SlideShare a Scribd company logo
Building Economy ARE 431
Dr. Mohammad A. Hassanain ١
Introduction to Cost Estimating
٢
Is Cost Estimating an Art or a Science?
What is an Estimate?
What is the Purpose of Estimating?
What is the Role of the Estimator?
What the Estimator Must Know (Skills)?
The Components of an Estimate.
Possible Sources of Errors in Cost Estimates.
Today’s Lecture
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٢
٣
Is Cost Estimating an Art or a Science?
Before answering this question, let us first define what
is an Art ? And what is a Science ?
An art is the process of arranging elements in
a manner that affects senses and emotions. It
involves imagination and creativity.
A science is the systematic approach to
gathering knowledge and data based on laws
and theories.
Cost estimating involves calculating cost as well as
visualization of how the project will be built, therefore,
cost estimating is a blend of both art and science.
٤
What is an Estimate?
An estimate involves calculating the costs of
construction work on the basis of probabilities.
Two activities are undertaken when carrying out a
cost estimate:
Measurements: all measurements are
approximate.
Pricing: the degree of approximation is even
greater because of the difficulty in predicting
all the probabilities of items such as labor
productivity and site conditions.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٣
٥
What is an Estimate?
Costs of construction work are classified as:
1. Materials costs.
2. Labor costs.
3. Equipment costs.
4. Overhead (general and job) costs.
5. Profit.
Data on all of these costs are required to develop or
prepare an estimate.
٦
What is the Purpose of Estimating?
The purpose of estimating is to forecast (predict) the
cost required to complete a construction project in
accordance with the contract plans and specifications.
There are two distinct tasks in estimating:
To determine the probable real cost of the project.
To determine the probable real time to build the
project.
Because construction estimates are prepared before
a project is constructed, an estimate is, at best, a
close approximation of the actual costs.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٤
٧
What is the Purpose of Estimating?
The true value of the project will not be known until
the project has been completed and all costs have
been recorded.
Therefore, the estimator does not establish the cost
of a project; he simply establishes the amount which
the contractor will receive for constructing the project.
٨
What is the Role of the Estimator?
The estimator’s job is to prepare estimates of building
project costs.
The success of a contractor’s business depends on the
accuracy of these estimates.
The estimator’s success will be based on his previous
experience and knowledge of the construction industry.
A contractor or estimator lacking this experience may
over-, or under-estimates his project costs.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٥
٩
What is the Role of the Estimator?
In either case, this could impact the success of his
company:
If costs are too high, his jobs will be few and
far between.
If costs are too low, he will not be able to stay
in business.
All cost data is acquired from experience.
If an estimator does not have cost data from his own
experience, he must use cost data from price books
and handbooks.
١٠
What is the Role of the Estimator?
The more valid data the estimator has available, the
better he will be able to estimate the probabilities of
costs.
The following factors affect the accuracy of cost
estimates:
1. Site location and accessibility.
2. Subsurface and soil conditions.
3. Time and season.
4. Climatic conditions.
5. Wage agreements.
6. Strikes.
7. Market prices of basic materials.
8. Availability of money.
9. The demand for construction.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٦
١١
What the Estimator Must Know (Skills)?
1. He must have a thorough knowledge of the building
trades.
This includes types of construction and methods
of construction.
2. He must be able to read building plans and notes, and
understand the specifications.
If he finds any discrepancies between the plans
and specifications, he will bring them to the
attention of the architect or owner for solution.
When all the questions are answered and
problems are solved, he can then prepare and
finish the cost estimate.
١٢
What the Estimator Must Know?
3. He must have a thorough understanding of the
building codes in the area where the building project
is to be constructed.
4. He must have a thorough understanding of
construction materials.
He must understand the sizes, strengths, and the
capabilities of the materials with which he works.
He must be able to substitute equal quality
materials when specified material are not
available.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٧
١٣
What the Estimator Must Know?
5. He must keep up with the development of new construction
products and materials.
To keep current, he should frequently visit trade
shows and subscribe to building magazines.
6. He has to possess some basic mathematical ability.
7. He has to have at his fingertips reference materials, books,
tables, and tabulating equipments to speed up his job.
In time he will acquire reference materials in the
form of material catalogs, brochures, and
manufacturer specification sheets for the product
he uses.
١٤
What the Estimator Must Know?
8. Finally, he must project (forecast) labor cost changes.
The estimator must realize that labor costs may
vary in different geographical areas of the country.
He must also realize and project in his estimates
future increases in labor costs because of
upcoming events.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٨
١٥
The Components of an Estimate
Most estimates are made up of the following five parts:
1. Materials: The estimator makes a take-off of
all the different materials required on the
project from the plans and specifications.
2. Labor: The estimator estimates the hours
needed to do the required work and then
multiply by the appropriate wage.
3. Equipment: The cost of equipment includes
ownership or rental fees, moving to the job
site, erecting, dismantling and operating.
١٦
The Components of an Estimate
4. Overhead: There are two types of overheads:
4a. General overhead: includes all costs that
can not be directly charged to any particular
project, such as the cost of office supplies,
rent, travel expenses and salaries.
4b. Job overhead: includes all costs which
apply directly to the project and can not be
charged to materials, labor, or equipment.
5. Profit: Most estimators show the profit
expected from a job as a percentage of the
total estimated cost of the project. The profit
varies from 6-15%.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٩
١٧
The Components of an Estimate
Approximate profits usually expected are:
Small projects 15%
Medium projects 12%
Large projects 10%
Very large projects 6-8%
١٨
Possible Sources of Errors in Estimates
1. Mistakes in material take-offs.
2. Errors in carrying forward material from quantity sheets
to summary sheets and from there to direct cost
sheets.
3. Mistakes in estimating the labor time required for
certain items of work.
4. Errors in estimating hourly wages of labor.
5. Failure to allow for rising costs of materials.
6. Failure to allow for delays due to breakdown of
machines and acts of God (e.g. earthquakes and
storms).
Building Economy ARE 431
Dr. Mohammad A. Hassanain ١٠
١٩
Possible Sources of Errors in Estimates
7. Making no provisions to have estimates checked.
8. Insufficient allowance for overhead.
9. Omission of profit.

