SlideShare a Scribd company logo
1 of 11
ANDREW BARNETT
PERSONAL
NAME ANDREW BARNETT
ADDRESS 63 Nevada Way, Chelmsley Wood, Birmingham, B37 7LH
CONTACT NUMBERS 07891 908161 - MOBILE TEL.
E-MAIL ADDRESS Andy.Barnett@astonmartin.com
I am an experienced, professional, forward thinking achiever whose career within the vehicle
manufacturing sector has spanned the last 30 years and included many levels and
disciplines.Succes and achievment has been via my ability to integrate effective
man-management and team building skills with a keen awareness for reducing operating costs
via the monitoring of and reaction to Business KPI, driving standardisation and challenging “
the norm “.
I am an effective communicator at all levels and believe strongly in engagement at each stage
within the change process.
I have a broad experience within the manufacturing industry and have extensive knowledge &
experience in Trim & Final assy, BIW,Paint and Press Operations having held Senior
Management positions in all of these area’s. I have an excellent track record in team building,
cross functional integration,multi-skilling and the development of individuals in achieving
Company objectives.
Aston Martin Lagonda Sept 2010 – to date
March 2014 – to date
Position : Senior Production Manager Paint Operations
Main Responsibilities and Duties
⋅ Operational responsibility for Paint Operation which includes Main Paint System,
Special Paint applications ( Tri – Coat, Graphics , Special Q cars ) and OWR ( on
wheels repair )
⋅ Direct and indirect headcount of up to 165 heads with support staff of 7 Group
Leaders and 13 lead technicians.
⋅ Manufacturing Engineering team of 1 Snr Eng and 6 engineers
⋅ Overseeing manufacture of a range of World Class sports cars with a value ranging
between £85k - £500k
⋅ Managing ‘people,product,processes,quality and environment’ to exacting standards
aligned with the ‘Aston Martin’marque.
⋅ Responsibility and accountability for achievement of all performance objectives and
Key Performance Indicators QCDSME.
⋅ Responsibility and accountability for both internal and external customer quality
assurance processes.
⋅ Responsibility for area budgetary creation & control within the operation.
⋅ Health & Safety legislation conformance & monitoring.
⋅ Quality Management adherence in line with ISO 9002 & ISO 14001 Standards.
KEY PERSONAL ACHIEVMENTS
⋅ Appointed position via Manufacturing Director due to the very high turnover within
the position over previous 4 years.
⋅ Introduced revised structure within Manufacturing area to distribute resource/skills to
prioritise the painting and processing of car not the repair.
⋅ Introduction of ‘Quality Glidepath’ by process area
⋅ Sustaining vehicle continuity whilst introducing new ‘paint system’ under very exacting
circumstances
⋅ Improved Quality and descision making via improved leadership and direction.
⋅ Reduction of AMCPA score (Aston Martin Company Product Audit) all 4 models
under target for last Qtr
⋅ Introduction of Comet ( stretch Rapide ) into Special paints in line with timing and
Budget.
⋅ Introduction of ‘specialist’ team to process 100 special edition GT12 with varied
‘Graphic Pack’s’ designed to customer specification and within very specific
timescales.
Sept 2010 – Feb 2104
Position : Senior Production Manager Trim & Final Assy
Main Responsibilities and Duties
⋅ Operational responsibility for Trim & Final assy operations
⋅ Direct and indirect headcount of up to 130 heads with support staff of 5 Group
Leaders and 9 lead technicians.
⋅ Overseeing manufacture of a range of World Class sports cars with a value ranging
between £85k - £200k
⋅ Managing ‘people,product,processes,quality and environment’ to exacting standards
aligned with the ‘Aston Martin’marque.
⋅ Responsibility and accountability for achievement of all performance objectives and
Key Performance Indicators QCDSME.
⋅ Responsibility and accountability for both internal and external customer quality
assurance processes.
⋅ Responsibility for area budgetary creation & control within the operation.
