Here is my ten point interpretation of BIM...
1. Most importantly, BIM is not a technology. It is a process. This is possibly the most important
aspect to understand. BIM applies to all aspects of the construction of a building, from the design, the
estimating, the supply chain, the delivery of goods during the build, the build process, the resource
allocation, the productivity requirements to meet targets and on in to the post-handover phase
through Facilities and Asset Management.
2. Aspects of BIM are enabled through various technology platforms. There are several providers of
technology which supports architectural tools plus the addition of intelligent information against the
model. Examples include Autodesk Revit, Graphisoft ArchiCAD 17, 12d Model and Synchro
Professional.
3. BIM has several implementation levels:Level 0: CAD using drawings, lines, arcs, text, etc.
Level 1: 2D & 3D using models, objects plus file based collaboration
Level 2: BIMs plus file based collaboration and library management for models
and objects and
Level 3: iBIM, Lifestyle Management, common dictionaries, data and processes
PO STED BY N EIL CALVERT,SPATIAL.IQ O N DEC 12,2013 2:39:24 PM
m arketing@ synchroltd.com
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
1 of 11 25/02/2016 19:39
underpinned by integrated and interoperable data through web services
Level 2 BIM is often seen as the minimum standard to achieve. These levels are also split in to A and
B, e.g. 2A and 2B which denotes the directionality of information sharing, i.e. one-way or multi-way.
Here are two diagrams explaining the differences:
Figure 2 -Adapted from CRC forConstruction Innovation 2009,p.13
 Figure 3 -Source:M ark Brew and M ervyn Richards
4. Industry Foundation Classes (IFC) and COBie are standards used to share information. IFCs
describe building and construction industry data. It is a platform neutral, open file format developed by
buildingSMART to facilitate interoperability in the architecture, engineering and construction (AEC)
industry. COBie is a data format for the publication of a subset of building model information focused
on delivering building information and not geometric modelling. It is closely associated with BIM and is
typically exchanged using XML. These formats enable BIM interoperability and all BIM software is
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
2 of 11 25/02/2016 19:39
able to consume this information. Most are able to write it, enabling the sharing of information, even
at Level 2 BIM to be easily achieved. External software such as Safe Software Feature Manipulation
Engine (FME) is able to transform from IFC and COBie to other formats. This represents the
beginnings of full integration possibilities between BIM and GIS.
5. BIM is so much more than just a detailed 3D model of a building. The concept is most easily
explained by the term build 4 times which means build three times in the model and once on the
ground. The accuracy of the model combined with animations and fly-throughs allow contractors to
access the design layout before the build takes place and make alterations. This means that when
the build takes place, there are fewer errors and far less rework needed. This moves the construction
procurement process from design and build to design build by bringing the construction team in to the
design process rather than them simply having to respond to a tender for construction after the
design has been completed.
6. Parametric Modelling is a key principle of BIM. Essentially this means that everything in the model
is connected to everything else. If you move the location of a wall, the elements attached to the wall
also move. If you change the volume of a floor, the quantities of material needed to lay the floor alter.
If you move ducting in the ceiling, all aspects associated with the ducting update and conflicts are
highlighted. This is also true for BIMs that have been developed independently and brought together
in a collaborative BIM environment. This allows organisations who may be controlling different
elements of the build to benefit from one another as aspects of the model are altered through the
process. Change once, benefit many times.
7. The 'D' elements of BIM relate to the information associated with the model.
4D relates to scheduling information; when will an element be built. With this
information you can enable just-in-time (JIT) delivery of materials to site. This in
turn has an impact on transportation, making it more efficient, and reduces
storage issues as materials are delivered and immediately installed.
5D relates to the estimating and cost aspects of the building. Each element within
the building model has a cost associated with it. This allows for detailed analysis
to be done regarding budgets. It also allows the delivery team to make accurate
predictions regarding how much needs to be done at any given time in order to
meet the construction targets.
6D covers the sustainability targets for a building allowing information such as
energy use, sustainability from a materials and management point of view to be
understood and Leadership in Energy and Environmental Design (LEED) tracking
to be performed.
