Square Foot Estimate - Approach
The method of developing a square foot estimate is similar to
that used for a conceptual estimate except more information
is required and costs are tabulated per square foot, not by
service unit.
The estimate is still used primarily by the owner for
budgeting purposes and still conducted during the
conceptual stage of the project.
Cost data can be taken from outside data sources or can be
developed by the designer, owner, or construction company.
Adjustments are made the same as in the rough order of
magnitude (ROM) estimate.
These estimates take slightly longer than a ROM estimate
and should provide an accuracy in the plus or minus 15%
range.
2
Square Foot Estimate - Data
Companies that have information for ROM estimates should
also have the data needed for square foot estimates.
If information is not available in-house, Means has two
square foot data books, each published utilizing different
source material.
The first source:
The Assemblies Cost Data Book. (Figure 5-7)
Bases its costs on actual completed projects as
reported by owners, designers, and contractors.
This is the same source of information used in the
conceptual estimate, only broken down on a
square foot basis. It uses the same ¼, median, and
¾ quality distinction and it is based on 11,500
projects.
Building Economy ARE 431
Dr. Mohammad A. Hassanain 2
3
Square Foot Estimate - Data
Advantages of the Assemblies Cost Data Book:
1. The reported costs are derived from actual projects that have
been built around the country.
2. The costs have been localized to the national average.
3. These are true costs reflecting actual contractor costs
including overhead and profit.
Disadvantage of the Assemblies Cost Data Book:
Specific project conditions are not known, thereby making it
difficult to know exactly what the square foot cost includes.
4
Square Foot Estimate - Data
The second source
The Square Foot Data Book. (Figures 5-8, 5-9)
Based on stereotypical models that have been
created for different project types.
This allows Means to determine the quantities of
materials and labor required to build each project at
the sizes tabulated.
With the quantities held constant, each year the unit
prices are adjusted to reflect current costs for labor
and materials.
Building Economy ARE 431
Dr. Mohammad A. Hassanain 3
5
Square Foot Estimate - Data
Advantages of the Square Foot Data book:
1. The modeled data is more specific.
2. It identifies the costs associated with different combinations
of structural and exterior closures.
3. It allows specific pricing for common project additives such as
basements, and adjustment for story height and building
perimeter.
4. The perimeter adjustment factor allows the estimator to
properly account for the added cost associated with
unusually shaped buildings.
5. This data book also provides a detailed breakout of the
model for the project. The detail breakout allows the
estimator to make small adjustments for items in the model
by deleting or adding line items as necessary.
6
Square Foot Estimate - Data
Using the Reported Square Foot Data:
What is the cost of a 15,000 sq. ft. library? Assume
median quality and 1995 data.
Using Figure 5-7
Total cost = size in sq. ft. x cost per sq. ft.
Total cost = 15,000 sq. ft. x $87.7/sq. ft.
Total cost = $1,315,500
Building Economy ARE 431
Dr. Mohammad A. Hassanain 4
7
Square Foot Estimate - Data
Using the Modeled Square Foot Data
What is the estimated cost of a 15,000 sq. ft.
library? Assume face brick with concrete block
back-up and a reinforced concrete frame, using
1995 data.
Using Figure 5-8
Total cost = size in sq. ft. x cost per sq. ft.
8
Square Foot Estimate - Data
Using the Modeled Square Foot Data
Determining the cost per sq. ft of the library, the
table shows the following estimates for given sizes:
13,000 sq. ft. = $89.00
16,000 sq. ft. = $87.00
For a 15,000 sq. ft. building, interpolate to a cost of
87.67 per sq. ft.
Total cost = 15,000 sq. ft. x $87.67 = $1,315,050
Both approaches have provided us with a square foot price
that at this point is unadjusted and therefore is good for the
national average city in the data year.
Building Economy ARE 431
Dr. Mohammad A. Hassanain 5
9
Square Foot Estimate - Adjustments
Reported Square Foot Prices
To make adjustments to the reported square foot
prices, the same method is used as in a ROM
estimate.
Example:
To design and build a median quality, 15,000 sq. ft.
library in Orlando, Florida, with construction to
begin in June 1995.
Previously the cost for a median quality library at
1995 prices was determined to be $1,315,500.
10
Square Foot Estimate - Adjustments
Reported Square Foot Prices
To make adjustment for size (see Figure 5-3).
Size factor = 15,000/12,000 = 1.25
Cost modifier = 0.98
Library adjusted for size = $1,315,500 x 0.98 = $1,289,190
To adjust for location:
Orlando index = 88.6
Estimated cost/100 = Adjusted cost for city/City index
Orlando cost = ($1,289, 190 x 88.6)/100 = $1,142,222
Building Economy ARE 431
Dr. Mohammad A. Hassanain 6
11
Square Foot Estimate - Adjustments
Reported Square Foot Prices
To adjust for time:
Assume a June 1995 construction start and a projected
increase of 2.5% per year, thus add 1.25% to the above
(early 1995) price.
Total project cost = $1,142,222 + ($1,142,222 x 0.0125)
Total project cost = $1,142,222 + $14,278
Total project cost = $1,156,500
12
Square Foot Estimate - Adjustments
Reported Square Foot Prices
Design fee adjustment (See Figure 5-10)
A further adjustment would add in the design fee. That reference
table shows that a library is in the same category as an apartment
building. Therefore, read 7.3%, as this building’s cost is close to
$1,000,000.
Total project cost = $1,156,500 + ($1,156,500 x 0.073)
Total project cost = $1,156,500 + $84,424
Total project cost = $1,240,924
This represent a median quality 15,000 sq. ft. library in
Orlando. Construction would begin in mid 1995, and the
cost includes a 7.3% fee for design services.
Building Economy ARE 431
Dr. Mohammad A. Hassanain 7
13
Square Foot Estimate - Adjustments
Modeled Square Foot Prices
Adjustment is somewhat different from the Reported Square
Foot approach, because data from Means’ Modeled Square
Foot references does not include some common features that
would be in a typical library.
These typical add-on features that have to be added in
include:
Study carrels.
Emergency lights.
Furnishings (bookshelves, reading tables).
Site work is not included but the architect’s fee is.
14
Square Foot Estimate - Adjustments
Modeled Square Foot Prices
The price determined previously, building with face brick
with concrete block backup with a reinforced concrete
frame, using 1995 data, was $1,315,050. Accounting for
these project additives (See Figure 5-8).
(5) emergency lights @ 610 each = $3,050
(20) Study carrels @700 each = $14,000
(1) flagpole = $3,125
Bookshelves