⋅ Health & Safety legislation conformance & monitoring.
⋅ Quality Management adherence in line with ISO 9002 & ISO 14001 Standards.
KEY PERSONAL ACHIEVMENTS
⋅ Promotion to Senior Production manager after 9 months at AML.
⋅ Introduction of /and integration into Gaydon of the ‘Rapide’ model formerly produced
in Graz, Austria. June 2012.
⋅ Launch of the replacement DBS model, The Vanquish, whilst maintaining production
of the DB9 model on the same facility. September 2012.
⋅ Introduction of simultaneous 2 line operation under a single management structure
⋅ Reduction of DPV (defects per vehicle) to 3.2 at the end of 2011 across both model
lines.
⋅ Reduction of AMCPA score (Aston Martin Company Product Audit) to 120 per car
by end of 2012.
⋅ Consistancy of output, OPR at 95%
⋅ Operating profit within Business Unit.
Swissport (Birmingham Airport)
Position Held : Airside Operations Manager
Sept 2009 – May 2010
Main Responsibilities and Duties
⋅ Operational responsibility for safe conveyance of passengers and baggage/cargo from
Terminal to aircraft and return.
⋅ Responsibility for 100 staff operating 24/7 365 days
⋅ Management of labour in line with Airline SLA and DIDFLY
⋅ Process and labour management to exceptionally tight security and H&S standards.
⋅ Vehicle fleet and resource management
KEY PERSONAL ACHIEVEMENTS
⋅ Transition from Manufacturing environment to Service industry
⋅ Development of operating relationship with Key customer accounts FlyBe, Swiss Air
and PIA (Pakistan International Airways)
LDV Group Ltd
Oct 2008 – April 2009
Position: Operations Manager Paint,Trim and Vanguard
Main Responsibilities and Duties
⋅ Operational responsibility for Paint Shop, Trim & Final Assy, SVO (Special Vehicle
Operations), Vehicle Finishing and Vanguard (2nd
hand vehicle refurbishment).
⋅ Direct and indirect headcount of approx 250 with Staff support of 17 heads.
⋅ Re-organisation of operations structure to direct focus into Vanguard refurb area due
to major performance shortfall.
⋅ Responsibility and accountability for achievement of all performance objectives and
measurements.
⋅ Responsibility and accountability for both internal and external customer quality
assurance processes.
⋅ Responsibility for area budgetary creation & control within the operation.
⋅ Health & Safety legislation conformance & monitoring.
⋅ Quality Management adherence in line with ISO 9002 & ISO 14001 Standards.
⋅ PS strategy & plans for both Trim & Final and Paint.
⋅ Re-organisation of off line processes to assign on line.
⋅ Restructure of Staff resources and major man-assignment change in reaction to
customer demand.
KEY PERSONAL ACHIEVEMENTS
⋅ 30% performance improvement via integration of off line SVO operations into on line
assignment.
⋅ 10% reduction in headcount as a direct result of PS (Production System) initiatives.
⋅ Refocus of attention in Vanguard Refurb area and introduction of key performance
measures resulting in daily/weekly/monthly reporting and full cost breakdown of
labour, parts and overheads.
LDV Group Ltd
Oct 2007 – Oct 2008
Position: GPS Introduction Manager Press Operations
Main Responsibilities and Duties
· Accountability for the development of Team for the introduction of TPS/GPS within
Press Operations(Gaz Production System).
· Selection / training and coaching of Team in principles of GPS.
· Management of ‘Model Line’ project, integration, training and coaching of current
Production Team including Cell Manager, Supervisors and workforce.
· Development of ‘Kanban’ principles for Model Line.
· Development of ‘roll out plan’ for remaining Manufacturing Cells.
· Both inward and outward communication, including presentations to GAZ board
members, of progress and project status plus next steps.
KEY PERSONAL ACHIEVEMENTS
· Development of 4 off strangers into a team of GPS proffessionals within Press Ops.
· Introduction of Standardised work process for the ‘Model Line’ changeover process.
· Reduction in Double Action changeover time from 240 mins to average 17 mins.
· Reduction in total line changeover from 4 hours to 45 mins.
