Important Points to Remember for Quantity Estimation. 
Civil Works: 
 To carefully note the various levels while calculating excavation & backfilling. 
 To make note of the various levels of the structure & compare the measured 
heights/length of various items with the levels. 
 To check all the sections & elevations carefully prior to any estimation. 
 To look into the NOTES given at the right side of the drawing in the info column. 
 To look out for trenches, drops, slab elevations, projections & many others. 
 To check for different slab depths over the plan. 
 To carefully look into the openings, their types & numbers. 
 To measure the height of the pedestal & columns up to the top level of above Ground 
(plinth) & Roof beams respectively. 
 To measure the length of the beam from column face to face. 
 To carefully note the various given dimensions of the different structures. 
 To carefully carry out the estimation of staircase, trenches etc. separately. 
 To carefully note the beam positions & their depths while calculating Block/Brickwork. 
 To consider the height of the wall for internal plastering works up to the slab bottom & 
thereby considering deductions for openings. 
 To carefully note the beams bottom surface (where there is no block work) for roof 
bottom plastering. 
Steel Reinforcement: 
 To carefully name & number every individual rods before any calculations & workout 
the no. of rods, length & span accordingly & individually. 
 To learn the extra length formulae for the 45 & 30 deg cranks. 
 To learn the calculations of the length & no. of rods for the top reinforcement in slab. 
 To carefully note the data while calculating the length of rods, their numbers, their 
span of distribution etc. 
 To carefully keep note of the covers for various items of the structure. 
 To carefully note the bends, elevations, cranks, while calculating length of rods. 
 To carefully calculate the stirrups, their shapes, bends & the no. of stirrups for columns 
& beams – Please learn about no. of branches of stirrups. 
 To learn the measurement of lengths of 45, 90 deg bends, small cranks, hooks etc.
Unit Weight of steel (Kg/m) 
 Unit Weight of steel (Kg/m) = Area (mm2) X Density (Kg/m3) 
= (Pi * d2) / 4 X 7850. 
= 3.141*d2 / 4 X 7850. 
Since d is in mm, convert it into meters by diving it by (1000) 
= 3.141*d2*7850/ (4*(1000)2) 
= (3.141*7850*d2) / (4000000) 
= 0.00616 * (d2) 
= d2 / 162. 
 1 cum = 30.31 cft. 
 1 sqm = 10.76 sft. 
 1 m = 3.28 ft. 
 1 feet = 0.305 m. 
 1 inch = 25.4 mm. 
 1 cum of cement = 1440 kgs. 
 1 bag of cement (50kg) = 0.034 cum. 
 1 sqm of block work = 13 blocks (for 6” & 8”), 
15 blocks (for 4” block) 
 1 cum of brick work = 473 bricks 
 1 sqm of brick work = 44 bricks 
 M5 = 1:5:4 
 M7.5 = 1:4:8 
 M10 = 1:3:6 
 M15 = 1:2:4 
 M20 = 1:1.5:3 
 M25 = 1:1:2
Steps in Quantity Estimation 
1. Excavation - Individual footings / Entire Area with extra working space. 
2. Backfilling - By Parts / Total excavation minus concrete qty below GL. 
3. Column Necks/Pedestals - up to Grade Beam top level. 
4. Plinth/Grade Beam - PCC & Concrete (Column face to face). 
5. Columns - Grade Beam top to Roof Beam bottom. 
6. Grade Slab - PCC, moisture insulation polyethylene & concrete. 
7. Water Insulation/Bitumen for the substructure 
 Footing bottom, side & top 
 Column neck sides 
 Concrete Walls 
 Grade beams below GL 
 Grade Slab Bottom 
8. Roof Beam concrete 
9. Roof Slab Concrete 
10. Parappet Wall - RCC / Block work 
11. Lintel Concrete 
12. Block work 
13. Plastering - Ceiling, Wall - ext & int, jambs. 
14. Painting 
15. Flooring - cement, tiles, marble etc. 
16. Schedule of openings 
17. Floor Finishes 
 Roof Concrete slopes 
 Heat insulation layers 
 Screed concrete 
 Mortar floor

More Related Content

What's hot

How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?Duc Tran Xuan
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
Deepak Patil
 