7D is the "as-built" BIM model which is important as part of the handover process
to the building owner. This model is a fundamental part of the ROI for BIM as it
provide accurate Facilities Management (FM) and Asset Management (AM). Each
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
3 of 11 25/02/2016 19:39
part within the building will have a lifespan and in the event of replacement, the
easy identification of parts ensures that these processes may be performed
efficiently.
The outcomes from having this information are impressing detail regarding all aspects of the
construction project. By the very nature of the BIM model, this information is already there, you
simply have to ask for the output you need whether that is a financial plan or a resource plan.
Figure 4 -the levelsofBIM from bim porn.tum blr.com
8. BIM enables new procurement processes to take place which deliver certainty to all parties
involved. A typical process might look like this:
The design and construction teams are selected
The design work is done and is reviewed by the construction team and other
subject matter experts. This review identifies areas of rework.
This process iterates 2 more times, the result is the best possible design.
Generic objects may have been used for materials and/or equipment; these may
now be replaced by specific models conforming to the IFC classes with known
materials, costs and supply chain information associated with them. In this way,
the full cost of the building, the suppliers and supply chain costs of materials and
the installation methodology is known by everyone involved.
The work can now start on site using the BIM to direct the build. Technology
assists in the build by presenting the BIM information in the field as construction
takes place. JIT delivery of materials keeps building efficient.
9. Governments around the world are now realising the benefits of BIM, especially for large
construction funded with public money, and are beginning to mandate the use of BIM for these
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
4 of 11 25/02/2016 19:39
projects. When has that ever happened for GIS? The effect of this is to seed the industry to change.
The reality is that the industry is moving this way anyway as they have already recognised the
advantage of using BIM. The issue has been the slow adoption of the client to realise the benefits of
the BIM approach – to the point that some are still rejecting the final as-built BIM model, considering it
an unnecessary cost rather than realising that it will reduce the AM/FM costs of running the building.
Given that government is often the client, it would appear that this is actually an internal issue
between government agencies or even roles with the same government agency that needs to be
resolved as quickly as possible.
The UK have appointed a "Head of BIM" within the Cabinet Office. David Philp's role is to accelerate
the adoption of BIM and mandate its use.
10. The result of BIM is impressive ROI figures:
 
Figure 5 -Taken from BluEnt
20% reduction in build costs(buy4,getone free!)
33% reduction iscostsoverthe lifetim e ofthe building
47% to 65% reduction in conflictsand re-w ork during
construction
44% to 59% increase in the overallprojectquality
35% to 43% reduction in risk,betterpredictabilityofoutcom es
34% to 40% betterperform ing com pleted infrastructure
32% to 38% im provem entin review and approvalcycles
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
5 of 11 25/02/2016 19:39
 
Figure 6 -Taken from UK Governm entCabinetO  ce BIM StrategyPaper
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
6 of 11 25/02/2016 19:39
BIM
SH ARE TH IS PO ST Tw eet
 
Figure 7 -the BenetsofBIM taken from geospatialw orld August2013
Exerted from NeilCalvert'sposton w w w .spatialiq.co.nz
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
7 of 11 25/02/2016 19:39
Author
H erm an O ogink 17/12/2013,11:39:51 PM
Good article.Itgivesa clearsum m aryofw hatBIM m eans.
Reply to Herman Oogink
H erm an O ogink 17/12/2013,11:39:52 PM
Good article.Itgivesa clearsum m aryofw hatBIM m eans.
Reply to Herman Oogink
Philippe M .18/12/2013,3:42:35 PM
Very interesting and fullinform ation forBIM
Reply to Philippe M.
Bim training 21/7/2015,2:05:48 PM
BIM hasm anym ore benetsand itisthe future ofconstruction industry.Thanksfor
sharing an aw esom e know ledge w ith readers.Keep Sharing
Reply to Bim training
PRADEEP RAJ20/9/2015,7:19:40 PM
BIM helpsin alototherthan cost,tim e,clash.Ithelpsm aintaining good relationship
betw een fellow designers,w hich isthe costliestofall.
Reply to PRADEEP RAJ
hum za chow dhry 17/12/2015,10:20:25 AM
veryinteresting and helpfularticle.keep itup.