More Related Content

What's hot

Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
Janak Mehta
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
Simarpreet Singh
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
Ganesh Tatikonda
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
RANJIT KUMAR PANDA
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
Simarpreet Singh
 
Types of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimatorTypes of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimator
AshwiniChaudhari13
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Aabid Ansar
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
Aishwarya Deopujari
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
srinivas2036
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
Vijay325
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materialsAkash Patel
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)Waqas Aslam
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
Sakshi Kirar
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
bee_by
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
Ashar Gill
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
AB MAKASANA
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
Ganesh Tatikonda
 
Principles of planning and bye laws pns
Principles of planning and bye laws pnsPrinciples of planning and bye laws pns
Principles of planning and bye laws pns
Pratap Shinde
 

What's hot (20)

Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
 
Estimation
EstimationEstimation
Estimation
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Types of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimatorTypes of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimator
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materials
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Principles of planning and bye laws pns
Principles of planning and bye laws pnsPrinciples of planning and bye laws pns
Principles of planning and bye laws pns
 

Similar to 4.2 square foot estimating

type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
Educational Learner
 
Lec05.pptx
Lec05.pptxLec05.pptx
Lec05.pptx
AHMADAHMAD735251
 
06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf
JunaidMughal34
 
5 costestimation-110716160453-phpapp01
5 costestimation-110716160453-phpapp015 costestimation-110716160453-phpapp01
5 costestimation-110716160453-phpapp01
hlksd
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
SHAZEBALIKHAN1
 
