WELCOME TO OUR
PRESENTATION
1
PRESENTATION
TOPIC NAME:
SIX STOREY BUILDING PROJECT
2
GROUP NO: 01
OUR GROUP MEMBER:
NAME ID
12. Ruhul Amin 12306034
13. Afsana Yesmin Shathe 12306004
14. Fakrul Islam 13106099
15. Md. Rashedul Islam 13106009
16. Arman Chowdhury 13106051
17. Md. Arifuzzaman 13106037
18. Mst. Laboni Akter 13106003
NAME ID
1. Md. Arifujjaman 11306030
2. Md. Emdad Bhuiyan 12306063
3. Md. Jahurul Islam 12306028
4. A.T.M Fahad 12306055
5. Hafizur Rahman 13106052
6. Abdullah AL Mamun 12306076
7. Md. Masud Rana 12306067
8. Md. Ruhul Amin 12306101
9. Md. Firoj Amin 12306075
10. Sinjan Mallick 12106120
11. Md. Rahman Manna 123606093
3
ABOUT OUR PROJECT
Project Name: Six story building
project
Project Location Plot-65, Road-02,
Sector-10, Uttara
Dhaka
COMPANY NAME Building Technology
and Ideas Ltd. (bti)
Land Area 4.5 Katha
Building Height Ground Floor +
5Floor (6 Storied)
Unit Single Unit (East
Facing)
Expected
Completion
December 2016
OWNER NAME Md. Supan.
4
A project is an endeavor that is undertaken to produce the results that
are expected from the requesting party.
INTRODUCTION
Project design:
A project may be design only
 Construction
 or a combination of design and
construction
Important Components of a project
 kickoff meeting
 Scope
 Budget
 Estimate and
 Schedule
5
Chairman
Managing Director
Marketing Director
Manager Marketing
Marketing Executive
Manager (Purchase)
Store keeper
Director
(Construction)
Project Co-ordinator
Trainee Engineer
Sicurity Gard
Site Superviser
Company Organogram
6
KICK OFF MEETING
The Kick-Off Meeting gets us started; it introduces the project team, confirms
the overall purpose and objectives of the project, determines the roles and
responsibilities of the team members, and establishes ground rules for
working together. The most important purpose is to get commitment to the
scope and objectives of the project.
The kickoff meeting for a new project is your best opportunity to energize the
group and establish a common purpose toward completing the work.
A kickoff meeting is the first meeting with the project team and the client of
the project.
This meeting introduces the members of the project team and the client and
provides the opportunity to discuss the role of team member.
There is a special discussion on the legalities involved in the project
7
OBJECTIVE
• Provide Equal Access and Flexibility
• History of Accessible Facility Design
• Beyond Accessibility to Universal Design
• To develop the management, quality and try to utilize they qualification about this
subject.
• Increasing good communication skill of any project work as a project manager.
8
Utilize Cost Management Throughout
Planning
Design and
Development Process
Consider Non-Monetary
Benefits Such As
Aesthetics
Historic Preservation
Security and
Safety
COST-EFFETHETICS:
9
Initial budget :
Initial budge depends on
Building Size
Building Cost
Building Type
10
FUNCTIONAL/OPERATIONAL:
• Account for Functional Needs.
• Ensure Appropriate Product/Systems
Integration.
• Meet Performance Objectives.
AESTHETICS:
Pertains to the physical appearance and image of building
elements and spaces as well as the integrated design process.
11
PRODUCTIVE:
• Assure Reliable Systems and Spaces
• Promote Health and Well-Being
• Provide Comfortable Environments
SECURE/ SAFE:
• Fire Protection
• Occupant Safety and Health
• Natural Hazards and Security
12
SUSTAINABLE:
The main objectives of sustainable design are to reduce, or completely avoid depletion
of critical resources like energy, water, and raw materials, prevent environmental
degradation caused by facilities and infrastructure throughout their life cycle; and
create built environments that are livable, comfortable, safe, and productive.
LOCATION:
This project building is situated in uttara model town at Dhaka district. It is very close
to the main road.
13
TECHICAL DRAWINGS OF THE PLAN
Structural Drawing:
Typical floor plan 14
Column Layout
Column section
15
Stair case
16
ESTIMATION:
• Estimate ore building based on required materials in cubic feet.
• This is approximate estimation.
• It is done only for giving primary idea to the owner, how much material
may be required for build this six story building.
• Some extra materials may be required. And many other equipment may
be needed in future those are not included here.
• they have done this estimate by finding total volume of specific
material then calculate the volume of cement, sand, aggregate by its
ratio.
17
MODERN ESTIMATE SOFTWARE
http://www.architecture.onlinenewsvenue.com/how-to-cost-estimate-with-microsoft-excel-free-template-design/
18
SCHEDULE
The project schedule is the tool that communicates what work needs to be performed, which
resources of the organization will perform the work and the timeframes in which that work needs
to be performed.
Schedule Benefits:
• The project schedule should reflect all of the work associated with delivering the project on time.
• Without a full and complete schedule, the project manager will be unable to communicate the
complete effort, in terms of cost and resource, necessary to deliver the project.
• They have shown all information which helped for everyone understand in this part they have tried to
mention that when there are started this work and how many times to spend to complete the project
work.
• How many labor needed of their overall project work.
• Time is the main fact in scheduling when their owner has been given that project and how long time
needed to complete that work. 19
Gantt Chart
Examples for construction projects are an effective approach to start project management.
Both a commercial building and residential construction Concept Draw PROJECT is a best
software to get started any project. 20
CONCLUSION
The construction site is a place where an engineer can acquire knowledge about a
building project. The construction processes of column, beam, slab and stair have
been learned. Making good communication with people like client, Labours etc.
have been learned also. During the project work unexpected problems
were occurring and how to overcome that problem in that situation have been
learned. By applying theoretical and practical knowledge in construction site, the
real engineering experiences have been acquired.
21
22
Any Questions?
23