· Introduction of ‘Team’ concept and major upskilling of ‘Team Members’.
· Reduction of inventory due to cycle time reduction via major improvments in
changeover times.
· Management of Team in Russia during training period.
LDV Group Ltd, BPL (Birmingham Pressings Ltd), SBP (Stadco birmingham
Pressings).
FEB 1997 – Oct 2007
Position: Press Operations Manager
MAIN DUTIES & RESPONSIBILITIES
· Total responsibility for manufacturing operations and Quality control processes and
procedures consisting of 3 individual manufacturing cells. Facilities briefly consisting of
1 fully automated power press line (9 robots – 6 presses), and 9 manually operated
press lines (45 presses) BIW Chassis assy and ‘Major’ sub-assy for Maxus production.
· Responsibility and accountability for achievement of all performance objectives and
measurements.
· Management and development of “best practice” manufacturing teams including multi-
skilled production personnel across both direct and indirect functions. Total headcount
circa 250 heads.
· Raw material and finished product inventory control through JIT principles.
· Total operation capacity utilisation and weekly production schedule achievment against
pre-determined performance levels and standards.
· Responsibility and accountability for both internal and external customer quality
assurance processes.
· Responsibility for area budgetary creation & control within the operation.
· Health & Safety legislation conformance & monitoring.
· Quality Management adherence in line with TS 16949, ISO 14001 & IOS 18002
Standards.
KEY PERSONAL ACHIEVEMENTS
· Major Reduction in rework/rectification costs on finished product by £50k per annum.
· Reduction in raw material and finished product inventory by £100k per annum.
· Reduction in shift premiums year on year.
· Increase in productivity in all manufacturing areas on an annual basis, average 4-5%
per annum.
· Planning, communication, training and introduction of processes and procedures to
achieve transition from ISO 9002 to TS16949
· Management of all Lloyds/BSI ISO 9002/TS 16949/ISO 14002/ISO 18001
assesments with no major non-compliances.
· Development & implementation of fully autonomous manufacturing cells.
· Elimination of skills and functional demarcation lines without dispute.
· Communication of change within Press Ops including all Trade Union
Communications.
· Year on year reduction in total accidents and RIDDOR.
Summary Of Previous Experience
LDV Ltd
1993 – 1997
Position: Van Operations Manager
· After Management buy out in 1993 assumed responsibility for BIW, Paint and Trim
and Final operations as part of a new and drastically reduced Management Team.
· Re-organised Business into Manufacturing Cells incorporating Technical Support and
Production support into shop floor multi – skilled teams.
· Introduced Teamleader concept onto shopfloor.
EDUCATION
DATES QUALIFICATIONS & PLACE OF STUDY
’09 - ’09 NEBOSH General Certificate (results due June 2009)
NVQ Level 3 Health & Safety Management (results due June 2009)
‘99 - ‘00 NVQ Level V – Management Leadership
Dudley College
‘87 - ‘88 NEBBS DIPLOMA
SOLIHULL TECHNICAL COLLEGE
‘83 - ‘86 FULL TECH CERT MECHANICAL ENGINEERING
GARRETTS GREEN TECHNICAL COLLEGE
‘80 - ‘82 C & G Part 1,2 & 3 – MECHANICAL ENG. CRAFT STUDIES
GARRETTS GREEN TECHNICAL COLLEGE
‘75 - ‘80 O Level - Mathematics, Eng. Lit., Eng. Lang., Physics, Tech. Drawing,
Engineering & Geography
Internal Courses Attended
• Risk Assessments & Manual Handling Assessments
• Health & Safety Auditing
• Time Management
• Statistical Process Control
• Appraisel Training
• Industrial Engineering
• Introduction Into Management
• Teambuilding
• COSSH Regulations
External Courses Attended
• “The Business” introduction to basic finance
• Cranfield Middle Management
• QES Crosby
• NLP (Neuro Linguistic Programming)
• CLAIT
• NEBOSH (National General Certificate)
Hobbies/Interests
· Keeping fit via roadrunning and gym work.
· Watching football
· DIY
AB - Personal Profile April 2015 (AML)
AB - Personal Profile April 2015 (AML)

