SCHOOL OF BUILT ENVIRONMENT
BSc (Hons) IN QUANTITY SURVEYING & COST
MANAGEMENT
BUSINESS MANANGEMENT
(6506 BEKL)
FEBUARY 2018 SEMESTER
TABLE OF CONTENTS
CONTENTS PAGES
Introduction 1
Project Summary 2
Observation & Questions 3
Activities Progress of Work 4
Material on Site 5
Plant and Equipment 6
Site Valuation Process 7
Conclusion 8
1
Introduction
On 18th
April 2018, we went to a site which is located in Morib, Selangor for site
visit. The project is under Sentoria Sdn Bhd and it is about to construct a water park,
semi D and hotel building. The project is started in 2015 and expected to complete in
2020.
Before we went to the site, the safety precautions such as safety helmets and
safety boots had given by our lecturer, Ms Nadirah and collected by all of us. We
went to the site by carpooling and reached there at 10am. After that, a short brief
about the site was given by our lecturers and seniors. We have spent about 2 and half
hours to visit the site and know more about the project.
The objectives of site visit are to:
 Explore the different types of building materials and machinery used on site
 Observe the activities and techniques carried out on site
 Have an up-close view of the entire building structure as opposed to see it in the
drawings
 Know the condition of the site and the importance of safety on site
 Gain more information about the construction works and learn the experiences
from those supervisors.
2
Project Summary
Project Title : CADANGAN PEMBANGUNAN “WATER PARK” DI ATAS
DAERAH SEBAHAGIAN LOT 13213 (GERAN 314497)
(SELUAS 22.0 EKAR), MUKIM MORIB, KUALA LANGAT,
SELANGOR DARUL EHSAN.
CONTRACT SUM (WITHOUT HOTEL) : RM 63,217,500.00
CONSTRUCTION PERIOD : 1st
November 2015 – 23rd
May 2020
CLIENT : Sentoria Morib Bay Shd Bhd
ARCHITECT : SAM Arkitek Perunding
C&S : HTM Consultants Sdn Bhd
M&E : ICL Associates Sdn Bhd
QS : NIL (in house)
CONTRACTOR : Sentoria Bina Shd Bhd
3
Observation & Questions
Observation
- Earthwork: According to the site QS, the piling works are done for most of the
parts and it can be observed that the site has a lot of piles done.
- Structural Works: Most of the steel bars used are high tensile steel bars and
they are all skillfully and tidily constructed.
- Health and Safety: There was a Safety and Health officer and site security that
followed us around which shows that the site is secured and safe.
- Workers: The workers are all in full working uniform with both helmets and
safety boots, which means they follow the rules.
- The site is 22 acres in total size which is huge enough to accommodate both
hotel and water theme park.
- However, the site is quite far away from populated area and there is a
competition in hotel industry as the site is just 5km away from the famous
Gold Coast Resort.
- The site is surrounded by oil palm estate and quite further away from the main
road, with another project of semidetached residential houses which is also
under the developer’s project.
- The construction commencing on the site is very tidy and systematic.
- The site QS that brought us around are very informative as they managed to
answer all the questions asked and provide us with extra information that we
didn’t ask.
- The project seems to be behind schedule and after enquiries, the site QS did
admit their project is slightly delayed.
Questions
- What are the reasons that make the client and developer to choose this
particular site for the proposed project?
- How much is the total cost of project together with both the hotel and
semidetached houses?
- How do the company keep the construction site so tidy and the workers so
efficient?
4
Actvities Progress of Work
This is the first floor of main entrance building which is equal to 2 floors high.
The water park and beach are still undergoing construction. The excavation and
piling works have been carried out by the workers.
5
Materials on Site
BRC reinforcement
Cement blocks are put between the BRC and floor slab to create a space between
them.
6
Plant and Equipment
Clamp on site
Excavator to excavate site
7
Site Valuation Process
Documents Required
1. Green cards for all the visitors to site
2. Approval letter for site visit from the institute to the company
3. Construction project’s drawing for reference
Parties Involved
1. Site Quantity Surveyors
2. Safety and Health Officer
3. Site Security
4. Lecturers
5. Students
8
Conclusion
As future Quantity Surveyors, I learn that this site visit has given us a vital and
necessary experience and lesson for us to work in the future. This site visit has
provided us with valuable lessons that definitely cannot be obtained from normal
classes attended in the institutes, even with all the tutorials done.
First of all, I do realize that it will be extremely tiring and more difficult as
expected to work as a Quantity Surveyor in the future as the site visit does require a
lot of time and energy especially when climbing up and down between floors. Also,
we visited the site in a good weather and it sure will be more difficult if there is a bad
weather and require us to visit the site regardless of the weather.
Moreover, we have managed to learn a lot of valuable information from the site
Quantity Surveyors that brought us around the site. They taught us extra lessons such
as what will make a design and build project to be delayed, types of building materials
and their specific uses, and other relevant and useful information.
Last but not least, we do find that the site visit can make us to understand more
about how a site progress usually and what needed to be done when there are
problems such as project delayed. The site visit also manage to teach us to observe
what cannot be seen and examine when we are doing works like measurement and
taking off.

