 Definition
 Relationship with Maintainability and Reliability
 Classification
 Availability and Number of Nine
 Component Availability Flow Chart
 Calculationa of Total Availability
 Improving Techniques
 References
Consider a Situation-
1. Today, you are in an industry
2. The shift is of 8 hours(10:00 am to 6:00 pm)
3. It has so many machines
4. Consider one machine –A Lathe Machine
5. The machine should work for 8 continuous hours
6. Suppose a component fails at 12:00 noon and it stops working
7. It took 30 minutes in maintenance of that machine
8. Again it stopped working for 30 minutes at 3:30pm.
How long the Lathe Machine did actually work in a given shift?
Is that 7 hours?
 Exactly 7 hours is the actual time when machine worked without
any kind of failure.
 The machine worked for 7 hours with zero failure
 Failure and maintenance time 1 hour
 Total Time = 7+1=8 hours
What will you call the ratio 7/8?
It is Availability.
Definition of Availability
 From Situation given, during 8 hours of shift, 1 hour is considered for any
kind of failure and its maintenance, the Availability of that machine will be 7/8
or 0.875 or 87.5% for that particular shift on specified date.
 Availability is the probability that the system/component is
operational at a given time, without any kind of failure.
 Availability could also be understood with ‘Readiness’.
 Availability does not show how many times the maintenance
was performed.
Relationship between Reliability, Availability and
Maintainability
Its good if you are thinking of your Smartphone smartly.
Classification of Availability
Availability can be classified as followings-
1. Inherent Availability
2. Achieved Availability
3. Operational Availability
Inherent Availability
 The steady state availability when considering only the corrective
downtime of the system.
 For a single component, this can be computed by:
- For a system, the Mean Time Between Failures, or MTBF, is used to
compute inherent availability:
9
Achieved Availability
 Achieved Availability is similar to Inherent Availability except Preventive
Maintenance (PM) is also included.
 The steady state availability when considering the corrective and preventive
downtime of the system computed by looking at the Mean Time Between
Maintenance actions, MTBM and the Mean Maintenance Downtime:
10
Operational Availability
 Operational Availability is the percentage of calendar time to which one can
expect a system to work properly when it is required.
 Expression of User Need rather than just Design Need.
 Operational Availability is the ratio of the system Uptime and Total time.
Mathematically, it is:
DowntimeUptime
Uptime
Ao


• Includes all experienced sources of downtime, such as administrative downtime and
logistic downtime to restore the system.
• It is also called Operational Readiness.
11
Basic System of Availability
 Inherent Availability and Achieved Availability are controlled by the system
designer/manufacturer.
 Operational Availability is not solely controlled by the manufacturer due to
variations in location, resources and logistics factors under the province of
the end user of the product.
Availability and Number of 9
 Availability is typically described in nines notation.
 For Example- Availability of a system is considered over one year.
Factors Affecting Total Availability
 Hardware
 Hardware failures like File System Full error, Kernel In-Memory Table Full error, disk
full, power spike, power failure, and LAN infrastructure problem.
 Software
 Complexity of software, Size of software, Experience of team developer, Percentage
of the code which is used before in a stable project, How much test/debug is done
before releasing the product.
 Environment
 These fault can be occur by power outages, fires, earthquakes, tornadoes and other
events.
 The point is that these events cannot be predicted and when encountering with
them, the whole system becomes down for some hours or even months depending
on the damages they impose.
 Human Errors
Component Availability Flow Chart
Calculation of Availability
 Total availability calculations
are same as calculation of
Reliability.
 There are three systems-
 Parallel
 Series
 Mixed
Parallel System
Total Availability = 1-[(1-A1)(1-A2)]
=1 − [(1− 0.005)(1-0.005)]
= 0.999975
Series System
Total Availability = A1xA2
=0.995x0.995
=0.990025
Improving Techniques
 Proper training of plant employees
 Consistent cleaning of machines and equipments
 Proper maintenance scheduling
 Good quality lubricants
 The 5S
 Safety measures
 Automation
 Monitoring availability
 Uninterrupted Power Supplies (UPS)
 Standby Systems
 Logistics
References
 Elsayed, E., Reliability Engineering, Addison Wesley, Reading, MA, 1996.
 Hoda Rohani, Azad Kamali Roosta, Information Services Organization
KLM-Air France, Amsterdam
 Wendai Wang et al.,2002, IEEE, USA
THANK YOU!

