Submitted by:-
Amit Verma
1203340026
Serial No. Depot No. of based Coaches
1 Minor 50 – 100
2 Medium 100 – 250
3 Major Above 250
CLASSIFICATION OF COACHING
MAINTENANCE DEPOTS
• ICF- Integral Coach Factory(Chennai)
• RCF- Rail Coach Factory( Kapurthala , Punjab)
• LHB- Link Holfmann Bushh (Fiat Bogies)
• HYBRID- LHB body on modified ICF bogies
COACHES
ICF/RCF LHB/HYBRID
Length over buffer 22296(mm) 24000(mm)
Length over head
stock
21336(mm) 23540(mm)
Width 3245(mm) 3030(mm)
Codal life 25 years 30 years
DIMENSIONS OF COACH SHELL
Washing Line
1. Trip Schedule : After every trip by primary maintenance depot.
 Sick Line
1. Schedule A : Monthly (1 month + 7 days)
2. Schedule B : Quarterly (3 months + 15 days)
3. Schedule C : After 180 days or 6 Months
4. IOH : Every 9 months
5. POH : Every 18 months
MAINTENANCE SCHEDULE AND
CATEGORY
SICK LINE
• Sick line is the workshop for the major and periodical
maintenance of the coaches.
• It consists of modern facilities like pit for working
under frame And crane for separation of coach &
bogie for repair of all type of defects.
1. Wheel and Axle Assembly
2. Bogie Maintenance
3. Buffer Maintenance
4. Air Brake System Maintenance
5. Trolley Maintenance
6. Lifting of Coaches
7. Riding Index
WORKS CARRIED OUT IN SICK LINE
1. Width of wheel = 127 mm
2. Wheel Diameter = 915 (new), 825 (condemn)
Permissible diameter variation in wheel
Coaching
• On same axle – 0.5 mm
• On same bogie – 5.0 mm
• On same coach – 13.0 mm
Goods
• On same axle – 0.5 mm
• On same bogie – 13.0 mm
• On same coach – 25.0 mm
Fig. 1 Wheel profile (all length dimension are in mm)
Wheel and Axle Assembly
Wheels are fixed on the axle with the help of bearings.
Like wheel, it is also made up of steel.
Brake cylinder are attached to axle.
Braking discs are fixed on the axle
Fig. 2 Axle
Buffer height adjustment
Causes of low buffer height in ICF coaching stock :
a) excessive wear of wheel
b) Due to loss of proper stiffness of coil spring
c) Due to excessive wear on side bearer’s metal & bronze piece.
Maximum buffer height = 1105 mm [In empty condition]
Minimum buffer height = 1030 mm [In loaded condition]
To achieve buffer height a standard size of wooden packing pieces are used
which are kept below the Dash Pot Flange on axle Box wings of primary
suspension.
Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm)
1. Below 889 up to 863 13
2. Below 863 up to 839 26
3. Below 839 up to 819 38
4. 819 & below 48
In Air Brake system compressed air is used for operating the
brake system. The locomotive compressor charges the feed
pipe and the brake pipes throughout the length of the train.
The feed pipe is connected to the auxiliary reservoirs and the
brake pipe is connected to the brake cylinders through the
distributor valve. Brake application takes place by dropping the
pressure in the brake pipe.
TYPES:
1. Direct Release System- brakes are released immediately,
as soon as releasing of brakes is initiated.
2. Gradguate Release System - brake cylinder pressure can
be reduced gradually in steps in proportion to the increase in
brake pipe pressure.
AIR BRAKE SYSTEM
• Single Pipe Air Brake System:- There is only one
pipe called brake pipe running from loco to the
brake van in order to get continuity of air for the
application & release of brakes.
• Twin Pipe Air Brake System :- In addition to brake
pipe, there is one more pipe called feed pipe ,
running loco to the brake van to charge the
auxiliary reservoir continuously to 6 kg/cm2
Types of Gradguate Release System
Trolley Maintenance
Parts of Trolley
1. Trolley Frame
2. Center pivot
3. Side Bearing
4. Brake Cylinder
Fig. 3 Trolley
Lifting of coaches
Require tools and equipments
1. With the use of Mechanical Jacks
2. With the use of Hydraulic Jacks
3. With the use of Electrical operated Travelling Crane
4. With the use of Whiting Jacks
PLATFORM TRAIN DUTY
 Rolling In
Rolling out
Axle box feeling
Brake Power Certificate
Safe to Run
ROLLING IN/ROLLING OUT
When train enters in station Examiner staff take up positions on
both sides inspect the train enters at the speed of 8 Km/hr
Whistling sound of hot axle boxes.
 Any hanging part or loose fitting of vehicle.
Any component or spring suspension bracket loose/broken.
 Abnormal behaviour of vehicle.
Axle box feeling
After the train come to halt, all axle boxes are felt within 20
minutes. The temp. of axle is checked by touching with hand
Temp. is found high then it is checked by the temp. gun which
gives exact temp.
If this temp. is found more than 30 degree than atm. temp.
then the cause is inspected and coach is sent to workshop
BRAKE POWER Certificate
 This certificate is jointly signed by Guard , Driver, and C&W
supervisor.
 The incoming driver shall handover the brake power
certificate to Reliving driver or Deposit it the nominated
authority, who will give it to the outgoing Driver.
 The outgoing driver and guard will satisfy themselves from
the listed coach numbers that the Brake Power Certificate
pertains to their train.
Safe to run
If all of above factors like no hanging parts brakes are
working correctly the temp of axle box is with in range
and the train is in good and safe condition of running
then the train is announced as safe to run.
Riding is a quality of comfort experienced by passenger,
depends not only upon acceleration, rate of change of
acceleration & vibration but also some other factors as like
noise, moisture temperature etc.
Ride Index = 0.896
10 𝑏3
𝑓
𝐹(𝑓)
b : Amplitude of acceleration
f : Frequency of acceleration
F(f) : a correction factor dependent on the frequency
Ride index for ICF: <3.5
for LHB<2.75
RIDING INDEX
THANK YOU ALL FOR YOUR KIND ATTENTION

