Embed presentation
Download to read offline

This document outlines the requirements for an ACMV/ECS engineering project which requires 4 parts across mechanical and electrical engineering. The mechanical work includes 2 parts for the air side (ducting and fans) and water side (piping and AC equipment). The electrical work includes secondary electrical from the MCC to field devices and control systems. It provides details on the subcomponents needed for ducting and piping including insulation, boards, dampers, valves, flanges, and strainers. Authority involvement is requested for interface meetings to provide advice and input.
