SlideShare a Scribd company logo
10 kanban boards and their context
Hi!
I’ve visualized a set of kanban boards from
operations, development and sales to trigger ideas.
But don’t forget, a kanban board is a tool to help you
think for yourself, in your context. So remember to
apply the work in progress limits, policies and
cadencies that is right for you.
”Never copy, only improve”
1
”Never copy, only improve”
- Mattias Skarin
Dude, what’s kanban?
www.limitedwipsociety.org
www.crisp.se/kanban
Scrum team
applying WIP limits
Why? To trigger a shift from
a burndown like this..
Context
Scrum team
T I W D
orem ipsum dolor
sit amet, co nse
ctetur
[3][3][3][3]
orem ipsum dolor
sit amet, co nse
ctetur
orem ipsum dolor
sit amet, co nse
ctetur
Work in progress limit
Sun
Rob
2
Mattias Skarin, 2010
To something more like:
Jane
Development team
using defined process
Context
Development team
combined with specialists
New In Dev User Test Deploy Done
[3] [3] [5]
WIP limit
In progr. Done In progr. Done Queue In progr
Ready buffer
Stakeholders:
- Product owner / Project manager
Test design
[1]
In progr. Done
3
Mattias Skarin, 2010
• Has a testcase
• Tag!
• In CI
• In stage • Buildfile
updated
• User happy!
Visible policies
Pro:
• Polices are clear
• WIP in each step
• Ready buffer’s from which next step
can pull work
Cons:
• New column can get messy if
no person maintains it
• Risks identified
• 1 Happy path
test case
A buffer is a trade-off
between cycle time
and variance absorbtion
Development team
with multiple clients
Context
Custom solutions
dev team with project
manager
New Estimate Done
Prod issue
[2]
In progr. Done
Test
design
Active projects
Package
Stakeholders:
- Customer A
- Customer B
- Other teams
- Platform architects
New In Work
Code Test
[3] [3] [6]
4
Mattias Skarin, 2010
Pro:
• Projects and features visible
• WIP in each step
• Estimations can be regular /or ”on need”
triggered event
Cons:
• Tempting to default features to
”time constrained” (even though there
really isn’t any costly delay consequence)
Time constrained feature
Ordinary feature
Bug
Classes of services in use: To risk balance your
portfolio, limit the
amount of each
category allowed
on the board at any
time
Fixing tech debt
Development team
with completion prediction
Context
Development team
New In Work Dev
complete
Stakeholders:
- Product owner / Project manager
Selected
Selected Dev
ready
Mon Tue Wed Thu Fri
Feature
Tasks
5
Mattias Skarin, 2010
Pro:
• Completion date visible
• Learning of prediction towards cycle time
Cons:
When developer starts a task
it is placed on the day they think it
will finish. Each day, this prediction is
updated.
If estimated size > 5d
task is broken down
further
@ Chris Matts
Multi tier kanban with
swimlanes
Context
x Development teams
Analysts, Testers
New
requests
De-
compose
Done
Stakeholders:
- Business units
- CTO
- Architects
Active Analyze Dev Verify
Acc
test
Dev in progress [3]
Features in progress [5]
Requests in progress [9]
6
Mattias Skarin, 2010
Pro:
• Add limits all stages of the design cycle
• Synchronises flow of cooperative work
by specialists and generalists
Cons:
• You may need a big enough area in
front of the board to gather around ☺
System administration
Context
System administrator team
supporting development and
production
Prod
Done
In
work
Break
down
Release Dev
Support
Project A Project B
[8]
Stakeholders:
- Production site