Eca workshop
Eca workshopEca workshop
Eca workshop
shensin1015
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
Kai Yun Pang
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
NaumanIjaz12
 
cost estimation model per unit model and segmenting model.pdf
cost estimation model per unit model and segmenting model.pdfcost estimation model per unit model and segmenting model.pdf
cost estimation model per unit model and segmenting model.pdf
ArnabChakraborty499766
 
B0342014027
B0342014027B0342014027
B0342014027
inventionjournals
 
Cost Indices for Industrial Application
Cost Indices for Industrial ApplicationCost Indices for Industrial Application
Cost Indices for Industrial Application
K. Shahzad Baig
 
Project Management C8 -cost_estimation_and_budgeting
Project Management C8  -cost_estimation_and_budgetingProject Management C8  -cost_estimation_and_budgeting
Project Management C8 -cost_estimation_and_budgetingIzah Asmadi
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimating
hatim ahmed
 
Lec.2 binifits of estamations...Types of Estimation
Lec.2  binifits of estamations...Types of EstimationLec.2  binifits of estamations...Types of Estimation
Lec.2 binifits of estamations...Types of Estimation
Muthanna Abbu
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
Arpit Sethia
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
Nat Rice
 

Similar to 4.2 square foot estimating (20)

4.1 conceptual estimates
4.1 conceptual estimates4.1 conceptual estimates
4.1 conceptual estimates
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
 
Lec05.pptx
Lec05.pptxLec05.pptx
Lec05.pptx
 
06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf
 
5 costestimation-110716160453-phpapp01
5 costestimation-110716160453-phpapp015 costestimation-110716160453-phpapp01
5 costestimation-110716160453-phpapp01
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
 
Eca workshop
Eca workshopEca workshop
Eca workshop
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
 
cost estimation model per unit model and segmenting model.pdf
cost estimation model per unit model and segmenting model.pdfcost estimation model per unit model and segmenting model.pdf
cost estimation model per unit model and segmenting model.pdf
 
B0342014027
B0342014027B0342014027
B0342014027
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
Cost Indices for Industrial Application
Cost Indices for Industrial ApplicationCost Indices for Industrial Application
Cost Indices for Industrial Application
 
Project Management C8 -cost_estimation_and_budgeting
Project Management C8  -cost_estimation_and_budgetingProject Management C8  -cost_estimation_and_budgeting
Project Management C8 -cost_estimation_and_budgeting
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
3 estimate considerations
3 estimate considerations3 estimate considerations
3 estimate considerations
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimating
 
Lec.2 binifits of estamations...Types of Estimation
Lec.2  binifits of estamations...Types of EstimationLec.2  binifits of estamations...Types of Estimation
Lec.2 binifits of estamations...Types of Estimation
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
 

More from Ali Juma Albahrani

9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio methodAli Juma Albahrani
 
7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost methodAli Juma Albahrani
 
6.1 simple versus compound interest
6.1 simple versus compound interest6.1 simple versus compound interest
6.1 simple versus compound interestAli Juma Albahrani
 
4.0 pre-construction estimates
4.0 pre-construction estimates4.0 pre-construction estimates
4.0 pre-construction estimates
Ali Juma Albahrani
 
1 introduction to cost estimating
1 introduction to cost estimating1 introduction to cost estimating
1 introduction to cost estimatingAli Juma Albahrani
 

More from Ali Juma Albahrani (17)

10 depreciation and depletion
10 depreciation and depletion10 depreciation and depletion
10 depreciation and depletion
 
9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio method
 
8.the rate of return method
8.the rate of return method8.the rate of return method
8.the rate of return method
 
7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method
 
7.1 present worth method
7.1 present worth method7.1 present worth method
7.1 present worth method
 