Ch 7 design of rcc footing
Ch 7 design of rcc footingCh 7 design of rcc footing
Ch 7 design of rcc footing
MD.MAHBUB UL ALAM
 
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحةالفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
Ahmed Gamal Abdel Gawad
 
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
AMIT PAYAL
 
Tower smart tower_detailing_tips_series_3
Tower smart tower_detailing_tips_series_3Tower smart tower_detailing_tips_series_3
Tower smart tower_detailing_tips_series_3
stan gad
 
Tutor brickwork below ground level
Tutor brickwork below ground levelTutor brickwork below ground level
Tutor brickwork below ground level
Luke D'Arcy
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
sharda university
 

What's hot (8)

How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
 
Ch 7 design of rcc footing
Ch 7 design of rcc footingCh 7 design of rcc footing
Ch 7 design of rcc footing
 
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحةالفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
 
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
 
Tower smart tower_detailing_tips_series_3
Tower smart tower_detailing_tips_series_3Tower smart tower_detailing_tips_series_3
Tower smart tower_detailing_tips_series_3
 
Tutor brickwork below ground level
Tutor brickwork below ground levelTutor brickwork below ground level
Tutor brickwork below ground level
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 

Similar to 232365197 points-qe

ppt.pptx
ppt.pptxppt.pptx
Sp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGSp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILING
Ankammarao Yanam
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
EVERSENDAI ENGINEERING (L.L.C.)
 
flat Slab
flat Slabflat Slab
flat Slab
Vikas Mehta
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
final praveen.pptx
final praveen.pptxfinal praveen.pptx
final praveen.pptx
RajeshKumar25548
 
Plinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protectionPlinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protection
AkshayKamble94
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
CADmantra Technologies
 
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
IRJET Journal
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
malang1214
 
slabs.ppt
slabs.pptslabs.ppt
slabs.ppt
MOHNIKASAMINENI
 
Form Work
Form Work Form Work
Form Work
Kezar Ali. Shah
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
Moussa Rili
 
Formwork
FormworkFormwork
Formwork
kajol panchal
 
Bar bending schedule (2)
Bar bending schedule (2)Bar bending schedule (2)
Bar bending schedule (2)
ManimaranS17
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Aabid Ansar
 
Roof framing
Roof framingRoof framing
Roof framing
Slawek Dobrowolski
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
Kishor Ade
 
Estimation & costing guide
Estimation & costing guideEstimation & costing guide
Estimation & costing guide
Hiren Thakkar
 

Similar to 232365197 points-qe (20)

ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
Sp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGSp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILING
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 
flat Slab
flat Slabflat Slab
flat Slab
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
final praveen.pptx
final praveen.pptxfinal praveen.pptx
final praveen.pptx
 
Plinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protectionPlinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protection
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
 
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
slabs.ppt
slabs.pptslabs.ppt
slabs.ppt
 
Form Work
Form Work Form Work
Form Work
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
Formwork
FormworkFormwork
Formwork
 
Bar bending schedule (2)
Bar bending schedule (2)Bar bending schedule (2)
Bar bending schedule (2)
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Roof framing
Roof framingRoof framing
Roof framing
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Estimation & costing guide
Estimation & costing guideEstimation & costing guide
Estimation & costing guide
 
I Download (1)
I Download (1)I Download (1)
I Download (1)
 

More from hlksd

Podium Output report for the tower design
Podium Output report for the tower designPodium Output report for the tower design
Podium Output report for the tower design
hlksd
 
Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a dayhlksd
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayhlksd
 
Reasonskills
ReasonskillsReasonskills
Reasonskillshlksd
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillshlksd
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayhlksd
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skillshlksd
 
Tuladhar
TuladharTuladhar
Tuladharhlksd
 
Standard specifications
Standard specificationsStandard specifications
Standard specificationshlksd
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comhlksd
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62hlksd
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildingshlksd
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building constructionhlksd
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteelhlksd
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)hlksd
 
Peb structures
Peb structuresPeb structures
Peb structureshlksd
 
As22267272
As22267272As22267272
As22267272hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 

More from hlksd (20)

Podium Output report for the tower design
Podium Output report for the tower designPodium Output report for the tower design
Podium Output report for the tower design
 
Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a day
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a day
 
