MAINTENANCE SCHEDULE AND CATEGORY
 Washing Line
1. Trip Schedule : After every trip by primary maintenance depot.
 Sick Line
2. Schedule A : Monthly (1 month + 7 days)
3. Schedule B : Quarterly (3 months + 15 days)
4. Schedule C : After 180 days or 6 Months
5. IOH : Every 9 months
6. POH : Every 18 months
CLASSIFICATION OF COACHING MAINTENANCE DEPOTS
• Serial No. Depot No. of based Coaches
• 1 Minor 50 – 100
• 2 Medium 100 – 250
• 3 Major Above 250
WORKS CARRIED OUT IN WASHING LINE
 Inspection
 Cleaning & washing
 Brake testing
 Primary Maintenance
 Secondary Maintenance
 Watering
 Loading of linen
 Maintenance of AC & electrical circuits of coaches
Brake testing is carried by using RTR (rack test rig).
Rack testing rig is capable of testing full train (up to 24 coaches) at a
time.
 The trains for the secondary maintenance are given at least 2 hrs. on
the washing line.
 Linen and pantry car provisions
 Washing & cleaning of coaches
 Maintenance of AC of coaches
BRAKE TESTING IN WASHING LINE BRAKE
SECONDARY MAINTENANCE
PRIMARY MAINTENANCE
 The trains for the primary maintenance are given at least 6 hrs at the
washing line in addition to secondary maintenance
 Oil in hydraulic dash pots
 Wheel profiles are visually examined and gauged
 Pest control treatment
 Axle box is examined for grease oozing
 Brake blocks & piston stroke checked & changed
Sick line is the workshop for the major and periodical maintenance of the
coaches
1. Works carried out in sick line
2. Wheel and Axle Assembly
3. Bogie Maintenance
4. Buffer Maintenance
5. Air Brake System Maintenance
SICK LINE
1. Width of wheel = 127 mm
2. Wheel Diameter = 915 (new), 825 (condemn)
Permissible diameter variation in wheel Coaching
a) On same axle – 0.5 mm
b) On same bogie – 5.0 mm
c) On same coach – 13.0 mm
Goods
a) On same axle – 0.5 mm
b) On same bogie – 13.0 mm
c) On same coach – 25.0 mm
WHEEL AND AXLE ASSEMBLY
Wheels are fixed on the axle with the help of bearings.
Like wheel, it is also made up of steel.
Brake cylinder are attached to axle.
Braking discs are fixed on the axle.
Causes of low buffer height in ICF coaching stock :
a) excessive wear of wheel
b) Due to loss of proper stiffness of coil spring
c) Due to excessive wear on side bearer’s metal & bronze piece.
Maximum buffer height = 1105 mm [In empty condition]
Minimum buffer height = 1030 mm [In loaded condition]
To achieve buffer height a standard size of wooden packing pieces are used which
are kept below the Dash Pot Flange on axle Box wings of primary suspension.
BUFFER HEIGHT ADJUSTMENT
Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm)
1. Below 889 up to 863 13
2. Below 863 up to 839 26
3. Below 839 up to 819 38
4. 819 & below 48
AIR BRAKE SYSTEM MAINTENANCE
Components of Air Brake System
1. Brake Container
2. Distributor Valve
3. Pressure Tanks (125 liters, 6 liters)
4. B.P. / F.P. coupling and hosts
5. Emergency Brake Pull Box
6. Emergency Brake Valve
Parts of Trolley
1. Trolley Frame
2. Center pivot
3. Side Bearing
4. Brake Cylinder
TROLLEY MAINTENANCE
Require tools and equipment's
1. With the use of Mechanical Jacks
2. With the use of Hydraulic Jacks
3. With the use of Electrical operated Travelling Crane
4. With the use of Whiting Jacks
LIFTING OF COACHES
PLATFORM TRAIN DUTY
Rolling In
Rolling out
Axle box feeling
Brake Power Certificate
Safe to Run
ROLLING IN/ROLLING OUT
When train enters in station Examiner staff take up positions on both sides
inspect the train enters at the speed of 8 Km/hr.
Whistling sound of hot axle boxes.
Any hanging part or loose fitting of vehicle.
Any component or spring suspension bracket loose/broken.
Abnormal behavior of vehicle
AXLE BOX FEELING
After the train come to halt, all axle boxes are felt within 20 minutes. The temp.
of axle is checked by touching with hand
Temp. is found high then it is checked by the temp. gun which gives exact temp.
If this temp. is found more than 30 degree than atm. temp. then the cause is
inspected and coach is sent to workshop
This certificate is jointly signed by Guard , Driver, and C&W supervisor.
 The incoming driver shall handover the brake power certificate to Reliving driver
or Deposit it the nominated authority, who will give it to the outgoing Driver.
The outgoing driver and guard will satisfy themselves from the listed coach
numbers that the Brake Power Certificate pertains to their train.
BRAKE POWER CERTIFICATE
If all of above factors like no hanging parts brakes are working correctly the temp of
axle box is with in range and the train is in good and safe condition of running then
the train is announced as safe to run.
SAFE TO RUN
THANK YOU