More Related Content

What's hot

Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
Raj Shah
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Waleed Liaqat
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
Eduardo Alves
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
Kailash Chander
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
A Makwana
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Shrikant Kate
 
rate analysis
rate analysisrate analysis
rate analysis
Ganesh Tatikonda
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
AshwiniChaudhari13
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
Padmasinh Patil
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
Susitra Anandan
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
Xubitech
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
lizwi nyandu
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Shrikant Kate
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
Ganesh Tatikonda
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and scheduling
Subash Bhattarai
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
Vîñõđ Kůmåř
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
Saravana murthy
 

What's hot (20)

Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
rate analysis
rate analysisrate analysis
rate analysis
 
4.3 assemblies estimating
4.3 assemblies estimating4.3 assemblies estimating
4.3 assemblies estimating
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and scheduling
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
 

Viewers also liked

Construction Estimating
Construction EstimatingConstruction Estimating
Construction Estimating
mauinick
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1Natalie Ulza
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
Yousuf Dinar
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
Md.Asif Rahman
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
Husen Khorajiya
 
Project management
Project managementProject management
Project management
Satish Yadavalli
 

Viewers also liked (7)

Construction Estimating
Construction EstimatingConstruction Estimating
Construction Estimating
 
Slab
SlabSlab
Slab
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Project management
Project managementProject management
Project management
 

Similar to 1 introduction to cost estimating

Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
Arpit Sethia
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to Estimation
Muthanna Abbu
 
abate and h.pptx
abate and h.pptxabate and h.pptx
abate and h.pptx
BetshaTizazu1
 
Module Three Exercises 2BA 1200 Foundations of Business.docx
Module Three Exercises  2BA 1200 Foundations of Business.docxModule Three Exercises  2BA 1200 Foundations of Business.docx
Module Three Exercises 2BA 1200 Foundations of Business.docx
roushhsiu
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
bkbk37
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf
ssuserad21d8
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
Ashok Tundare
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Redsun Communication
 
Software Cost and Effort Esitmation
Software Cost and Effort EsitmationSoftware Cost and Effort Esitmation
Software Cost and Effort EsitmationMuhammad Taqi
 
Estimation
EstimationEstimation
Estimation
Aditya Sanyal
 
Estimation guidelines and templates
Estimation guidelines and templatesEstimation guidelines and templates
Estimation guidelines and templates
Hoa PN Thaycacac
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
nagashree123
 
Interest in Engineering Economic
Interest in Engineering Economic Interest in Engineering Economic
Interest in Engineering Economic
Nzar Braim
 
24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-making24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-makingHasan Subhani
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
AprilRosal1
 

Similar to 1 introduction to cost estimating (20)

Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
3 estimate considerations
3 estimate considerations3 estimate considerations
3 estimate considerations
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to Estimation
 
abate and h.pptx
abate and h.pptxabate and h.pptx
abate and h.pptx
 
Module Three Exercises 2BA 1200 Foundations of Business.docx
Module Three Exercises  2BA 1200 Foundations of Business.docxModule Three Exercises  2BA 1200 Foundations of Business.docx
Module Three Exercises 2BA 1200 Foundations of Business.docx
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
 
