BT

Brian Thomas

Sort by
Justifying Migration of legacy process control systems
Central Process Utility Plant controls upgrade required 100% uptime
OnTrack CIP Validation
Produced Water Handling System Upgrade
Production Line OEE (Overall Equipment Effectiveness)
Bausch lomb leverages plant p ax_rev1
Food Safety Modernization Act (FSMA) regulatory requirements by FDA
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table solution
DCS migration - zero downtime upgrade
Zero downtime upgrate for dcs migration Thermo Systems