Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 1 -
Basic Concepts of
Computerized Systems Validation (CSV)
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 2 -
S.No Table of Contents Page No.
1 Definitions (CSV, GxP, GAMP, etc..) 3
2 GAMP5 13
3 21 CFR Part 211 - Sections 14
4 ALCOA++ 17
5 21 CFR Part 11.10 – Check List 18
6 Important Abbreviations in Pharma Industry 21
7 Regulatory Agencies 23
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 3 -
CSV: Achieving and maintaining compliance with applicable GxP regulations and fitness for intended
use by:
• The Adoption of principles, approaches and life cycle activities within the framework of
validation plans and reports.
• The application of appropriate operational controls through the life of the system
Data Integrity: The extent to which all data are complete, consistent and accurate throughout the data
lifecycle.
GxP Compliance: Meeting all applicable pharmaceutical and associated life-science regulatory
requirements. (x is variable, it can be GMP, GLP, GDP, GCP)
Regulation: Regulation is the controlling of an activity or process, usually by means of rules. A rule of
order having the force of law, prescribed by a superior or competent authority, relating to the actions of
those under the authority's control. Regulations are issued by various federal government departments
and agencies. (Power of law)
Guidelines: Guideline is a non-specific rule or principle that provides direction to action or behaviour,
or A Guideline is a statement of advice or instruction pertaining to practice
Directives: Legal acts that require EU member states to achieve a specified result.
US FDA: The United States Food and Drug Administration (FDA or USFDA) is a federal agency of the Department
of Health and Human Services. The FDA is responsible for protecting and promoting public health through the
control and supervision of food safety, tobacco products, biopharmaceuticals and OTC Drugs.
General and Permanent rules and regulations published in Federal Register.
The CFR is divided into 50 titles that represent broad areas subject to federal regulation.
One of 50 titles, title 21 is rules of Food & Drugs and Administration.
21 CFR divided into 3 chapters:
1. Food and Drug Administration
2. Drug Enforcement Administration
3. Office of National Drug Control Policy
Form 482: FDA may conduct an inspection of your operation for a variety of reasons, such as a routinely
scheduled investigation, a survey, or a response to a reported problem. The investigator will present
credentials and “Notice of Inspection” upon arriving at your plant.
Form 483: An FDA form 483 is issued to firm management at the conclusion of an inspection when an
investigator has observed any conditions that in their judgement may constitute violations of the Food
Drug and Cosmetic (FD&C) Act and related acts.
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 4 -
CDSCO: The Central Drugs Standard Control Organisation is India's national regulatory body for
pharmaceuticals and medical devices. The Drug Controller General of India (DCGI) regulates
pharmaceuticalandmedicaldevicesandispositioningwithintheMinistryof HealthandFamilyWelfare.
• CDSCO exercises regulatory control over the quality of drugs, cosmetics and notified medical
devices in the country.
• It is the Central Drug Authority for discharging functions assigned to the Central Government
under the Drugs and Cosmetics Act.
EMA: The European Medicines Agency is an agency of the European Union in charge of the evaluation
and supervision of medicinal products.
• EMA is responsible for scientific evaluation, supervision and safety monitoring of medicines in
EU.
• Protects public health and animal health in 28 EU member states, as well as the countries of the
European Economic Area.
PIC/S: Pharmaceutical Inspection Convention/ Pharmaceutical Inspection Co-operation Scheme
The main aim of PIC/S is to improve the Co-operation in the field of GMP between regulatory authorities
and pharmaceutical industry.
PIC was founded in 1970 by European Free Trade Association (EFTA), Because of incompatibility
between convention and European law, it was not possible for new countries to be admitted as
members of PIC. As a consequence, the Pharmaceutical Inspection Co-operation Scheme was formed
on 2 November 1995.
ICH: The International Council for Harmonisation of Technical Requirements for Pharmaceuticals for
Human Use (ICH) is unique in bringing together the regulatory authorities and pharmaceutical industry
to discuss scientific and technical aspects of pharmaceuticals and develop ICH guidelines.
ICH Products: Quality, Safety, Efficacy, Multidisciplinary
WHO: The World Health Organization is a specialized agency of the United Nations responsible for
international public health. The WHO Constitution, which establishes the agency's governing structure
and principles, states its main objective as "the attainment by all peoples of the highest possible level
of health"
Regulatory Affairs: Regulatory Affairs in a Pharmaceutical industry is a profession which acts as the
interface between the pharmaceutical industry and Drug Regulatory authorities across the world. It is
mainly involved in the registration of the drug products in respective countries prior to their marketing.
Computerized System: A Computerized system consists of the hardware, software and networking
components, Personnel, together with the controlled functions and associated documentation.
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 5 -
Validation: Establishing documented evidence which provides a high degree of assurance that a
specific process will consistently produce a product meeting its predetermined specifications and
Quality Attributes. (Validation is Process Oriented)
Verification: Verification is the act or process of establishing the truth or reality of something.
Qualification: Is an act or process to assure something complies with some condition, standard or
specific requirements.
Commissioning:Ensuresthatutilities,manufacturingfacilitiesandequipmentisdesignedproperlyand
functions as intended as defined in the URS.
Deviation: Deviation is any change from written procedure like Protocols, SOP, STP, BMR. Etc. Any
deviationfromestablishedproceduresshouldbedocumentedandexplained.Criticaldeviationsshould
be investigated, and the investigation and its conclusion should be documented.
Incident: It’s an unwritten event that is against GMP. Incident can be defined as unplanned or
uncontrolledeventintheformofnon-compliancefromthedesignedsystemsorproceduresatanystage
of manufacturing, packing, testing, holding and storage of drug product due to system.
OutofSpecifications(OOS):Resultsgeneratedduringtestingthatdonotcomplywithrelevantstandard
or specification.
Out of Trends (OOT): Any test result obtained for a particular batch that is markedly different from the
results of batches in a series.
ChangeControl:AProcesswhichensuresthatchangestoprocedures,materials,methods,equipment,
and software are properly documented, approved, validated and traceable.
Corrective Action and Preventive Action (CAPA): CAPA consists of improvements to an organization's
processes taken to eliminate causes of non-conformities or other undesirable situations.
Corrective Action: Action required to correct and prevent a re-occurrence for something that happened
yesterday
Preventive Action: Action required to prevent an occurrence of something that may happen tomorrow
Root Cause Analysis: Root cause analysis is a problem solving technique for identifying the basic or
cause factor (s) that underlie the occurrence or possible occurrences of an adverse event in a process
similar to diagnosis of disease – with the goal always in mind of preventing reoccurrence.
Market Complaints: A complaint is any expression of dissatisfaction with a product or service
marketed.
Risk Assessment: A systematic process of organizing information to support a risk decision to be made
within a risk management process. It consists of the identification of hazards and the analysis and
evaluation of risks associated with exposure to those hazards.