More Related Content

What's hot

Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Kedar Borgaonkar
 
DANECRAIG Resume
DANECRAIG ResumeDANECRAIG Resume
DANECRAIG ResumeDane Craig
 
DANECRAIG Resume
DANECRAIG ResumeDANECRAIG Resume
DANECRAIG ResumeDane Craig
 
Curriculum_Vitae_of_D.J Drude
Curriculum_Vitae_of_D.J DrudeCurriculum_Vitae_of_D.J Drude
Curriculum_Vitae_of_D.J DrudeDaryl Drude
 
Jeffrey Frady Resume.PDF
Jeffrey Frady Resume.PDFJeffrey Frady Resume.PDF
Jeffrey Frady Resume.PDFJeffrey Frady
 
Paulo Costa CV (05-16) EN Public
Paulo Costa CV  (05-16) EN PublicPaulo Costa CV  (05-16) EN Public
Paulo Costa CV (05-16) EN PublicPaulo Costa
 
Mark Harrison Profile
Mark Harrison ProfileMark Harrison Profile
Mark Harrison ProfileMark Harrison
 
Resume_2016 with Learning Logistics
Resume_2016 with Learning LogisticsResume_2016 with Learning Logistics
Resume_2016 with Learning LogisticsJuan Burnett
 
Cv james taylor_mwd
Cv james taylor_mwdCv james taylor_mwd
Cv james taylor_mwdJames Taylor
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16Rick Smith
 
2017Damian Patrick Walsh CV
2017Damian Patrick Walsh CV2017Damian Patrick Walsh CV
2017Damian Patrick Walsh CVDamian Walsh
 
resume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-levelresume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-levelclement amal
 

What's hot (20)

Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
 
DANECRAIG Resume
DANECRAIG ResumeDANECRAIG Resume
DANECRAIG Resume
 
DANECRAIG Resume
DANECRAIG ResumeDANECRAIG Resume
DANECRAIG Resume
 
Curriculum_Vitae_of_D.J Drude
Curriculum_Vitae_of_D.J DrudeCurriculum_Vitae_of_D.J Drude
Curriculum_Vitae_of_D.J Drude
 
Jeffrey Frady Resume.PDF
Jeffrey Frady Resume.PDFJeffrey Frady Resume.PDF
Jeffrey Frady Resume.PDF
 
Paulo Costa CV (05-16) EN Public
Paulo Costa CV  (05-16) EN PublicPaulo Costa CV  (05-16) EN Public
Paulo Costa CV (05-16) EN Public
 
Mark Harrison Profile
Mark Harrison ProfileMark Harrison Profile
Mark Harrison Profile
 
RES
RESRES
RES
 
Resume_2016 with Learning Logistics
Resume_2016 with Learning LogisticsResume_2016 with Learning Logistics
Resume_2016 with Learning Logistics
 
CV_RF_English 2015
CV_RF_English 2015CV_RF_English 2015
CV_RF_English 2015
 
Cv David Prieto English 11-21-16
Cv David Prieto English 11-21-16Cv David Prieto English 11-21-16
Cv David Prieto English 11-21-16
 
RESUME JOAQUIN GONZALEZ
RESUME JOAQUIN GONZALEZRESUME JOAQUIN GONZALEZ
RESUME JOAQUIN GONZALEZ
 
Van Resume June 2016
Van Resume June 2016Van Resume June 2016
Van Resume June 2016
 
Cv james taylor_mwd
Cv james taylor_mwdCv james taylor_mwd
Cv james taylor_mwd
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16
 
2017Damian Patrick Walsh CV
2017Damian Patrick Walsh CV2017Damian Patrick Walsh CV
2017Damian Patrick Walsh CV
 
Amazon Resume
Amazon ResumeAmazon Resume
Amazon Resume
 
resume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-levelresume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-level
 
Cv linked in
Cv linked inCv linked in
Cv linked in
 
KVM_ Oct 2015
KVM_ Oct 2015KVM_ Oct 2015
KVM_ Oct 2015
 

Viewers also liked

The State of Enterprise Resilience - Resilience Survey 2015
The State of Enterprise Resilience - Resilience Survey 2015The State of Enterprise Resilience - Resilience Survey 2015
The State of Enterprise Resilience - Resilience Survey 2015Julian R
 
201308 CV - Andrew Burnett
201308 CV - Andrew Burnett201308 CV - Andrew Burnett
201308 CV - Andrew BurnettAndrew Burnett
 
Bhushan Mantri Profile 2012
Bhushan Mantri   Profile 2012Bhushan Mantri   Profile 2012
Bhushan Mantri Profile 2012bhushan_mantri
 
