments is possible.
- It is also possible to finish prefabricated concrete stair
elements with timber or stone.
22
Produce off site, save space but
need special equipment to move it
to higher level
The landing can
be functioned as
beam to sustain
its own weight,
but the main load
bearer of the
staircase is the
secondary beam
at the beginning
and the end of
the staircase.
Beams and columns are connected to form an integrated frame system before the floor slabs
are placed. Hence structural connectors are required to connect all the structural components
of beams, columns and slabs. The most important connections are beam to column, column to
column and column to base and these connections are either structurally pinned or rigid. The
complete precast frame must be designed to comply with the required strength, stiffness,
ductility, and reliability.
4.JOINTS
23
4.1 COLUMN TO COLUMN
In all joints design, the
connection must able to resist
the applied structural forces. It
should also be shown clearly
wherever the joint functions as
a pinned or moment
connection. An example of a
typical joint of column to
column is as shown in the
drawings..
24
4.2 BEAM TO COLUMN
The simplest connection of beam to
column is to place beam on top of
column. However, for two or three
storey building, it is suitable to use
column with corbel or nib support
25
A detail drawing of beam to column connection
26
(A) Column to beam connection with corbel (B) Column to beam connection with nib support
Steel Base Plate Connection
Steel plates or angles are welded
at base of precast concrete
column. The column is then bolted
tightly to foundation. Finally the
gap in between plate and
foundation is filled with non-shrink
cement grout
4.3 COLUMN TO BASE CONNECTION
27
28
A progress of column to base connection from different parts to assembly together after grouted.
5) BLOCKWORK SYSTEM
`DSF
29
Bricks and blocks are components of durable masonry
construction in which uniformly shaped individual units are
laid in courses with mortar as the bed and binding material.
They consist of high mass materials with good compressive
strength formed into units that can be lifted and handled by
a single worker. Solid brick or blockwork walls deliver good
load bearing capacity along with substantial thermal mass
to provide a unique combination of structural, thermal and
aesthetic benefits.
30
6) STEEL TRUSSES SYSTEM
A standard truss is a series of triangles - a stable geometric shape that is difficult to distort under load. Regardless of its overall
size and shape, all the chords and webs of a truss form triangles. These triangles combine to distribute the load across each of
the other members, resulting in a light structure that is stronger than the sum of the strength of its individual components. Most
roof trusses have webs that run at an angle between top and bottom chords. The gable-end truss must be supported along the
entire length, and stabilized at the truss/wall intersection. There are a number of truss types that leave space for attic storage or
living area. In any roof truss, however, attic or living space comes at a price. The bottom chord of the attac truss also acts as a
floor joist and must be sized to accommodate a live load.
31
7. SEQUENCE OF CONSTRUCTION
1. 2. 3. 4.
1.Joing of Precast
Concrete with pile
cap
- The precast column is
connected to the pile cap with
anchor bolts by using the bolted
connection.
- A shim plate or bearing plate is
placed directly under the
embedded steel plates.
- The column is placed on top of
the embedded steel plate and
the nut is screwed in with the
anchor bolt.
2.Grouting of
Precast Concret with
Pile Cap
- After the columns are
mechanically joined the
connection is grouted and
formwork is conducted.
- The stump is made to provide
full bearing between elements
and protect the metal
components from fire and
corrosion.
3. Installation of
Precast Ground
Beam
- Precast concrete ground floor
beams to each other, and to the
pile caps, with small in situ
concrete “patches”
4. Installation of
precast floor slab
- The ground floor slab is lifted by
using ropes (crane) and are
placed and installed on top of
ground floor beam.
- The joints are grouted solid.
33
5. 6. 7. 8.
6. Setting up for
precast wall
installation
- Setting reference line and
offset, line are used to
determine the position of the
precast wall to be installed.
- The grid and marks of the wall
position are transformed on slab
- A 100mm offset line from near
building edge is marked.
- A 2x2 timber is secured to the
floor at wall edge to guide the
wall.
5. Construction of
second later
reinforcement cast
in-situ concrete
- A layer BRC wire mesh is
place on top of the precast
concrete slab for reinforcement.
- 75mm of cast in situ concrete
is poured on top for a smooth
finish with visible joints.
7. Positioning of the
wall
- The precast concrete wall is
lifted by using a crane and
carefully installed on the correct
position by following the
reference mark during the wall
setting procedure.
8. Wall Adjustment
- The adjacent walls and plumb
wall comers are positioned at
200mm offset.
- The walls are adjusted