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 6 -
User Requirements Specifications (URS): URS describes what users require from the system. URS are
written early in the validation process, typically before the system is created
URS will be written by the system owner and End users, with input from Quality Assurance
Validation Plan: Validation Plan define the scope and goals of a validation project. These are specific to
a single validation project. VP include deliverables to be generated during the validation process and
Validation Team and the time line for completing the project.
DesignQualification(DQ):Documentedverificationthattheproposeddesignoffacilities,systems,and
equipment is suitable for the intended purpose.
Functional Specifications (FS): The functional specifications document, if created, define functions
and technological solutions that are specified for the computerized system based upon technical
requirements needed to satisfy user requirements.
Functional Risk Assessment (FRA): A functional risk assessment is performed following approval of
the functional specification to identify potential risks. Mitigation activities are then planned to manage
the identified risks and allow focusing on critical areas, e.g.by modifying functionality, detailed testing,
procedural controls or training.
Installation Qualification (IQ): Establishing a high degree of confidence that the equipment as installed
is consistent with manufacture’s requirements and specifications.
Operating Qualification (OQ): Establishing a high degree of confidence that the equipment as installed
is able to consistently operate within established limits and tolerances.
Test Case: It is a document that contains the steps that has to be executed, it has been planned earlier.
Test Script: Test scripts provide documented evidence that you have tested the system against your
requirements.
PerformanceQualification(PQ): Establishinga highdegree of confidence, withappropriate testingthat
the equipment, under normal operating conditions, will consistently produce a quality product.
Traceability Matrix: Traceability matrix is a document that traces and maps the relationship between
the two baseline documents. This includes one with the requirement specifications and another one
with the test cases.
Validation Summary Report (VSR): Documents confirming that the entire project planned activities
have been completed. On acceptance of the Validation Summary Report, the user releases the system
for use, possibly with a requirement that continuing monitoring should take place for a certain time.
User Acceptance Testing (UAT): Verification of the fully-configured computerized system installed in
the production environment to perform as intended in the automated business process when operated
byenduserstrainedinenduserstandardoperatingproceduresthatdefinesystemuseandcontrol.User
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 7 -
acceptance testing may be a component of the performance qualification or a validation step separate
from the PQ.
Factory Acceptance Test: An acceptance test in the supplier’s factory, usually involving the customer.
Code review: A meeting at which software code is presented to project personnel, managers, users,
customers, or other interested parties for comment or approval.
Custom-built software: Also known as a Bespoke System, Custom-Built Software is software produced
for a customer, specifically to order, to meet a defined set of user requirements.
System Owner the person(s) who have responsibility for the operational system and bear the ultimate
responsibility for ensuring a positive outcome of any regulatory inspection or quality audit of the system.
Process Owner: Process owner is usually a section in-charge or block in-charge based on specific
knowledge of the process.
System Development Life Cycle (SDLC): The period of time that starts when a computerized system is
conceived and ends when the product is no longer available for by end-users. The system life cycle
typicallyincludesarequirementandplanningphaseadevelopmentphasethatincludes.Adesignphase
and a programming and testing phase and a system qualification and release phase that includes:
system integration and testing phase system validation phase system release phase, and a system
operation and maintenance phase, and a system retirement phase.
System life divided into four phases:
• Concept
• Plan
• Operation
• Retirement
Vendor Management: For Vendor supplied, Vendor-managed computerized systems or system
components, including cloud-based systems, an evaluation of the vendor-supplied system and the
vendor’s quality system should be conducted and recorded. The scope and depth of this evaluation
should be based upon risk management principles.
Impact Assessment: Are a formal process used to identify systems and the components of those
systems that have a direct impact on Product Quality.
Gap Analysis: Is a method of assessing the difference in performance between a business information
systems or software applications to determine whether business requirements are being met and if not
what steps should be taken to ensure they are met successfully.
Business Continuity Plan: A written plan that is documented and maintained that defines the ongoing
process supported by management and funded to ensure that the necessary steps are taken to identify
the impact of potential losses, maintain viable recovery
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 8 -
GAMP5: Good Automated Manufacturing Practice
A risk based approach to compliant GxP computerized systems provides a frame work for the risk-based
approach to computer system validation where a system is evaluated and assigned to a predefined
category based on its intended use and complexity.
Category 1: Operating Systems
Category 3: Standard / Non-Configured Software
Category 4: Configured Software
Category 5: Customized Software
Prospective validation: Validation conducted prior to the distribution of either a new product, or
product made under a revised manufacturing process, where the revisions may affect the product’s
characteristics.
Retrospective Validation: evaluation Establishing documented evidence that a system does what it
purports to do, based on an analysis of historical information. The process of evaluating a computer
system currently in operation against standard validation practices and procedures. The evaluation
determines the reliability, accuracy, and completeness of a system
Concurrent Validation: Occurs Simultaneously with production
Validation Protocol: A written plan stating how validation will be conducted, including test parameters,
product characteristics, production equipment, and decision points on what constitutes acceptable
test results.
Legacy Systems: Production computer systems that are operating on older computer hardware or are
based on older software applications. In some cases, the vendor may no longer support the hardware
or software.
Open System: A Computer system where user access is not controlled by the same people responsible
for its contents. The company can’t confirm the identity of all users prior to providing access to the
electronic record system.
Closed System: A Computer system whose user access is controlled by the same people responsible
for its contents. The company can confirm the identity of all users prior to providing access to the
electronic record system and only electronic signatures are required.
Hybrid System: An environment consisting of both Electronic & Paper-based records.
Migration: Periodic transfer of digital materials from one hardware/software configuration to another,
or from one generation of computer technology to a subsequent generation.
Periodic Review: A documented assessment of the documentation, procedures, records, and
performance of a computer system to determine whether it is still in a validated state and what actions,
if any, are necessary to restore its validated state.
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 9 -
Audit Trail: The audit trail is a form of metadata containing information associated with actions that
relate to the creation, modification or deletion of GxP records.
Electronic Record: Electronic records mean any combination of text, graphics, data, audio, pictorial or
other information presentation in digital form that is created, modified, maintained, archived, retrieved,
or distributed by a computer system.
Electronic Signature (ES): A set of symbols that is as unique and legally binding as a handwritten
signature, but that is used to sign records in a computer system. Any time an electronic record is signed.
Digital Signature: A digital Signature creates an electronic “Fingerprint”, This fingerprint is a coded
message that requires encryption and data integrity.
Biometrics: Means of identifying an individual based on measurement of physical attributes such as
fingerprint, retinal scan etc.
Data Backup: A backup means a copy of one or more electronic files created as an alternative in case
the original data or system are lost or become unusable (for example: in the event of a system crash or
corruption of a disk).
Data Restore: Data restore is procedure by which data the backup data restored and verified.