- Development teams
- Internal projects
- Testers
Flow
Prio
7
Mattias Skarin, 2010
down
New
Pro:
• Course grained prio visible
• WIP balanced across work types
• Visible learnings opportunities for
team members in maintainance
and project work
Cons:
• Newly arrived reguests can get messy if
no person maintains it
Operations - business
process maintenance
Context
Course
grained
Prio
Production
problem
Planned
business
need
(Low impact)
Find cause Fix cause
New Done!
In work [3]
Routine
(High impact)
Due 1 weekDue 1 monthDue 2 months
Stakeholders:
- Production site
- Business functions
- Business planning dept.
- Development team
Flow
Pro:
8
Mattias Skarin, 2010
Unplanned
Platform
improvements
New
New Committed
[1]
Committed
[1]
In work
[2]
In work
[1]
Test
[2]
Test
[2]
Pro:
• Time and scope visibility
Cons:
• WIP limits can be difficult to
review
First line support
Context
Prio
Solving
Done!
Stakeholders:
- Customer developers
- Customer users
- Sales
- Architects
Pro:
Need feedback from client
Awaiting confirmation
On hold – get contract! Call up client
Need help
from
specialist
Improvements
Own platform bugs
Customer bugs
Questions
Flow
9
Mattias Skarin, 2010
Pro:
• Time and scope visibility
Cons:
• WIP limits can be difficult to
review
Signal to pull
specialist skill in
(architects)
Signal to get or confirm
client support contract (sales)
Signal to call client
up for confirmation
(manager)
Second line support
Context
Done
Stakeholders:
- First line support
- Development teams
- Operations managers
Pro:
Painkiller
[1]
Backlog
Address root cause,
(one at a time)
Backlog New Investigate
[3]
Follow up
[6]
Done
In work [1]
High prio
”The rest”
Overflow
{ 0 }
No of new
incidents not
addressed
(yesterday)
10
Mattias Skarin, 2010
Pro:
• Wip limits on follow up work
• Focus on one root cause at a time,
stay with it until fixed
Cons:
• Not all incidents can go on the board
- requires size limitation or similar for
tasks on the board to avoid
overadministration
Wip Overflow section
– Policy: Notify source
”We haven’t dropped it,
But won’t be doing anything
about this for a while. You
are best off giving it a go
yourself.”
Sales team
- respond to RFP
Context
New
Stakeholders:
- Sales
- Tech leads
- CEO
Pro:
QACreate RFPEstablish
team
In Progr. Done
#1
[1] [3]
Done
11
Mattias Skarin, 2010
Pro:
• Visibility to sales people, often
multitasking
Cons:
• WIP limits can be difficult to
review
#2
#3
Also works as ”ready” buffer
for Create RFP
Sales team
- from lead to purchase
Context
JohnStakeholders:
- Sales
- Tech leads
- CEO
Pro:
Won
(verbal ok)
Proposal
Writen
Lead Purchase
order
received
Under
Negotiation
Alice
Hot
Cold
Hot
Cold
Sales team
12
Mattias Skarin, 2010
Pro:
• Can help focusing sales effort
while opportunity window permits
Cons:
• Many opportunities to manage
• Physical board requires co-location
Tintin
Hot
Cold
”Key stuff is to make sure won
tranforms fast into purchase
order received”
- CEO
Marketing team
Context
Idea board / todo
Stakeholders:
- CEO
- Sales
Pro:
Hot (dogs)Ice (popcicles)
In progress @ Third party Under
Validation
(well) Done
Web
Communication
Events
ReleasesSmall marketing team
PR, web, graphics, blog
Marketing kanban
Classes of services
13
Mattias Skarin, 2010
Pro:
• Ideas repriotitization and aging
visible
• Visual progress of combined
work
Cons:
• Over administration?
Now, go practice! ☺
14
http://blog.crisp.se/mattiasskarin