More Related Content

What's hot

Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
XinYee Khoo
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
kaiwenyeo
 
Site visit report
Site visit report Site visit report
Site visit report
Liming Hiew
 
A Tomlinson updated CV 06 December 2016
A Tomlinson updated CV 06 December 2016A Tomlinson updated CV 06 December 2016
A Tomlinson updated CV 06 December 2016Antony Tomlinson
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Community Meeting - Construction Update Presentation September 16, 2015
Community Meeting - Construction Update Presentation September 16, 2015Community Meeting - Construction Update Presentation September 16, 2015
Community Meeting - Construction Update Presentation September 16, 2015
DerekC1990
 
Construction site
Construction siteConstruction site
Construction site
Timun Loh
 

What's hot (9)

Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
 
Site visit report
Site visit report Site visit report
Site visit report
 
A Tomlinson updated CV 06 December 2016
A Tomlinson updated CV 06 December 2016A Tomlinson updated CV 06 December 2016
A Tomlinson updated CV 06 December 2016
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Community Meeting - Construction Update Presentation September 16, 2015
Community Meeting - Construction Update Presentation September 16, 2015Community Meeting - Construction Update Presentation September 16, 2015
Community Meeting - Construction Update Presentation September 16, 2015
 
Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
Construction site
Construction siteConstruction site
Construction site
 

Similar to Site visit report

Site visit report
Site visit reportSite visit report
Site visit report
EyelynLee
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
Jia Hong Mui
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2itsmylifesl
 
Project brief
Project brief Project brief
Project brief PK146
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
MdManikurRahman
 
resume of Mr Roy2
resume of Mr Roy2resume of Mr Roy2
resume of Mr Roy2roy aranas
 
Project brief
Project brief Project brief
Project brief Haziq1511
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)
TeohPeiNi
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
Infinity studio project report
Infinity studio project reportInfinity studio project report
Infinity studio project report
amee16
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othman
nadiacbass
 
Site report
Site reportSite report
Site report
vaylu
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
Sharon Yu Jung Lim
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Report
tianji96
 

Similar to Site visit report (20)

Site visit report
Site visit reportSite visit report
Site visit report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
 
Project brief
Project brief Project brief
Project brief
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
resume of Mr Roy2
resume of Mr Roy2resume of Mr Roy2
resume of Mr Roy2
 
Project brief
Project brief Project brief
Project brief
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Project
Project Project
Project
 
Infinity studio project report
Infinity studio project reportInfinity studio project report
Infinity studio project report
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othman
 
Project background
Project backgroundProject background
Project background
 
Site report
Site reportSite report
Site report
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Slk m india
Slk m indiaSlk m india
Slk m india
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Report
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 

Recently uploaded

Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
Listing Turkey
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
simpolosparkteam
 
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Listing Turkey
 
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfRixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Listing Turkey
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
kishor21012022
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
Vinra Construction
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
JagadishKR1
 
The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
Listing Turkey
 
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
JagadishKR1
 
Dynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction ProjectsDynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction Projects
Dynamic Netsoft
 
Architectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdfArchitectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdf
susantebinum
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
Lixin Azarmehr
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
VickyAulakh1
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
SVN International Corp.
 
Brigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdfBrigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdf
SachinChauhan191
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
Listing Turkey
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
Lead Generation Media
 
GT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.pptGT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.ppt
leonardmichael1
 

Recently uploaded (20)

Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
 
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
 
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfRixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
 
The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
 
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
 
Dynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction ProjectsDynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction Projects
 
Architectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdfArchitectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdf
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
 
Brigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdfBrigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdf
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
 
GT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.pptGT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.ppt
 