Data Retention: Data Retention may be for archiving (protected data for long-term storage) or backup
(data for the purposes of disaster recovery)
Raw Data: The original data that has not been manipulated or data that cannot be easily derived or
recalculated from other information.
Meta Data: Metadata are data that describe the attributes of other data and provide context and
meaning. Typically, these are data that describe the structure, data elements, inter relationship and
other characteristics of data. e.g. Audit trails.
Transient Data: Transient data is not defined as an electronic record. It is the data generated by a
computer that is not retained or stored by the system, although it may remain in the computer’s memory
for a significant time.
Disaster Recovery: Process for planning or engaging appropriate resources to restore the normal
business function in the event of a disaster.
Encryption: The process of converting information into a code or cipher. A secret key, or password, is
required to decrypt (decode) the information, which would otherwise be unreadable.
Authentication: The process used to confirm the identity of a person, or to prove the integrity of specific
information. In the case of a message, authentication involves determining the message source, and
providing assurance that the message has not been modified or replaced in transit.
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 10 -
Critical Process Parameters (CPP): A Process parameter whose variability has an impact on a critical
Quality Attributes and thereof should be monitored or controlled to ensure the process produces the
desired quality.
Critical Quality Attributes (CQA): A Critical Quality Attribute is a physical, chemical, biological or
microbiological property or characteristics that should be within an appropriate limit, range or
distribution to ensure the desired product quality.
Contamination: The undesired introduction of impurities of chemical, microbiological. Foreign matter
during Production, Sampling, Packing.
Cross-contamination: Contamination of a material or of a product with another material or product.
Calibration: It is a demonstration that, a particular Instrument or device produces results with in
specified limits by comparisons with those produced by a reference or traceable standard over an
appropriate range of measurements.
GMP: GMP is the part of Quality assurance which ensures that products are consistently produced and
controlled to the quality standards appropriate to their intended use and as required by the marketing
authorization.
SOP: Standard Operating Procedure
SOP is a type of document that describes in a step-by-step outline from how to perform a particular task
or operation. Everyone in a company must follow the same procedures to assure that tasks are
performed consistently and correctly.
Good Manufacturing Practice:
• ICH: Q7
• US FDA: 21 CFR Part 210 – cGMP General
• 211- cGMP for Finished Pharmaceuticals
• WHO- Technical Report Series-937
• PIC/S- Recommendations PE-009
• EU-Part1, Annex5
• EU-Part11, Chapter 13
5 CGMP Attributes: (SISPQ)
S – Safety
I – Identity
S – Strength
P – Purity
Q – Quality
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 11 -
ICH Q: Quality
Q1 Stability
Q2 Analytical Validation
Q3 Impurities
Q4 Pharmacopeias
Q5 Quality of Biotechnological Products
Q6 Specifications
Q7 Good Manufacturing Practice
Q8 Pharmaceutical Development
Q9 Quality Risk Management
Q10 Pharmaceutical Quality Systems
Q11 Development and Manufacture of Drug Substance
Q12 Life Cycle Management
Q13 Continuous Manufacturing of Drug Substances and Drug Products
Q14 Analytical Procedure Development
ICH Q7: Good Manufacturing Process
1 Introduction
2 Quality Management
3 Personnel
4 Building & Premises
5 Process & Equipment
6 Documentation & Records
7 Material Management
8 Production and In-process controls
9 Packing and Labelling
10 Storage and Distribution
11 Laboratory Control
12 Validation
13 Change Control
14 Rejection and Re-use of Materials
15 Complaints and Recalls
16 Contract Manufacturing
21 CFR Part 211: CGMP for Finished Pharmaceuticals
A General Provisions
B Personnel and Qualifications
C Building and Facilities
D Equipment
E Drug Product Containers and Closures
F Production and Process Control
G Packing and Labelling Control
H Holding and Distribution
I Laboratory Controls
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 12 -
J Records and Reports
K Returns and Salvaged Drug Products
21 CFR Part 211: CGMP for Finished Pharmaceuticals (Sections)
211.22 211.22- Responsibilities of Quality Control unit
211.25 Personnel Qualifications
211.28 Personnel Responsibilities
211.42 Design and construction features
211.44 Lighting
211.46 Ventilation, Air-Filtration, Air Heating and Cooling
211.48 Plumbing
211.50 Sewage and refuse
211.52 Washing and toilet facilities
211.56 Sanitation
211.58 Maintenance
211.63 Equipment design, Size, and location
211.65 Equipment construction
211.67 Equipment cleaning and maintenance
211.68 Automatic, mechanical, and electronic equipment
211.72 Filters
211.80 General Requirements
21.82 Receipt and storage of untested components, drug product containers, and closures
211.84 Testing and Approval or rejection of components, drug product containers and closures
211.86 Use of approved components, drug product containers, and closures
211.87 Retesting of approved components, drug product containers and closures
211.89 Rejected components, drug product containers, and closures
211.94 Drug Product containers and closures
211.100 Written Procedures and Deviations
211.101 Charge-in of components
211.103 Calculation of Yield
211.105 Equipment Identification
211.111 Time limitations on production
211.113 Control for microbiological contamination
211.115 Reprocessing
211.122 Materials examination and usage criteria
211.125 Labelling Issuance
211.130 Packing and labelling operations
211.134 Drug Product inspection
211.137 Expiration dating
211.142 Warehousing Procedures
211.150 Distribution procedures
211.160 Laboratory Controls (Gen. Req)
211.165 Testing and release for distribution
211.166 Stability testing
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 13 -
211.170 Reserve samples
211.180 General requirements
211.182 Equipment cleaning and use log
211.184 Component, drug product container, closure and labelling records
211.186 Master production and control records
211.188 Batch Production and control records
211.192 Production record review
211.194 Laboratory records
211.196 Distribution records
211.198 Complaint files
211.204 Returned drug products
211.208 Drug products salvaging
EU GMP: Volume 4, Annex 11
1 Risk Management
2 Personnel
3 Suppliers and Service Providers
4 Validation
5 Data
6 Accuracy Checks
7 Data Storage
8 Printouts
9 Audit Trails
10 Change and Configuration Management
11 Periodic Evaluation
12 Security
13 Incident Management
14 Electronic Signatures
15 Batch Release
16 Business Continuity
17 Archiving
Data Integrity: ALCOA ++
Attributable The Identity of the person completing a record (Who, When, Why)
Legible The data is readable, Understandable, Traceable, Permanent allowing for a
clear picture of the activities that occurred
Contemporaneous The data is recorded at the time it is generated or observed (No Back dating)
Original Original Records must preserve data accuracy, completeness, content and
meaning. Data as the file or format in which it was initially generated
Accurate The data record must be accurate whether paper or electronic, it must be exact,
true and free from error (this might require a second verification if necessary)
Consistent Consistent application of date and time stamps in the expected sequence.
Complete All Information needs to be maintained. Batch pass-fail, Reanalyses carried out.