More Related Content

What's hot

Assessing Your Agility: Introducing the Comparative Agility Assessment
Assessing Your Agility: Introducing the Comparative Agility AssessmentAssessing Your Agility: Introducing the Comparative Agility Assessment
Assessing Your Agility: Introducing the Comparative Agility Assessment
Mike Cohn
 
Planning Your CAD Future – Robert Green, Robert Green Consulting Group
Planning Your CAD Future – Robert Green, Robert Green Consulting GroupPlanning Your CAD Future – Robert Green, Robert Green Consulting Group
Planning Your CAD Future – Robert Green, Robert Green Consulting Group
Synergis Engineering Design Solutions
 
Continuous Improvement Tricks
Continuous Improvement TricksContinuous Improvement Tricks
Continuous Improvement Tricks
LitheSpeed
 
Scrum in an hour
Scrum in an hourScrum in an hour
Scrum in an hour
Giordano Scalzo
 
Beyond scrum of scrums scaling agile how it works
Beyond scrum of scrums scaling agile how it worksBeyond scrum of scrums scaling agile how it works
Beyond scrum of scrums scaling agile how it works
India Scrum Enthusiasts Community
 
Scrum Training (One Day)
Scrum Training (One Day)Scrum Training (One Day)
Scrum Training (One Day)
beLithe
 
Kanban 101
Kanban 101Kanban 101
Kanban 101
Dennis Stevens
 
Beyond Scrum of Scrums
Beyond Scrum of ScrumsBeyond Scrum of Scrums
Beyond Scrum of Scrums
Gil Irizarry
 
Scrum In Ten Slides (v2.0) 2018
Scrum In Ten Slides (v2.0) 2018Scrum In Ten Slides (v2.0) 2018
Scrum In Ten Slides (v2.0) 2018
pmengal
 
Agile (Scrum)
Agile (Scrum)Agile (Scrum)
Agile (Scrum)
Dom Cushnan
 
Agile Truths and Misconceptions
Agile Truths and MisconceptionsAgile Truths and Misconceptions
Agile Truths and Misconceptions
Richard Cheng
 
Scrum Introduction
Scrum IntroductionScrum Introduction
Scrum Introduction
James Brett
 
Scrum of Scrums Patterns Library
Scrum of Scrums Patterns LibraryScrum of Scrums Patterns Library
Scrum of Scrums Patterns Library
David Hanson
 
All You Want To About Kanban Before Doing Kanban Certification | AgileFever
All You Want To About Kanban Before Doing Kanban Certification | AgileFeverAll You Want To About Kanban Before Doing Kanban Certification | AgileFever
All You Want To About Kanban Before Doing Kanban Certification | AgileFever
AgileFever
 
Getting Agile with Srum
Getting Agile with SrumGetting Agile with Srum
Getting Agile with Srum
Mike Cohn
 
Scrum 101
Scrum 101Scrum 101
Scrum 101
beLithe
 
Beyond the Scrum Team: Delivering "Done" at Scale
Beyond the Scrum Team: Delivering "Done" at ScaleBeyond the Scrum Team: Delivering "Done" at Scale
Beyond the Scrum Team: Delivering "Done" at Scale
Tasktop
 
Scrumban (Lean Agile Fusion) V1.1
Scrumban (Lean Agile Fusion) V1.1Scrumban (Lean Agile Fusion) V1.1
Scrumban (Lean Agile Fusion) V1.1
Michael O'Rourke
 
Kevin Graves SCQAA-SF Scrum Presentation
Kevin Graves SCQAA-SF Scrum PresentationKevin Graves SCQAA-SF Scrum Presentation
Kevin Graves SCQAA-SF Scrum Presentation
Kevin Graves
 
Themalunch scrum
Themalunch scrumThemalunch scrum
Themalunch scrum
Rody Middelkoop
 

What's hot (20)

Assessing Your Agility: Introducing the Comparative Agility Assessment
Assessing Your Agility: Introducing the Comparative Agility AssessmentAssessing Your Agility: Introducing the Comparative Agility Assessment
Assessing Your Agility: Introducing the Comparative Agility Assessment
 
Planning Your CAD Future – Robert Green, Robert Green Consulting Group
Planning Your CAD Future – Robert Green, Robert Green Consulting GroupPlanning Your CAD Future – Robert Green, Robert Green Consulting Group
Planning Your CAD Future – Robert Green, Robert Green Consulting Group
 
Continuous Improvement Tricks
Continuous Improvement TricksContinuous Improvement Tricks
Continuous Improvement Tricks
 
Scrum in an hour
Scrum in an hourScrum in an hour
Scrum in an hour
 
Beyond scrum of scrums scaling agile how it works
Beyond scrum of scrums scaling agile how it worksBeyond scrum of scrums scaling agile how it works
Beyond scrum of scrums scaling agile how it works
 
Scrum Training (One Day)
Scrum Training (One Day)Scrum Training (One Day)
Scrum Training (One Day)
 
Kanban 101
Kanban 101Kanban 101
Kanban 101
 
Beyond Scrum of Scrums
Beyond Scrum of ScrumsBeyond Scrum of Scrums
Beyond Scrum of Scrums
 
Scrum In Ten Slides (v2.0) 2018
Scrum In Ten Slides (v2.0) 2018Scrum In Ten Slides (v2.0) 2018
Scrum In Ten Slides (v2.0) 2018
 
Agile (Scrum)
Agile (Scrum)Agile (Scrum)
Agile (Scrum)
 