More Related Content

What's hot

Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
akashpadole
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
AB MAKASANA
 
Tender
TenderTender
Prefabrication
PrefabricationPrefabrication
Prefabrication
Kush Agarwal
 
Construction contract
Construction contract Construction contract
Construction contract
Rakshith Reddy
 
Construction project management
Construction project managementConstruction project management
Construction project management
Senthil Kannan
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
Kailash Chander
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an Architect
Clara Lee
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
srinivas2036
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
maria_singh
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
Being Deepak
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
Mereia Kali
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
Namrata Agnihotri
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
RajeshPV12
 
Building construction pdf
Building construction pdfBuilding construction pdf
Building construction pdf
dezyneecole
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
Kishor Ade
 

What's hot (20)

Construction process
Construction processConstruction process
Construction process
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Tender
TenderTender
Tender
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Construction contract
Construction contract Construction contract
Construction contract
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an Architect
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Formwork
FormworkFormwork
Formwork
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
Building construction pdf
Building construction pdfBuilding construction pdf
Building construction pdf
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 

Similar to Building project presentation

Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
SiharaGallage
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
Sharon Yu Jung Lim
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
Final practicum report
Final practicum reportFinal practicum report
Final practicum report
manisha sah
 
Ici individual
Ici individualIci individual
Ici individual
Klaus Chiang
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1JamesMoy7
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)Pinky Chan
 
Portfolio 2019
Portfolio 2019 Portfolio 2019
Portfolio 2019
Mohammed Fawaz
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
Bharathwaj Iyengar
 
Project brief
Project brief Project brief
Project brief PK146
 
Kriti ghai project ppt
Kriti ghai project pptKriti ghai project ppt
Kriti ghai project ppt
KritiGhai3
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
Nishant Pandey
 
Role of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case StudyRole of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case Study
IJERA Editor
 
The Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessThe Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project Success
IRJET Journal
 
Site visit report
Site visit reportSite visit report
Site visit report
wleying
 
Ici final project
Ici final projectIci final project
Ici final project
温 庄壁
 

Similar to Building project presentation (20)

Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Project background
Project backgroundProject background
Project background
 
Final practicum report
Final practicum reportFinal practicum report
Final practicum report
 
Ici individual
Ici individualIci individual
Ici individual
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Portfolio 2019
Portfolio 2019 Portfolio 2019
Portfolio 2019
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
 
Project brief
Project brief Project brief
Project brief
 
Kriti ghai project ppt
Kriti ghai project pptKriti ghai project ppt
Kriti ghai project ppt
 
Magazine (ICI)
Magazine (ICI)Magazine (ICI)
Magazine (ICI)
 
MAGAZINE.ppt
MAGAZINE.pptMAGAZINE.ppt
MAGAZINE.ppt
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Role of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case StudyRole of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case Study
 
The Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessThe Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project Success
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Ici final project
Ici final projectIci final project
Ici final project
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 