vertically within +2 or-2mm
- The Four faces of every walls
are adjusted
- A string is positioned 250mm
from the face the walls
- Walls within the same line are
adjusted within the same
tolerance
- Grouting is performed to seal
the air pockets.
34
9. 10. 11. 12.
10. Construction of
subsequences
stories
- After the installation of the first
floor beam, the placing of the
first floor slab has been carried
out.
- The construction sequences
step 4 to step 8 has been
repeated and carried
subsequently until the
construction reached the final
storey of walls panels erected.
9. Installation of
precast concrete
beam
- The beam is lifted by the crane
and moved above to the
correct installation position.
- A piece a shim plate is placed
to correct the beam soffit level
- The beam is connected to the
precast columns by the anchor
rebar.
11. Installation of
the precast concrete
staircase
- The landing and slabs are
positioned and verified at soffit
level at four corners.
- The level is adjusted within
tolerance.
- Shim plates are placed at the
staircase support location to the
correct level.
- A 10mm gap between the
precast plank and staircase be
left for grouting.
12. Installation of
prefabricated timber
roof trusses
- The prefabricated roof trusses
are lifted up by wire ropes
(crane) and postioned on top of
the roof beams
- The positioning of the trusses
is carefully adjusted to the
correct postion.
- The first truss is erected at one
end. After it is in the correct
position, the truss is nailed to
the wall plates. The end truss is
then temporily braced to the
ground at two places using
timber.
35
13. 14. 15. 16.
14. Installation of
roofing sheets
- Roofing sheets are laid over
the purlins. The roofing sheets
consist of corrugated metal
deck and aluminium foil
insulation sheets.
13. Installation of
roof purlins
- Purlins are nailed to each rafter
with two 78mm nails, are on
each side.
- Fascia boards and barge
boards are fixed to the ends of
rafters and purlins.
15. Installation of
doors, windows and
railing
- As the installation of the roof is
completed a dry interior
environment is presented.
- The installation of doors,
windows and railings are carried
out.
16. Finishing
- Lastly, the finsihing work is the
conducted which included
facing, plastering, flooring,
painting, wall papering and
glazing.
36
8. CONSTRUCTION DRAWINGS
37
FLOOR PLAN SCALE:NTS
B
A
B
A
38
ROOF PLAN SCALE:NTS
39
SECTION A-A, B-B SCALE:NTS
40
ELEVATION SCALE:NTS
41
ELEVATION SCALE:NTS
9. SCHEDULE OF IBS COMPONENTS
42
43
44
45
46
47
48
49
50
10. CONSTRUCTION PROCESS
51
52
1.1. 1.2. 1.3.
1.4. 1.5. 1.6.
1.7. 1.8.
1.9.
1.10. 1.11. 1.12.
53
1.4. 1.5. 1.6.
1.7. 1.8. 1.9.
1.10. 1.11.
11. MODEL MAKING PROCESS
54
55
1.1.
1.2.
3.
4.
Footing were
attached
underneath the
base.
Column were
erected on top
of the stumps.
Upper beam were
laid horizontal on
top of the corbels.
Blockwork
were arranged
underneath the
beams.
56
5.
1.6.
7.
8.
First floor were
erected in
repeat steps.
Staircase
landing were
installed.
Staircase were
vertically installed.
Slabs were laid
horizontally on
top of the
beam.
57
9.
1.10.
11.
12.
Repetiton steps
of blockwork
and upper beam
install.
Prefabricated
truss
horizontally
laid on top of
the upper
beam.
Purlins laid
perpendicular
across the trusses.
Final outcome
12. IBS SCORE
58
Part 1: Structural systems (Beams, Columns, Slabs, Roof Truss)
ELEMENTS DIMENSIONS
(M/SQ.)
IBS FACTOR TOTAL
(COVERAGE)
IBS SCORE
Prefabricated steel
roof truss
24m X 9.3m = 223.2 1.0 223.2 / 775.2 = 0.3 50 X 0.3 X 1.0 = 15
Precast concrete
beam & column with
precast hollow core
slab (3 Stories)
184m X 3 = 552 1.0 552 X 775.2 = 0.7 50 X 0.7 X 1.0 = 36
TOTAL PART 1 775.2 1.0 51
59
Part 2: Wall systems
ELEMENTS DIMENSIONS
(M/SQ.)
IBS FACTOR TOTAL
(COVERAGE)
IBS SCORE
Internal wall : Block
work system (3
Stories)
36.8m X 3 = 110.4 0.5 110.4 / 349.2 = 0.32 20 X 0.32 X 0.5 = 3.2
External wall : Block
work system (3
Stories)
79.6m X 3 = 238.8 0.5 238.8 / 349.2 = 0.7 20 X 0.7 X 0.5 = 7
TOTAL PART 2 349.2 1.0 3.9
60
Part 3: Other Simplified Construction method
ELEMENTS DIMENSIONS
(M/SQ.)
IBS FACTOR TOTAL
(COVERAGE)
IBS SCORE
Beam dimension
complies to MS 1064
PART: 10 2001
100% 4
Column dimension
complies to MS 1064
PART: 10 2001
100% 4
Door dimension
complies to MS 1064
PART: 10 2001
100% 4
Window dimension
complies to MS 1064
PART: 10 2001
100% 4
Wall dimension
complies to MS 1064
PART: 10 2001
100% 4
Horizontal repetition of
structural
100% 2
61
ELEMENTS DIMENSIONS
(M/SQ.)
IBS FACTOR TOTAL
(COVERAGE)
IBS SCORE
Vertical repetition of
structural
100% 2
Floor layout 100% 2
Repetition of floor to
floor height
100% 2
TOTAL PART 3 28
IBS project contents
score (PART 1, PART
2 and PART 3)
82.9
REFERENCES
file:///C:/Users/zoelo/Desktop/TAYLOR'S%20STUFF/DEGREE/3RD%20YEAR/5th%20sem/Btech%201/IBS%20Scoring%
20by%20Setia%20Alam%20.pdf
http://ibsportal.cidb.gov.my/ibsnetfiles//PublicationAndGuidelinesController/82aa1f08-fb10-48f1-a711-51adbce0158f.pdf
http://www.midf.com.my/images/Downloads/Research/EqStrategy/SpecialReports/Construction-IBS_MIDF_140214.pdf
http://www.cidb.gov.my/images/content/pdf/cis/CIS-18-2018-Final-Draft-6-Dec-2017-1.pdf
62