Agile Truths and Misconceptions
Agile Truths and MisconceptionsAgile Truths and Misconceptions
Agile Truths and Misconceptions
 
Scrum Introduction
Scrum IntroductionScrum Introduction
Scrum Introduction
 
Scrum of Scrums Patterns Library
Scrum of Scrums Patterns LibraryScrum of Scrums Patterns Library
Scrum of Scrums Patterns Library
 
All You Want To About Kanban Before Doing Kanban Certification | AgileFever
All You Want To About Kanban Before Doing Kanban Certification | AgileFeverAll You Want To About Kanban Before Doing Kanban Certification | AgileFever
All You Want To About Kanban Before Doing Kanban Certification | AgileFever
 
Getting Agile with Srum
Getting Agile with SrumGetting Agile with Srum
Getting Agile with Srum
 
Scrum 101
Scrum 101Scrum 101
Scrum 101
 
Beyond the Scrum Team: Delivering "Done" at Scale
Beyond the Scrum Team: Delivering "Done" at ScaleBeyond the Scrum Team: Delivering "Done" at Scale
Beyond the Scrum Team: Delivering "Done" at Scale
 
Scrumban (Lean Agile Fusion) V1.1
Scrumban (Lean Agile Fusion) V1.1Scrumban (Lean Agile Fusion) V1.1
Scrumban (Lean Agile Fusion) V1.1
 
Kevin Graves SCQAA-SF Scrum Presentation
Kevin Graves SCQAA-SF Scrum PresentationKevin Graves SCQAA-SF Scrum Presentation
Kevin Graves SCQAA-SF Scrum Presentation
 
Themalunch scrum
Themalunch scrumThemalunch scrum
Themalunch scrum
 

Similar to 10 different kanban boards and their context

10 tips
10 tips10 tips
10 tips
djras
 
Effective Scrum
Effective ScrumEffective Scrum
Neil Potter Presentation
Neil Potter Presentation Neil Potter Presentation
Agile Projects in Waterfall Surroundings - Challenges and Lessons Learned
Agile Projects in Waterfall Surroundings - Challenges and Lessons LearnedAgile Projects in Waterfall Surroundings - Challenges and Lessons Learned
Agile Projects in Waterfall Surroundings - Challenges and Lessons Learned
QAware GmbH
 
From Project Manager to Scrum Master
From Project Manager to Scrum MasterFrom Project Manager to Scrum Master
From Project Manager to Scrum Master
LitheSpeed
 
From mini waterfall to scrum
From mini waterfall to scrumFrom mini waterfall to scrum
From mini waterfall to scrum
Nick Meggoudis, PSM
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative development
Deny Prasetia
 
Pushing the Bottleneck: Predicting and Addressing the Next, Next Thing
Pushing the Bottleneck: Predicting and Addressing the Next, Next ThingPushing the Bottleneck: Predicting and Addressing the Next, Next Thing
Pushing the Bottleneck: Predicting and Addressing the Next, Next Thing
IBM UrbanCode Products
 
Transitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to PracticeTransitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to Practice
TechWell
 
Why Scrum Why Now
Why Scrum Why NowWhy Scrum Why Now
Why Scrum Why Now
mtoppa
 
User Stories from Scenarios
User Stories from ScenariosUser Stories from Scenarios
User Stories from Scenarios
Ravikanth-BA
 
IntroSCRUM
IntroSCRUMIntroSCRUM
2013 06 04_5806_case_manager_implementation__
2013 06 04_5806_case_manager_implementation__2013 06 04_5806_case_manager_implementation__
2013 06 04_5806_case_manager_implementation__
Katleen Aems
 
MongoDB World 2018: How an Idea Becomes a MongoDB Feature
MongoDB World 2018: How an Idea Becomes a MongoDB FeatureMongoDB World 2018: How an Idea Becomes a MongoDB Feature
MongoDB World 2018: How an Idea Becomes a MongoDB Feature
MongoDB
 
How to develop a common sense of "DONE"?
How to develop a common sense of "DONE"?How to develop a common sense of "DONE"?
How to develop a common sense of "DONE"?
Dr. Alexander Schwartz
 
Using Scrum Internship Course
Using Scrum Internship CourseUsing Scrum Internship Course
Using Scrum Internship Course
Zoltan Iszlai
 