More Related Content

What's hot

Coach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopalCoach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopal
Anuj Singh
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
Chirag Jain
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
Shikhar Gupta
 
Coach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopalCoach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopal
Anuj Singh
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
anish malan
 
Inplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactoryInplant Training - Integral Coach Factory
Inplant Training - Integral Coach Factory
Sudarshan Mohan
 
Vocational traning report on Railways Workshop
Vocational traning report on Railways WorkshopVocational traning report on Railways Workshop
Vocational traning report on Railways Workshop
Anand Mohan
 
Report -Jklu Copy
Report -Jklu Copy Report -Jklu Copy
Report -Jklu Copy
Pramit Munshi
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training report
Krishna Yadav
 
Baja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 PortfolioBaja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 Portfolio
Reinaldo Wiener
 
Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~i
haxxo24
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
Sahil arora
 
TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULL
anish malan
 
Hand book on C&W
Hand book on C&W Hand book on C&W
Hand book on C&W
SrinivasaRao Guduru
 
Carriage and wagon
Carriage and wagon Carriage and wagon
Carriage and wagon
Deewan singh
 
Northern railway
Northern railwayNorthern railway
Northern railway
manish tiwari
 
BEST workshop Industrial Visit Report
BEST workshop Industrial Visit ReportBEST workshop Industrial Visit Report
BEST workshop Industrial Visit Report
Arshad Habib Khan
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian Railways
Deewan singh
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory Report
Sameer Shah
 
V-belt drive Design Procedure
V-belt drive   Design ProcedureV-belt drive   Design Procedure
V-belt drive Design Procedure
VARUN BABUNELSON
 

What's hot (20)

Coach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopalCoach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopal
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 
Coach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopalCoach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopal
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
Inplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactoryInplant Training - Integral Coach Factory
Inplant Training - Integral Coach Factory
 
Vocational traning report on Railways Workshop
Vocational traning report on Railways WorkshopVocational traning report on Railways Workshop
Vocational traning report on Railways Workshop
 
Report -Jklu Copy
Report -Jklu Copy Report -Jklu Copy
Report -Jklu Copy
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training report
 
Baja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 PortfolioBaja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 Portfolio
 
Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~i
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULL
 
Hand book on C&W
Hand book on C&W Hand book on C&W
Hand book on C&W
 
Carriage and wagon
Carriage and wagon Carriage and wagon
Carriage and wagon
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
BEST workshop Industrial Visit Report
BEST workshop Industrial Visit ReportBEST workshop Industrial Visit Report
BEST workshop Industrial Visit Report
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian Railways
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory Report
 
V-belt drive Design Procedure
V-belt drive   Design ProcedureV-belt drive   Design Procedure
V-belt drive Design Procedure
 