More Related Content

What's hot

RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
anish malan
 
Revised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsRevised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trains
SrinivasaRao Guduru
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
Itnesh Kumar
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
noor patel
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
haxxo24
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
Vishal Singh
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
haxxo24
 
Bogie
BogieBogie
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
Awanish Kumar
 
INTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYSINTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYS
ShubhankarShukla3
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
Mohammad Adnan
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
SrinivasaRao Guduru
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coaches
SrinivasaRao Guduru
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
anand prasad
 
G-97 Manual
G-97 ManualG-97 Manual
G-97 Manual
Padarthy Narayana
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
Ashutosh Khaitan
 
Report -Jklu Copy
Report -Jklu Copy Report -Jklu Copy
Report -Jklu Copy
Pramit Munshi
 
Training report
Training reportTraining report
Training report
Sumit Kumar
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
haxxo24
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
Apeksha Shrivastav
 

What's hot (20)

RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
Revised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsRevised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trains
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Bogie
BogieBogie
Bogie
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
 
INTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYSINTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYS
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coaches
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
G-97 Manual
G-97 ManualG-97 Manual
G-97 Manual
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
 
Report -Jklu Copy
Report -Jklu Copy Report -Jklu Copy
Report -Jklu Copy
 
Training report
Training reportTraining report
Training report
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
 

Similar to Itnesh -Persentation on coach care

amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
AryanYadav924184
 
Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891
IstekharALI
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
vijay patel
 
Project Report
Project Report Project Report
Project Report
Praveen Kumar
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
PRASHANT KUMAR PATEL
 
Harish rathi
Harish rathiHarish rathi
Harish rathi
Harish Rathee
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
pradeep verma
 
16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report
drbmc
 
Allison training report
Allison training reportAllison training report
Allison training report
Infosys
 
E1303072935
E1303072935E1303072935
E1303072935
IOSR Journals
 
It presentation
It presentation It presentation
It presentation
ALOK RAJ
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
INDUSTRIAL ENGINEERING
 
Master Specifications Vehicle Lifts
Master Specifications Vehicle LiftsMaster Specifications Vehicle Lifts
Master Specifications Vehicle Lifts
SlideCommunity
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
Palash Awasthi
 
abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabad
Palash Awasthi
 
training report
training reporttraining report
Tower crane safety
Tower crane safetyTower crane safety
Tower crane safety
Shiva Kaveri
 
seminar ppt on ajmer railway loco workshop
seminar ppt on ajmer railway loco workshopseminar ppt on ajmer railway loco workshop
seminar ppt on ajmer railway loco workshop
Ashok Meena
 
A project on buffer
A project on bufferA project on buffer
A project on buffer
Ritesh Rohan
 
Skidded helicopter tug design calculation
Skidded helicopter tug design calculationSkidded helicopter tug design calculation
Skidded helicopter tug design calculation
Lahiru Dilshan
 

Similar to Itnesh -Persentation on coach care (20)

amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
 
Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
 
Project Report
Project Report Project Report
Project Report
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
Harish rathi
Harish rathiHarish rathi
Harish rathi
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
 
16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report
 
Allison training report
Allison training reportAllison training report
Allison training report
 
E1303072935
E1303072935E1303072935
E1303072935
 
It presentation
It presentation It presentation
It presentation
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 
Master Specifications Vehicle Lifts
Master Specifications Vehicle LiftsMaster Specifications Vehicle Lifts
Master Specifications Vehicle Lifts
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabad
 
training report
training reporttraining report
training report
 
Tower crane safety
Tower crane safetyTower crane safety
Tower crane safety
 
seminar ppt on ajmer railway loco workshop
seminar ppt on ajmer railway loco workshopseminar ppt on ajmer railway loco workshop
seminar ppt on ajmer railway loco workshop
 