Agile Cafe Boulder - Panelist and keynote slides
Agile Cafe Boulder - Panelist and keynote slidesAgile Cafe Boulder - Panelist and keynote slides
Agile Cafe Boulder - Panelist and keynote slides
Cloud Elements
 
Scrum-Agile : An Introduction
Scrum-Agile : An IntroductionScrum-Agile : An Introduction
Scrum-Agile : An Introduction
Global SQA
 
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
camunda services GmbH
 
(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects
(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects
(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects
Amazon Web Services
 

Similar to 10 different kanban boards and their context (20)

10 tips
10 tips10 tips
10 tips
 
Effective Scrum
Effective ScrumEffective Scrum
Effective Scrum
 
Neil Potter Presentation
Neil Potter Presentation Neil Potter Presentation
Neil Potter Presentation
 
Agile Projects in Waterfall Surroundings - Challenges and Lessons Learned
Agile Projects in Waterfall Surroundings - Challenges and Lessons LearnedAgile Projects in Waterfall Surroundings - Challenges and Lessons Learned
Agile Projects in Waterfall Surroundings - Challenges and Lessons Learned
 
From Project Manager to Scrum Master
From Project Manager to Scrum MasterFrom Project Manager to Scrum Master
From Project Manager to Scrum Master
 
From mini waterfall to scrum
From mini waterfall to scrumFrom mini waterfall to scrum
From mini waterfall to scrum
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative development
 
Pushing the Bottleneck: Predicting and Addressing the Next, Next Thing
Pushing the Bottleneck: Predicting and Addressing the Next, Next ThingPushing the Bottleneck: Predicting and Addressing the Next, Next Thing
Pushing the Bottleneck: Predicting and Addressing the Next, Next Thing
 
Transitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to PracticeTransitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to Practice
 
Why Scrum Why Now
Why Scrum Why NowWhy Scrum Why Now
Why Scrum Why Now
 
User Stories from Scenarios
User Stories from ScenariosUser Stories from Scenarios
User Stories from Scenarios
 
IntroSCRUM
IntroSCRUMIntroSCRUM
IntroSCRUM
 
2013 06 04_5806_case_manager_implementation__
2013 06 04_5806_case_manager_implementation__2013 06 04_5806_case_manager_implementation__
2013 06 04_5806_case_manager_implementation__
 
MongoDB World 2018: How an Idea Becomes a MongoDB Feature
MongoDB World 2018: How an Idea Becomes a MongoDB FeatureMongoDB World 2018: How an Idea Becomes a MongoDB Feature
MongoDB World 2018: How an Idea Becomes a MongoDB Feature
 
How to develop a common sense of "DONE"?
How to develop a common sense of "DONE"?How to develop a common sense of "DONE"?
How to develop a common sense of "DONE"?
 
Using Scrum Internship Course
Using Scrum Internship CourseUsing Scrum Internship Course
Using Scrum Internship Course
 
Agile Cafe Boulder - Panelist and keynote slides
Agile Cafe Boulder - Panelist and keynote slidesAgile Cafe Boulder - Panelist and keynote slides
Agile Cafe Boulder - Panelist and keynote slides
 
Scrum-Agile : An Introduction
Scrum-Agile : An IntroductionScrum-Agile : An Introduction
Scrum-Agile : An Introduction
 
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
 
(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects
(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects
(SPOT205) 5 Lessons for Managing Massive IT Transformation Projects
 

More from Anna Lavrova

User story mapping - с чего начать и зачем
User story mapping - с чего начать и зачемUser story mapping - с чего начать и зачем
User story mapping - с чего начать и зачем
Anna Lavrova
 
Risk management Rules
Risk management RulesRisk management Rules
Risk management Rules
Anna Lavrova
 
Метрики для scrum master. Что отслеживать?
Метрики для scrum master. Что отслеживать?Метрики для scrum master. Что отслеживать?
Метрики для scrum master. Что отслеживать?
Anna Lavrova
 
Goal - OKR - Plan. Scrumday Online 2020
Goal - OKR - Plan. Scrumday Online 2020Goal - OKR - Plan. Scrumday Online 2020
Goal - OKR - Plan. Scrumday Online 2020
Anna Lavrova
 
