2. To: Hazim Challub Group DATE: 11-Dec-14
14th Tamooz Street
Basra, Iraq PROJECT: Majnoon Field Development
SIPD- 938
TRANSMITTAL NO.
ATT: Hayder Hazim SIPD-HCG938-0248-TX
Project Manager
SL REV. TITLE COD
1 00A 1
STATUS CODE
X 1 - WORK MAY PROCEED / ACCEPTED AS FINAL 5 - ISSUED FOR CONSTRUCTION
2 - PROCEED, CHANGES AS NOTED AND RE-SUBMIT 6 -TECHNICAL IMPLEMENTATION
3 - DO NOT PROCEED, REVISE AS PER COMMENTS & RESUBMIT X - VOID-TO BE CANCELLED / DELETED
4 - FOR INFORMATION ONLY, NO REVIEW REQUIRED F - AS-BUILT / RED LINE MARK UP
REMARKS:
COPIES TO: TRANSMITTED BY:
Nufail Keeri
Project document control
Please sign a copy of this transmittal and return by mail RECEIVED BY:
as acknowledgment of receipt to DCC
NAME:
Attention: Site Document Controller DATE:
DOCUMENTS TRANSMITTAL
TRANSMITTING OF:
DRAWING/DOC. REF./ NO.
FCPG-00000-HCG938-00-ZH-3377-00015 CV of New HSE Manager
Shell Iraq Petroleum Development B.V.
Shakir Kadir Naje
3. CV
Shakir Abd AL Kadir
:Content info
TEL Zain IQ: 0790 1547650.
Asia cell: 0771 8504891.
Email:
Shuke224@yahoo.com
.naje@gmail.comShakir
:Address
Baghdad- IRAQ
Personal Functional Competencies:
1- Working in Teams.
2-Shares knowledge and experience.
.3- Appropriate and Transparent Decision Making.
4- High experience AutoCAD design.
5- Participated in Scaffolding Certificate Trainer as
6- Participated in Code of Business Conduct and Ethics Certificate Trainer.
7- Participated in Safety basic Trainer with SOC. (South Oil Company).
Academic Degrees:
University of Technology, Baghdad .Iraq 1986.
Bachelor of Science Mechanical Engineering.
Certificate in Auto mobile and Generator Mechanics.
:Training and certifications.
:OfficeMicrosoft2007
Computer., Access, PowerPoint. WordExcel.CertificationSuite2007
skill.
High performance Auto CAD Designer.
NCE with job title :EXPERIE
As:style Company .Baghdad. Iraq.Modern2003-2002
(Site engineer) for local contractor:
With Baghdad municipalities to improvement wastewater and Coaching and
monitoring the progress on site and pump station Function
1- Complete excavation and renovation of city sewage.
2- Supervised more 40 employs.
3- Certificate Appreciation for best performance in site.
As:International Corporation.Washington-2004
(Site Engineer for pipe Excavation)
Participated in many orientation course for safety manual
Water resources and infrastructure.
1- Certificate Appreciation .Equipment Safety Program.
4. 2- Certificate Appreciation Manual Resources and Infrastructure.
.3- Certificate Appreciation 29 (CFR) Construction Standards (SOR)-
Statement of Requirement.
4- Certificate Appreciation demonstrated understanding of
Element of safety to perform on site.
H:With 30Training:OSHA
Certificated training with ID #
1- 60034999. Form US Department of labor. With Washington International
Corporation. 2005.
From US. Department of labor. With CH2MHL 2008.2- 000721606.
Parsons Corporation As:-2005
(QA/QC Inspector)
My job was following up the agreed schedule and work in a wide variety
inspection of manufacturing to get the customers’ standards and initial QCP
Certificate for Completion training and high Performance.
;asRKEL International for constrictionA-2006
(Site Engineer& Mechanical engineer designer)
My job as Drafter (including Consolation) with project management
(Drafter) in project for the US Embassy /Baghdad. IZ.
Meticulously checkup AutoCAD layout and make acceptable, approved
Certificated as High Performance in an office working as Drafter &
Perform a variety to support to design, planning and implementation of the
Program. Steel structure Design Supervised over 200 Employees.