More Related Content

What's hot

7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurementAkash Bakshi
 
Predictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive MaintenancePredictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive Maintenance
Mobility Work
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
Anil Mohindru
 
02training material for msa
02training material for msa02training material for msa
02training material for msa營松 林
 
Availability and reliability
Availability and reliabilityAvailability and reliability
Availability and reliability
sommerville-videos
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
Matthew Clemens
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Flevy.com Best Practices
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
pradhyot05
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
Tripti Mittal
 
Introduction to time study
Introduction to time studyIntroduction to time study
Introduction to time study
mechanical2015
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
Pramod A
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
Dr. Munthear Alqaderi
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategy
gumma alsgier
 
Quality of maintenance
Quality of maintenanceQuality of maintenance
Quality of maintenance
Odai Assaf
 
basic concepts of reliability
basic concepts of reliabilitybasic concepts of reliability
basic concepts of reliability
dennis gookyi
 
Maintenance
MaintenanceMaintenance
Maintenance
vijayrajsatish
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECA
Michael Herman
 
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNINGPRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
laxtwinsme
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
Anand Subramaniam
 
Reliability
ReliabilityReliability
Reliability
SAURABH SINGH
 

What's hot (20)

7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Predictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive MaintenancePredictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive Maintenance
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
02training material for msa
02training material for msa02training material for msa
02training material for msa
 
Availability and reliability
Availability and reliabilityAvailability and reliability
Availability and reliability
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Introduction to time study
Introduction to time studyIntroduction to time study
Introduction to time study
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategy
 
Quality of maintenance
Quality of maintenanceQuality of maintenance
Quality of maintenance
 
basic concepts of reliability
basic concepts of reliabilitybasic concepts of reliability
basic concepts of reliability
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECA
 
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNINGPRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Reliability
ReliabilityReliability
Reliability
 

Similar to Availability

WS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptxWS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptx
ShakuSingla
 
Ch11 reliability engineering
Ch11 reliability engineeringCh11 reliability engineering
Ch11 reliability engineering
software-engineering-book
 
Ch11 - Reliability Engineering
Ch11 - Reliability EngineeringCh11 - Reliability Engineering
Ch11 - Reliability Engineering
Harsh Verdhan Raj
 
An Investigation of Fault Tolerance Techniques in Cloud Computing
An Investigation of Fault Tolerance Techniques in Cloud ComputingAn Investigation of Fault Tolerance Techniques in Cloud Computing
An Investigation of Fault Tolerance Techniques in Cloud Computing
ijtsrd
 
PPT TARUNA.pptx
PPT TARUNA.pptxPPT TARUNA.pptx
PPT TARUNA.pptx
ssuser5ba6931
 
Designing High Available Cloud Applications
Designing High Available Cloud ApplicationsDesigning High Available Cloud Applications
Designing High Available Cloud Applications
Giovanni Mazzeo
 
Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17koolkampus
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
ijsrd.com
 
RTOS_GROUP_activity which is for the 7th sem e
RTOS_GROUP_activity which is for  the 7th sem eRTOS_GROUP_activity which is for  the 7th sem e
RTOS_GROUP_activity which is for the 7th sem e
RajeshKotian11
 
Predict Software Reliability Before the Code is Written
Predict Software Reliability Before the Code is WrittenPredict Software Reliability Before the Code is Written
Predict Software Reliability Before the Code is Written
Ann Marie Neufelder
 
Embedded system software
Embedded system softwareEmbedded system software
Embedded system software
Jamia Hamdard
 
Software Reliability_CS-3059_VISHAL_PADME.pptx
Software Reliability_CS-3059_VISHAL_PADME.pptxSoftware Reliability_CS-3059_VISHAL_PADME.pptx
Software Reliability_CS-3059_VISHAL_PADME.pptx
VishalPadme2
 