(OOS, OOT)
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 14 -
Enduring Medium used to record data should be permanent and not temporary memory
RAM.
Available Available/Accessible for review / audit for the life time of the record.
21 CFR Part 11: Electronic Records and Electronic Signatures
11.10 Controls for Closed Systems
11.30 Controls for Open Systems
11.50 Signature Manifestations
11.70 Signature/Record linking
11.100 Electronic Signatures (General Requirements)
11.200 (a) Electronic Signatures Components & Controls (Non-Biometrics)
11.200 (b) Electronic Signatures based upon biometrics
11.300 Controls for Identification Codes and Passwords
21 CFR Part 11.10: Controls for Closed Systems
A Validation
B Records
C Data Archival and Restoration
D User Access Levels
E Audit Trail
F Sequence Steps
G Authorizations
H Inputs/Outputs
I Experience, Education, Training
J Accountability
K Documentation
21 CFR Part 11:10 Controls for Closed Systems – Check List
11.10 (a) Is the system validated?
11.10 (a)
Does the validation documentation show that Part 11 requirements have been met and
are Functioning correctly?
11.10 (a)
Is the system able to detect invalid records where applicable (e.g. invalid field entries,
fields left blank that should contain data, values outside of limits)?
11.10 (b) Is it possible to view the entire contents of the records?
11.10 (b) Is it possible to print the entire contents of the records?
11.10 (b)
Is it possible to generate all the records electronically in a format that can be put on a
portable medium (e.g. diskette or CD) or Transferred electronically?
11.10 (c) Are records protected against intentional or Accidental modification or deletion?
11.10 (c)
Isdataarchivedoffthesystem?Ifso,isthemetadata(includingtheaudittrail)archived
as well? Can all the archived data be accurately retrieved after system upgrades?
11.10 (d)
Are there different levels of access based on User responsibilities (e.g. user,
administrator) (If appropriate)? Is this documented and controlled?
11.10 (d)
Are user access levels approved by management or the system owner before
assignment to a user?
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 15 -
11.10 (d)
Is there is a controlled, documented process for granting access to a new user, for
changing privileges for an existing user and for deleting user accounts?
11.10 (d)
Is there physical security and procedures to protect the server, database and system
components from unauthorized access?
11.10 (e) Is an electronic audit trail function automatically generated for all operator entries?
11.10 (e)
Is the audit trail completely outside the control and access of users (except for read-
only access of the audit trail file)?
11.10 (e) Is it impossible to disable the audit trail function?
11.10 (e) Is the system date and time protected from unauthorized change?
11.10 (e) When data is changed or deleted, are all Previous values still electronically available?
11.10 (e)
Is the audit trail data protected from accidental or international modification or
deletion (read-only access)?
11.10 (e)
Are the electronic audit trails maintained and retrievable for at least as long as its
respective electronic records?
11.10 (e) Are the electronic audit trails readily available for inspections and audits?
11.10 (e) Can selected portions of the audit trail be viewed and printed by inspectors?
11.10 (e)
Canselectedportionsoftheaudittrailbeextractedinatransportableelectronicformat
that can be read by regulatory agencies?
11.10 (e)
If no audit trail is available, can the system detect that a record was altered since its
last approval?
11.10 (e)
Are operator name, date, time, and indication of record (or file) creation, modification
or deletion recorded in audit trail?
11.10 (e)
If the predicate regulation requires it, is the reason for a change included in the audit
trail?
11.10 (f)
If the system required sequenced steps, does it ensure that the actions are performed
in the correct sequence?
11.10 (g) Does the system ensure that only authorized individuals can use the system?
11.10 (g)
Does the system (or procedure) verify that an individual has the authority to
electronically sign a record before allowing them to do so?
11.10 (h)
If it is a requirement of the system that data input or instructions can only come from
specific input devices (e.g. instruments, terminals); does the system check for the
correct device?
11.10 (i)
Is there documentation to show that persons who develop the system have the
education, training and experience to perform their assigned tasks (including
temporary and contract staff)?
11.10 (i)
Is there documentation to show that persons who maintain or use the system have the
education, training and experience to perform their assigned tasks (including
temporary and contract staff)?
11.10 (j)
Is there a written policy in place and enforced that holds Individuals fully accountable
and responsible for actions initiated under their electronic signatures?
11.10 (k)(1)
Is the distribution of, access to, and use of systems operation and maintenance
documentation controlled?
11.10 (k)(1)
Is access to “sensitive” systems documentation restricted e.g. network security
documentation, system access documentation?
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 16 -
11.10 (k)(2)
Is there a Change Control (or equivalent) SOP governing revisions to system
documentation?
Important Abbreviations in Pharma Industry
ANDAs Abbreviated New Drug Applications
DCS Distributed Control Systems
PLC Programmable Logic Controller
MRP Material Requirement Planning
SLA Service Level Agreement
SCADA Supervisory Control and Data Acquisition
ERP Enterprise Resource Planning
DCS Distributed Control System
MES Manufacturing Execution System
ELN Electronic Laboratory Notebook
QSIT Quality System Inspection Technique
PAC Process Automation Controller
ISMS Information Security Management System
BMS Building Management
SATA Serial Advanced Technology Attachment
HDMI High-Definition Multimedia Interface
VGA Video Graphics Array
DVI Digital Visual Interface
TCP Transmission Control Protocol
ANSI American National Standard Institute
MACO Maximum Allowable Carryover
NOEL No Observable Effect Level
EIR Establishment Inspection Record
KPI Key Performance Indicator
COA Certificate of Analysis
CFR Code of Federal Regulation
DES Data Encryption Standard
FAT Factory Acceptance Test
SAT Site Acceptance Test
GCP Good Clinical Practice
GLP Good Laboratory Practice
ISO International Organization for Standardization
IIS Internet Information Services
IOT Internet of Things
OTG On The Go
LAN Local Area Network
NBS National Bureau of Standards
NDA New Drug Application
P&ID Process and Instrumentation Drawings
PIN Personal Identification Number
Basic Concepts of
Computerized Systems Validation (CSV)
Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com
- 17 -
SAP Systems, Applications and Products
SDLC System Development Life Cycle
SSL Secure Socket Layer
UPS Uninterruptable Power Supply
VPN Virtual Private Network
SOP Standard Operating Procedure
ESG Electronic Submissions Gateway
PTO Patent Term Office
CIP Clean in Place
SIP Sterile in Place
PFD Process Flow Diagram
PDI Pre-Delivery Inspection
OOS Out of Specifications
OOT Out of Trends
QMS Quality Management System
Regulatory Agencies:
India CDSCO Central Drugs Standard Control Organization
WHO World Health Organization
USA FDA Food and Drug Administration
UK MHRA Medicines and Healthcare products Regulatory Agency
EU EMA European Medicines Agency
EU EDQM European Directorate for Quality of Medicines
South Africa SAHPRA South African Health Products Regulatory Authority
Australia TGA Therapeutic Goods Administration
Japan PMDA Pharmaceutical Medical Devices Agency
India CDSCO Central Drugs Standard Control Organization
Canada TPD Therapeutic Products Directorate
Singapore HSA Health Sciences Authority
Russia Ministry of Health
Brazil ANVISA The National Health Surveillance Agency
Switzerland SWISSMEDIC Swiss Agency for Therapeutic Products
Arab States GCC Gulf Cooperation Council