5.2 unit pricing
5.2 unit pricing5.2 unit pricing
5.2 unit pricing
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf
 
5.3 estimate setup
5.3 estimate setup5.3 estimate setup
5.3 estimate setup
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
 
Software Cost and Effort Esitmation
Software Cost and Effort EsitmationSoftware Cost and Effort Esitmation
Software Cost and Effort Esitmation
 
Project mgt
Project mgtProject mgt
Project mgt
 
2 types of estimates
2 types of estimates2 types of estimates
2 types of estimates
 
Estimation
EstimationEstimation
Estimation
 
Estimation guidelines and templates
Estimation guidelines and templatesEstimation guidelines and templates
Estimation guidelines and templates
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
 
Interest in Engineering Economic
Interest in Engineering Economic Interest in Engineering Economic
Interest in Engineering Economic
 
24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-making24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-making
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
 

More from Ali Juma Albahrani

9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio methodAli Juma Albahrani
 
7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost methodAli Juma Albahrani
 
6.1 simple versus compound interest
6.1 simple versus compound interest6.1 simple versus compound interest
6.1 simple versus compound interestAli Juma Albahrani
 
4.0 pre-construction estimates
4.0 pre-construction estimates4.0 pre-construction estimates
4.0 pre-construction estimates
Ali Juma Albahrani
 

More from Ali Juma Albahrani (14)

10 depreciation and depletion
10 depreciation and depletion10 depreciation and depletion
10 depreciation and depletion
 
9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio method
 
8.the rate of return method
8.the rate of return method8.the rate of return method
8.the rate of return method
 
7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method
 
7.1 present worth method
7.1 present worth method7.1 present worth method
7.1 present worth method
 
7.0 life cycle costing
7.0 life cycle costing7.0 life cycle costing
7.0 life cycle costing
 
6.4 multiple factors
6.4 multiple factors6.4 multiple factors
6.4 multiple factors
 
6.3 use of interest tables
6.3 use of interest tables6.3 use of interest tables
6.3 use of interest tables
 
6.2 cash flow - time diagrams
6.2 cash flow - time diagrams6.2 cash flow - time diagrams
6.2 cash flow - time diagrams
 
6.1 simple versus compound interest
6.1 simple versus compound interest6.1 simple versus compound interest
6.1 simple versus compound interest
 
5.0 detailed estimating
5.0 detailed estimating5.0 detailed estimating
5.0 detailed estimating
 
4.2 square foot estimating
4.2 square foot estimating4.2 square foot estimating
4.2 square foot estimating
 
4.1 conceptual estimates
4.1 conceptual estimates4.1 conceptual estimates
4.1 conceptual estimates
 
4.0 pre-construction estimates
4.0 pre-construction estimates4.0 pre-construction estimates
4.0 pre-construction estimates
 

Recently uploaded

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 

Recently uploaded (20)