Agile Wake Up #3 : La transformation Agile de Kisio Digital
Agile Wake Up #3 : La transformation Agile de Kisio DigitalAgile Wake Up #3 : La transformation Agile de Kisio Digital
Agile Wake Up #3 : La transformation Agile de Kisio DigitalZenika
 
Private limited-company
Private limited-companyPrivate limited-company
Private limited-companyshaynehughes
 
Certification_1887604
Certification_1887604Certification_1887604
Certification_1887604Rafael Lobo
 
Mistrzowie infrastruktury Czerwiec 2016 Lenovo Nutanix
Mistrzowie infrastruktury Czerwiec 2016 Lenovo NutanixMistrzowie infrastruktury Czerwiec 2016 Lenovo Nutanix
Mistrzowie infrastruktury Czerwiec 2016 Lenovo NutanixEngave
 
GEEGO FAN Resume 041608
GEEGO FAN Resume 041608GEEGO FAN Resume 041608
GEEGO FAN Resume 041608Geego Fan
 
Goldilocks and the three laws broken
Goldilocks and the three laws brokenGoldilocks and the three laws broken
Goldilocks and the three laws brokenLynden Schwan
 

Viewers also liked (12)

The State of Enterprise Resilience - Resilience Survey 2015
The State of Enterprise Resilience - Resilience Survey 2015The State of Enterprise Resilience - Resilience Survey 2015
The State of Enterprise Resilience - Resilience Survey 2015
 
Bucks Fire 7 Rescue Service
Bucks Fire 7 Rescue ServiceBucks Fire 7 Rescue Service
Bucks Fire 7 Rescue Service
 
201308 CV - Andrew Burnett
201308 CV - Andrew Burnett201308 CV - Andrew Burnett
201308 CV - Andrew Burnett
 
Bhushan Mantri Profile 2012
Bhushan Mantri   Profile 2012Bhushan Mantri   Profile 2012
Bhushan Mantri Profile 2012
 
Agile Wake Up #3 : La transformation Agile de Kisio Digital
Agile Wake Up #3 : La transformation Agile de Kisio DigitalAgile Wake Up #3 : La transformation Agile de Kisio Digital
Agile Wake Up #3 : La transformation Agile de Kisio Digital
 
Private limited-company
Private limited-companyPrivate limited-company
Private limited-company
 
Certification_1887604
Certification_1887604Certification_1887604
Certification_1887604
 
Mistrzowie infrastruktury Czerwiec 2016 Lenovo Nutanix
Mistrzowie infrastruktury Czerwiec 2016 Lenovo NutanixMistrzowie infrastruktury Czerwiec 2016 Lenovo Nutanix
Mistrzowie infrastruktury Czerwiec 2016 Lenovo Nutanix
 
GEEGO FAN Resume 041608
GEEGO FAN Resume 041608GEEGO FAN Resume 041608
GEEGO FAN Resume 041608
 
Goldilocks and the three laws broken
Goldilocks and the three laws brokenGoldilocks and the three laws broken
Goldilocks and the three laws broken
 
Women in Engineering
Women in EngineeringWomen in Engineering
Women in Engineering
 
Green concrete
Green concreteGreen concrete
Green concrete
 

Similar to AB - Personal Profile April 2015 (AML)

Similar to AB - Personal Profile April 2015 (AML) (20)

Numan CV
Numan CVNuman CV
Numan CV
 
CV CS
CV CSCV CS
CV CS
 
Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17
 
bks cv
bks cvbks cv
bks cv
 
John Gwozdz - resume 8-10-16
John Gwozdz - resume  8-10-16John Gwozdz - resume  8-10-16
John Gwozdz - resume 8-10-16
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Numan Noor
Numan NoorNuman Noor
Numan Noor
 
CV S Larner 2016
CV S Larner 2016CV S Larner 2016
CV S Larner 2016
 
Six Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSix Sigma Final PPT - Revised
Six Sigma Final PPT - Revised
 
MS CV New v2
MS CV New v2MS CV New v2
MS CV New v2
 
CV_Dhage2
CV_Dhage2CV_Dhage2
CV_Dhage2
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashev
 
Harpreet Singh-Resume-QA
Harpreet Singh-Resume-QAHarpreet Singh-Resume-QA
Harpreet Singh-Resume-QA
 
VG cv Pro.
VG cv Pro.VG cv Pro.
VG cv Pro.
 
Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
 
John F Petak Resume July 2011
John F Petak   Resume July  2011John F Petak   Resume July  2011
John F Petak Resume July 2011
 
VVS
VVSVVS
VVS
 
Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resume
 
Mark-Wheelhouse_2084829_cv-library
Mark-Wheelhouse_2084829_cv-libraryMark-Wheelhouse_2084829_cv-library
Mark-Wheelhouse_2084829_cv-library
 

AB - Personal Profile April 2015 (AML)

  • 2. PERSONAL NAME ANDREW BARNETT ADDRESS 63 Nevada Way, Chelmsley Wood, Birmingham, B37 7LH CONTACT NUMBERS 07891 908161 - MOBILE TEL. E-MAIL ADDRESS Andy.Barnett@astonmartin.com I am an experienced, professional, forward thinking achiever whose career within the vehicle manufacturing sector has spanned the last 30 years and included many levels and disciplines.Succes and achievment has been via my ability to integrate effective man-management and team building skills with a keen awareness for reducing operating costs via the monitoring of and reaction to Business KPI, driving standardisation and challenging “ the norm “. I am an effective communicator at all levels and believe strongly in engagement at each stage within the change process. I have a broad experience within the manufacturing industry and have extensive knowledge & experience in Trim & Final assy, BIW,Paint and Press Operations having held Senior Management positions in all of these area’s. I have an excellent track record in team building, cross functional integration,multi-skilling and the development of individuals in achieving Company objectives. Aston Martin Lagonda Sept 2010 – to date March 2014 – to date Position : Senior Production Manager Paint Operations
  • 3. Main Responsibilities and Duties ⋅ Operational responsibility for Paint Operation which includes Main Paint System, Special Paint applications ( Tri – Coat, Graphics , Special Q cars ) and OWR ( on wheels repair ) ⋅ Direct and indirect headcount of up to 165 heads with support staff of 7 Group Leaders and 13 lead technicians. ⋅ Manufacturing Engineering team of 1 Snr Eng and 6 engineers ⋅ Overseeing manufacture of a range of World Class sports cars with a value ranging between £85k - £500k ⋅ Managing ‘people,product,processes,quality and environment’ to exacting standards aligned with the ‘Aston Martin’marque. ⋅ Responsibility and accountability for achievement of all performance objectives and Key Performance Indicators QCDSME. ⋅ Responsibility and accountability for both internal and external customer quality assurance processes. ⋅ Responsibility for area budgetary creation & control within the operation. ⋅ Health & Safety legislation conformance & monitoring. ⋅ Quality Management adherence in line with ISO 9002 & ISO 14001 Standards. KEY PERSONAL ACHIEVMENTS ⋅ Appointed position via Manufacturing Director due to the very high turnover within the position over previous 4 years. ⋅ Introduced revised structure within Manufacturing area to distribute resource/skills to prioritise the painting and processing of car not the repair. ⋅ Introduction of ‘Quality Glidepath’ by process area ⋅ Sustaining vehicle continuity whilst introducing new ‘paint system’ under very exacting circumstances ⋅ Improved Quality and descision making via improved leadership and direction. ⋅ Reduction of AMCPA score (Aston Martin Company Product Audit) all 4 models under target for last Qtr ⋅ Introduction of Comet ( stretch Rapide ) into Special paints in line with timing and Budget. ⋅ Introduction of ‘specialist’ team to process 100 special edition GT12 with varied ‘Graphic Pack’s’ designed to customer specification and within very specific timescales. Sept 2010 – Feb 2104 Position : Senior Production Manager Trim & Final Assy Main Responsibilities and Duties