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
vtunotesbysree
 
chapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptxchapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptx
GemechisEdosa2
 
Performance testing basics
Performance testing basicsPerformance testing basics
Performance testing basics
Charu Anand
 
Design approach for fault
Design approach for faultDesign approach for fault
Design approach for fault
VLSICS Design
 
Performance Test Plan - Sample 1
Performance Test Plan - Sample 1Performance Test Plan - Sample 1
Performance Test Plan - Sample 1Atul Pant
 
Real Time Systems & RTOS
Real Time Systems & RTOSReal Time Systems & RTOS
Real Time Systems & RTOS
Vishwa Mohan
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Sanjeev Deshmukh
 
Developing rma requirements
Developing rma requirementsDeveloping rma requirements
Developing rma requirements
csk selva
 

Similar to Availability (20)

WS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptxWS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptx
 
Ch11 reliability engineering
Ch11 reliability engineeringCh11 reliability engineering
Ch11 reliability engineering
 
Ch11 - Reliability Engineering
Ch11 - Reliability EngineeringCh11 - Reliability Engineering
Ch11 - Reliability Engineering
 
An Investigation of Fault Tolerance Techniques in Cloud Computing
An Investigation of Fault Tolerance Techniques in Cloud ComputingAn Investigation of Fault Tolerance Techniques in Cloud Computing
An Investigation of Fault Tolerance Techniques in Cloud Computing
 
PPT TARUNA.pptx
PPT TARUNA.pptxPPT TARUNA.pptx
PPT TARUNA.pptx
 
Designing High Available Cloud Applications
Designing High Available Cloud ApplicationsDesigning High Available Cloud Applications
Designing High Available Cloud Applications
 
Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
 
RTOS_GROUP_activity which is for the 7th sem e
RTOS_GROUP_activity which is for  the 7th sem eRTOS_GROUP_activity which is for  the 7th sem e
RTOS_GROUP_activity which is for the 7th sem e
 
Predict Software Reliability Before the Code is Written
Predict Software Reliability Before the Code is WrittenPredict Software Reliability Before the Code is Written
Predict Software Reliability Before the Code is Written
 
Embedded system software
Embedded system softwareEmbedded system software
Embedded system software
 
Software Reliability_CS-3059_VISHAL_PADME.pptx
Software Reliability_CS-3059_VISHAL_PADME.pptxSoftware Reliability_CS-3059_VISHAL_PADME.pptx
Software Reliability_CS-3059_VISHAL_PADME.pptx
 
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
 
chapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptxchapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptx
 
Performance testing basics
Performance testing basicsPerformance testing basics
Performance testing basics
 
Design approach for fault
Design approach for faultDesign approach for fault
Design approach for fault
 
Performance Test Plan - Sample 1
Performance Test Plan - Sample 1Performance Test Plan - Sample 1
Performance Test Plan - Sample 1
 
Real Time Systems & RTOS
Real Time Systems & RTOSReal Time Systems & RTOS
Real Time Systems & RTOS
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Developing rma requirements
Developing rma requirementsDeveloping rma requirements
Developing rma requirements
 

More from SAMEER VISHWAKARMA

MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTSMATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
SAMEER VISHWAKARMA
 
MATERIAL SCIENCE LECTURE NOTES.pptx
MATERIAL SCIENCE LECTURE NOTES.pptxMATERIAL SCIENCE LECTURE NOTES.pptx
MATERIAL SCIENCE LECTURE NOTES.pptx
SAMEER VISHWAKARMA
 
CAM AND FOLLOWER MECHANISM.pptx
CAM AND FOLLOWER MECHANISM.pptxCAM AND FOLLOWER MECHANISM.pptx
CAM AND FOLLOWER MECHANISM.pptx
SAMEER VISHWAKARMA
 
Power steering system
Power steering systemPower steering system
Power steering system
SAMEER VISHWAKARMA
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
SAMEER VISHWAKARMA
 
Field Ion - Infrared- Raman Spectroscopy
Field Ion - Infrared- Raman SpectroscopyField Ion - Infrared- Raman Spectroscopy
Field Ion - Infrared- Raman Spectroscopy
SAMEER VISHWAKARMA
 