More Related Content

What's hot

Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building Solution
Lee Wan Xuan
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
Nekumi Kida
 
Btech report final
Btech report finalBtech report final
Btech report final
Sarah Esa
 
Ibs part1
Ibs part1Ibs part1
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1
DavidJPCChai
 
ibs 304
ibs 304ibs 304
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Building Technology II Project 1
Building Technology II Project 1Building Technology II Project 1
Building Technology II Project 1
Nik Ahmad Munawwar Nik Din
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
ashleyyeap
 
Window topic 8
Window topic 8Window topic 8
Window topic 8
Chiety Lasim
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
Farah Sham
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
Farah Sham
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
Zhao Wei Kim
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
Nabeel Rajpoot
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
Jy Chong
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
w ss
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
Joshua Lee
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
Haziq1511
 
The cable in building structures
The cable in building structuresThe cable in building structures
The cable in building structures
Wolfgang Schueller
 

What's hot (20)

Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building Solution
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1
 
ibs 304
ibs 304ibs 304
ibs 304
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Building Technology II Project 1
Building Technology II Project 1Building Technology II Project 1
Building Technology II Project 1
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Window topic 8
Window topic 8Window topic 8
Window topic 8
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
 
The cable in building structures
The cable in building structuresThe cable in building structures
The cable in building structures
 

Similar to Building Technology PJT 1 Report

434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
ra1508
 
Btech report
Btech reportBtech report
Btech report
Chong Chin Pin
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
Quinn Liew
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
Bolin Loong
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
Mohd Zulhairi Mohd Noor
 
Chap 2-literature-review (3)
Chap 2-literature-review (3)Chap 2-literature-review (3)
Chap 2-literature-review (3)
Jessyca Than
 
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET Journal
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
Construction Tech. and Mgmt., VNIT Nagpur
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
Gopinan
 
IBS group 5 material assignment.pptx
IBS group 5 material assignment.pptxIBS group 5 material assignment.pptx
IBS group 5 material assignment.pptx
AndualemDamtew
 
Prefabrication structures in construction
Prefabrication structures in constructionPrefabrication structures in construction
Prefabrication structures in construction
RajalekshmiSivaram
 
Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptx
AtulBhagwat6
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressed
Weng Chuan
 
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate DevelopersIRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET Journal
 
Cost and Quality Management in Buildings
Cost and Quality Management in BuildingsCost and Quality Management in Buildings
Cost and Quality Management in Buildings
IRJET Journal
 
A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES
VEMANA INSTITUTE OF TECHNOLOGY, VTU
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3 Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
Yee Len Wan
 
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
civej
 

Similar to Building Technology PJT 1 Report (20)

434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
 
Btech report
Btech reportBtech report
Btech report
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
 
Chap 2-literature-review (3)
Chap 2-literature-review (3)Chap 2-literature-review (3)
Chap 2-literature-review (3)
 
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
 
Ct3
Ct3Ct3
Ct3
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
 
MMC Revision Notes
MMC Revision NotesMMC Revision Notes
MMC Revision Notes
 
IBS group 5 material assignment.pptx
IBS group 5 material assignment.pptxIBS group 5 material assignment.pptx
IBS group 5 material assignment.pptx
 
Prefabrication structures in construction
Prefabrication structures in constructionPrefabrication structures in construction
Prefabrication structures in construction
 
Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptx
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressed
 
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate DevelopersIRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
 
Cost and Quality Management in Buildings
Cost and Quality Management in BuildingsCost and Quality Management in Buildings
Cost and Quality Management in Buildings
 
A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3 Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
 

More from ForestedTiger

Building science 2 PJT 1 report
Building science 2 PJT 1 reportBuilding science 2 PJT 1 report
Building science 2 PJT 1 report
ForestedTiger
 
LA pjt 1: Site location and context
LA pjt 1: Site location and contextLA pjt 1: Site location and context
LA pjt 1: Site location and context
ForestedTiger
 