7.0 life cycle costing
7.0 life cycle costing7.0 life cycle costing
7.0 life cycle costing
 
6.4 multiple factors
6.4 multiple factors6.4 multiple factors
6.4 multiple factors
 
6.3 use of interest tables
6.3 use of interest tables6.3 use of interest tables
6.3 use of interest tables
 
6.2 cash flow - time diagrams
6.2 cash flow - time diagrams6.2 cash flow - time diagrams
6.2 cash flow - time diagrams
 
6.1 simple versus compound interest
6.1 simple versus compound interest6.1 simple versus compound interest
6.1 simple versus compound interest
 
5.3 estimate setup
5.3 estimate setup5.3 estimate setup
5.3 estimate setup
 
5.2 unit pricing
5.2 unit pricing5.2 unit pricing
5.2 unit pricing
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
5.0 detailed estimating
5.0 detailed estimating5.0 detailed estimating
5.0 detailed estimating
 
4.0 pre-construction estimates
4.0 pre-construction estimates4.0 pre-construction estimates
4.0 pre-construction estimates
 
2 types of estimates
2 types of estimates2 types of estimates
2 types of estimates
 
1 introduction to cost estimating
1 introduction to cost estimating1 introduction to cost estimating
1 introduction to cost estimating
 

Recently uploaded

Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 

Recently uploaded (20)

Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 

4.2 square foot estimating

  • 1. Building Economy ARE 431 Dr. Mohammad A. Hassanain 1 1 Square Foot Estimate - Approach The method of developing a square foot estimate is similar to that used for a conceptual estimate except more information is required and costs are tabulated per square foot, not by service unit. The estimate is still used primarily by the owner for budgeting purposes and still conducted during the conceptual stage of the project. Cost data can be taken from outside data sources or can be developed by the designer, owner, or construction company. Adjustments are made the same as in the rough order of magnitude (ROM) estimate. These estimates take slightly longer than a ROM estimate and should provide an accuracy in the plus or minus 15% range. 2 Square Foot Estimate - Data Companies that have information for ROM estimates should also have the data needed for square foot estimates. If information is not available in-house, Means has two square foot data books, each published utilizing different source material. The first source: The Assemblies Cost Data Book. (Figure 5-7) Bases its costs on actual completed projects as reported by owners, designers, and contractors. This is the same source of information used in the conceptual estimate, only broken down on a square foot basis. It uses the same ¼, median, and ¾ quality distinction and it is based on 11,500 projects.
  • 2. Building Economy ARE 431 Dr. Mohammad A. Hassanain 2 3 Square Foot Estimate - Data Advantages of the Assemblies Cost Data Book: 1. The reported costs are derived from actual projects that have been built around the country. 2. The costs have been localized to the national average. 3. These are true costs reflecting actual contractor costs including overhead and profit. Disadvantage of the Assemblies Cost Data Book: Specific project conditions are not known, thereby making it difficult to know exactly what the square foot cost includes. 4 Square Foot Estimate - Data The second source The Square Foot Data Book. (Figures 5-8, 5-9) Based on stereotypical models that have been created for different project types. This allows Means to determine the quantities of materials and labor required to build each project at the sizes tabulated. With the quantities held constant, each year the unit prices are adjusted to reflect current costs for labor and materials.
  • 3. Building Economy ARE 431 Dr. Mohammad A. Hassanain 3 5 Square Foot Estimate - Data Advantages of the Square Foot Data book: 1. The modeled data is more specific. 2. It identifies the costs associated with different combinations of structural and exterior closures. 3. It allows specific pricing for common project additives such as basements, and adjustment for story height and building perimeter. 4. The perimeter adjustment factor allows the estimator to properly account for the added cost associated with unusually shaped buildings. 5. This data book also provides a detailed breakout of the model for the project. The detail breakout allows the estimator to make small adjustments for items in the model by deleting or adding line items as necessary. 6 Square Foot Estimate - Data Using the Reported Square Foot Data: What is the cost of a 15,000 sq. ft. library? Assume median quality and 1995 data. Using Figure 5-7 Total cost = size in sq. ft. x cost per sq. ft. Total cost = 15,000 sq. ft. x $87.7/sq. ft. Total cost = $1,315,500
  • 4. Building Economy ARE 431 Dr. Mohammad A. Hassanain 4 7 Square Foot Estimate - Data Using the Modeled Square Foot Data What is the estimated cost of a 15,000 sq. ft. library? Assume face brick with concrete block back-up and a reinforced concrete frame, using 1995 data. Using Figure 5-8 Total cost = size in sq. ft. x cost per sq. ft. 8 Square Foot Estimate - Data Using the Modeled Square Foot Data Determining the cost per sq. ft of the library, the table shows the following estimates for given sizes: 13,000 sq. ft. = $89.00 16,000 sq. ft. = $87.00 For a 15,000 sq. ft. building, interpolate to a cost of 87.67 per sq. ft. Total cost = 15,000 sq. ft. x $87.67 = $1,315,050 Both approaches have provided us with a square foot price that at this point is unadjusted and therefore is good for the national average city in the data year.
  • 5. Building Economy ARE 431 Dr. Mohammad A. Hassanain 5 9 Square Foot Estimate - Adjustments Reported Square Foot Prices To make adjustments to the reported square foot prices, the same method is used as in a ROM estimate. Example: To design and build a median quality, 15,000 sq. ft. library in Orlando, Florida, with construction to begin in June 1995. Previously the cost for a median quality library at 1995 prices was determined to be $1,315,500. 10 Square Foot Estimate - Adjustments Reported Square Foot Prices To make adjustment for size (see Figure 5-3). Size factor = 15,000/12,000 = 1.25 Cost modifier = 0.98 Library adjusted for size = $1,315,500 x 0.98 = $1,289,190 To adjust for location: Orlando index = 88.6 Estimated cost/100 = Adjusted cost for city/City index Orlando cost = ($1,289, 190 x 88.6)/100 = $1,142,222
  • 6. Building Economy ARE 431 Dr. Mohammad A. Hassanain 6 11 Square Foot Estimate - Adjustments Reported Square Foot Prices To adjust for time: Assume a June 1995 construction start and a projected increase of 2.5% per year, thus add 1.25% to the above (early 1995) price. Total project cost = $1,142,222 + ($1,142,222 x 0.0125) Total project cost = $1,142,222 + $14,278 Total project cost = $1,156,500 12 Square Foot Estimate - Adjustments Reported Square Foot Prices Design fee adjustment (See Figure 5-10) A further adjustment would add in the design fee. That reference table shows that a library is in the same category as an apartment building. Therefore, read 7.3%, as this building’s cost is close to $1,000,000. Total project cost = $1,156,500 + ($1,156,500 x 0.073) Total project cost = $1,156,500 + $84,424 Total project cost = $1,240,924 This represent a median quality 15,000 sq. ft. library in Orlando. Construction would begin in mid 1995, and the cost includes a 7.3% fee for design services.
  • 7. Building Economy ARE 431 Dr. Mohammad A. Hassanain 7 13 Square Foot Estimate - Adjustments Modeled Square Foot Prices Adjustment is somewhat different from the Reported Square Foot approach, because data from Means’ Modeled Square Foot references does not include some common features that would be in a typical library. These typical add-on features that have to be added in include: Study carrels. Emergency lights. Furnishings (bookshelves, reading tables). Site work is not included but the architect’s fee is. 14 Square Foot Estimate - Adjustments Modeled Square Foot Prices The price determined previously, building with face brick with concrete block backup with a reinforced concrete frame, using 1995 data, was $1,315,050. Accounting for these project additives (See Figure 5-8). (5) emergency lights @ 610 each = $3,050 (20) Study carrels @700 each = $14,000 (1) flagpole = $3,125 Bookshelves