ScrumdayUA 2019. Scaled fix price case study.
ScrumdayUA 2019. Scaled fix price case study.ScrumdayUA 2019. Scaled fix price case study.
ScrumdayUA 2019. Scaled fix price case study.
Anna Lavrova
 
Who is Middle PM in IT Projects?
Who is Middle PM in IT Projects?Who is Middle PM in IT Projects?
Who is Middle PM in IT Projects?
Anna Lavrova
 
Outsource people conference 2017 - Project as a Titanic
Outsource people conference 2017 - Project as a TitanicOutsource people conference 2017 - Project as a Titanic
Outsource people conference 2017 - Project as a Titanic
Anna Lavrova
 
Organisational culture overview with questions
Organisational culture overview with questionsOrganisational culture overview with questions
Organisational culture overview with questions
Anna Lavrova
 
Project monitoring controls in a nutshell
Project monitoring controls in a nutshellProject monitoring controls in a nutshell
Project monitoring controls in a nutshell
Anna Lavrova
 
Time management essential tools
Time management essential toolsTime management essential tools
Time management essential tools
Anna Lavrova
 
Роль тим лида в разработке
Роль тим лида в разработкеРоль тим лида в разработке
Роль тим лида в разработке
Anna Lavrova
 
How to build a mutually beneficial relationship with the client - 12 lifehacks
How to build a mutually beneficial relationship with the client - 12 lifehacksHow to build a mutually beneficial relationship with the client - 12 lifehacks
How to build a mutually beneficial relationship with the client - 12 lifehacks
Anna Lavrova
 
Once upon a time in IT: Outsource, Outstaff and Product
Once upon a time in IT: Outsource, Outstaff and ProductOnce upon a time in IT: Outsource, Outstaff and Product
Once upon a time in IT: Outsource, Outstaff and Product
Anna Lavrova
 
When fairy tale meets reality
When fairy tale meets realityWhen fairy tale meets reality
When fairy tale meets reality
Anna Lavrova
 
Meet me halfway
Meet me halfwayMeet me halfway
Meet me halfway
Anna Lavrova
 
Agile land of wonders
Agile land of wondersAgile land of wonders
Agile land of wonders
Anna Lavrova
 
Geekweek Lavrova
Geekweek LavrovaGeekweek Lavrova
Geekweek Lavrova
Anna Lavrova
 
ABC heroes lavrova
ABC heroes lavrovaABC heroes lavrova
ABC heroes lavrova
Anna Lavrova
 
Successfull project metrics
Successfull project metricsSuccessfull project metrics
Successfull project metrics
Anna Lavrova
 
Risk management theory
Risk management theoryRisk management theory
Risk management theory
Anna Lavrova
 

More from Anna Lavrova (20)

User story mapping - с чего начать и зачем
User story mapping - с чего начать и зачемUser story mapping - с чего начать и зачем
User story mapping - с чего начать и зачем
 
Risk management Rules
Risk management RulesRisk management Rules
Risk management Rules
 
Метрики для scrum master. Что отслеживать?
Метрики для scrum master. Что отслеживать?Метрики для scrum master. Что отслеживать?
Метрики для scrum master. Что отслеживать?
 
Goal - OKR - Plan. Scrumday Online 2020
Goal - OKR - Plan. Scrumday Online 2020Goal - OKR - Plan. Scrumday Online 2020
Goal - OKR - Plan. Scrumday Online 2020
 
ScrumdayUA 2019. Scaled fix price case study.
ScrumdayUA 2019. Scaled fix price case study.ScrumdayUA 2019. Scaled fix price case study.
ScrumdayUA 2019. Scaled fix price case study.
 
Who is Middle PM in IT Projects?
Who is Middle PM in IT Projects?Who is Middle PM in IT Projects?
Who is Middle PM in IT Projects?
 