Urban landscape Quality Index Report
Urban landscape Quality Index ReportUrban landscape Quality Index Report
Urban landscape Quality Index Report
ForestedTiger
 
Theories comparison essay
Theories comparison essayTheories comparison essay
Theories comparison essay
ForestedTiger
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
ForestedTiger
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
ForestedTiger
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
ForestedTiger
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
ForestedTiger
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
ForestedTiger
 
PROJECT 3 DRAWINGS
PROJECT 3 DRAWINGSPROJECT 3 DRAWINGS
PROJECT 3 DRAWINGS
ForestedTiger
 
Stadium negara report history2
Stadium negara report history2Stadium negara report history2
Stadium negara report history2
ForestedTiger
 
Northeast kl
Northeast klNortheast kl
Northeast kl
ForestedTiger
 
Amphitheatre studio 2
Amphitheatre studio 2Amphitheatre studio 2
Amphitheatre studio 2
ForestedTiger
 
Rose seidler house
Rose seidler houseRose seidler house
Rose seidler house
ForestedTiger
 
BCON PJT 1
BCON PJT 1BCON PJT 1
BCON PJT 1
ForestedTiger
 
DPJs Brief
DPJs BriefDPJs Brief
DPJs Brief
ForestedTiger
 
Maths exercise
Maths exerciseMaths exercise
Maths exercise
ForestedTiger
 
Area and Volume Exercises
Area and Volume ExercisesArea and Volume Exercises
Area and Volume Exercises
ForestedTiger
 
MATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTERMATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTER
ForestedTiger
 
MATHS STATISTICS PROJECT
MATHS STATISTICS PROJECTMATHS STATISTICS PROJECT
MATHS STATISTICS PROJECT
ForestedTiger
 

More from ForestedTiger (20)

Building science 2 PJT 1 report
Building science 2 PJT 1 reportBuilding science 2 PJT 1 report
Building science 2 PJT 1 report
 
LA pjt 1: Site location and context
LA pjt 1: Site location and contextLA pjt 1: Site location and context
LA pjt 1: Site location and context
 
Urban landscape Quality Index Report
Urban landscape Quality Index ReportUrban landscape Quality Index Report
Urban landscape Quality Index Report
 
Theories comparison essay
Theories comparison essayTheories comparison essay
Theories comparison essay
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
PROJECT 3 DRAWINGS
PROJECT 3 DRAWINGSPROJECT 3 DRAWINGS
PROJECT 3 DRAWINGS
 
Stadium negara report history2
Stadium negara report history2Stadium negara report history2
Stadium negara report history2
 
Northeast kl
Northeast klNortheast kl
Northeast kl
 
Amphitheatre studio 2
Amphitheatre studio 2Amphitheatre studio 2
Amphitheatre studio 2
 
Rose seidler house
Rose seidler houseRose seidler house
Rose seidler house
 
BCON PJT 1
BCON PJT 1BCON PJT 1
BCON PJT 1
 
DPJs Brief
DPJs BriefDPJs Brief
DPJs Brief
 
Maths exercise
Maths exerciseMaths exercise
Maths exercise
 
Area and Volume Exercises
Area and Volume ExercisesArea and Volume Exercises
Area and Volume Exercises
 
MATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTERMATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTER
 
MATHS STATISTICS PROJECT
MATHS STATISTICS PROJECTMATHS STATISTICS PROJECT
MATHS STATISTICS PROJECT
 

Recently uploaded

Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 

Recently uploaded (20)

Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 

Building Technology PJT 1 Report

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN BACHELOR OF SCIENCE (HONS) ARCHITECTURE TAYLOR’S UNIVERSITY COLLEGE BUILDING TECHNOLOGY 1 (BLD 60703) ASSIGNMENT 1: INDUSTRIALISED BUILDING SYSTEM TUTOR: AR.EDWIN CHONG YIT JIA 0331684 KELVIN SHIM KAH VUN 0331371 PAUL WONG SZE LING 0331208 ZOE LOW LI MIEN 0319444 PHAN GUANG LEI 0331858 1
  • 2. TABLE OF CONTENTS 2 1.INTRODUCTION ……………………………………..……....3 1.2 Strengths of the IBS System………………………………...4 1.3 Weaknesses of the IBS System…………………………….8 1.CASE STUDY…………………………………………………….11 2.1 Task & Methodology………………………………………….14 1.PRECAST CONCRETE FRAMING…………………………….15 3.1 Skeletal Frame System………………………………………16 3.2 Types of Precast Components……………………………....17 3.3 Precast beams………………………………………………...19 3.4 Precast Columns……………………………………………....20 3.5 Precast Slabs…………………………………………………..21 3.6 Precast Staircase……………………………………………....22 1.Joints………………………………………………………………...23 4.1 Column to Column……………………………………………..24 4.2 Beam to Column………………………………………………..25 4.3 Column to Base……………………………………………..….27 1.Blockwork System……………………………………………..…..29 2.Steel truss System…………………………………………..……..30 3.Sequence of Construction.…………..……………………..……..31 4.Construction Drawings……………………………………..……...36 5. Schedule of IBS Components…………………………………....42 6. Construction Process……………………………………………..51 7. Model Making Process…………………………………………...54 8.IBS Score…………………………………………………………..58
  • 3. 1.INTRODUCTION The five most commonly used IBS Systems in Malaysia are: 1.Precast concrete framing, panel and box systems; 2.Steel framework systems; 3.Prefabricated timber framing systems; 4.Steel framing systems; and 5.Blockwork systems In our project’s case, we used the Precast Concrete Framing System to construct our building. IBS system is a construction method which components are manufactured in a controlled, factory environment at site or off - site. In Malaysia’s case, the term “IBS” is used to describe this construction method, whereas in other countries it is also known as Pre-fabricated/Pre-fab Construction, Modern Method of Construction (MMC) and Off-site Construction. These manufactured components are transported, positioned and assembled in site. 3
  • 4. 4 1.2 STRENGTHS OF THE IBS SYSTEM
  • 5. a) Providing a cleaner & safer construction site IBS construction sites are proven to be tidier and neatly organised compared to the wet and dirty traditional construction sites. The usage of IBS components can reduce wet work at construction sites. It also reduces the site’s wastage such as timber formworks and props on temporary works. These common conventional constructions. are reduced greatly as the construction of the project put greater emphasises on IBS components. Prompting construction sites to become neater, reducing involved risks related to health and well-being of the site other than promoting a safer working environment. b) Cost reduction IBS construction methods are cheaper than traditional construction methods. Reducing the employment of workers needed to construction labour in terms of wages. Due to the usage of prefabricated materials, IBS also can reduce the usage of scaffoldings and other temporary supports compared to in-situ systems. This system is considered to be one of the cheapest options when the overall cost incurred for the construction of a building project is considered. Bringing the phenomenon of this construction method, where it has been made beneficial for the constructions of small shops, offices and simple house designs. Proving this system is to be useful when a project is constructing repetitive designs. 5
  • 6. c) Reduced Labour The construction sector in Malaysia is very dependent on foreign labour from neighbouring countries such as Indonesia, Bangladesh and Vietnam. With the implementation of the IBS system, this dependency can be reduced for the benefit of the local economy. By doing so, the IBS system is able to reduce the number of workers such as concreter, carpenters, bar benders, plasterer and many more. When the IBS components are produced at factories using complex machineries, it minimises the requirement of labour needed to construct the project. Replacing the task with a group of IBS component installers which consisted of at least 5 individuals in each project. Leading to saving expenses in terms of labour costs. d) High and controlled quality of end products The IBS system offers improvements on the quality, productivity and efficiency of the project due to the prefabrication of components. Reducing the poor workmanship and lack of quality control. Providing high quality surface finishes as the joint sections are the only parts to be grouted, eliminating the requirement of plastering. The construction is completed in shaded and protective environments which emphasises on critical elements such as material curing processes for e.g. Temperature control would be able to evade crack problems on the concrete structures. 6
  • 7. f) Faster completion time The IBS system reduces the project’s time period of construction, which helps to reduce monetary losses. This is due to the construction of prefabricated components, which are concurrently constructing. Enabling it to proceed when the foundations of the construction sites are under surveyed or when the prefab components are involved in the earthwork. The installations of IBS components will occur on the sites only after this process. This phenomenon helps to reduce the risks of project delays and unnecessary expenditures. The production of IBS elements are not affected by weather conditions. Instead, the use of large panel structures would be able to accelerate structural-related tasks such as painting, electrical wiring and plumbing. g) Not affected by adverse weather conditions The datelines of the IBS projects will not be affected due to the faster rates of completion. This prevents the construction operations from being affected as the fabrications of the IBS components are conducted at factories under controlled environments. 7