  • 4. ⋅ Operational responsibility for Trim & Final assy operations ⋅ Direct and indirect headcount of up to 130 heads with support staff of 5 Group Leaders and 9 lead technicians. ⋅ Overseeing manufacture of a range of World Class sports cars with a value ranging between £85k - £200k ⋅ Managing ‘people,product,processes,quality and environment’ to exacting standards aligned with the ‘Aston Martin’marque. ⋅ Responsibility and accountability for achievement of all performance objectives and Key Performance Indicators QCDSME. ⋅ Responsibility and accountability for both internal and external customer quality assurance processes. ⋅ Responsibility for area budgetary creation & control within the operation. ⋅ Health & Safety legislation conformance & monitoring. ⋅ Quality Management adherence in line with ISO 9002 & ISO 14001 Standards. KEY PERSONAL ACHIEVMENTS ⋅ Promotion to Senior Production manager after 9 months at AML. ⋅ Introduction of /and integration into Gaydon of the ‘Rapide’ model formerly produced in Graz, Austria. June 2012. ⋅ Launch of the replacement DBS model, The Vanquish, whilst maintaining production of the DB9 model on the same facility. September 2012. ⋅ Introduction of simultaneous 2 line operation under a single management structure ⋅ Reduction of DPV (defects per vehicle) to 3.2 at the end of 2011 across both model lines. ⋅ Reduction of AMCPA score (Aston Martin Company Product Audit) to 120 per car by end of 2012. ⋅ Consistancy of output, OPR at 95% ⋅ Operating profit within Business Unit. Swissport (Birmingham Airport) Position Held : Airside Operations Manager Sept 2009 – May 2010 Main Responsibilities and Duties
  • 5. ⋅ Operational responsibility for safe conveyance of passengers and baggage/cargo from Terminal to aircraft and return. ⋅ Responsibility for 100 staff operating 24/7 365 days ⋅ Management of labour in line with Airline SLA and DIDFLY ⋅ Process and labour management to exceptionally tight security and H&S standards. ⋅ Vehicle fleet and resource management KEY PERSONAL ACHIEVEMENTS ⋅ Transition from Manufacturing environment to Service industry ⋅ Development of operating relationship with Key customer accounts FlyBe, Swiss Air and PIA (Pakistan International Airways) LDV Group Ltd Oct 2008 – April 2009 Position: Operations Manager Paint,Trim and Vanguard
  • 6. Main Responsibilities and Duties ⋅ Operational responsibility for Paint Shop, Trim & Final Assy, SVO (Special Vehicle Operations), Vehicle Finishing and Vanguard (2nd hand vehicle refurbishment). ⋅ Direct and indirect headcount of approx 250 with Staff support of 17 heads. ⋅ Re-organisation of operations structure to direct focus into Vanguard refurb area due to major performance shortfall. ⋅ Responsibility and accountability for achievement of all performance objectives and measurements. ⋅ Responsibility and accountability for both internal and external customer quality assurance processes. ⋅ Responsibility for area budgetary creation & control within the operation. ⋅ Health & Safety legislation conformance & monitoring. ⋅ Quality Management adherence in line with ISO 9002 & ISO 14001 Standards. ⋅ PS strategy & plans for both Trim & Final and Paint. ⋅ Re-organisation of off line processes to assign on line. ⋅ Restructure of Staff resources and major man-assignment change in reaction to customer demand. KEY PERSONAL ACHIEVEMENTS ⋅ 30% performance improvement via integration of off line SVO operations into on line assignment. ⋅ 10% reduction in headcount as a direct result of PS (Production System) initiatives. ⋅ Refocus of attention in Vanguard Refurb area and introduction of key performance measures resulting in daily/weekly/monthly reporting and full cost breakdown of labour, parts and overheads. LDV Group Ltd Oct 2007 – Oct 2008 Position: GPS Introduction Manager Press Operations Main Responsibilities and Duties
  • 7. · Accountability for the development of Team for the introduction of TPS/GPS within Press Operations(Gaz Production System). · Selection / training and coaching of Team in principles of GPS. · Management of ‘Model Line’ project, integration, training and coaching of current Production Team including Cell Manager, Supervisors and workforce. · Development of ‘Kanban’ principles for Model Line. · Development of ‘roll out plan’ for remaining Manufacturing Cells. · Both inward and outward communication, including presentations to GAZ board members, of progress and project status plus next steps. KEY PERSONAL ACHIEVEMENTS · Development of 4 off strangers into a team of GPS proffessionals within Press Ops. · Introduction of