Basic Concepts of Computerised Systems Validation (CSV)-Katalyst HLS.pdf

  • 1.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 1 - Basic Concepts of Computerized Systems Validation (CSV)
  • 2.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 2 - S.No Table of Contents Page No. 1 Definitions (CSV, GxP, GAMP, etc..) 3 2 GAMP5 13 3 21 CFR Part 211 - Sections 14 4 ALCOA++ 17 5 21 CFR Part 11.10 – Check List 18 6 Important Abbreviations in Pharma Industry 21 7 Regulatory Agencies 23
  • 3.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 3 - CSV: Achieving and maintaining compliance with applicable GxP regulations and fitness for intended use by: • The Adoption of principles, approaches and life cycle activities within the framework of validation plans and reports. • The application of appropriate operational controls through the life of the system Data Integrity: The extent to which all data are complete, consistent and accurate throughout the data lifecycle. GxP Compliance: Meeting all applicable pharmaceutical and associated life-science regulatory requirements. (x is variable, it can be GMP, GLP, GDP, GCP) Regulation: Regulation is the controlling of an activity or process, usually by means of rules. A rule of order having the force of law, prescribed by a superior or competent authority, relating to the actions of those under the authority's control. Regulations are issued by various federal government departments and agencies. (Power of law) Guidelines: Guideline is a non-specific rule or principle that provides direction to action or behaviour, or A Guideline is a statement of advice or instruction pertaining to practice Directives: Legal acts that require EU member states to achieve a specified result. US FDA: The United States Food and Drug Administration (FDA or USFDA) is a federal agency of the Department of Health and Human Services. The FDA is responsible for protecting and promoting public health through the control and supervision of food safety, tobacco products, biopharmaceuticals and OTC Drugs. General and Permanent rules and regulations published in Federal Register. The CFR is divided into 50 titles that represent broad areas subject to federal regulation. One of 50 titles, title 21 is rules of Food & Drugs and Administration. 21 CFR divided into 3 chapters: 1. Food and Drug Administration 2. Drug Enforcement Administration 3. Office of National Drug Control Policy Form 482: FDA may conduct an inspection of your operation for a variety of reasons, such as a routinely scheduled investigation, a survey, or a response to a reported problem. The investigator will present credentials and “Notice of Inspection” upon arriving at your plant. Form 483: An FDA form 483 is issued to firm management at the conclusion of an inspection when an investigator has observed any conditions that in their judgement may constitute violations of the Food Drug and Cosmetic (FD&C) Act and related acts.
  • 4.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 4 - CDSCO: The Central Drugs Standard Control Organisation is India's national regulatory body for pharmaceuticals and medical devices. The Drug Controller General of India (DCGI) regulates pharmaceuticalandmedicaldevicesandispositioningwithintheMinistryof HealthandFamilyWelfare. • CDSCO exercises regulatory control over the quality of drugs, cosmetics and notified medical devices in the country. • It is the Central Drug Authority for discharging functions assigned to the Central Government under the Drugs and Cosmetics Act. EMA: The European Medicines Agency is an agency of the European Union in charge of the evaluation and supervision of medicinal products. • EMA is responsible for scientific evaluation, supervision and safety monitoring of medicines in EU. • Protects public health and animal health in 28 EU member states, as well as the countries of the European Economic Area. PIC/S: Pharmaceutical Inspection Convention/ Pharmaceutical Inspection Co-operation Scheme The main aim of PIC/S is to improve the Co-operation in the field of GMP between regulatory authorities and pharmaceutical industry. PIC was founded in 1970 by European Free Trade Association (EFTA), Because of incompatibility between convention and European law, it was not possible for new countries to be admitted as members of PIC. As a consequence, the Pharmaceutical Inspection Co-operation Scheme was formed on 2 November 1995. ICH: The International Council for Harmonisation of Technical Requirements for Pharmaceuticals for Human Use (ICH) is unique in bringing together the regulatory authorities and pharmaceutical industry to discuss scientific and technical aspects of pharmaceuticals and develop ICH guidelines. ICH Products: Quality, Safety, Efficacy, Multidisciplinary WHO: The World Health Organization is a specialized agency of the United Nations responsible for international public health. The WHO Constitution, which establishes the agency's governing structure and principles, states its main objective as "the attainment by all peoples of the highest possible level of health" Regulatory Affairs: Regulatory Affairs in a Pharmaceutical industry is a profession which acts as the interface between the pharmaceutical industry and Drug Regulatory authorities across the world. It is mainly involved in the registration of the drug products in respective countries prior to their marketing. Computerized System: A Computerized system consists of the hardware, software and networking components, Personnel, together with the controlled functions and associated documentation.
  • 5.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 5 - Validation: Establishing documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and Quality Attributes. (Validation is Process Oriented) Verification: Verification is the act or process of establishing the truth or reality of something. Qualification: Is an act or process to assure something complies with some condition, standard or specific requirements. Commissioning:Ensuresthatutilities,manufacturingfacilitiesandequipmentisdesignedproperlyand functions as intended as defined in the URS. Deviation: Deviation is any change from written procedure like Protocols, SOP, STP, BMR. Etc. Any deviationfromestablishedproceduresshouldbedocumentedandexplained.Criticaldeviationsshould be investigated, and the investigation and its conclusion should be documented. Incident: It’s an unwritten event that is against GMP. Incident can be defined as unplanned or uncontrolledeventintheformofnon-compliancefromthedesignedsystemsorproceduresatanystage of manufacturing, packing, testing, holding and storage of drug product due to system. OutofSpecifications(OOS):Resultsgeneratedduringtestingthatdonotcomplywithrelevantstandard or specification. Out of Trends (OOT): Any test result obtained for a particular batch that is markedly different from the results of batches in a series. ChangeControl:AProcesswhichensuresthatchangestoprocedures,materials,methods,equipment, and software are properly documented, approved, validated and traceable. Corrective Action and Preventive Action (CAPA): CAPA consists of improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. Corrective Action: Action required to correct and prevent a re-occurrence for something that happened yesterday Preventive Action: Action required to prevent an occurrence of something that may happen tomorrow Root Cause Analysis: Root cause analysis is a problem solving technique for identifying the basic or cause factor (s) that underlie the occurrence or possible occurrences of an adverse event in a process similar to diagnosis of disease – with the goal always in mind of preventing reoccurrence. Market Complaints: A complaint is any expression of dissatisfaction with a product or service marketed. Risk Assessment: A systematic process of organizing information to support a risk decision to be made within a risk management process. It consists of the identification of hazards and the analysis and evaluation of risks associated with exposure to those hazards.