Reply to humza chowdhry
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
8 of 11 25/02/2016 19:39
FirstN am e *
LastN am e
Em ail*
W ebsite
Com m ent*
Subscribe to follow -up com m entsforthispost
thank you so m uch......
Benjam in Fem i-Francis13/1/2016,4:30:30 PM
TO W HO M IT M AY CO NCERN
Iam reallysorryto dis-approved yourrstparagraph statem entthatsays
M ostim portantly,BIM isnota technology.Itisa process.
Yes,a processofsocialscience in technology
Ido notknow the perspective area you're focusing yourdiscussion to be precise
Thisisa socialscience program undertechnology,so can you re-addressthisphrase
w ell.Itm ightlook confusing to som e researchers,studentsand othercuriouslearners.
Thanks
Reply to Benjamin Femi-Francis
Privacy  Terms
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
9 of 11 25/02/2016 19:39
Subm itCom m ent
You are an influencer with the power to shape the future of the construction
industry. Voice your opinion, share your experience, dare to change the status quo.
4D BIM for Construction (16)
Synchro Software (15)
BIM (13)
4D Construction Scheduling (11)
4D Planning (11)
Construction ProjectO w ners-Are You Leading H igh
Perform ance Construction?
Im proving Construction The Synchro W ay:Real
Results
First Name* Last Name*
Co mp an y Name* Email*
SUBSCRIBE
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
10 of 11 25/02/2016 19:39
H ow 4D scheduling createssynergiesbetw een BIM
 Lean
M AXIM IZE TH E VALUE O F 3D DATA TH RO UGH 4D
PLAN N IN G
Safety Planning w ith Synchro atPearlH arbor
H angerRenovation
Five ThingsTo Know W hen Evaluating 4D
Construction Softw are
10 PointChecklist:Is4D Construction Softw are
RightForYou?
Build N Y Live:Connecting the Com m unity w ith BIM
     
CopyrightŠ 2015 Synchro Softw are Ltd.
10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
11 of 11 25/02/2016 19:39

10 points and the benefits of bim

  • 1.
    Here is myten point interpretation of BIM... 1. Most importantly, BIM is not a technology. It is a process. This is possibly the most important aspect to understand. BIM applies to all aspects of the construction of a building, from the design, the estimating, the supply chain, the delivery of goods during the build, the build process, the resource allocation, the productivity requirements to meet targets and on in to the post-handover phase through Facilities and Asset Management. 2. Aspects of BIM are enabled through various technology platforms. There are several providers of technology which supports architectural tools plus the addition of intelligent information against the model. Examples include Autodesk Revit, Graphisoft ArchiCAD 17, 12d Model and Synchro Professional. 3. BIM has several implementation levels:Level 0: CAD using drawings, lines, arcs, text, etc. Level 1: 2D & 3D using models, objects plus file based collaboration Level 2: BIMs plus file based collaboration and library management for models and objects and Level 3: iBIM, Lifestyle Management, common dictionaries, data and processes PO STED BY N EIL CALVERT,SPATIAL.IQ O N DEC 12,2013 2:39:24 PM m arketing@ synchroltd.com 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 1 of 11 25/02/2016 19:39
  • 2.
    underpinned by integratedand interoperable data through web services Level 2 BIM is often seen as the minimum standard to achieve. These levels are also split in to A and B, e.g. 2A and 2B which denotes the directionality of information sharing, i.e. one-way or multi-way. Here are two diagrams explaining the differences: Figure 2 -Adapted from CRC forConstruction Innovation 2009,p.13  Figure 3 -Source:M ark Brew and M ervyn Richards 4. Industry Foundation Classes (IFC) and COBie are standards used to share information. IFCs describe building and construction industry data. It is a platform neutral, open file format developed by buildingSMART to facilitate interoperability in the architecture, engineering and construction (AEC) industry. COBie is a data format for the publication of a subset of building model information focused on delivering building information and not geometric modelling. It is closely associated with BIM and is typically exchanged using XML. These formats enable BIM interoperability and all BIM software is 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 2 of 11 25/02/2016 19:39
  • 3.