  • 8. 1.3 WEAKNESSES OF IBS SYSTEM 8
  • 9. a) High capital costs The weakness of the the IBS system are the high Initial capital costs within this project. This is due to taking account of all the costs of the construction works in the factories. Such as the casting of beds and the acquisition of supported machineries which leads to high expenses. Besides this, in some case, the IBS system can also require a large demand of export labour. Therefore, resulting the project to face extra costs required to train the unskilled or semi-skilled labour. b) Problem of joints between components Malaysia has an equatorial climate which experiences heavy rainfall. This climatical aspect issues the problem of leakages which the building has to face when it is constructed using IBS applications. When this leakage occurs, other complications may have to follow, leading the project to have issues of dampness, corrosion and many more issues. 9
  • 10. c)Sophisticated plants and skilled operators In the IBS system, extensive usage of sophisticated plants and machineries are involved which are needed to be maintained by skilled operators. If any damages to the plants or on the machines occur, it will result a significant impact upon the production of IBS components. d) Site accessibility Site facility and accessibility is one of the most important factors in the implementation of the IBS. The IBS system requires adequate access to transport all the components of the plants up to the construction sites. It is possible for complications to arise at the construction sites. One example is the delay of the installation of the components due to transportation woes, which results in construction delay. Prompting the installation task to perform at a later date. 10 e) Rigid Sizing The main disadvantage of using the IBS System is that the components are prefabricated in Fixed modular sizes. In term of coordination, when there are mistakes involving sizing or components occur, it leads to a wastage of costs and prefabrication.
  • 11. 2. CASE STUDY Seri Jati Apartment, Setia Alam A 10 storey, 6 blocks apartment consisting of 948 Units. Seri Jati uses the Precast System for IBS. Known for its high IBS score due to their application of a reusable system formwork onto the Precast Structural Frames along with in-situ concrete floor. Precast Components such as: - Precast Loadbearing & non-loadbearing walls - Staircases & Landing Slabs - Lift Core Walls - Bathroom Slabs - Air-Con Ledges 11
  • 12. 12
  • 13. IBS Score Advantages: 1.Project has high degree of repetitions for both horizontal and vertical plain. 2.Architectural and Structural designs with precast intention to capitalise on precast advantages. 3.High economy of scale with >900 units apartment with a single unit layout. 4.Construction logistic is fully considered at planning stage E.g. wall layout, work sequencing,crane’s capacity and movement. IBS Score Disadvantages: 1.Brickwork/plastering in stand alone amenities building, box- out for M&E services/risers and kitchen/yardwalls. 2.Non-compliance in Modular Coordination for structural elements and architectural design input. 13
  • 14. 2.1) TASK AND METHODOLOGY THE APPLICATION OF IBS SYSTEM: i) Design an apartment unit which do not exceed more than 100 meter square. ii) The apartment consist of a living hall, a dining area, three bedrooms and two toilets. iii) The design should apply mainly Ibs system components and construction method such as precast wall, blockwork hollow core slab, precast staircase, toilet pod, prefabricated timber roof truss, etc , appropriate sizes. COMPONENTS APPLICATION: Our apartment consist of these three main systems: i) Precast concrete framing - Precast beams - Precast columns - Precast slabs - Precast staircase ii) Blockwork system iii) steel truss system 14
  • 15. The precast concrete framing system consists of precast slab, beam and column components which are fabricated and manufactured off-site. This systematic fabrication process is carried out to produce similar components repeatedly. The components are casted in reusable mould which is then cured under controlled environment, transported to site and placed at the required position. The components of precast concrete framing and its technical details are compiled and presented as a catalogue. The contalogue contains basic information of precast concrete components such as section properties, capacities and detailing. We are required to use the catalogue as our design guidelines to apply proper sizes of precast concrete components 3) PRECAST CONCRETE FRAMING 15
  • 16. The skeletal frame system is a structural system, which consists of precast concrete beams, columns and slabs as shown in the figure. Non-load bearing walls also can be incorporated in the frame. 3.1) SKELETAL FRAME SYSTEM 16
  • 17. 17 3.2) TYPES OF PRECAST BUILDING COMPONENTS
  • 18. 18
  • 19. The selection of beams are not determined by the function and utilities of a building. However a flat and wide rectangular precast concrete beam is commonly used to support a long span hollow core slab because it provides enough bearing seating for the slab. While inverted T-beams and edge beams are used for internal and external beams respectively to increase the ceiling height. For a floor layout, a secondary beam is used to transfer building load to primary beam which is connected to columns. 3.3 PRECAST BEAMS `19 Building Structural Components. (A) Rectangular Beam (B) Inverted T Beam (C) Edge Beam. C .B. A.