  • 6.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 6 - User Requirements Specifications (URS): URS describes what users require from the system. URS are written early in the validation process, typically before the system is created URS will be written by the system owner and End users, with input from Quality Assurance Validation Plan: Validation Plan define the scope and goals of a validation project. These are specific to a single validation project. VP include deliverables to be generated during the validation process and Validation Team and the time line for completing the project. DesignQualification(DQ):Documentedverificationthattheproposeddesignoffacilities,systems,and equipment is suitable for the intended purpose. Functional Specifications (FS): The functional specifications document, if created, define functions and technological solutions that are specified for the computerized system based upon technical requirements needed to satisfy user requirements. Functional Risk Assessment (FRA): A functional risk assessment is performed following approval of the functional specification to identify potential risks. Mitigation activities are then planned to manage the identified risks and allow focusing on critical areas, e.g.by modifying functionality, detailed testing, procedural controls or training. Installation Qualification (IQ): Establishing a high degree of confidence that the equipment as installed is consistent with manufacture’s requirements and specifications. Operating Qualification (OQ): Establishing a high degree of confidence that the equipment as installed is able to consistently operate within established limits and tolerances. Test Case: It is a document that contains the steps that has to be executed, it has been planned earlier. Test Script: Test scripts provide documented evidence that you have tested the system against your requirements. PerformanceQualification(PQ): Establishinga highdegree of confidence, withappropriate testingthat the equipment, under normal operating conditions, will consistently produce a quality product. Traceability Matrix: Traceability matrix is a document that traces and maps the relationship between the two baseline documents. This includes one with the requirement specifications and another one with the test cases. Validation Summary Report (VSR): Documents confirming that the entire project planned activities have been completed. On acceptance of the Validation Summary Report, the user releases the system for use, possibly with a requirement that continuing monitoring should take place for a certain time. User Acceptance Testing (UAT): Verification of the fully-configured computerized system installed in the production environment to perform as intended in the automated business process when operated byenduserstrainedinenduserstandardoperatingproceduresthatdefinesystemuseandcontrol.User
  • 7.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 7 - acceptance testing may be a component of the performance qualification or a validation step separate from the PQ. Factory Acceptance Test: An acceptance test in the supplier’s factory, usually involving the customer. Code review: A meeting at which software code is presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Custom-built software: Also known as a Bespoke System, Custom-Built Software is software produced for a customer, specifically to order, to meet a defined set of user requirements. System Owner the person(s) who have responsibility for the operational system and bear the ultimate responsibility for ensuring a positive outcome of any regulatory inspection or quality audit of the system. Process Owner: Process owner is usually a section in-charge or block in-charge based on specific knowledge of the process. System Development Life Cycle (SDLC): The period of time that starts when a computerized system is conceived and ends when the product is no longer available for by end-users. The system life cycle typicallyincludesarequirementandplanningphaseadevelopmentphasethatincludes.Adesignphase and a programming and testing phase and a system qualification and release phase that includes: system integration and testing phase system validation phase system release phase, and a system operation and maintenance phase, and a system retirement phase. System life divided into four phases: • Concept • Plan • Operation • Retirement Vendor Management: For Vendor supplied, Vendor-managed computerized systems or system components, including cloud-based systems, an evaluation of the vendor-supplied system and the vendor’s quality system should be conducted and recorded. The scope and depth of this evaluation should be based upon risk management principles. Impact Assessment: Are a formal process used to identify systems and the components of those systems that have a direct impact on Product Quality. Gap Analysis: Is a method of assessing the difference in performance between a business information systems or software applications to determine whether business requirements are being met and if not what steps should be taken to ensure they are met successfully. Business Continuity Plan: A written plan that is documented and maintained that defines the ongoing process supported by management and funded to ensure that the necessary steps are taken to identify the impact of potential losses, maintain viable recovery
  • 8.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 8 - GAMP5: Good Automated Manufacturing Practice A risk based approach to compliant GxP computerized systems provides a frame work for the risk-based approach to computer system validation where a system is evaluated and assigned to a predefined category based on its intended use and complexity. Category 1: Operating Systems Category 3: Standard / Non-Configured Software Category 4: Configured Software Category 5: Customized Software Prospective validation: Validation conducted prior to the distribution of either a new product, or product made under a revised manufacturing process, where the revisions may affect the product’s characteristics. Retrospective Validation: evaluation Establishing documented evidence that a system does what it purports to do, based on an analysis of historical information. The process of evaluating a computer system currently in operation against standard validation practices and procedures. The evaluation determines the reliability, accuracy, and completeness of a system Concurrent Validation: Occurs Simultaneously with production Validation Protocol: A written plan stating how validation will be conducted, including test parameters, product characteristics, production equipment, and decision points on what constitutes acceptable test results. Legacy Systems: Production computer systems that are operating on older computer hardware or are based on older software applications. In some cases, the vendor may no longer support the hardware or software. Open System: A Computer system where user access is not controlled by the same people responsible for its contents. The company can’t confirm the identity of all users prior to providing access to the electronic record system. Closed System: A Computer system whose user access is controlled by the same people responsible for its contents. The company can confirm the identity of all users prior to providing access to the electronic record system and only electronic signatures are required. Hybrid System: An environment consisting of both Electronic & Paper-based records. Migration: Periodic transfer of digital materials from one hardware/software configuration to another, or from one generation of computer technology to a subsequent generation. Periodic Review: A documented assessment of the documentation, procedures, records, and performance of a computer system to determine whether it is still in a validated state and what actions, if any, are necessary to restore its validated state.
  • 9.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 9 - Audit Trail: The audit trail is a form of metadata containing information associated with actions that relate to the creation, modification or deletion of GxP records. Electronic Record: Electronic records mean any combination of text, graphics, data, audio, pictorial or other information presentation in digital form that is created, modified, maintained, archived, retrieved, or distributed by a computer system. Electronic Signature (ES): A set of symbols that is as unique and legally binding as a handwritten signature, but that is used to sign records in a computer system. Any time an electronic record is signed. Digital Signature: A digital Signature creates an electronic “Fingerprint”, This fingerprint is a coded message that requires encryption and data integrity. Biometrics: Means of identifying an individual based on measurement of physical attributes such as fingerprint, retinal scan etc. Data Backup: A backup means a copy of one or more electronic files created as an alternative in case the original data or system are lost or become unusable (for example: in the event of a system crash or corruption of a disk). Data Restore: Data restore is procedure by which data the backup data restored and verified. Data Retention: Data Retention may be for archiving (protected data for long-term storage) or backup (data for the purposes of disaster recovery) Raw Data: The original data that has not been manipulated or data that cannot be easily derived or recalculated from other information. Meta Data: Metadata are data that describe the attributes of other data and provide context and meaning. Typically, these are data that describe the structure, data elements, inter relationship and other characteristics of data. e.g. Audit trails. Transient Data: Transient data is not defined as an electronic record. It is the data generated by a computer that is not retained or stored by the system, although it may remain in the computer’s memory for a significant time. Disaster Recovery: Process for planning or engaging appropriate resources to restore the normal business function in the event of a disaster. Encryption: The process of converting information into a code or cipher. A secret key, or password, is required to decrypt (decode) the information, which would otherwise be unreadable. Authentication: The process used to confirm the identity of a person, or to prove the integrity of specific information. In the case of a message, authentication involves determining the message source, and providing assurance that the message has not been modified or replaced in transit.