    able to consumethis information. Most are able to write it, enabling the sharing of information, even at Level 2 BIM to be easily achieved. External software such as Safe Software Feature Manipulation Engine (FME) is able to transform from IFC and COBie to other formats. This represents the beginnings of full integration possibilities between BIM and GIS. 5. BIM is so much more than just a detailed 3D model of a building. The concept is most easily explained by the term build 4 times which means build three times in the model and once on the ground. The accuracy of the model combined with animations and fly-throughs allow contractors to access the design layout before the build takes place and make alterations. This means that when the build takes place, there are fewer errors and far less rework needed. This moves the construction procurement process from design and build to design build by bringing the construction team in to the design process rather than them simply having to respond to a tender for construction after the design has been completed. 6. Parametric Modelling is a key principle of BIM. Essentially this means that everything in the model is connected to everything else. If you move the location of a wall, the elements attached to the wall also move. If you change the volume of a floor, the quantities of material needed to lay the floor alter. If you move ducting in the ceiling, all aspects associated with the ducting update and conflicts are highlighted. This is also true for BIMs that have been developed independently and brought together in a collaborative BIM environment. This allows organisations who may be controlling different elements of the build to benefit from one another as aspects of the model are altered through the process. Change once, benefit many times. 7. The 'D' elements of BIM relate to the information associated with the model. 4D relates to scheduling information; when will an element be built. With this information you can enable just-in-time (JIT) delivery of materials to site. This in turn has an impact on transportation, making it more efficient, and reduces storage issues as materials are delivered and immediately installed. 5D relates to the estimating and cost aspects of the building. Each element within the building model has a cost associated with it. This allows for detailed analysis to be done regarding budgets. It also allows the delivery team to make accurate predictions regarding how much needs to be done at any given time in order to meet the construction targets. 6D covers the sustainability targets for a building allowing information such as energy use, sustainability from a materials and management point of view to be understood and Leadership in Energy and Environmental Design (LEED) tracking to be performed. 7D is the "as-built" BIM model which is important as part of the handover process to the building owner. This model is a fundamental part of the ROI for BIM as it provide accurate Facilities Management (FM) and Asset Management (AM). Each 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 3 of 11 25/02/2016 19:39
  • 4.
    part within thebuilding will have a lifespan and in the event of replacement, the easy identification of parts ensures that these processes may be performed efficiently. The outcomes from having this information are impressing detail regarding all aspects of the construction project. By the very nature of the BIM model, this information is already there, you simply have to ask for the output you need whether that is a financial plan or a resource plan. Figure 4 -the levelsofBIM from bim porn.tum blr.com 8. BIM enables new procurement processes to take place which deliver certainty to all parties involved. A typical process might look like this: The design and construction teams are selected The design work is done and is reviewed by the construction team and other subject matter experts. This review identifies areas of rework. This process iterates 2 more times, the result is the best possible design. Generic objects may have been used for materials and/or equipment; these may now be replaced by specific models conforming to the IFC classes with known materials, costs and supply chain information associated with them. In this way, the full cost of the building, the suppliers and supply chain costs of materials and the installation methodology is known by everyone involved. The work can now start on site using the BIM to direct the build. Technology assists in the build by presenting the BIM information in the field as construction takes place. JIT delivery of materials keeps building efficient. 9. Governments around the world are now realising the benefits of BIM, especially for large construction funded with public money, and are beginning to mandate the use of BIM for these 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 4 of 11 25/02/2016 19:39
  • 5.
    projects. When hasthat ever happened for GIS? The effect of this is to seed the industry to change. The reality is that the industry is moving this way anyway as they have already recognised the advantage of using BIM. The issue has been the slow adoption of the client to realise the benefits of the BIM approach – to the point that some are still rejecting the final as-built BIM model, considering it an unnecessary cost rather than realising that it will reduce the AM/FM costs of running the building. Given that government is often the client, it would appear that this is actually an internal issue between government agencies or even roles with the same government agency that needs to be resolved as quickly as possible. The UK have appointed a "Head of BIM" within the Cabinet Office. David Philp's role is to accelerate the adoption of BIM and mandate its use. 10. The result of BIM is impressive ROI figures:   Figure 5 -Taken from BluEnt 20% reduction in build costs(buy4,getone free!) 33% reduction iscostsoverthe lifetim e ofthe building 47% to 65% reduction in conflictsand re-w ork during construction 44% to 59% increase in the overallprojectquality 35% to 43% reduction in risk,betterpredictabilityofoutcom es 34% to 40% betterperform ing com pleted infrastructure 32% to 38% im provem entin review and approvalcycles 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 5 of 11 25/02/2016 19:39
  • 6.