A project on buffer
A project on bufferA project on buffer
A project on buffer
 
Skidded helicopter tug design calculation
Skidded helicopter tug design calculationSkidded helicopter tug design calculation
Skidded helicopter tug design calculation
 

More from Itnesh Kumar

Energy generation using exhaust then cooling- Report
Energy generation using exhaust then cooling- ReportEnergy generation using exhaust then cooling- Report
Energy generation using exhaust then cooling- Report
Itnesh Kumar
 
Energy generation using exaust then cooling- Power point presentation
Energy generation using exaust then cooling- Power point presentationEnergy generation using exaust then cooling- Power point presentation
Energy generation using exaust then cooling- Power point presentation
Itnesh Kumar
 
synopsis- Energy genration using exaust
synopsis- Energy genration using exaustsynopsis- Energy genration using exaust
synopsis- Energy genration using exaust
Itnesh Kumar
 
Lcscm synopsis- itnesh
Lcscm synopsis- itnesh Lcscm synopsis- itnesh
Lcscm synopsis- itnesh
Itnesh Kumar
 
Low carbon supply chain management- Project brief
Low  carbon supply chain management- Project briefLow  carbon supply chain management- Project brief
Low carbon supply chain management- Project brief
Itnesh Kumar
 
Itnesh kumar freeze drying- report
Itnesh kumar   freeze drying- reportItnesh kumar   freeze drying- report
Itnesh kumar freeze drying- report
Itnesh Kumar
 
Itnesh- Aerodynamics in cars
Itnesh- Aerodynamics in carsItnesh- Aerodynamics in cars
Itnesh- Aerodynamics in cars
Itnesh Kumar
 
Itnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain managementItnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain management
Itnesh Kumar
 
Itnesh kumar freeze drying
Itnesh kumar   freeze dryingItnesh kumar   freeze drying
Itnesh kumar freeze drying
Itnesh Kumar
 

More from Itnesh Kumar (9)

Energy generation using exhaust then cooling- Report
Energy generation using exhaust then cooling- ReportEnergy generation using exhaust then cooling- Report
Energy generation using exhaust then cooling- Report
 
Energy generation using exaust then cooling- Power point presentation
Energy generation using exaust then cooling- Power point presentationEnergy generation using exaust then cooling- Power point presentation
Energy generation using exaust then cooling- Power point presentation
 
synopsis- Energy genration using exaust
synopsis- Energy genration using exaustsynopsis- Energy genration using exaust
synopsis- Energy genration using exaust
 
Lcscm synopsis- itnesh
Lcscm synopsis- itnesh Lcscm synopsis- itnesh
Lcscm synopsis- itnesh
 
Low carbon supply chain management- Project brief
Low  carbon supply chain management- Project briefLow  carbon supply chain management- Project brief
Low carbon supply chain management- Project brief
 
Itnesh kumar freeze drying- report
Itnesh kumar   freeze drying- reportItnesh kumar   freeze drying- report
Itnesh kumar freeze drying- report
 
Itnesh- Aerodynamics in cars
Itnesh- Aerodynamics in carsItnesh- Aerodynamics in cars
Itnesh- Aerodynamics in cars
 
Itnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain managementItnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain management
 
Itnesh kumar freeze drying
Itnesh kumar   freeze dryingItnesh kumar   freeze drying
Itnesh kumar freeze drying
 

Recently uploaded

Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 

Recently uploaded (20)

Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 

Itnesh -Persentation on coach care

  • 1. PERSENTATION ON COACH CARE OF INDIAN RAILWAYS NEW DELHI SUBMITTED BY : ITNESH KUMAR B.Tech [ME-C] 4th YEAR 1403340095 RAJ KUMAR GOEL INSTITUTE OF TECHNOLOGY , GHAZIABAD SUBMITTED TO: UMESH JHA
  • 2. MAINTENANCE SCHEDULE AND CATEGORY  Washing Line 1. Trip Schedule : After every trip by primary maintenance depot.  Sick Line 2. Schedule A : Monthly (1 month + 7 days) 3. Schedule B : Quarterly (3 months + 15 days) 4. Schedule C : After 180 days or 6 Months 5. IOH : Every 9 months 6. POH : Every 18 months
  • 3. CLASSIFICATION OF COACHING MAINTENANCE DEPOTS • Serial No. Depot No. of based Coaches • 1 Minor 50 – 100 • 2 Medium 100 – 250 • 3 Major Above 250
  • 4. WORKS CARRIED OUT IN WASHING LINE  Inspection  Cleaning & washing  Brake testing  Primary Maintenance  Secondary Maintenance  Watering  Loading of linen  Maintenance of AC & electrical circuits of coaches
  • 5. Brake testing is carried by using RTR (rack test rig). Rack testing rig is capable of testing full train (up to 24 coaches) at a time.  The trains for the secondary maintenance are given at least 2 hrs. on the washing line.  Linen and pantry car provisions  Washing & cleaning of coaches  Maintenance of AC of coaches BRAKE TESTING IN WASHING LINE BRAKE SECONDARY MAINTENANCE
  • 6. PRIMARY MAINTENANCE  The trains for the primary maintenance are given at least 6 hrs at the washing line in addition to secondary maintenance  Oil in hydraulic dash pots  Wheel profiles are visually examined and gauged  Pest control treatment  Axle box is examined for grease oozing  Brake blocks & piston stroke checked & changed
  • 7. Sick line is the workshop for the major and periodical maintenance of the coaches 1. Works carried out in sick line 2. Wheel and Axle Assembly 3. Bogie Maintenance 4. Buffer Maintenance 5. Air Brake System Maintenance SICK LINE
  • 8. 1. Width of wheel = 127 mm 2. Wheel Diameter = 915 (new), 825 (condemn) Permissible diameter variation in wheel Coaching a) On same axle – 0.5 mm b) On same bogie – 5.0 mm c) On same coach – 13.0 mm Goods a) On same axle – 0.5 mm b) On same bogie – 13.0 mm c) On same coach – 25.0 mm WHEEL AND AXLE ASSEMBLY
  • 9. Wheels are fixed on the axle with the help of bearings. Like wheel, it is also made up of steel. Brake cylinder are attached to axle. Braking discs are fixed on the axle.
  • 10. Causes of low buffer height in ICF coaching stock : a) excessive wear of wheel b) Due to loss of proper stiffness of coil spring c) Due to excessive wear on side bearer’s metal & bronze piece. Maximum buffer height = 1105 mm [In empty condition] Minimum buffer height = 1030 mm [In loaded condition] To achieve buffer height a standard size of wooden packing pieces are used which are kept below the Dash Pot Flange on axle Box wings of primary suspension. BUFFER HEIGHT ADJUSTMENT Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm) 1. Below 889 up to 863 13 2. Below 863 up to 839 26 3. Below 839 up to 819 38 4. 819 & below 48
  • 11. AIR BRAKE SYSTEM MAINTENANCE Components of Air Brake System 1. Brake Container 2. Distributor Valve 3. Pressure Tanks (125 liters, 6 liters) 4. B.P. / F.P. coupling and hosts 5. Emergency Brake Pull Box 6. Emergency Brake Valve
  • 12. Parts of Trolley 1. Trolley Frame 2. Center pivot 3. Side Bearing 4. Brake Cylinder TROLLEY MAINTENANCE
  • 13. Require tools and equipment's 1. With the use of Mechanical Jacks 2. With the use of Hydraulic Jacks 3. With the use of Electrical operated Travelling Crane 4. With the use of Whiting Jacks LIFTING OF COACHES
  • 14. PLATFORM TRAIN DUTY Rolling In Rolling out Axle box feeling Brake Power Certificate Safe to Run
  • 15. ROLLING IN/ROLLING OUT When train enters in station Examiner staff take up positions on both sides inspect the train enters at the speed of 8 Km/hr. Whistling sound of hot axle boxes. Any hanging part or loose fitting of vehicle. Any component or spring suspension bracket loose/broken. Abnormal behavior of vehicle
  • 16. AXLE BOX FEELING After the train come to halt, all axle boxes are felt within 20 minutes. The temp. of axle is checked by touching with hand Temp. is found high then it is checked by the temp. gun which gives exact temp. If this temp. is found more than 30 degree than atm. temp. then the cause is inspected and coach is sent to workshop
  • 17. This certificate is jointly signed by Guard , Driver, and C&W supervisor.  The incoming driver shall handover the brake power certificate to Reliving driver or Deposit it the nominated authority, who will give it to the outgoing Driver. The outgoing driver and guard will satisfy themselves from the listed coach numbers that the Brake Power Certificate pertains to their train. BRAKE POWER CERTIFICATE
  • 18. If all of above factors like no hanging parts brakes are working correctly the temp of axle box is with in range and the train is in good and safe condition of running then the train is announced as safe to run. SAFE TO RUN