1-AutoCAD design, for 16 living trailer and 2 building office.
And piping net and Sewage system. Monitor the completion
A- Certificated As high performance superintendent Eng. position.
Mercury International Development Eng. As;-2007
(Mechanical Engineer Designer)
My job was Over 10 project Designer for pipe and sewage system
Throw ICC (International Code Conical).
IPC .IPSDC -2006 and .SOR- 2006
(IPC) International Plumping Code.
(IPSDC) International Private Sewage Disposal Code.
Rehabilitation al madden project and al latiyfa project
For the water net and sewage system.
Translation for Iraq mechanical Eng., standard. Codes and
Technical reports from Arabic to English between the
Company and AFCEE personal on site.
A- Certificated as a professional mechanical engineer.
:ASENGINEERSUS CROUP OF-8200
(QA/QC Mechanical ENG)
My job was maintaining, designing and controlling quality strategies and
quality management systems and Coordinated for ensuring that all risk
factors have been scientifically assessed and to check all forms for
QA/QC mechanical engineer for with piping checking /SDMR /MRR/
QCP.ITP.
5. As77 International Constriction Co.-2008
(Mechanical Engineer Design)
My job was to do calculate piping installation Materials needed and match with
AUTOCAD design and calculation for Plumping and Sewage layout system.
Supervised over 200 employees to run project task for brakes
Monitor complementary issue for site.
Bennett&Fouch Associates CO.AS:-9200
(Mechanical Engineer Designer& Site ENG).
My job was Confer with engineers and other personnel to implement
operating procedures, resolve system malfunctions, and provide technical
information. Research, design, evaluate, install, operate, and maintain
mechanical products, equipment, systems and processes to meet
requirements, applying knowledge of engineering principles. Working as CAD
drafter for–Irbil and hit project.
- Certificated as a professional mechanical engineer.
:ASLAKESHORETOLTEST CO-2011
(Mechanical Engineer –Frame Cad)
My jobs AutoCAD Designer for the camp lay- out and transfer the AutoCAD to
Frame Cad after provide and follow up to date with work schedule of the
project development for two locations
1- FCP at (AL bardjazia) Basra/ Oil Field Project Development.
2-LSB at (AL Garraf) Nasiriya Oil Field Project Development.
Pan East General Contracting Co.AS:-2012
(HSE Project Manager)
My job as HSE Manager is implement safe environmental working conditions
for all employees. to prevent accidents, infections, injuries and property loss
due to natural causes or daily life circumstances. And for QA/QC was
contribution to do it right at the first time with QA/QC procedure form the first
step to finishing from (RFI) and QCP
Weld control piping with all forms..
-Fabrication, Erection and testing of underground and
above ground piping .with all forms.
Mechanical QA/QC Engineering at (LSB) logistic support Base project.
Project in (Al Zubair) Oil Field Development Project for ENI Company QA/QC
manager at hammer Base in (AL Bardjazia) oil field / Fabricate & welding
.Piping Alignment with WPS &all QCP
Certificated as special Recognition for 2,000,000 Hour without LTI.
Certificated as QA/QC with High Performance to do it right at the first time.
6. HCG General Contracting Co. AS-2014
My job as HSE Project Manager
is responsible for developing and implementingHSE Manager
Conduct risk assessments to detectorganizational safety programs.
potential hazards and plan precautionary measures conduct risk
s and plan for it.assessments to detect potential hazard
Get approved from Shell Iraq Petroleum Development as HSE
Manager for HCG Company.
1-Certficted as HSE Leadership for WHM Supervisor or as lecturer
/ Trainer From shell Global Talent team at International Energy City
IEC/ Basra / AL Zubair.
Related Skill and Recognition:
Fluent in native Arabic and English Language.
Reference:
All appreciated Certificate available upon request.
:Content info
TEL Zain IQ: 0790 1547650.
Asia cell: 0771 8504891.
Email:
Shuke224@yahoo.com
.naje@gmail.comShakir
Address:
.Baghdad- IRAQ