Site visit report

  • 1. Diploma in Information Technology Assessment Requirements And Assessment Requirements And Student Checklist Student’s Name Vincent Ting Ek Kiong Wong Le Ying Student’s ID No. 1008497 1008496 NRIC No. 931031-13-6273 960416-08-5174 Lecturer Name Ms. Nadirah Start Date 18th April 2018 End Date 19th April 2018 SCHOOL OF BUILT ENVIRONMENT BSc (Hons) IN QUANTITY SURVEYING & COST MANAGEMENT BUSINESS MANANGEMENT (6506 BEKL) FEBUARY 2018 SEMESTER
  • 2. TABLE OF CONTENTS CONTENTS PAGES Introduction 1 Project Summary 2 Observation & Questions 3 Activities Progress of Work 4 Material on Site 5 Plant and Equipment 6 Site Valuation Process 7 Conclusion 8
  • 3. 1 Introduction On 18th April 2018, we went to a site which is located in Morib, Selangor for site visit. The project is under Sentoria Sdn Bhd and it is about to construct a water park, semi D and hotel building. The project is started in 2015 and expected to complete in 2020. Before we went to the site, the safety precautions such as safety helmets and safety boots had given by our lecturer, Ms Nadirah and collected by all of us. We went to the site by carpooling and reached there at 10am. After that, a short brief about the site was given by our lecturers and seniors. We have spent about 2 and half hours to visit the site and know more about the project. The objectives of site visit are to:  Explore the different types of building materials and machinery used on site  Observe the activities and techniques carried out on site  Have an up-close view of the entire building structure as opposed to see it in the drawings  Know the condition of the site and the importance of safety on site  Gain more information about the construction works and learn the experiences from those supervisors.
  • 4. 2 Project Summary Project Title : CADANGAN PEMBANGUNAN “WATER PARK” DI ATAS DAERAH SEBAHAGIAN LOT 13213 (GERAN 314497) (SELUAS 22.0 EKAR), MUKIM MORIB, KUALA LANGAT, SELANGOR DARUL EHSAN. CONTRACT SUM (WITHOUT HOTEL) : RM 63,217,500.00 CONSTRUCTION PERIOD : 1st November 2015 – 23rd May 2020 CLIENT : Sentoria Morib Bay Shd Bhd ARCHITECT : SAM Arkitek Perunding C&S : HTM Consultants Sdn Bhd M&E : ICL Associates Sdn Bhd QS : NIL (in house) CONTRACTOR : Sentoria Bina Shd Bhd
  • 5. 3 Observation & Questions Observation - Earthwork: According to the site QS, the piling works are done for most of the parts and it can be observed that the site has a lot of piles done. - Structural Works: Most of the steel bars used are high tensile steel bars and they are all skillfully and tidily constructed. - Health and Safety: There was a Safety and Health officer and site security that followed us around which shows that the site is secured and safe. - Workers: The workers are all in full working uniform with both helmets and safety boots, which means they follow the rules. - The site is 22 acres in total size which is huge enough to accommodate both hotel and water theme park. - However, the site is quite far away from populated area and there is a competition in hotel industry as the site is just 5km away from the famous Gold Coast Resort. - The site is surrounded by oil palm estate and quite further away from the main road, with another project of semidetached residential houses which is also under the developer’s project. - The construction commencing on the site is very tidy and systematic. - The site QS that brought us around are very informative as they managed to answer all the questions asked and provide us with extra information that we didn’t ask. - The project seems to be behind schedule and after enquiries, the site QS did admit their project is slightly delayed. Questions - What are the reasons that make the client and developer to choose this particular site for the proposed project? - How much is the total cost of project together with both the hotel and semidetached houses? - How do the company keep the construction site so tidy and the workers so efficient?
  • 6. 4 Actvities Progress of Work This is the first floor of main entrance building which is equal to 2 floors high. The water park and beach are still undergoing construction. The excavation and piling works have been carried out by the workers.
  • 7. 5 Materials on Site BRC reinforcement Cement blocks are put between the BRC and floor slab to create a space between them.
  • 8. 6 Plant and Equipment Clamp on site Excavator to excavate site
  • 9. 7 Site Valuation Process Documents Required 1. Green cards for all the visitors to site 2. Approval letter for site visit from the institute to the company 3. Construction project’s drawing for reference Parties Involved 1. Site Quantity Surveyors 2. Safety and Health Officer 3. Site Security 4. Lecturers 5. Students
  • 10. 8 Conclusion As future Quantity Surveyors, I learn that this site visit has given us a vital and necessary experience and lesson for us to work in the future. This site visit has provided us with valuable lessons that definitely cannot be obtained from normal classes attended in the institutes, even with all the tutorials done. First of all, I do realize that it will be extremely tiring and more difficult as expected to work as a Quantity Surveyor in the future as the site visit does require a lot of time and energy especially when climbing up and down between floors. Also, we visited the site in a good weather and it sure will be more difficult if there is a bad weather and require us to visit the site regardless of the weather. Moreover, we have managed to learn a lot of valuable information from the site Quantity Surveyors that brought us around the site. They taught us extra lessons such as what will make a design and build project to be delayed, types of building materials and their specific uses, and other relevant and useful information. Last but not least, we do find that the site visit can make us to understand more about how a site progress usually and what needed to be done when there are problems such as project delayed. The site visit also manage to teach us to observe what cannot be seen and examine when we are doing works like measurement and taking off.