Outsource people conference 2017 - Project as a Titanic
Outsource people conference 2017 - Project as a TitanicOutsource people conference 2017 - Project as a Titanic
Outsource people conference 2017 - Project as a Titanic
 
Organisational culture overview with questions
Organisational culture overview with questionsOrganisational culture overview with questions
Organisational culture overview with questions
 
Project monitoring controls in a nutshell
Project monitoring controls in a nutshellProject monitoring controls in a nutshell
Project monitoring controls in a nutshell
 
Time management essential tools
Time management essential toolsTime management essential tools
Time management essential tools
 
Роль тим лида в разработке
Роль тим лида в разработкеРоль тим лида в разработке
Роль тим лида в разработке
 
How to build a mutually beneficial relationship with the client - 12 lifehacks
How to build a mutually beneficial relationship with the client - 12 lifehacksHow to build a mutually beneficial relationship with the client - 12 lifehacks
How to build a mutually beneficial relationship with the client - 12 lifehacks
 
Once upon a time in IT: Outsource, Outstaff and Product
Once upon a time in IT: Outsource, Outstaff and ProductOnce upon a time in IT: Outsource, Outstaff and Product
Once upon a time in IT: Outsource, Outstaff and Product
 
When fairy tale meets reality
When fairy tale meets realityWhen fairy tale meets reality
When fairy tale meets reality
 
Meet me halfway
Meet me halfwayMeet me halfway
Meet me halfway
 
Agile land of wonders
Agile land of wondersAgile land of wonders
Agile land of wonders
 
Geekweek Lavrova
Geekweek LavrovaGeekweek Lavrova
Geekweek Lavrova
 
ABC heroes lavrova
ABC heroes lavrovaABC heroes lavrova
ABC heroes lavrova
 
Successfull project metrics
Successfull project metricsSuccessfull project metrics
Successfull project metrics
 
Risk management theory
Risk management theoryRisk management theory
Risk management theory
 

Recently uploaded

Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
GanpatiKumarChoudhar
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
tdt5v4b
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
Alexey Krivitsky
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
Bill641377
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
strikingabalance
 
Sethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and LeadershipSethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and Leadership
Anjana Josie
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
TulsiDhidhi1
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
Alberto Brandolini
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
bernanbumatay1
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
Rob Healy
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
spandane
 
Credit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentationCredit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentation
bernanbumatay1
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
Pierre E. NEIS
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
dsnow9802
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
Ahmed AbdelMoneim
 

Recently uploaded (20)

Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
 
Sethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and LeadershipSethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and Leadership
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
 
Credit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentationCredit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentation
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
 