      Figure 6 -Takenfrom UK Governm entCabinetO  ce BIM StrategyPaper 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 6 of 11 25/02/2016 19:39
  • 7.
    BIM SH ARE THIS PO ST Tw eet   Figure 7 -the BenetsofBIM taken from geospatialw orld August2013 Exerted from NeilCalvert'sposton w w w .spatialiq.co.nz 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 7 of 11 25/02/2016 19:39
  • 8.
    Author H erm anO ogink 17/12/2013,11:39:51 PM Good article.Itgivesa clearsum m aryofw hatBIM m eans. Reply to Herman Oogink H erm an O ogink 17/12/2013,11:39:52 PM Good article.Itgivesa clearsum m aryofw hatBIM m eans. Reply to Herman Oogink Philippe M .18/12/2013,3:42:35 PM Very interesting and fullinform ation forBIM Reply to Philippe M. Bim training 21/7/2015,2:05:48 PM BIM hasm anym ore benetsand itisthe future ofconstruction industry.Thanksfor sharing an aw esom e know ledge w ith readers.Keep Sharing Reply to Bim training PRADEEP RAJ20/9/2015,7:19:40 PM BIM helpsin alototherthan cost,tim e,clash.Ithelpsm aintaining good relationship betw een fellow designers,w hich isthe costliestofall. Reply to PRADEEP RAJ hum za chow dhry 17/12/2015,10:20:25 AM veryinteresting and helpfularticle.keep itup. Reply to humza chowdhry 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 8 of 11 25/02/2016 19:39
  • 9.
    FirstN am e* LastN am e Em ail* W ebsite Com m ent* Subscribe to follow -up com m entsforthispost thank you so m uch...... Benjam in Fem i-Francis13/1/2016,4:30:30 PM TO W HO M IT M AY CO NCERN Iam reallysorryto dis-approved yourrstparagraph statem entthatsays M ostim portantly,BIM isnota technology.Itisa process. Yes,a processofsocialscience in technology Ido notknow the perspective area you're focusing yourdiscussion to be precise Thisisa socialscience program undertechnology,so can you re-addressthisphrase w ell.Itm ightlook confusing to som e researchers,studentsand othercuriouslearners. Thanks Reply to Benjamin Femi-Francis Privacy Terms 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 9 of 11 25/02/2016 19:39
  • 10.
    Subm itCom ment You are an influencer with the power to shape the future of the construction industry. Voice your opinion, share your experience, dare to change the status quo. 4D BIM for Construction (16) Synchro Software (15) BIM (13) 4D Construction Scheduling (11) 4D Planning (11) Construction ProjectO w ners-Are You Leading H igh Perform ance Construction? Im proving Construction The Synchro W ay:Real Results First Name* Last Name* Co mp an y Name* Email* SUBSCRIBE 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 10 of 11 25/02/2016 19:39
  • 11.
    H ow 4Dscheduling createssynergiesbetw een BIM Lean M AXIM IZE TH E VALUE O F 3D DATA TH RO UGH 4D PLAN N IN G Safety Planning w ith Synchro atPearlH arbor H angerRenovation Five ThingsTo Know W hen Evaluating 4D Construction Softw are 10 PointChecklist:Is4D Construction Softw are RightForYou? Build N Y Live:Connecting the Com m unity w ith BIM       CopyrightŠ 2015 Synchro Softw are Ltd. 10 Points and the Benefits of BIM http://blog.synchroltd.com/10-points-and-the-benefits-of-bim 11 of 11 25/02/2016 19:39