Reasonskills
ReasonskillsReasonskills
Reasonskills
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskills
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a day
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skills
 
Tuladhar
TuladharTuladhar
Tuladhar
 
Standard specifications
Standard specificationsStandard specifications
Standard specifications
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.com
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildings
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
 
Peb
PebPeb
Peb
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)
 
Peb structures
Peb structuresPeb structures
Peb structures
 
As22267272
As22267272As22267272
As22267272
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 

Recently uploaded

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 

Recently uploaded (20)

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 

232365197 points-qe

  • 1. Important Points to Remember for Quantity Estimation. Civil Works:  To carefully note the various levels while calculating excavation & backfilling.  To make note of the various levels of the structure & compare the measured heights/length of various items with the levels.  To check all the sections & elevations carefully prior to any estimation.  To look into the NOTES given at the right side of the drawing in the info column.  To look out for trenches, drops, slab elevations, projections & many others.  To check for different slab depths over the plan.  To carefully look into the openings, their types & numbers.  To measure the height of the pedestal & columns up to the top level of above Ground (plinth) & Roof beams respectively.  To measure the length of the beam from column face to face.  To carefully note the various given dimensions of the different structures.  To carefully carry out the estimation of staircase, trenches etc. separately.  To carefully note the beam positions & their depths while calculating Block/Brickwork.  To consider the height of the wall for internal plastering works up to the slab bottom & thereby considering deductions for openings.  To carefully note the beams bottom surface (where there is no block work) for roof bottom plastering. Steel Reinforcement:  To carefully name & number every individual rods before any calculations & workout the no. of rods, length & span accordingly & individually.  To learn the extra length formulae for the 45 & 30 deg cranks.  To learn the calculations of the length & no. of rods for the top reinforcement in slab.  To carefully note the data while calculating the length of rods, their numbers, their span of distribution etc.  To carefully keep note of the covers for various items of the structure.  To carefully note the bends, elevations, cranks, while calculating length of rods.  To carefully calculate the stirrups, their shapes, bends & the no. of stirrups for columns & beams – Please learn about no. of branches of stirrups.  To learn the measurement of lengths of 45, 90 deg bends, small cranks, hooks etc.
  • 2. Unit Weight of steel (Kg/m)  Unit Weight of steel (Kg/m) = Area (mm2) X Density (Kg/m3) = (Pi * d2) / 4 X 7850. = 3.141*d2 / 4 X 7850. Since d is in mm, convert it into meters by diving it by (1000) = 3.141*d2*7850/ (4*(1000)2) = (3.141*7850*d2) / (4000000) = 0.00616 * (d2) = d2 / 162.  1 cum = 30.31 cft.  1 sqm = 10.76 sft.  1 m = 3.28 ft.  1 feet = 0.305 m.  1 inch = 25.4 mm.  1 cum of cement = 1440 kgs.  1 bag of cement (50kg) = 0.034 cum.  1 sqm of block work = 13 blocks (for 6” & 8”), 15 blocks (for 4” block)  1 cum of brick work = 473 bricks  1 sqm of brick work = 44 bricks  M5 = 1:5:4  M7.5 = 1:4:8  M10 = 1:3:6  M15 = 1:2:4  M20 = 1:1.5:3  M25 = 1:1:2
  • 3. Steps in Quantity Estimation 1. Excavation - Individual footings / Entire Area with extra working space. 2. Backfilling - By Parts / Total excavation minus concrete qty below GL. 3. Column Necks/Pedestals - up to Grade Beam top level. 4. Plinth/Grade Beam - PCC & Concrete (Column face to face). 5. Columns - Grade Beam top to Roof Beam bottom. 6. Grade Slab - PCC, moisture insulation polyethylene & concrete. 7. Water Insulation/Bitumen for the substructure  Footing bottom, side & top  Column neck sides  Concrete Walls  Grade beams below GL  Grade Slab Bottom 8. Roof Beam concrete 9. Roof Slab Concrete 10. Parappet Wall - RCC / Block work 11. Lintel Concrete 12. Block work 13. Plastering - Ceiling, Wall - ext & int, jambs. 14. Painting 15. Flooring - cement, tiles, marble etc. 16. Schedule of openings 17. Floor Finishes  Roof Concrete slopes  Heat insulation layers  Screed concrete  Mortar floor