10 different kanban boards and their context

  • 1. 10 kanban boards and their context Hi! I’ve visualized a set of kanban boards from operations, development and sales to trigger ideas. But don’t forget, a kanban board is a tool to help you think for yourself, in your context. So remember to apply the work in progress limits, policies and cadencies that is right for you. ”Never copy, only improve” 1 ”Never copy, only improve” - Mattias Skarin Dude, what’s kanban? www.limitedwipsociety.org www.crisp.se/kanban
  • 2. Scrum team applying WIP limits Why? To trigger a shift from a burndown like this.. Context Scrum team T I W D orem ipsum dolor sit amet, co nse ctetur [3][3][3][3] orem ipsum dolor sit amet, co nse ctetur orem ipsum dolor sit amet, co nse ctetur Work in progress limit Sun Rob 2 Mattias Skarin, 2010 To something more like: Jane
  • 3. Development team using defined process Context Development team combined with specialists New In Dev User Test Deploy Done [3] [3] [5] WIP limit In progr. Done In progr. Done Queue In progr Ready buffer Stakeholders: - Product owner / Project manager Test design [1] In progr. Done 3 Mattias Skarin, 2010 • Has a testcase • Tag! • In CI • In stage • Buildfile updated • User happy! Visible policies Pro: • Polices are clear • WIP in each step • Ready buffer’s from which next step can pull work Cons: • New column can get messy if no person maintains it • Risks identified • 1 Happy path test case A buffer is a trade-off between cycle time and variance absorbtion
  • 4. Development team with multiple clients Context Custom solutions dev team with project manager New Estimate Done Prod issue [2] In progr. Done Test design Active projects Package Stakeholders: - Customer A - Customer B - Other teams - Platform architects New In Work Code Test [3] [3] [6] 4 Mattias Skarin, 2010 Pro: • Projects and features visible • WIP in each step • Estimations can be regular /or ”on need” triggered event Cons: • Tempting to default features to ”time constrained” (even though there really isn’t any costly delay consequence) Time constrained feature Ordinary feature Bug Classes of services in use: To risk balance your portfolio, limit the amount of each category allowed on the board at any time Fixing tech debt
  • 5. Development team with completion prediction Context Development team New In Work Dev complete Stakeholders: - Product owner / Project manager Selected Selected Dev ready Mon Tue Wed Thu Fri Feature Tasks 5 Mattias Skarin, 2010 Pro: • Completion date visible • Learning of prediction towards cycle time Cons: When developer starts a task it is placed on the day they think it will finish. Each day, this prediction is updated. If estimated size > 5d task is broken down further @ Chris Matts
  • 6. Multi tier kanban with swimlanes Context x Development teams Analysts, Testers New requests De- compose Done Stakeholders: - Business units - CTO - Architects Active Analyze Dev Verify Acc test Dev in progress [3] Features in progress [5] Requests in progress [9] 6 Mattias Skarin, 2010 Pro: • Add limits all stages of the design cycle • Synchronises flow of cooperative work by specialists and generalists Cons: • You may need a big enough area in front of the board to gather around ☺
  • 7. System administration Context System administrator team supporting development and production Prod Done In work Break down Release Dev Support Project A Project B [8] Stakeholders: - Production site - Development teams - Internal projects - Testers Flow Prio 7 Mattias Skarin, 2010 down New Pro: • Course grained prio visible • WIP balanced across work types • Visible learnings opportunities for team members in maintainance and project work Cons: • Newly arrived reguests can get messy if no person maintains it
  • 8. Operations - business process maintenance Context Course grained Prio Production problem Planned business need (Low impact) Find cause Fix cause New Done! In work [3] Routine (High impact) Due 1 weekDue 1 monthDue 2 months Stakeholders: - Production site - Business functions - Business planning dept. - Development team Flow Pro: 8 Mattias Skarin, 2010 Unplanned Platform improvements New New Committed [1] Committed [1] In work [2] In work [1] Test [2] Test [2] Pro: • Time and scope visibility Cons: • WIP limits can be difficult to review
  • 9. First line support Context Prio Solving Done! Stakeholders: - Customer developers - Customer users - Sales - Architects Pro: Need feedback from client Awaiting confirmation On hold – get contract! Call up client Need help from specialist Improvements Own platform bugs Customer bugs Questions Flow 9 Mattias Skarin, 2010 Pro: • Time and scope visibility Cons: • WIP limits can be difficult to review Signal to pull specialist skill in (architects) Signal to get or confirm client support contract (sales) Signal to call client up for confirmation (manager)
  • 10. Second line support Context Done Stakeholders: - First line support - Development teams - Operations managers Pro: Painkiller [1] Backlog Address root cause, (one at a time) Backlog New Investigate [3] Follow up [6] Done In work [1] High prio ”The rest” Overflow { 0 } No of new incidents not addressed (yesterday) 10 Mattias Skarin, 2010 Pro: • Wip limits on follow up work • Focus on one root cause at a time, stay with it until fixed Cons: • Not all incidents can go on the board - requires size limitation or similar for tasks on the board to avoid overadministration Wip Overflow section – Policy: Notify source ”We haven’t dropped it, But won’t be doing anything about this for a while. You are best off giving it a go yourself.”
  • 11. Sales team - respond to RFP Context New Stakeholders: - Sales - Tech leads - CEO Pro: QACreate RFPEstablish team In Progr. Done #1 [1] [3] Done 11 Mattias Skarin, 2010 Pro: • Visibility to sales people, often multitasking Cons: • WIP limits can be difficult to review #2 #3 Also works as ”ready” buffer for Create RFP
  • 12. Sales team - from lead to purchase Context JohnStakeholders: - Sales - Tech leads - CEO Pro: Won (verbal ok) Proposal Writen Lead Purchase order received Under Negotiation Alice Hot Cold Hot Cold Sales team 12 Mattias Skarin, 2010 Pro: • Can help focusing sales effort while opportunity window permits Cons: • Many opportunities to manage • Physical board requires co-location Tintin Hot Cold ”Key stuff is to make sure won tranforms fast into purchase order received” - CEO
  • 13. Marketing team Context Idea board / todo Stakeholders: - CEO - Sales Pro: Hot (dogs)Ice (popcicles) In progress @ Third party Under Validation (well) Done Web Communication Events ReleasesSmall marketing team PR, web, graphics, blog Marketing kanban Classes of services 13 Mattias Skarin, 2010 Pro: • Ideas repriotitization and aging visible • Visual progress of combined work Cons: • Over administration?
  • 14. Now, go practice! ☺ 14 http://blog.crisp.se/mattiasskarin