  • 10.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 10 - Critical Process Parameters (CPP): A Process parameter whose variability has an impact on a critical Quality Attributes and thereof should be monitored or controlled to ensure the process produces the desired quality. Critical Quality Attributes (CQA): A Critical Quality Attribute is a physical, chemical, biological or microbiological property or characteristics that should be within an appropriate limit, range or distribution to ensure the desired product quality. Contamination: The undesired introduction of impurities of chemical, microbiological. Foreign matter during Production, Sampling, Packing. Cross-contamination: Contamination of a material or of a product with another material or product. Calibration: It is a demonstration that, a particular Instrument or device produces results with in specified limits by comparisons with those produced by a reference or traceable standard over an appropriate range of measurements. GMP: GMP is the part of Quality assurance which ensures that products are consistently produced and controlled to the quality standards appropriate to their intended use and as required by the marketing authorization. SOP: Standard Operating Procedure SOP is a type of document that describes in a step-by-step outline from how to perform a particular task or operation. Everyone in a company must follow the same procedures to assure that tasks are performed consistently and correctly. Good Manufacturing Practice: • ICH: Q7 • US FDA: 21 CFR Part 210 – cGMP General • 211- cGMP for Finished Pharmaceuticals • WHO- Technical Report Series-937 • PIC/S- Recommendations PE-009 • EU-Part1, Annex5 • EU-Part11, Chapter 13 5 CGMP Attributes: (SISPQ) S – Safety I – Identity S – Strength P – Purity Q – Quality
  • 11.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 11 - ICH Q: Quality Q1 Stability Q2 Analytical Validation Q3 Impurities Q4 Pharmacopeias Q5 Quality of Biotechnological Products Q6 Specifications Q7 Good Manufacturing Practice Q8 Pharmaceutical Development Q9 Quality Risk Management Q10 Pharmaceutical Quality Systems Q11 Development and Manufacture of Drug Substance Q12 Life Cycle Management Q13 Continuous Manufacturing of Drug Substances and Drug Products Q14 Analytical Procedure Development ICH Q7: Good Manufacturing Process 1 Introduction 2 Quality Management 3 Personnel 4 Building & Premises 5 Process & Equipment 6 Documentation & Records 7 Material Management 8 Production and In-process controls 9 Packing and Labelling 10 Storage and Distribution 11 Laboratory Control 12 Validation 13 Change Control 14 Rejection and Re-use of Materials 15 Complaints and Recalls 16 Contract Manufacturing 21 CFR Part 211: CGMP for Finished Pharmaceuticals A General Provisions B Personnel and Qualifications C Building and Facilities D Equipment E Drug Product Containers and Closures F Production and Process Control G Packing and Labelling Control H Holding and Distribution I Laboratory Controls
  • 12.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 12 - J Records and Reports K Returns and Salvaged Drug Products 21 CFR Part 211: CGMP for Finished Pharmaceuticals (Sections) 211.22 211.22- Responsibilities of Quality Control unit 211.25 Personnel Qualifications 211.28 Personnel Responsibilities 211.42 Design and construction features 211.44 Lighting 211.46 Ventilation, Air-Filtration, Air Heating and Cooling 211.48 Plumbing 211.50 Sewage and refuse 211.52 Washing and toilet facilities 211.56 Sanitation 211.58 Maintenance 211.63 Equipment design, Size, and location 211.65 Equipment construction 211.67 Equipment cleaning and maintenance 211.68 Automatic, mechanical, and electronic equipment 211.72 Filters 211.80 General Requirements 21.82 Receipt and storage of untested components, drug product containers, and closures 211.84 Testing and Approval or rejection of components, drug product containers and closures 211.86 Use of approved components, drug product containers, and closures 211.87 Retesting of approved components, drug product containers and closures 211.89 Rejected components, drug product containers, and closures 211.94 Drug Product containers and closures 211.100 Written Procedures and Deviations 211.101 Charge-in of components 211.103 Calculation of Yield 211.105 Equipment Identification 211.111 Time limitations on production 211.113 Control for microbiological contamination 211.115 Reprocessing 211.122 Materials examination and usage criteria 211.125 Labelling Issuance 211.130 Packing and labelling operations 211.134 Drug Product inspection 211.137 Expiration dating 211.142 Warehousing Procedures 211.150 Distribution procedures 211.160 Laboratory Controls (Gen. Req) 211.165 Testing and release for distribution 211.166 Stability testing
  • 13.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 13 - 211.170 Reserve samples 211.180 General requirements 211.182 Equipment cleaning and use log 211.184 Component, drug product container, closure and labelling records 211.186 Master production and control records 211.188 Batch Production and control records 211.192 Production record review 211.194 Laboratory records 211.196 Distribution records 211.198 Complaint files 211.204 Returned drug products 211.208 Drug products salvaging EU GMP: Volume 4, Annex 11 1 Risk Management 2 Personnel 3 Suppliers and Service Providers 4 Validation 5 Data 6 Accuracy Checks 7 Data Storage 8 Printouts 9 Audit Trails 10 Change and Configuration Management 11 Periodic Evaluation 12 Security 13 Incident Management 14 Electronic Signatures 15 Batch Release 16 Business Continuity 17 Archiving Data Integrity: ALCOA ++ Attributable The Identity of the person completing a record (Who, When, Why) Legible The data is readable, Understandable, Traceable, Permanent allowing for a clear picture of the activities that occurred Contemporaneous The data is recorded at the time it is generated or observed (No Back dating) Original Original Records must preserve data accuracy, completeness, content and meaning. Data as the file or format in which it was initially generated Accurate The data record must be accurate whether paper or electronic, it must be exact, true and free from error (this might require a second verification if necessary) Consistent Consistent application of date and time stamps in the expected sequence. Complete All Information needs to be maintained. Batch pass-fail, Reanalyses carried out. (OOS, OOT)
  • 14.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 14 - Enduring Medium used to record data should be permanent and not temporary memory RAM. Available Available/Accessible for review / audit for the life time of the record. 21 CFR Part 11: Electronic Records and Electronic Signatures 11.10 Controls for Closed Systems 11.30 Controls for Open Systems 11.50 Signature Manifestations 11.70 Signature/Record linking 11.100 Electronic Signatures (General Requirements) 11.200 (a) Electronic Signatures Components & Controls (Non-Biometrics) 11.200 (b) Electronic Signatures based upon biometrics 11.300 Controls for Identification Codes and Passwords 21 CFR Part 11.10: Controls for Closed Systems A Validation B Records C Data Archival and Restoration D User Access Levels E Audit Trail F Sequence Steps G Authorizations H Inputs/Outputs I Experience, Education, Training J Accountability K Documentation 21 CFR Part 11:10 Controls for Closed Systems – Check List 11.10 (a) Is the system validated? 11.10 (a) Does the validation documentation show that Part 11 requirements have been met and are Functioning correctly? 11.10 (a) Is the system able to detect invalid records where applicable (e.g. invalid field entries, fields left blank that should contain data, values outside of limits)? 11.10 (b) Is it possible to view the entire contents of the records? 11.10 (b) Is it possible to print the entire contents of the records? 11.10 (b) Is it possible to generate all the records electronically in a format that can be put on a portable medium (e.g. diskette or CD) or Transferred electronically? 11.10 (c) Are records protected against intentional or Accidental modification or deletion? 11.10 (c) Isdataarchivedoffthesystem?Ifso,isthemetadata(includingtheaudittrail)archived as well? Can all the archived data be accurately retrieved after system upgrades? 11.10 (d) Are there different levels of access based on User responsibilities (e.g. user, administrator) (If appropriate)? Is this documented and controlled? 11.10 (d) Are user access levels approved by management or the system owner before assignment to a user?