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

1 introduction to cost estimating

  • 1. Building Economy ARE 431 Dr. Mohammad A. Hassanain ١ Introduction to Cost Estimating ٢ Is Cost Estimating an Art or a Science? What is an Estimate? What is the Purpose of Estimating? What is the Role of the Estimator? What the Estimator Must Know (Skills)? The Components of an Estimate. Possible Sources of Errors in Cost Estimates. Today’s Lecture
  • 2. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٢ ٣ Is Cost Estimating an Art or a Science? Before answering this question, let us first define what is an Art ? And what is a Science ? An art is the process of arranging elements in a manner that affects senses and emotions. It involves imagination and creativity. A science is the systematic approach to gathering knowledge and data based on laws and theories. Cost estimating involves calculating cost as well as visualization of how the project will be built, therefore, cost estimating is a blend of both art and science. ٤ What is an Estimate? An estimate involves calculating the costs of construction work on the basis of probabilities. Two activities are undertaken when carrying out a cost estimate: Measurements: all measurements are approximate. Pricing: the degree of approximation is even greater because of the difficulty in predicting all the probabilities of items such as labor productivity and site conditions.
  • 3. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٣ ٥ What is an Estimate? Costs of construction work are classified as: 1. Materials costs. 2. Labor costs. 3. Equipment costs. 4. Overhead (general and job) costs. 5. Profit. Data on all of these costs are required to develop or prepare an estimate. ٦ What is the Purpose of Estimating? The purpose of estimating is to forecast (predict) the cost required to complete a construction project in accordance with the contract plans and specifications. There are two distinct tasks in estimating: To determine the probable real cost of the project. To determine the probable real time to build the project. Because construction estimates are prepared before a project is constructed, an estimate is, at best, a close approximation of the actual costs.
  • 4. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٤ ٧ What is the Purpose of Estimating? The true value of the project will not be known until the project has been completed and all costs have been recorded. Therefore, the estimator does not establish the cost of a project; he simply establishes the amount which the contractor will receive for constructing the project. ٨ What is the Role of the Estimator? The estimator’s job is to prepare estimates of building project costs. The success of a contractor’s business depends on the accuracy of these estimates. The estimator’s success will be based on his previous experience and knowledge of the construction industry. A contractor or estimator lacking this experience may over-, or under-estimates his project costs.
  • 5. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٥ ٩ What is the Role of the Estimator? In either case, this could impact the success of his company: If costs are too high, his jobs will be few and far between. If costs are too low, he will not be able to stay in business. All cost data is acquired from experience. If an estimator does not have cost data from his own experience, he must use cost data from price books and handbooks. ١٠ What is the Role of the Estimator? The more valid data the estimator has available, the better he will be able to estimate the probabilities of costs. The following factors affect the accuracy of cost estimates: 1. Site location and accessibility. 2. Subsurface and soil conditions. 3. Time and season. 4. Climatic conditions. 5. Wage agreements. 6. Strikes. 7. Market prices of basic materials. 8. Availability of money. 9. The demand for construction.
  • 6. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٦ ١١ What the Estimator Must Know (Skills)? 1. He must have a thorough knowledge of the building trades. This includes types of construction and methods of construction. 2. He must be able to read building plans and notes, and understand the specifications. If he finds any discrepancies between the plans and specifications, he will bring them to the attention of the architect or owner for solution. When all the questions are answered and problems are solved, he can then prepare and finish the cost estimate. ١٢ What the Estimator Must Know? 3. He must have a thorough understanding of the building codes in the area where the building project is to be constructed. 4. He must have a thorough understanding of construction materials. He must understand the sizes, strengths, and the capabilities of the materials with which he works. He must be able to substitute equal quality materials when specified material are not available.
  • 7. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٧ ١٣ What the Estimator Must Know? 5. He must keep up with the development of new construction products and materials. To keep current, he should frequently visit trade shows and subscribe to building magazines. 6. He has to possess some basic mathematical ability. 7. He has to have at his fingertips reference materials, books, tables, and tabulating equipments to speed up his job. In time he will acquire reference materials in the form of material catalogs, brochures, and manufacturer specification sheets for the product he uses. ١٤ What the Estimator Must Know? 8. Finally, he must project (forecast) labor cost changes. The estimator must realize that labor costs may vary in different geographical areas of the country. He must also realize and project in his estimates future increases in labor costs because of upcoming events.
  • 8. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٨ ١٥ The Components of an Estimate Most estimates are made up of the following five parts: 1. Materials: The estimator makes a take-off of all the different materials required on the project from the plans and specifications. 2. Labor: The estimator estimates the hours needed to do the required work and then multiply by the appropriate wage. 3. Equipment: The cost of equipment includes ownership or rental fees, moving to the job site, erecting, dismantling and operating. ١٦ The Components of an Estimate 4. Overhead: There are two types of overheads: 4a. General overhead: includes all costs that can not be directly charged to any particular project, such as the cost of office supplies, rent, travel expenses and salaries. 4b. Job overhead: includes all costs which apply directly to the project and can not be charged to materials, labor, or equipment. 5. Profit: Most estimators show the profit expected from a job as a percentage of the total estimated cost of the project. The profit varies from 6-15%.
  • 9. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٩ ١٧ The Components of an Estimate Approximate profits usually expected are: Small projects 15% Medium projects 12% Large projects 10% Very large projects 6-8% ١٨ Possible Sources of Errors in Estimates 1. Mistakes in material take-offs. 2. Errors in carrying forward material from quantity sheets to summary sheets and from there to direct cost sheets. 3. Mistakes in estimating the labor time required for certain items of work. 4. Errors in estimating hourly wages of labor. 5. Failure to allow for rising costs of materials. 6. Failure to allow for delays due to breakdown of machines and acts of God (e.g. earthquakes and storms).
  • 10. Building Economy ARE 431 Dr. Mohammad A. Hassanain ١٠ ١٩ Possible Sources of Errors in Estimates 7. Making no provisions to have estimates checked. 8. Insufficient allowance for overhead. 9. Omission of profit.