Building project presentation

  • 3. GROUP NO: 01 OUR GROUP MEMBER: NAME ID 12. Ruhul Amin 12306034 13. Afsana Yesmin Shathe 12306004 14. Fakrul Islam 13106099 15. Md. Rashedul Islam 13106009 16. Arman Chowdhury 13106051 17. Md. Arifuzzaman 13106037 18. Mst. Laboni Akter 13106003 NAME ID 1. Md. Arifujjaman 11306030 2. Md. Emdad Bhuiyan 12306063 3. Md. Jahurul Islam 12306028 4. A.T.M Fahad 12306055 5. Hafizur Rahman 13106052 6. Abdullah AL Mamun 12306076 7. Md. Masud Rana 12306067 8. Md. Ruhul Amin 12306101 9. Md. Firoj Amin 12306075 10. Sinjan Mallick 12106120 11. Md. Rahman Manna 123606093 3
  • 4. ABOUT OUR PROJECT Project Name: Six story building project Project Location Plot-65, Road-02, Sector-10, Uttara Dhaka COMPANY NAME Building Technology and Ideas Ltd. (bti) Land Area 4.5 Katha Building Height Ground Floor + 5Floor (6 Storied) Unit Single Unit (East Facing) Expected Completion December 2016 OWNER NAME Md. Supan. 4
  • 5. A project is an endeavor that is undertaken to produce the results that are expected from the requesting party. INTRODUCTION Project design: A project may be design only  Construction  or a combination of design and construction Important Components of a project  kickoff meeting  Scope  Budget  Estimate and  Schedule 5
  • 6. Chairman Managing Director Marketing Director Manager Marketing Marketing Executive Manager (Purchase) Store keeper Director (Construction) Project Co-ordinator Trainee Engineer Sicurity Gard Site Superviser Company Organogram 6
  • 7. KICK OFF MEETING The Kick-Off Meeting gets us started; it introduces the project team, confirms the overall purpose and objectives of the project, determines the roles and responsibilities of the team members, and establishes ground rules for working together. The most important purpose is to get commitment to the scope and objectives of the project. The kickoff meeting for a new project is your best opportunity to energize the group and establish a common purpose toward completing the work. A kickoff meeting is the first meeting with the project team and the client of the project. This meeting introduces the members of the project team and the client and provides the opportunity to discuss the role of team member. There is a special discussion on the legalities involved in the project 7
  • 8. OBJECTIVE • Provide Equal Access and Flexibility • History of Accessible Facility Design • Beyond Accessibility to Universal Design • To develop the management, quality and try to utilize they qualification about this subject. • Increasing good communication skill of any project work as a project manager. 8
  • 9. Utilize Cost Management Throughout Planning Design and Development Process Consider Non-Monetary Benefits Such As Aesthetics Historic Preservation Security and Safety COST-EFFETHETICS: 9
  • 10. Initial budget : Initial budge depends on Building Size Building Cost Building Type 10
  • 11. FUNCTIONAL/OPERATIONAL: • Account for Functional Needs. • Ensure Appropriate Product/Systems Integration. • Meet Performance Objectives. AESTHETICS: Pertains to the physical appearance and image of building elements and spaces as well as the integrated design process. 11
  • 12. PRODUCTIVE: • Assure Reliable Systems and Spaces • Promote Health and Well-Being • Provide Comfortable Environments SECURE/ SAFE: • Fire Protection • Occupant Safety and Health • Natural Hazards and Security 12
  • 13. SUSTAINABLE: The main objectives of sustainable design are to reduce, or completely avoid depletion of critical resources like energy, water, and raw materials, prevent environmental degradation caused by facilities and infrastructure throughout their life cycle; and create built environments that are livable, comfortable, safe, and productive. LOCATION: This project building is situated in uttara model town at Dhaka district. It is very close to the main road. 13
  • 14. TECHICAL DRAWINGS OF THE PLAN Structural Drawing: Typical floor plan 14
  • 17. ESTIMATION: • Estimate ore building based on required materials in cubic feet. • This is approximate estimation. • It is done only for giving primary idea to the owner, how much material may be required for build this six story building. • Some extra materials may be required. And many other equipment may be needed in future those are not included here. • they have done this estimate by finding total volume of specific material then calculate the volume of cement, sand, aggregate by its ratio. 17
  • 19. SCHEDULE The project schedule is the tool that communicates what work needs to be performed, which resources of the organization will perform the work and the timeframes in which that work needs to be performed. Schedule Benefits: • The project schedule should reflect all of the work associated with delivering the project on time. • Without a full and complete schedule, the project manager will be unable to communicate the complete effort, in terms of cost and resource, necessary to deliver the project. • They have shown all information which helped for everyone understand in this part they have tried to mention that when there are started this work and how many times to spend to complete the project work. • How many labor needed of their overall project work. • Time is the main fact in scheduling when their owner has been given that project and how long time needed to complete that work. 19
  • 20. Gantt Chart Examples for construction projects are an effective approach to start project management. Both a commercial building and residential construction Concept Draw PROJECT is a best software to get started any project. 20
  • 21. CONCLUSION The construction site is a place where an engineer can acquire knowledge about a building project. The construction processes of column, beam, slab and stair have been learned. Making good communication with people like client, Labours etc. have been learned also. During the project work unexpected problems were occurring and how to overcome that problem in that situation have been learned. By applying theoretical and practical knowledge in construction site, the real engineering experiences have been acquired. 21