Robot sensors
Robot sensorsRobot sensors
Robot sensors
SAMEER VISHWAKARMA
 
Robot kinematics
Robot kinematicsRobot kinematics
Robot kinematics
SAMEER VISHWAKARMA
 
Product life cycle
Product life cycleProduct life cycle
Product life cycle
SAMEER VISHWAKARMA
 
Animation
AnimationAnimation
Dme 5201 tom lecture zero
Dme 5201 tom lecture zeroDme 5201 tom lecture zero
Dme 5201 tom lecture zero
SAMEER VISHWAKARMA
 
Dme 5201 tom lecture 9 12 clutches
Dme 5201 tom lecture 9 12 clutchesDme 5201 tom lecture 9 12 clutches
Dme 5201 tom lecture 9 12 clutches
SAMEER VISHWAKARMA
 
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversions
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversionsDme 5201 tom lecture 5 8 kchains, mechanisms and inversions
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversions
SAMEER VISHWAKARMA
 
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
SAMEER VISHWAKARMA
 
Dme 5201 tom lecture 1 2 types of links n pairs
Dme 5201 tom lecture 1 2 types of links n pairsDme 5201 tom lecture 1 2 types of links n pairs
Dme 5201 tom lecture 1 2 types of links n pairs
SAMEER VISHWAKARMA
 
Explosive forming
Explosive formingExplosive forming
Explosive forming
SAMEER VISHWAKARMA
 
Maintenace policy
Maintenace policyMaintenace policy
Maintenace policy
SAMEER VISHWAKARMA
 
Energy conservation
Energy conservationEnergy conservation
Energy conservation
SAMEER VISHWAKARMA
 

More from SAMEER VISHWAKARMA (18)

MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTSMATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
 
MATERIAL SCIENCE LECTURE NOTES.pptx
MATERIAL SCIENCE LECTURE NOTES.pptxMATERIAL SCIENCE LECTURE NOTES.pptx
MATERIAL SCIENCE LECTURE NOTES.pptx
 
CAM AND FOLLOWER MECHANISM.pptx
CAM AND FOLLOWER MECHANISM.pptxCAM AND FOLLOWER MECHANISM.pptx
CAM AND FOLLOWER MECHANISM.pptx
 
Power steering system
Power steering systemPower steering system
Power steering system
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Field Ion - Infrared- Raman Spectroscopy
Field Ion - Infrared- Raman SpectroscopyField Ion - Infrared- Raman Spectroscopy
Field Ion - Infrared- Raman Spectroscopy
 
Robot sensors
Robot sensorsRobot sensors
Robot sensors
 
Robot kinematics
Robot kinematicsRobot kinematics
Robot kinematics
 
Product life cycle
Product life cycleProduct life cycle
Product life cycle
 
Animation
AnimationAnimation
Animation
 
Dme 5201 tom lecture zero
Dme 5201 tom lecture zeroDme 5201 tom lecture zero
Dme 5201 tom lecture zero
 
Dme 5201 tom lecture 9 12 clutches
Dme 5201 tom lecture 9 12 clutchesDme 5201 tom lecture 9 12 clutches
Dme 5201 tom lecture 9 12 clutches
 
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversions
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversionsDme 5201 tom lecture 5 8 kchains, mechanisms and inversions
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversions
 
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
 
Dme 5201 tom lecture 1 2 types of links n pairs
Dme 5201 tom lecture 1 2 types of links n pairsDme 5201 tom lecture 1 2 types of links n pairs
Dme 5201 tom lecture 1 2 types of links n pairs
 
Explosive forming
Explosive formingExplosive forming
Explosive forming
 
Maintenace policy
Maintenace policyMaintenace policy
Maintenace policy
 
Energy conservation
Energy conservationEnergy conservation
Energy conservation
 

Recently uploaded

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 

Recently uploaded (20)