Similar to Amitppt 151004200417-lva1-app6891

amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
AryanYadav924184
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
vijay patel
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
Rao Khola
 
Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02
*noT yeT workinG! !M stilL studyinG*
 
Northern railway
Northern railwayNorthern railway
Northern railway
sometech
 
Project Report
Project Report Project Report
Project Report
Praveen Kumar
 
Harish rathi
Harish rathiHarish rathi
Harish rathi
Harish Rathee
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
pradeep verma
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
Mohammad Adnan
 
Coach Care Complex,NWR Jaipur
Coach Care Complex,NWR JaipurCoach Care Complex,NWR Jaipur
Coach Care Complex,NWR Jaipur
National Institute of Technology, Hamirpur
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
Awanish Kumar
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
kalyan kumar
 
Dlw training session
Dlw training sessionDlw training session
Dlw training session
Shubham Khendkar
 
Types of PANTOGRAPH
Types of PANTOGRAPHTypes of PANTOGRAPH
Types of PANTOGRAPH
gauravjagdale
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
PRASHANT KUMAR PATEL
 
Braking_SystemS in Indian Railways_0.pdf
Braking_SystemS in Indian Railways_0.pdfBraking_SystemS in Indian Railways_0.pdf
Braking_SystemS in Indian Railways_0.pdf
kaustavroy55
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
haxxo24
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
Vishal Singh
 
Jaipur metro bogie
Jaipur metro bogieJaipur metro bogie
Jaipur metro bogie
TusharAgarwal161
 
Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080
Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080
Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080
fhsejkdkmem
 

Similar to Amitppt 151004200417-lva1-app6891 (20)

amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
 
Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
Project Report
Project Report Project Report
Project Report
 
Harish rathi
Harish rathiHarish rathi
Harish rathi
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
Coach Care Complex,NWR Jaipur
Coach Care Complex,NWR JaipurCoach Care Complex,NWR Jaipur
Coach Care Complex,NWR Jaipur
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
 
Dlw training session
Dlw training sessionDlw training session
Dlw training session
 
Types of PANTOGRAPH
Types of PANTOGRAPHTypes of PANTOGRAPH
Types of PANTOGRAPH
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
Braking_SystemS in Indian Railways_0.pdf
Braking_SystemS in Indian Railways_0.pdfBraking_SystemS in Indian Railways_0.pdf
Braking_SystemS in Indian Railways_0.pdf
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Jaipur metro bogie
Jaipur metro bogieJaipur metro bogie
Jaipur metro bogie
 
Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080
Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080
Jcb js130 t2 excavator service repair manual sn from 2373080 to 2375080
 

Recently uploaded

Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
PreethaV16
 

Recently uploaded (20)

Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
 

Amitppt 151004200417-lva1-app6891

  • 2. Serial No. Depot No. of based Coaches 1 Minor 50 – 100 2 Medium 100 – 250 3 Major Above 250 CLASSIFICATION OF COACHING MAINTENANCE DEPOTS
  • 3. • ICF- Integral Coach Factory(Chennai) • RCF- Rail Coach Factory( Kapurthala , Punjab) • LHB- Link Holfmann Bushh (Fiat Bogies) • HYBRID- LHB body on modified ICF bogies COACHES
  • 4. ICF/RCF LHB/HYBRID Length over buffer 22296(mm) 24000(mm) Length over head stock 21336(mm) 23540(mm) Width 3245(mm) 3030(mm) Codal life 25 years 30 years DIMENSIONS OF COACH SHELL
  • 5. Washing Line 1. Trip Schedule : After every trip by primary maintenance depot.  Sick Line 1. Schedule A : Monthly (1 month + 7 days) 2. Schedule B : Quarterly (3 months + 15 days) 3. Schedule C : After 180 days or 6 Months 4. IOH : Every 9 months 5. POH : Every 18 months MAINTENANCE SCHEDULE AND CATEGORY
  • 6. SICK LINE • Sick line is the workshop for the major and periodical maintenance of the coaches. • It consists of modern facilities like pit for working under frame And crane for separation of coach & bogie for repair of all type of defects.
  • 7. 1. Wheel and Axle Assembly 2. Bogie Maintenance 3. Buffer Maintenance 4. Air Brake System Maintenance 5. Trolley Maintenance 6. Lifting of Coaches 7. Riding Index WORKS CARRIED OUT IN SICK LINE
  • 8. 1. Width of wheel = 127 mm 2. Wheel Diameter = 915 (new), 825 (condemn) Permissible diameter variation in wheel Coaching • On same axle – 0.5 mm • On same bogie – 5.0 mm • On same coach – 13.0 mm Goods • On same axle – 0.5 mm • On same bogie – 13.0 mm • On same coach – 25.0 mm Fig. 1 Wheel profile (all length dimension are in mm) Wheel and Axle Assembly
  • 9. Wheels are fixed on the axle with the help of bearings. Like wheel, it is also made up of steel. Brake cylinder are attached to axle. Braking discs are fixed on the axle Fig. 2 Axle
  • 10. Buffer height adjustment Causes of low buffer height in ICF coaching stock : a) excessive wear of wheel b) Due to loss of proper stiffness of coil spring c) Due to excessive wear on side bearer’s metal & bronze piece. Maximum buffer height = 1105 mm [In empty condition] Minimum buffer height = 1030 mm [In loaded condition] To achieve buffer height a standard size of wooden packing pieces are used which are kept below the Dash Pot Flange on axle Box wings of primary suspension. Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm) 1. Below 889 up to 863 13 2. Below 863 up to 839 26 3. Below 839 up to 819 38 4. 819 & below 48
  • 11. In Air Brake system compressed air is used for operating the brake system. The locomotive compressor charges the feed pipe and the brake pipes throughout the length of the train. The feed pipe is connected to the auxiliary reservoirs and the brake pipe is connected to the brake cylinders through the distributor valve. Brake application takes place by dropping the pressure in the brake pipe. TYPES: 1. Direct Release System- brakes are released immediately, as soon as releasing of brakes is initiated. 2. Gradguate Release System - brake cylinder pressure can be reduced gradually in steps in proportion to the increase in brake pipe pressure. AIR BRAKE SYSTEM
  • 12. • Single Pipe Air Brake System:- There is only one pipe called brake pipe running from loco to the brake van in order to get continuity of air for the application & release of brakes. • Twin Pipe Air Brake System :- In addition to brake pipe, there is one more pipe called feed pipe , running loco to the brake van to charge the auxiliary reservoir continuously to 6 kg/cm2 Types of Gradguate Release System
  • 13. Trolley Maintenance Parts of Trolley 1. Trolley Frame 2. Center pivot 3. Side Bearing 4. Brake Cylinder Fig. 3 Trolley
  • 14. Lifting of coaches Require tools and equipments 1. With the use of Mechanical Jacks 2. With the use of Hydraulic Jacks 3. With the use of Electrical operated Travelling Crane 4. With the use of Whiting Jacks
  • 15. PLATFORM TRAIN DUTY  Rolling In Rolling out Axle box feeling Brake Power Certificate Safe to Run
  • 16. ROLLING IN/ROLLING OUT When train enters in station Examiner staff take up positions on both sides inspect the train enters at the speed of 8 Km/hr Whistling sound of hot axle boxes.  Any hanging part or loose fitting of vehicle. Any component or spring suspension bracket loose/broken.  Abnormal behaviour of vehicle.
  • 17. Axle box feeling After the train come to halt, all axle boxes are felt within 20 minutes. The temp. of axle is checked by touching with hand Temp. is found high then it is checked by the temp. gun which gives exact temp. If this temp. is found more than 30 degree than atm. temp. then the cause is inspected and coach is sent to workshop
  • 18. BRAKE POWER Certificate  This certificate is jointly signed by Guard , Driver, and C&W supervisor.  The incoming driver shall handover the brake power certificate to Reliving driver or Deposit it the nominated authority, who will give it to the outgoing Driver.  The outgoing driver and guard will satisfy themselves from the listed coach numbers that the Brake Power Certificate pertains to their train.
  • 19. Safe to run If all of above factors like no hanging parts brakes are working correctly the temp of axle box is with in range and the train is in good and safe condition of running then the train is announced as safe to run.
  • 20. Riding is a quality of comfort experienced by passenger, depends not only upon acceleration, rate of change of acceleration & vibration but also some other factors as like noise, moisture temperature etc. Ride Index = 0.896 10 𝑏3 𝑓 𝐹(𝑓) b : Amplitude of acceleration f : Frequency of acceleration F(f) : a correction factor dependent on the frequency Ride index for ICF: <3.5 for LHB<2.75 RIDING INDEX
  • 21. THANK YOU ALL FOR YOUR KIND ATTENTION