Standardised work process for the ‘Model Line’ changeover process. · Reduction in Double Action changeover time from 240 mins to average 17 mins. · Reduction in total line changeover from 4 hours to 45 mins. · Introduction of ‘Team’ concept and major upskilling of ‘Team Members’. · Reduction of inventory due to cycle time reduction via major improvments in changeover times. · Management of Team in Russia during training period. LDV Group Ltd, BPL (Birmingham Pressings Ltd), SBP (Stadco birmingham Pressings). FEB 1997 – Oct 2007 Position: Press Operations Manager MAIN DUTIES & RESPONSIBILITIES · Total responsibility for manufacturing operations and Quality control processes and procedures consisting of 3 individual manufacturing cells. Facilities briefly consisting of 1 fully automated power press line (9 robots – 6 presses), and 9 manually operated press lines (45 presses) BIW Chassis assy and ‘Major’ sub-assy for Maxus production.
  • 8. · Responsibility and accountability for achievement of all performance objectives and measurements. · Management and development of “best practice” manufacturing teams including multi- skilled production personnel across both direct and indirect functions. Total headcount circa 250 heads. · Raw material and finished product inventory control through JIT principles. · Total operation capacity utilisation and weekly production schedule achievment against pre-determined performance levels and standards. · Responsibility and accountability for both internal and external customer quality assurance processes. · Responsibility for area budgetary creation & control within the operation. · Health & Safety legislation conformance & monitoring. · Quality Management adherence in line with TS 16949, ISO 14001 & IOS 18002 Standards. KEY PERSONAL ACHIEVEMENTS · Major Reduction in rework/rectification costs on finished product by £50k per annum. · Reduction in raw material and finished product inventory by £100k per annum. · Reduction in shift premiums year on year. · Increase in productivity in all manufacturing areas on an annual basis, average 4-5% per annum. · Planning, communication, training and introduction of processes and procedures to achieve transition from ISO 9002 to TS16949 · Management of all Lloyds/BSI ISO 9002/TS 16949/ISO 14002/ISO 18001 assesments with no major non-compliances. · Development & implementation of fully autonomous manufacturing cells. · Elimination of skills and functional demarcation lines without dispute. · Communication of change within Press Ops including all Trade Union Communications. · Year on year reduction in total accidents and RIDDOR. Summary Of Previous Experience LDV Ltd 1993 – 1997 Position: Van Operations Manager · After Management buy out in 1993 assumed responsibility for BIW, Paint and Trim and Final operations as part of a new and drastically reduced Management Team. · Re-organised Business into Manufacturing Cells incorporating Technical Support and Production support into shop floor multi – skilled teams. · Introduced Teamleader concept onto shopfloor.
  • 9. EDUCATION DATES QUALIFICATIONS & PLACE OF STUDY ’09 - ’09 NEBOSH General Certificate (results due June 2009) NVQ Level 3 Health & Safety Management (results due June 2009) ‘99 - ‘00 NVQ Level V – Management Leadership Dudley College ‘87 - ‘88 NEBBS DIPLOMA SOLIHULL TECHNICAL COLLEGE ‘83 - ‘86 FULL TECH CERT MECHANICAL ENGINEERING GARRETTS GREEN TECHNICAL COLLEGE ‘80 - ‘82 C & G Part 1,2 & 3 – MECHANICAL ENG. CRAFT STUDIES GARRETTS GREEN TECHNICAL COLLEGE ‘75 - ‘80 O Level - Mathematics, Eng. Lit., Eng. Lang., Physics, Tech. Drawing, Engineering & Geography Internal Courses Attended • Risk Assessments & Manual Handling Assessments • Health & Safety Auditing • Time Management • Statistical Process Control • Appraisel Training • Industrial Engineering • Introduction Into Management • Teambuilding • COSSH Regulations External Courses Attended • “The Business” introduction to basic finance • Cranfield Middle Management • QES Crosby • NLP (Neuro Linguistic Programming) • CLAIT • NEBOSH (National General Certificate) Hobbies/Interests · Keeping fit via roadrunning and gym work. · Watching football · DIY