This document provides information on the maintenance schedules and processes for Indian Railways coaches. It discusses: 1) The different maintenance schedules for coaches including washing line (after every trip), schedule A/B/C maintenance (ranging from monthly to every 6 months), and IOH/POH (every 9 and 18 months). 2) The classification of coaching maintenance depots based on the number of coaches maintained ranging from minor (50-100 coaches) to major (above 250 coaches). 3) The various works carried out in the washing line and sick line, including inspection, cleaning, brake testing, maintenance works, and loading of provisions. 4) Additional details on wheel and axle assembly specifications