  • 15.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 15 - 11.10 (d) Is there is a controlled, documented process for granting access to a new user, for changing privileges for an existing user and for deleting user accounts? 11.10 (d) Is there physical security and procedures to protect the server, database and system components from unauthorized access? 11.10 (e) Is an electronic audit trail function automatically generated for all operator entries? 11.10 (e) Is the audit trail completely outside the control and access of users (except for read- only access of the audit trail file)? 11.10 (e) Is it impossible to disable the audit trail function? 11.10 (e) Is the system date and time protected from unauthorized change? 11.10 (e) When data is changed or deleted, are all Previous values still electronically available? 11.10 (e) Is the audit trail data protected from accidental or international modification or deletion (read-only access)? 11.10 (e) Are the electronic audit trails maintained and retrievable for at least as long as its respective electronic records? 11.10 (e) Are the electronic audit trails readily available for inspections and audits? 11.10 (e) Can selected portions of the audit trail be viewed and printed by inspectors? 11.10 (e) Canselectedportionsoftheaudittrailbeextractedinatransportableelectronicformat that can be read by regulatory agencies? 11.10 (e) If no audit trail is available, can the system detect that a record was altered since its last approval? 11.10 (e) Are operator name, date, time, and indication of record (or file) creation, modification or deletion recorded in audit trail? 11.10 (e) If the predicate regulation requires it, is the reason for a change included in the audit trail? 11.10 (f) If the system required sequenced steps, does it ensure that the actions are performed in the correct sequence? 11.10 (g) Does the system ensure that only authorized individuals can use the system? 11.10 (g) Does the system (or procedure) verify that an individual has the authority to electronically sign a record before allowing them to do so? 11.10 (h) If it is a requirement of the system that data input or instructions can only come from specific input devices (e.g. instruments, terminals); does the system check for the correct device? 11.10 (i) Is there documentation to show that persons who develop the system have the education, training and experience to perform their assigned tasks (including temporary and contract staff)? 11.10 (i) Is there documentation to show that persons who maintain or use the system have the education, training and experience to perform their assigned tasks (including temporary and contract staff)? 11.10 (j) Is there a written policy in place and enforced that holds Individuals fully accountable and responsible for actions initiated under their electronic signatures? 11.10 (k)(1) Is the distribution of, access to, and use of systems operation and maintenance documentation controlled? 11.10 (k)(1) Is access to “sensitive” systems documentation restricted e.g. network security documentation, system access documentation?
  • 16.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 16 - 11.10 (k)(2) Is there a Change Control (or equivalent) SOP governing revisions to system documentation? Important Abbreviations in Pharma Industry ANDAs Abbreviated New Drug Applications DCS Distributed Control Systems PLC Programmable Logic Controller MRP Material Requirement Planning SLA Service Level Agreement SCADA Supervisory Control and Data Acquisition ERP Enterprise Resource Planning DCS Distributed Control System MES Manufacturing Execution System ELN Electronic Laboratory Notebook QSIT Quality System Inspection Technique PAC Process Automation Controller ISMS Information Security Management System BMS Building Management SATA Serial Advanced Technology Attachment HDMI High-Definition Multimedia Interface VGA Video Graphics Array DVI Digital Visual Interface TCP Transmission Control Protocol ANSI American National Standard Institute MACO Maximum Allowable Carryover NOEL No Observable Effect Level EIR Establishment Inspection Record KPI Key Performance Indicator COA Certificate of Analysis CFR Code of Federal Regulation DES Data Encryption Standard FAT Factory Acceptance Test SAT Site Acceptance Test GCP Good Clinical Practice GLP Good Laboratory Practice ISO International Organization for Standardization IIS Internet Information Services IOT Internet of Things OTG On The Go LAN Local Area Network NBS National Bureau of Standards NDA New Drug Application P&ID Process and Instrumentation Drawings PIN Personal Identification Number
  • 17.
    Basic Concepts of ComputerizedSystems Validation (CSV) Katalyst HLS www.KatalystHLS.com info@KatalystHLS.com - 17 - SAP Systems, Applications and Products SDLC System Development Life Cycle SSL Secure Socket Layer UPS Uninterruptable Power Supply VPN Virtual Private Network SOP Standard Operating Procedure ESG Electronic Submissions Gateway PTO Patent Term Office CIP Clean in Place SIP Sterile in Place PFD Process Flow Diagram PDI Pre-Delivery Inspection OOS Out of Specifications OOT Out of Trends QMS Quality Management System Regulatory Agencies: India CDSCO Central Drugs Standard Control Organization WHO World Health Organization USA FDA Food and Drug Administration UK MHRA Medicines and Healthcare products Regulatory Agency EU EMA European Medicines Agency EU EDQM European Directorate for Quality of Medicines South Africa SAHPRA South African Health Products Regulatory Authority Australia TGA Therapeutic Goods Administration Japan PMDA Pharmaceutical Medical Devices Agency India CDSCO Central Drugs Standard Control Organization Canada TPD Therapeutic Products Directorate Singapore HSA Health Sciences Authority Russia Ministry of Health Brazil ANVISA The National Health Surveillance Agency Switzerland SWISSMEDIC Swiss Agency for Therapeutic Products Arab States GCC Gulf Cooperation Council