  • 20. Square precast columns with corbels structures are very common in this construction system. Corbels are used to provide support or bearing the beam ends so that beams can be released from crane immediately after placing. Precast concrete columns can be fabricated up to four storey high. However, for easy handling and transporting, one-storey and two-storey high columns are more preferred. 3.4 PRECAST COLUMN 20 Square precast columns with corbels A)single storey B) two storey s Square precast column with corbels connected to precast beam Two storey precast column Four storey precast column
  • 21. 3.5 PRECAST SLABS Precast hollow core slab or precast half slabs are types of flooring system which are used depending on suitability of floor structure. Precast hollow core slabs are normally used for long span structure such as office buildings to provide spacious areas. While precast half slabs are used for short span structures ranging from two to five meters which are suitable for residential dwellings. Since precast slabs are manufactured individually, each slab is joined to each other to form a diaphragm and is strengthened with cast in-situ structural concrete topping of thickness ranges between 50mm to 75mm. 21 Precast Hollow Slab With Con crete Topping Supported By Precast Beam Precast Hollow Core Slab for Long Span Structure Precast Half Slab supported by precast beams with structural concrete topping
  • 22. 3.6 PRECAST STAIRCASE Most of the concrete stair arrangements are possible to produce as precast concrete components which can be: - Individual steps units - Complete flight with number of steps required Advantages of precast concrete units: - Better quality control of the finished product - Saving of space on site as formwork storage space and fabrication space is not required - Stairway enclosing shaft can be utilized for hoisting or lifting of materials and equipments during the major construction period. - Can usually be positioned and fixed by semiskilled labor - Along with the extensive experiments in formwork tehcniques, the coloring of the concrete with various aggregates and the surface treatments is possible. - It is also possible to finish prefabricated concrete stair elements with timber or stone. 22 Produce off site, save space but need special equipment to move it to higher level The landing can be functioned as beam to sustain its own weight, but the main load bearer of the staircase is the secondary beam at the beginning and the end of the staircase.
  • 23. Beams and columns are connected to form an integrated frame system before the floor slabs are placed. Hence structural connectors are required to connect all the structural components of beams, columns and slabs. The most important connections are beam to column, column to column and column to base and these connections are either structurally pinned or rigid. The complete precast frame must be designed to comply with the required strength, stiffness, ductility, and reliability. 4.JOINTS 23
  • 24. 4.1 COLUMN TO COLUMN In all joints design, the connection must able to resist the applied structural forces. It should also be shown clearly wherever the joint functions as a pinned or moment connection. An example of a typical joint of column to column is as shown in the drawings.. 24
  • 25. 4.2 BEAM TO COLUMN The simplest connection of beam to column is to place beam on top of column. However, for two or three storey building, it is suitable to use column with corbel or nib support 25 A detail drawing of beam to column connection
  • 26. 26 (A) Column to beam connection with corbel (B) Column to beam connection with nib support
  • 27. Steel Base Plate Connection Steel plates or angles are welded at base of precast concrete column. The column is then bolted tightly to foundation. Finally the gap in between plate and foundation is filled with non-shrink cement grout 4.3 COLUMN TO BASE CONNECTION 27
  • 28. 28 A progress of column to base connection from different parts to assembly together after grouted.
  • 29. 5) BLOCKWORK SYSTEM `DSF 29 Bricks and blocks are components of durable masonry construction in which uniformly shaped individual units are laid in courses with mortar as the bed and binding material. They consist of high mass materials with good compressive strength formed into units that can be lifted and handled by a single worker. Solid brick or blockwork walls deliver good load bearing capacity along with substantial thermal mass to provide a unique combination of structural, thermal and aesthetic benefits.
  • 30. 30 6) STEEL TRUSSES SYSTEM A standard truss is a series of triangles - a stable geometric shape that is difficult to distort under load. Regardless of its overall size and shape, all the chords and webs of a truss form triangles. These triangles combine to distribute the load across each of the other members, resulting in a light structure that is stronger than the sum of the strength of its individual components. Most roof trusses have webs that run at an angle between top and bottom chords. The gable-end truss must be supported along the entire length, and stabilized at the truss/wall intersection. There are a number of truss types that leave space for attic storage or living area. In any roof truss, however, attic or living space comes at a price. The bottom chord of the attac truss also acts as a floor joist and must be sized to accommodate a live load.
  • 31. 31 7. SEQUENCE OF CONSTRUCTION
  • 32. 1. 2. 3. 4. 1.Joing of Precast Concrete with pile cap - The precast column is connected to the pile cap with anchor bolts by using the bolted connection. - A shim plate or bearing plate is placed directly under the embedded steel plates. - The column is placed on top of the embedded steel plate and the nut is screwed in with the anchor bolt. 2.Grouting of Precast Concret with Pile Cap - After the columns are mechanically joined the connection is grouted and formwork is conducted. - The stump is made to provide full bearing between elements and protect the metal components from fire and corrosion. 3. Installation of Precast Ground Beam - Precast concrete ground floor beams to each other, and to the pile caps, with small in situ concrete “patches” 4. Installation of precast floor slab - The ground floor slab is lifted by using ropes (crane) and are placed and installed on top of ground floor beam. - The joints are grouted solid.