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

Availability

  • 2. Contents  Definition  Relationship with Maintainability and Reliability  Classification  Availability and Number of Nine  Component Availability Flow Chart  Calculationa of Total Availability  Improving Techniques  References
  • 3. Consider a Situation- 1. Today, you are in an industry 2. The shift is of 8 hours(10:00 am to 6:00 pm) 3. It has so many machines 4. Consider one machine –A Lathe Machine 5. The machine should work for 8 continuous hours 6. Suppose a component fails at 12:00 noon and it stops working 7. It took 30 minutes in maintenance of that machine 8. Again it stopped working for 30 minutes at 3:30pm. How long the Lathe Machine did actually work in a given shift?
  • 4. Is that 7 hours?  Exactly 7 hours is the actual time when machine worked without any kind of failure.  The machine worked for 7 hours with zero failure  Failure and maintenance time 1 hour  Total Time = 7+1=8 hours What will you call the ratio 7/8? It is Availability.
  • 5. Definition of Availability  From Situation given, during 8 hours of shift, 1 hour is considered for any kind of failure and its maintenance, the Availability of that machine will be 7/8 or 0.875 or 87.5% for that particular shift on specified date.  Availability is the probability that the system/component is operational at a given time, without any kind of failure.  Availability could also be understood with ‘Readiness’.  Availability does not show how many times the maintenance was performed.
  • 6. Relationship between Reliability, Availability and Maintainability Its good if you are thinking of your Smartphone smartly.
  • 7. Classification of Availability Availability can be classified as followings- 1. Inherent Availability 2. Achieved Availability 3. Operational Availability
  • 8. Inherent Availability  The steady state availability when considering only the corrective downtime of the system.  For a single component, this can be computed by: - For a system, the Mean Time Between Failures, or MTBF, is used to compute inherent availability:
  • 9. 9 Achieved Availability  Achieved Availability is similar to Inherent Availability except Preventive Maintenance (PM) is also included.  The steady state availability when considering the corrective and preventive downtime of the system computed by looking at the Mean Time Between Maintenance actions, MTBM and the Mean Maintenance Downtime:
  • 10. 10 Operational Availability  Operational Availability is the percentage of calendar time to which one can expect a system to work properly when it is required.  Expression of User Need rather than just Design Need.  Operational Availability is the ratio of the system Uptime and Total time. Mathematically, it is: DowntimeUptime Uptime Ao   • Includes all experienced sources of downtime, such as administrative downtime and logistic downtime to restore the system. • It is also called Operational Readiness.
  • 11. 11 Basic System of Availability  Inherent Availability and Achieved Availability are controlled by the system designer/manufacturer.  Operational Availability is not solely controlled by the manufacturer due to variations in location, resources and logistics factors under the province of the end user of the product.
  • 12. Availability and Number of 9  Availability is typically described in nines notation.  For Example- Availability of a system is considered over one year.
  • 13. Factors Affecting Total Availability  Hardware  Hardware failures like File System Full error, Kernel In-Memory Table Full error, disk full, power spike, power failure, and LAN infrastructure problem.  Software  Complexity of software, Size of software, Experience of team developer, Percentage of the code which is used before in a stable project, How much test/debug is done before releasing the product.  Environment  These fault can be occur by power outages, fires, earthquakes, tornadoes and other events.  The point is that these events cannot be predicted and when encountering with them, the whole system becomes down for some hours or even months depending on the damages they impose.  Human Errors
  • 15. Calculation of Availability  Total availability calculations are same as calculation of Reliability.  There are three systems-  Parallel  Series  Mixed Parallel System Total Availability = 1-[(1-A1)(1-A2)] =1 − [(1− 0.005)(1-0.005)] = 0.999975 Series System Total Availability = A1xA2 =0.995x0.995 =0.990025
  • 16. Improving Techniques  Proper training of plant employees  Consistent cleaning of machines and equipments  Proper maintenance scheduling  Good quality lubricants  The 5S  Safety measures  Automation  Monitoring availability  Uninterrupted Power Supplies (UPS)  Standby Systems  Logistics
  • 17. References  Elsayed, E., Reliability Engineering, Addison Wesley, Reading, MA, 1996.  Hoda Rohani, Azad Kamali Roosta, Information Services Organization KLM-Air France, Amsterdam  Wendai Wang et al.,2002, IEEE, USA