  • 33. 33 5. 6. 7. 8. 6. Setting up for precast wall installation - Setting reference line and offset, line are used to determine the position of the precast wall to be installed. - The grid and marks of the wall position are transformed on slab - A 100mm offset line from near building edge is marked. - A 2x2 timber is secured to the floor at wall edge to guide the wall. 5. Construction of second later reinforcement cast in-situ concrete - A layer BRC wire mesh is place on top of the precast concrete slab for reinforcement. - 75mm of cast in situ concrete is poured on top for a smooth finish with visible joints. 7. Positioning of the wall - The precast concrete wall is lifted by using a crane and carefully installed on the correct position by following the reference mark during the wall setting procedure. 8. Wall Adjustment - The adjacent walls and plumb wall comers are positioned at 200mm offset. - The walls are adjusted vertically within +2 or-2mm - The Four faces of every walls are adjusted - A string is positioned 250mm from the face the walls - Walls within the same line are adjusted within the same tolerance - Grouting is performed to seal the air pockets.
  • 34. 34 9. 10. 11. 12. 10. Construction of subsequences stories - After the installation of the first floor beam, the placing of the first floor slab has been carried out. - The construction sequences step 4 to step 8 has been repeated and carried subsequently until the construction reached the final storey of walls panels erected. 9. Installation of precast concrete beam - The beam is lifted by the crane and moved above to the correct installation position. - A piece a shim plate is placed to correct the beam soffit level - The beam is connected to the precast columns by the anchor rebar. 11. Installation of the precast concrete staircase - The landing and slabs are positioned and verified at soffit level at four corners. - The level is adjusted within tolerance. - Shim plates are placed at the staircase support location to the correct level. - A 10mm gap between the precast plank and staircase be left for grouting. 12. Installation of prefabricated timber roof trusses - The prefabricated roof trusses are lifted up by wire ropes (crane) and postioned on top of the roof beams - The positioning of the trusses is carefully adjusted to the correct postion. - The first truss is erected at one end. After it is in the correct position, the truss is nailed to the wall plates. The end truss is then temporily braced to the ground at two places using timber.
  • 35. 35 13. 14. 15. 16. 14. Installation of roofing sheets - Roofing sheets are laid over the purlins. The roofing sheets consist of corrugated metal deck and aluminium foil insulation sheets. 13. Installation of roof purlins - Purlins are nailed to each rafter with two 78mm nails, are on each side. - Fascia boards and barge boards are fixed to the ends of rafters and purlins. 15. Installation of doors, windows and railing - As the installation of the roof is completed a dry interior environment is presented. - The installation of doors, windows and railings are carried out. 16. Finishing - Lastly, the finsihing work is the conducted which included facing, plastering, flooring, painting, wall papering and glazing.
  • 39. 39 SECTION A-A, B-B SCALE:NTS
  • 42. 9. SCHEDULE OF IBS COMPONENTS 42
  • 43. 43
  • 44. 44
  • 45. 45
  • 46. 46
  • 47. 47
  • 48. 48
  • 49. 49
  • 50. 50
  • 52. 52 1.1. 1.2. 1.3. 1.4. 1.5. 1.6. 1.7. 1.8. 1.9. 1.10. 1.11. 1.12.
  • 53. 53 1.4. 1.5. 1.6. 1.7. 1.8. 1.9. 1.10. 1.11.
  • 54. 11. MODEL MAKING PROCESS 54
  • 55. 55 1.1. 1.2. 3. 4. Footing were attached underneath the base. Column were erected on top of the stumps. Upper beam were laid horizontal on top of the corbels. Blockwork were arranged underneath the beams.
  • 56. 56 5. 1.6. 7. 8. First floor were erected in repeat steps. Staircase landing were installed. Staircase were vertically installed. Slabs were laid horizontally on top of the beam.
  • 57. 57 9. 1.10. 11. 12. Repetiton steps of blockwork and upper beam install. Prefabricated truss horizontally laid on top of the upper beam. Purlins laid perpendicular across the trusses. Final outcome
  • 58. 12. IBS SCORE 58 Part 1: Structural systems (Beams, Columns, Slabs, Roof Truss) ELEMENTS DIMENSIONS (M/SQ.) IBS FACTOR TOTAL (COVERAGE) IBS SCORE Prefabricated steel roof truss 24m X 9.3m = 223.2 1.0 223.2 / 775.2 = 0.3 50 X 0.3 X 1.0 = 15 Precast concrete beam & column with precast hollow core slab (3 Stories) 184m X 3 = 552 1.0 552 X 775.2 = 0.7 50 X 0.7 X 1.0 = 36 TOTAL PART 1 775.2 1.0 51
  • 59. 59 Part 2: Wall systems ELEMENTS DIMENSIONS (M/SQ.) IBS FACTOR TOTAL (COVERAGE) IBS SCORE Internal wall : Block work system (3 Stories) 36.8m X 3 = 110.4 0.5 110.4 / 349.2 = 0.32 20 X 0.32 X 0.5 = 3.2 External wall : Block work system (3 Stories) 79.6m X 3 = 238.8 0.5 238.8 / 349.2 = 0.7 20 X 0.7 X 0.5 = 7 TOTAL PART 2 349.2 1.0 3.9
  • 60. 60 Part 3: Other Simplified Construction method ELEMENTS DIMENSIONS (M/SQ.) IBS FACTOR TOTAL (COVERAGE) IBS SCORE Beam dimension complies to MS 1064 PART: 10 2001 100% 4 Column dimension complies to MS 1064 PART: 10 2001 100% 4 Door dimension complies to MS 1064 PART: 10 2001 100% 4 Window dimension complies to MS 1064 PART: 10 2001 100% 4 Wall dimension complies to MS 1064 PART: 10 2001 100% 4 Horizontal repetition of structural 100% 2
  • 61. 61 ELEMENTS DIMENSIONS (M/SQ.) IBS FACTOR TOTAL (COVERAGE) IBS SCORE Vertical repetition of structural 100% 2 Floor layout 100% 2 Repetition of floor to floor height 100% 2 TOTAL PART 3 28 IBS project contents score (PART 1, PART 2 and PART 3) 82.9